Sitework takeoff
Mass grading, structural fill, wet and dry utilities, and paving measured across multi-building Riverton sites.
CY · LF · TONWe prepare quantity takeoffs and cost estimates for Riverton builders working in Salt Lake County, from multifamily podiums to single-family subdivisions. Deliverables arrive in 24–48 hours as Excel and PDF, sorted by CSI MasterFormat division with marked-up plan sets.
Riverton's 2025 permit mix — 364 residential units, 76% multifamily — pushes estimates toward Type III and Type V wood-frame over podium work. Salt Lake County soil, freeze-thaw footings, Wasatch Front labor pricing and city utility and impact-fee schedules all move the number. ZIP-code-adjusted material and labor pricing keeps your bid aligned to the local market.
Riverton sits at the south end of the Salt Lake Valley, where most of the current work is residential. The 2025 permit data shows 364 new privately-owned residential units, up 13% from 323 the year before, with 275 of those units multifamily — 76% of the total. That mix means most Riverton estimates hinge on repetitive unit takeoffs, shared podiums, and sitework that has to be priced as a single package across multiple buildings.
We build those estimates from the plans, not from square-foot rules of thumb. Wall, floor and roof assemblies get counted by type and multiplied by unit count; sitework is measured separately for mass grading, wet and dry utilities, and paving. If you bid in Riverton or anywhere along the Wasatch Front, our Utah construction estimating team applies ZIP-code-adjusted material and labor pricing and returns Excel and PDF takeoffs organized by CSI MasterFormat division, with marked-up plan sets. Nearby work in Draper and Herriman follows the same format, so your historical pricing stays comparable.
For bidders. You need a bid that holds up at buyout. We count units, assemblies and sitework scope, flag alternates and exclusions, and deliver a division-sorted takeoff you can drop straight into your bid form.
For builders. You are pricing a repeat product. We keep unit types consistent across buildings, separate building shell from site package, and give you quantities you can reuse on the next Riverton phase.
For owners. You want a budget before design is final. We price what is drawn, list assumptions, and show the line items that swing the most so you can steer the design team early.
Select a bar to compare Riverton with the largest Utah markets we cover.
364 new housing units in 2025 (+12.7% vs 2024).
89 single-family · 275 multifamily (76%).
Riverton issued 364 new privately-owned residential units in 2025, up from 323 in 2024 — about 13% growth. Multifamily accounted for 275 units, or 76% of the total, while single-family accounted for 89. Permitted value reached $84M, an average of $231,900 per unit. For a bidder, that average is a useful sanity check, not a budget: it blends a wood-frame apartment unit with a detached house, and it excludes sitework, utilities and fees. Riverton ranked 11 of 25 covered Utah cities by units and took 3.1% of the 11,785 covered state total. When you bid here, expect the competition to be priced off the same multifamily-heavy pipeline, so unit-count accuracy matters more than a rounded square-foot rate. Our multi-family estimating services and residential estimating services are built around that split.
Salt Lake Valley soils commonly carry expansive clays and shallow groundwater in low areas, so footing and slab estimates need over-excavation, structural fill and moisture conditioning carried as separate line items — not buried in a general conditions allowance. Frost depth drives footing elevation, and the freeze-thaw cycle shortens the concrete and paving season, which pushes winter work into cold-weather protection costs. Mass grading, wet and dry utilities, and curb-and-gutter are typically bid as one package across all buildings on a Riverton site. If your next project is closer to the Point of the Mountain, our Draper construction estimating page covers the same scope; for work further south, see Spanish Fork.
Riverton's pipeline is mostly residential with supporting commercial and light industrial work. These are the takeoff packages we prepare most often for builders in Salt Lake County.
Mass grading, structural fill, wet and dry utilities, and paving measured across multi-building Riverton sites.
CY · LF · TONFootings, stem walls, slab-on-grade and podium decks priced with over-excavation and cold-weather protection.
CY · SFSpread footings and foundation walls sized to local frost depth and expansive Salt Lake Valley soils.
CY · LFWood-frame walls, floors and roof systems counted by unit type and multiplied across repeated buildings.
LF · EA · BFArchitectural shingle, TPO and membrane roofing with underlayment, flashing and snow-load detailing.
SQ · LFPlumbing, HVAC and electrical rough and finish counts per unit, plus shared building systems and risers.
EA · LFRetail, office and light industrial shells and tenant improvements along the Riverton corridor.
SF · EAPodium and garden-style apartment budgets with unit matrix, common areas and site package separated.
