Scope Precision EstimateContact Us
Taylorsville, UT

Construction estimating services in Taylorsville, UT

Scope Precision Estimate delivers quantity takeoffs and construction estimates for Taylorsville, UT builders. Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets, usually back in 24–48 hours.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Taylorsville ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Taylorsville · 2025
Taylorsville new housing permits2025
New housing units141Change vs. 2024+729%Permitted construction value$22MAverage value per unit$157,100Rank among covered Utah cities#19
Single-family: 16 (11%)Multifamily: 125 (89%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Taylorsville, UT different?

Taylorsville's 2025 permit mix — 141 new privately-owned residential units, 89% multifamily, $22M permitted value, $157,100 average per unit — drives estimating toward Type V and podium wood-frame takeoffs, parking structure concrete, and Wasatch Front labor pricing adjusted by ZIP code.

  • Taylorsville permitted 141 new housing units in 2025, #19 among the Utah cities we cover.
  • About 89% were in multifamily buildings; 11% were single-family.
  • Permit volume was up 729% compared with 2024.

Taylorsville sits in Salt Lake County, wedged between Murray, Millcreek, West Jordan and West Valley City along the I-215 belt. The city's 2025 residential permit data shows 141 new privately-owned units, up from 17 in 2024 — a 729% jump — with 125 multifamily units accounting for roughly 89% of that total. That mix means most of the takeoff volume here is apartment and townhome work, not scattered custom homes.

We build estimates from the same drawings your superintendent will frame from: architectural, structural, civil, and MEP sets, with addenda and revisions logged. Pricing runs on ZIP-code-adjusted material and labor rates, so Taylorsville quantities carry local numbers rather than a national average. Deliverables come back in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every line. Start with our Utah construction estimating services overview, or send plans straight through the estimate request form.

Coverage
Taylorsville and nearby Utah communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Taylorsville ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need bid-ready quantities fast. We return division-organized takeoffs so you can price labor, apply your own markup, and submit before the deadline. Multifamily and sitework packages are our most common Taylorsville requests.

02

For builders. You are buying out framing, concrete, and MEP. We break quantities by floor, building, and phase so purchase orders match what gets installed. Waste factors and unit conversions are shown, not buried.

03

For owners. You want a budget before design is final. We estimate from schematic and design-development sets, flag scope gaps, and give you a cost basis you can compare against contractor bids as documents tighten.

Taylorsville by the numbers

Taylorsville's residential construction pipeline

Select a bar to compare Taylorsville with the largest Utah markets we cover.

141New housing units, 2025
1.2%Of all units in the Utah cities we cover
$22MPermitted residential value
89%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Taylorsville

141 new housing units in 2025 (+729.4% vs 2024).

16 single-family · 125 multifamily (89%).

Multifamily dominates the 2025 permit mix

Taylorsville issued permits for 141 new privately-owned residential units in 2025, up from 17 in 2024 — a 729% increase, per the U.S. Census Bureau Building Permits Survey. Multifamily units totaled 125, or about 89% of the year's volume, while single-family units numbered 16. Permitted value reached $22M, an average of $157,100 per unit. For bidders this means the pipeline is apartment and townhome work, not one-off houses. Podium and Type V wood-frame over concrete parking is the typical assembly, and takeoffs need to separate building shell from sitework, since those scopes are usually bid as separate packages. Compare the same dynamics in South Jordan and Draper, where multifamily volume is also concentrated.

Where Taylorsville sits in the state pipeline

The city ranked 19th of 25 covered Utah cities by residential units in 2025, with 1.2% of the 11,785-unit state total. That is a small share, but the 729% year-over-year swing shows how quickly a single multifamily project can move a city's numbers. For estimating, the practical effect is lumpy bid calendars: a few large packages land at once, then the market goes quiet. Builders who keep a current cost basis on hand can price those packages without scrambling. The Wasatch Front's population growth keeps single-family and tech-campus construction active across the region, so labor and material pricing shifts faster than a static cost book reflects.

Services

Construction estimating services in Taylorsville

We price the scopes that show up on Taylorsville apartment, townhome, and infill projects, from dirt to trim.

Sitework takeoff

Cut and fill, utility trenching, and paving quantities for tight Taylorsville infill lots with limited staging.

CY · LF · TON

Concrete estimating

Footings, stem walls, slab-on-grade, and post-tensioned podium decks priced by mix and thickness.