UNIT · SFRiverton permitted 275 multifamily units in 2025, 76% of all residential permits. You need unit-by-unit takeoffs across repeated floor plans, shared corridors, and one site package priced across every building.
The city issued 89 single-family permits in 2025, up from the prior year. You bid the same plan on multiple lots, so we keep assemblies and waste factors consistent so your per-lot pricing stays comparable.
Riverton subdivisions require mass grading, wet and dry utility runs, and paving priced as one package. We measure cut and fill by area and count utility linear feet so your bid survives buyout.
Footings, stem walls, slab-on-grade, and post-tension slabs each get counted separately. We break out formwork, rebar by size, and concrete volume by placement so you can price labor by crew day.
Repeated unit types mean wall, floor, and roof assemblies repeat across buildings. We count studs by length, sheathing by sheet, trusses by span, and roofing squares by pitch and material.
Before design is final, we price what is drawn and list assumptions. You see which line items swing the most, so you can steer the architect and keep the Riverton pro forma on track.
We estimate projects throughout Riverton and the south Salt Lake Valley, from the city core to the surrounding communities along the Wasatch Front.
Riverton's 2025 permit mix is 76% multifamily and 24% single-family, so our takeoffs follow that split. We also price commercial and industrial work along the Wasatch Front.
Three- and four-story wood-frame buildings over podium or slab-on-grade, with repeated unit types. We count each unit type once, multiply by count, and price shared corridors, stairs, and elevators separately.
Watch for: Unit mix changes, corridor lengths, trash and mail rooms.
Party walls, fire separations, and individual utility meters drive cost. We count each building footprint, then break out shared walls, roof planes, and sitework per unit for accurate per-door pricing.
Watch for: Party wall ratings, meter counts, roof tie-ins.
Repeated plans on multiple lots. We take off one plan completely, apply waste factors by material, and multiply by lot count so your per-home budget stays consistent across phases.
Watch for: Plan revisions, lot-specific grading, option upgrades.
One-off designs with complex rooflines, mixed exterior materials, and upgraded MEP systems. We count every assembly individually and flag long-lead items that affect the schedule.
Watch for: Roofline complexity, window schedules, specialty MEP.
Strip centers, offices, and light industrial buildings along the commercial corridors. We price shell and core separately, then add tenant improvements as alternates so you can bid both.
Watch for: Shell vs. TI split, storefront glazing, site parking.
Pre-engineered metal buildings and tilt-up warehouses with large slab areas. We measure slab by square foot, count column lines, and price dock equipment and paving as separate line items.
Watch for: Slab flatness, dock counts, fire access lanes.
Riverton sits in Salt Lake County at the south end of the Salt Lake Valley. The items below are the ones that move numbers most on local takeoffs.
Riverton reviews plans under the adopted International Building Code and International Residential Code, and Utah amends the IECC energy provisions on its own cycle. Multifamily projects also go through fire and utility review. Confirm the adopted code edition and any local amendments with the Riverton building department before you finalize your scope. Allow time for plan review comments that can change wall, roof, and window specifications after bid.
IBC · IRC · IECC · Riverton building departmentMuch of the south valley sits on lake-bottom clays and silts with pockets of sand and gravel, and expansive soils are common enough that geotechnical reports often call for over-excavation or moisture conditioning. Footing depths, stem wall heights, and slab reinforcement change with the soils report. Price the geotech recommendation, not a default detail, and carry a line item for unsuitable material removal and replacement.
Geotechnical report · Expansive soils · Over-excavation · Slab reinforcementRiverton sits at roughly 4,400 feet with a cold, semi-arid climate. Ground snow loads, frost depth, and freeze-thaw cycles drive roof framing, footing depth, and exterior envelope details. Wind exposure on open valley sites affects roof sheathing nailing and cladding attachment. Price snow load per the adopted code and confirm the ground snow load figure with the building department rather than using a valley-wide default.
Ground snow load · Frost depth · Freeze-thaw · Wind exposureThe Wasatch Front is one of the fastest-growing population regions in the U.S., and framing, concrete, and MEP crews stay booked across Salt Lake and Utah counties. Labor rates and crew availability shift by trade and season. We price labor at ZIP-code-adjusted rates for Riverton and note when a trade is likely to require a premium or a longer lead time on your schedule.
Framing crews · Concrete crews · MEP trades · ZIP-code-adjusted laborRiverton subdivisions must manage stormwater on site, and the city and Salt Lake County review drainage, grading, and utility plans. Mass grading, retaining walls, and wet and dry utility runs are priced as one package across all buildings. Detention basins, curb and gutter, and asphalt paving are common line items. Confirm the current land use and stormwater requirements with the city before you finalize the site budget.