CY · SF · LB

Foundation estimating

Spread footings, rebar schedules, and waterproofing for Salt Lake Valley soils with variable groundwater.

CY · TON · SF

Framing takeoff

Type V wood-frame walls, floors, and roof trusses counted by member size, length, and piece count.

LF · EA · BF

Roofing estimating

Asphalt shingle, TPO, and membrane systems with insulation, flashing, and slope-adjusted squares.

SQ · LF · EA

MEP estimating

Plumbing, HVAC, and electrical rough-in quantities for multifamily units and common areas.

LF · EA · TON

Multi-family estimating

Full-building takeoffs split by unit type, floor, and building so buyout packages stay clean.

SF · EA · LF

Residential estimating

Single-family and townhome budgets from schematic through permit sets, with allowances called out.

SF · EA · LF
Who we provide estimates for

Who hires us for Taylorsville takeoffs

General contractors bidding multifamily

Taylorsville's 2025 permit mix is 89% multifamily — 125 of 141 units — so GCs bidding apartment and townhome packages along the I-215 belt need floor-by-floor quantities that stand up to hard bid deadlines.

Framing and drywall subcontractors

Wood-frame apartment and townhome work dominates here, and lumber, sheathing, and gypsum quantities must be broken by building and floor before you can lock a labor crew size.

Concrete and foundation contractors

Salt Lake Valley soils and winter pours drive footing, slab, and flatwork quantities. You need rebar, formwork, and mix volumes split by pour sequence, not a lump sum.

MEP subcontractors

Multifamily buildings repeat plumbing stacks and HVAC layouts across units. We count fixtures, fittings, and ductwork by unit type so your material buy matches the schedule.

Developers and owners

With permit value at $22M and an average of $157,100 per unit in 2025, you need a cost basis before design is final to compare contractor bids against a fixed budget.

Architects and design-build teams

Schematic and design-development sets benefit from early quantity checks. We flag scope gaps in civil, structural, and MEP packages while revisions are still cheap to make.

Where we provide estimates

Taylorsville areas and nearby communities we cover

We estimate from plans for projects across Salt Lake County and the Wasatch Front. If your site is in Taylorsville or within a short drive of it, we can price it.

Taylorsville and immediate surroundings

South Salt Lake County

North and west Wasatch Front

Property types

Types of Taylorsville properties we estimate

The city's 2025 permit data shows 141 new privately-owned residential units, with 125 of them multifamily. That mix shapes the property types we see most often.

Multifamily apartments

Garden-style and podium apartment buildings with repeated unit plans. We take off by floor and building, tracking plumbing stacks, HVAC zones, and exterior skin areas separately.

Watch for: Unit-turn repetition, corridor lengths, and roof drainage.

Townhome and rowhouse

Attached units with shared party walls and individual utility services. Quantities split by building type and unit count, with fire separations and roof tie-ins called out.

Watch for: Party-wall firestopping, truss layout, and service laterals.

Single-family homes

The 16 single-family units permitted in 2025 represent infill and custom work. We estimate full architectural, structural, and MEP scopes from permit sets.

Watch for: Site-specific foundations and utility trenching.

Mixed-use and commercial

Retail, office, and light industrial projects along major corridors. We break out tenant improvement allowances, shell-and-core scopes, and sitework separately.

Watch for: Shell vs. TI scope split and parking ratios.

Senior and assisted living

Facilities with commercial kitchens, nurse call systems, and accessible units. We count specialty fixtures, door hardware, and mechanical ventilation by room type.

Watch for: Accessibility clearances and kitchen equipment rough-ins.

Institutional and civic

Schools, churches, and municipal buildings. We estimate from full plan sets with specifications, tracking division 1 through 48 and flagging allowances.

Watch for: Code-driven egress, fire ratings, and seismic bracing.

Local factors

What changes a construction estimate in Taylorsville

Taylorsville sits in the Salt Lake Valley, where soil, climate, and code adoption all affect what your estimate looks like. These are the drivers we adjust for.

Permitting and code adoption

Utah adopts model codes on a statewide cycle, but Taylorsville and Salt Lake County enforce them locally. Confirm the adopted IBC, IRC, IECC, and NEC editions with the Taylorsville building department before you price. Plan review comments can add revisions that change quantities, especially for multifamily fire ratings and energy compliance. We track addenda and re-price affected divisions.

IBC · IRC · IECC · Taylorsville building department

Soils and foundations

Salt Lake Valley soils range from sandy gravels to expansive clays and localized fill. Geotechnical reports drive footing depths, over-excavation, and drainage details. We estimate from the soils report, not a default assumption, and separate structural fill, footings, stem walls, and slab-on-grade. If the report calls for deeper footings or moisture conditioning, those quantities show up as line items.

Geotechnical report · Expansive clay · Structural fill · Footing depths

Climate and winter construction

Taylorsville sees cold winters with freeze-thaw cycles and hot, dry summers. That affects concrete curing, insulation values, and roof underlayment. We include cold-weather protection, temporary heat, and snow removal allowances when the schedule crosses winter. Summer heat can also drive watering and dust control on exposed subgrade.

Freeze-thaw · IECC climate zone · Temporary heat · Curing compounds

Labor availability and wage rates

The Wasatch Front labor market is tight, especially for framing, concrete, and MEP trades. Our ZIP-code-adjusted pricing reflects local wage rates, but you should still confirm crew availability with your subs. Overtime, per diem, and shift work can swing labor costs on multifamily schedules. We show labor separately so you can apply your own burden and markup.

RSMeans data · ZIP-code adjustment · Labor burden · Overtime

Sitework and drainage

Taylorsville sites often need grading, utility trenching, and storm drainage before foundations. We estimate cut and fill, import/export, pipe runs, and detention requirements from the civil set. Slopes and existing utilities can add sheeting, shoring, or relocation. Those items are easy to miss in a building-only takeoff, so we price them as a separate division.

Civil drawings · Cut and fill · Storm drainage · Utility trenching

Materials and logistics

Most materials reach Taylorsville from Salt Lake City suppliers, so freight is short-haul. But multifamily projects consume large volumes of lumber, gypsum, and concrete, and supplier lead times can affect the schedule. We estimate waste factors for framing and drywall at typical ranges and show them as separate line items. Utah does not levy a statewide sales tax on construction materials for qualified projects, but confirm tax treatment with your accountant.

Waste factor · Supplier lead times · Utah sales tax · Freight
Taylorsville estimating guide

How Taylorsville conditions show up in a takeoff, trade by trade

Taylorsville sits in Salt Lake County with a building mix that has shifted hard toward attached housing, and the quantities that drive your bid change with it.

Sitework and utility trenching

Most Taylorsville lots are infill parcels with existing curb, gutter and sidewalk to protect, so your sitework takeoff needs separate line items for sawcut and removal of flatwork, haul-off of unsuitable subgrade, and replacement of the same flatwork at the end. On the Wasatch Front bench soils, you should carry over-excavation below footings and structural fill placed in lifts, not a single unclassified excavation number. Storm drainage runs to a city system, and any connection requires a tap and possibly a road cut. Price trench bedding, backfill compaction and imported granular borrow separately. Our sitework estimating services break these out by CSI division so nothing lands in a lump sum.

Framing and structural lumber

Taylorsville's newer attached product is usually three-story wood frame over a concrete podium or slab, so your framing takeoff should separate floor levels and shear wall zones. Count studs by wall length with plates, and price engineered lumber headers and beams separately from dimension lumber because the unit costs are not close. Include hardware: hold-downs, straps, anchor bolts, and blocking at shear walls. Panel sheathing is measured by area with openings deducted over a threshold, and roof sheathing by area with waste. If you are bidding in the Salt Lake Valley, confirm the adopted code edition with the building department before you lock shear nailing schedules. Our framing estimating services handle this level of detail.

Mechanical, electrical and plumbing rough-in

Multi-family plumbing in Taylorsville usually runs in shared walls and floor/ceiling assemblies, so take off fixtures by count per unit type and pipe by developed length, separating supply, drain-waste-vent and gas. Mechanical is typically a split system per unit with a common exhaust strategy for baths and kitchens; count condensers, air handlers, registers and thermostats, and price the line set by length. Electrical takeoff should include service and meter stacks, panelboards per unit, device counts by type, and smoke/CO alarm counts tied to the adopted code. Fire sprinkler and alarm scope in attached buildings is frequently a separate contract and a common gap. Our MEP estimating services cover divisions 21 through 28.