Mass grading · Stormwater detention · Wet and dry utilities · Curb and gutterMost material suppliers serve the Wasatch Front from Salt Lake City and Utah County, so trucking distance is short but delivery windows fill up during peak season. Concrete, trusses, and engineered wood are the items most likely to see lead-time changes. We price materials at ZIP-code-adjusted rates for Riverton and list long-lead items separately so you can lock them early. Sales tax treatment varies by project type; confirm it with your accountant.
Ready-mix concrete · Roof trusses · Engineered wood · Sales taxRiverton's mix of single-family and multifamily work, its expansive soils, and its cold, snowy winters each change what you measure and how you price it. Here is where those conditions hit the takeoff, trade by trade.
Riverton sits on the south end of the Salt Lake Valley, where soils range from sandy gravels near the Jordan River corridor to clay and silt pockets that hold water and move with seasonal moisture. In a takeoff, that shows up as deeper structural fill, over-excavation under footings, and subdrain or capillary break stone that would not appear on a dry bench site. You also need cut and fill quantities balanced by station, not just a total, because haul distance drives the cost. Import or export is priced per cubic yard with a separate line for compaction testing. We build these as separate line items under CSI Division 31 so the grading bid can be compared apples to apples. Our sitework estimating services cover this scope in detail.
Most Riverton residential framing is dimensional lumber and engineered wood, with roof pitches steep enough to shed snow. A useful takeoff separates wall framing by plate height, floor systems by joist depth and span, and roof framing by rafter or truss count, including hips, valleys, and gable overhangs. You also need sheathing by thickness, house wrap by square footage, and hardware by piece count. Truss packages should be priced from the supplier's layout, not a per-square-foot allowance, because girder and hip conditions change the piece count. Our framing estimating services and residential estimating services are set up to deliver this level of detail.
Mechanical, electrical, and plumbing takeoffs in Riverton multifamily work are driven by unit count and fixture count, not by square footage alone. We count fixtures by type, water heater and furnace connections, exhaust fans, and panel schedules by circuit. On the finish side, drywall is measured by square foot of wall and ceiling with a waste factor, paint by coat and substrate, and flooring by room type. Unit mix matters: a one-bedroom and a three-bedroom unit have very different trim and door counts. Our MEP estimating services and multi-family estimating services handle this scope. For commercial work, see our commercial estimating services.
With 89 single-family and 275 multifamily units permitted in 2025, foundation work in Riverton leans heavily toward slab-on-grade and post-tensioned slabs for the multifamily product. A takeoff needs footing widths and depths by wall type, stem wall heights, slab thickness, vapor barrier square footage, and reinforcing by bar size and spacing. Post-tensioned slabs add strand, anchor, and stressing line items that plain rebar takeoffs miss. Winter placements also require cold-weather curing measures, which we carry as a separate line rather than burying it in the concrete unit price. Our concrete estimating services and foundation estimating services break these out by pour and by building.
Riverton gets significant snow accumulation and freeze-thaw cycles, so roof assemblies need ice and water shield at eaves and valleys, a secondary underlayment, and ventilation balanced between intake and exhaust. The takeoff should measure roof area by plane, not just footprint, and add starter, ridge, hip and valley lineal feet, pipe boots, and step flashing by count. For multifamily, we separate roofing by building and by roof type so the bid can be phased. Wall assemblies add house wrap, flashing at openings, and sealant by lineal foot. Our roofing estimating services cover steep-slope and low-slope assemblies separately.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24" x 12" continuous | 48 | CY |
| 03 30 00 | Slab-on-grade concrete, 5" thick | 1120 | CY |
| 03 20 00 | Rebar, #4 and #5, including laps | 18.4 | TON |
| 03 20 00 | Post-tension strand and anchors | 6200 | LF |
| 06 10 00 | Wall framing, 2x6 studs at 16" o.c. | 9400 | LF |
| 06 10 00 | Floor joists, engineered, including rim | 3100 | LF |
| 07 30 00 | Roof underlayment, synthetic | 18400 | SF |
| 07 30 00 | Ice and water shield, eaves and valleys | 2600 | SF |
This example shows how a continuous footing takeoff is built from the foundation plan. The dimensions below are illustrative and do not represent a specific project. The same sequence applies to any strip footing on the Wasatch Front.
We start with the footing schedule. Assume a continuous footing 24 inches wide by 12 inches deep, running 620 lineal feet around the building perimeter and under interior bearing walls. Convert dimensions to feet: 24 inches is 2.0 ft, 12 inches is 1.0 ft. The cross-sectional area is 2.0 ft times 1.0 ft, or 2.0 square feet.
Multiply by the run length: 2.0 SF times 620 LF equals 1,240 cubic feet. Divide by 27 to convert to cubic yards: 1,240 divided by 27 equals 45.9 CY.
Add a waste and overpour factor. Typical waste for footing concrete runs 5 to 8 percent; we use 5 percent here. 45.9 CY times 1.05 equals 48.2 CY, rounded to 48 CY.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Footing width | 24 in ÷ 12 | 2.0 | ft |
| Footing depth | 12 in ÷ 12 | 1.0 | ft |
| Cross-section | 2.0 × 1.0 | 2.0 | SF |
| Run length | from plan | 620 | LF |
| Volume | 2.0 × 620 | 1,240 | CF |
| Convert | 1,240 ÷ 27 | 45.9 | CY |
| With 5% waste | 45.9 × 1.05 | 48.2 | CY |
Two things change this number on a real Riverton job. First, if the geotechnical report requires over-excavation, the footing volume stays the same but the structural fill and backfill quantities increase, and those are separate line items. Second, stepped footings on sloped grades add concrete at each step, so we measure each step separately rather than using one average depth. Both adjustments belong in the takeoff, not in a lump-sum allowance.
Pricing depends on project type, size, and the level of detail you need. We do not publish a flat rate because a 4,000 SF custom home and a 120-unit multifamily building require very different takeoff effort. Send the plans and we will quote the scope before we start. Most projects are returned in 24 to 48 hours, and rush turnaround is available when your bid date is close.
Most Riverton projects are delivered in 24 to 48 hours from the time we receive a complete set of plans and specifications. Larger multifamily or commercial packages may take longer, and we will tell you the schedule up front. Rush service is available if your bid deadline is tight. Missing details on the drawings are the most common cause of delay, so send the full set including addenda.
The permit figures on this page come from the U.S. Census Bureau Building Permits Survey for 2025. That survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits, additions, or renovations. So the 364 total units for Riverton reflect new residential construction only, and the $84M permitted value is the reported value of that residential work.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what was measured. The Excel file is set up so you can adjust quantities, add your own pricing, or drop it into your estimating software. The marked-up drawings show the takeoff boundaries and counts we used, which makes it easy to check our work or defend the number in a bid review.
Yes. Riverton's permit activity is mostly residential, with 89 single-family and 275 multifamily units permitted in 2025, but we also estimate commercial and light industrial projects. Residential work includes custom homes, production housing, and multifamily buildings. Commercial work includes tenant improvements, retail, and office. The takeoff method is the same, but the divisions and detail level change with the project type.
We read the geotechnical report and carry over-excavation, structural fill, subdrain, and capillary break stone as separate line items under Division 31 when the report calls for them. We also separate backfill from structural fill because they are priced differently. If the report is not available, we note the assumption on the estimate so you can adjust it once the soils report is issued. Confirm local requirements with the Riverton building department.
Yes, but the estimate will carry assumptions for the missing scope. We list those assumptions on the cover sheet so you know what is included and what is not. For example, if the structural drawings are not available, we may carry a foundation allowance based on similar Riverton projects and flag it for review. A complete set with specifications produces a tighter number. Send what you have and we will tell you what is missing.
We price material and labor using ZIP-code-adjusted data for the Riverton area, drawing on RSMeans data and our own historical project costs. That matters in Utah because labor rates and material availability differ from national averages. We also account for local supplier lead times on items like trusses and engineered wood. The result is a number that reflects what contractors in Riverton are actually paying, not a national index.
Send the architectural, structural, civil, and MEP drawings, the specifications, and any addenda. A geotechnical report helps with earthwork and foundation scope. If you have a bid form or a scope checklist, include it so we can match your format. For renovations, existing conditions drawings or a site visit report reduce assumptions. The more complete the set, the fewer allowances we have to carry.
Yes. We cover the Wasatch Front and beyond, including nearby cities such as Murray, Draper, Bountiful, Herriman, Spanish Fork, and Roy. If your project is in the Salt Lake Valley or along the I-15 corridor, we can handle it. The takeoff method and pricing basis stay the same; only the ZIP-code adjustments and local code references change. See our Utah construction estimating page for the full service area.
Email your drawings and specifications and we will return a CSI-organized takeoff in 24 to 48 hours.