Concrete and foundations

Taylorsville residential foundations are typically cast-in-place stem walls on spread footings, with slab-on-grade for garages and often for the main level. Take off footings by linear feet of wall times width times depth, then stem walls by linear feet times height times thickness, and keep the two in separate lines because forming costs differ. Include anchor bolt templates, sill seal, capillary break, and vapor retarder under slab. For multi-family podium or tuck-under parking, add retaining wall concrete, waterproofing and drainage board. Winter pours from roughly November through February need cold-weather protection in the pricing, and that shows up as an additive line, not a note. See our concrete estimating services for a division 03 breakdown.

Roofing and envelope

Roofs here see heavy snow loads and freeze-thaw at the eaves, so the takeoff has to carry ice and water shield beyond the code minimum at valleys, eaves and penetrations, plus a self-adhered underlayment on low-slope sections. Measure roof area from the slope-adjusted plan dimensions, not the plan area, and add hip and ridge cap by linear feet. For attached housing, count roof-to-wall flashing, step flashing at each unit separation, and vent boots by count. Wall envelope work includes house wrap or fluid-applied weather barrier, window flashing tape by linear feet of perimeter, and rigid insulation thickness that matches the energy code. Our roofing estimating services itemize these layers.

Scope gaps we see on Taylorsville bids

  • Over-excavation and structural fill below footings left out because the geotechnical report was issued after the bid.
  • Ice and water shield, drip edge and valley flashing omitted or shown as a single roofing allowance.
  • Fire sprinkler and fire alarm in attached buildings assumed to be another trade's contract with no line item.
  • Utility taps, road cuts and city inspection fees not carried, then absorbed as a change order.
  • Cold-weather concrete protection and temporary heat for winter pours priced as a note instead of a cost.
  • Final grade, landscape and flatwork replacement after trenching left out of the sitework scope.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Taylorsville project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Taylorsville conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to TaylorsvilleMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: three-story wood-frame multi-family building in Taylorsville

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Footing concrete, 24 in x 12 in18.4CY
03 30 00Stem wall concrete, 8 in wall42.7CY
03 10 00Slab vapor retarder9,850SF
05 10 00Wall framing, studs and plates1,140LF
06 10 00Engineered lumber headers268LF
06 16 00Wall sheathing, 7/16 in OSB12,400SF
07 30 00Roof underlayment, synthetic10,600SF
22 11 00PEX domestic water piping3,950LF

Worked example: footing concrete for a Taylorsville multi-family building

This example prices continuous spread footings for a three-story wood-frame building in Taylorsville. All dimensions are illustrative; substitute your own plan dimensions and confirm the footing size with the structural sheets and the geotechnical report before you price.

Assume a rectangular building with a perimeter of 620 linear feet, plus 180 linear feet of interior bearing and shear wall footings, for 800 linear feet of footing total. The footing is 24 inches wide and 12 inches deep.

StepCalculationResult
Footing length620 LF perimeter + 180 LF interior800 LF
Cross-section area24 in ÷ 12 = 2.0 ft; 12 in ÷ 12 = 1.0 ft; 2.0 × 1.02.00 SF
Net volume800 LF × 2.00 SF ÷ 27 CF per CY59.26 CY
Waste and spillage59.26 CY × 1.05 (typical 5%)62.22 CY
Order quantityround up to whole yards63 CY

A 5% waste factor is typical for continuous footings poured by pump or chute; step up to 8% if the pour is split across multiple days, if the footing has many jogs, or if you are placing on a slope. Do not bury the waste in the unit price, because the same factor will not apply to the stem wall.

Now add the cost layers that the volume alone misses. Forming is measured by contact area: 800 LF × 2.0 ft of vertical face for a one-sided form, or double that if both faces are formed. Reinforcement is taken off from the structural drawings by bar size and length, converted to pounds, and priced with a separate factor for chairs, dowels and lap. Include a line for anchor bolt templates and one for the vapor retarder if the footing doubles as a slab edge.

Finally, split the pour by season. Concrete placed between roughly November and February in the Salt Lake Valley needs heated water, blankets or enclosures, and that cost belongs in its own line so the client can see it. If you are comparing this scope against work in nearby cities, our Utah construction estimating services page covers how we handle the state-level pricing basis.

FAQ

Taylorsville construction estimating questions

Where does the Taylorsville permit data on this page come from?

The figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means additions, remodels, tenant improvements, commercial buildings and public work are not in the count. For Taylorsville, the survey shows 141 total residential units in 2025 against 17 in 2024, with 125 multifamily units and 16 single-family units, and a permitted value of about $22M. Use these numbers for market context, not as a scope list.

Why is multifamily such a large share of Taylorsville permits?

The 2025 survey shows 125 of 141 permitted units, about 89%, were multifamily, which tracks with the broader Wasatch Front pattern of attached and stacked product filling infill parcels. For an estimator, that changes the takeoff more than the total unit count does. You are pricing repeated unit types, shared plumbing walls, common area systems, and a single fire sprinkler contract across many units. Repetition rewards a careful per-unit template and punishes a lump-sum approach, because one missed fixture count multiplies across the whole building.

Do you price Taylorsville work from ZIP-code-adjusted material and labor rates?

Yes. We build pricing from RSMeans data adjusted for the project ZIP code, so material and labor rates reflect the local market rather than a national average. That matters in the Salt Lake Valley where labor rates and concrete pricing move with the volume of active work. We keep the adjustment visible in the estimate so you can see the base rate and the local factor separately, which makes it easier to defend the number in a bid review or a change order negotiation.

What do you need from me to start a Taylorsville takeoff?

Send the architectural, structural, civil and MEP plan sets in PDF, along with any specifications, the geotechnical report if one exists, and the unit mix for attached projects. If you only have a partial set, tell us which disciplines are missing so we can flag assumptions instead of guessing. We return Excel and PDF organized by CSI MasterFormat division with marked-up plan sets, typically in 24 to 48 hours for most projects, and rush turnaround is available when a bid date is close.

How do you handle snow load and winter conditions in a Taylorsville estimate?

Snow load drives the structural takeoff through member sizing, so we read the structural drawings rather than assume a number, and we tell you to confirm the adopted code edition and ground snow load with the local building department. Winter conditions drive the cost side: cold-weather concrete protection, temporary heat, and longer cure times between November and February. We carry those as separate additive lines so you can decide whether to schedule around them or price them in.

Should I use a quantity takeoff or a full estimate for a Taylorsville bid?

A quantity takeoff gives you measured quantities by CSI division with units, and you apply your own labor and pricing. A full estimate adds ZIP-code-adjusted material and labor pricing so you get a cost number you can hand to a client. Most general contractors bidding in Taylorsville want the full estimate for the base bid and a takeoff they can re-price for alternates. Tell us which one you need, and whether you want alternates or additive scopes broken out separately.

How do you treat fire sprinkler and alarm scope in attached housing?

In attached and stacked residential construction, fire sprinkler and fire alarm are frequently delegated to a specialty subcontractor, which is exactly why they fall through the gap on a general contractor's bid. We list them as a named exclusion with a placeholder if no design is available, or measure them if you provide the sprinkler drawings. Confirm the adopted code edition and the local requirements with the Taylorsville building department, because what triggers a sprinkler system in an attached building is a jurisdiction-specific question.

Can you estimate sitework and drainage for an infill lot in Taylorsville?

Yes. Infill work is where sitework takeoffs earn their keep, because you are removing and replacing flatwork, protecting existing curb and gutter, and often over-excavating to reach suitable bearing soils. We itemize sawcut and removal, haul-off, structural fill placed in lifts, trench bedding, imported borrow, and storm drainage runs to the city system including taps. If a road cut is required for the connection, we carry it as its own line rather than burying it in a general conditions allowance.

How do you price a project with repeated unit types without losing accuracy?

We build a per-unit template for each unit type, then multiply by the count and add the common areas, corridors, stairs, mechanical rooms and roof as separate scopes. That structure keeps the arithmetic auditable, so if the unit count changes you can see exactly what moves. It also exposes the difference between a one-bedroom and a two-bedroom unit in fixtures, pipe length and device counts, which a blended square-foot number hides. Our multi-family estimating services page describes the template approach in more detail.

Do you cover projects in cities near Taylorsville?

Yes. We work across the Salt Lake Valley and the Wasatch Front, including South Jordan, Lehi, Millcreek, Logan, Murray and Draper, and the pricing basis adjusts by project ZIP code rather than by city name. If your project is in one of those cities, send the plans with the project address and we will apply the correct local factor. The state page explains how we handle Utah projects generally.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Taylorsville project plans for a quote

Send your plan set and unit mix, and we will return a division-by-division takeoff or full estimate, typically within 24 to 48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote