Construction estimating services in Draper, UT

We produce construction estimates and quantity takeoffs for Draper, Utah projects — residential, commercial, and industrial — organized by CSI MasterFormat division and delivered in Excel and PDF with marked-up plan sets.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Draper ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Draper · 2025
Draper new housing permits2025
New housing units280Change vs. 2024−7%Permitted construction value$120MAverage value per unit$427,200Rank among covered Utah cities#14
Single-family: 222 (79%)Multifamily: 58 (21%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Draper different?

Draper pricing turns on four local drivers: expansive clay soils in the Salt Lake Valley that drive deeper footings and soil treatment, steep east-bench grades near the Wasatch foothills that add retaining and shoring, seismic and snow-load requirements in the adopted Utah code, and a permit mix that is 222 single-family units out of 280 total.

  • Draper permitted 280 new housing units in 2025, #14 among the Utah cities we cover.
  • About 21% were in multifamily buildings; 79% were single-family.
  • Permit volume was down 7% compared with 2024.

Draper sits at the south end of the Salt Lake Valley, where the Wasatch bench meets I-15 and Bangerter Highway. That geography shapes almost every estimate we build here: hillside lots on the east side need retaining walls, deeper stem walls, and more import fill than flatland subdivisions, while commercial pads along the corridor carry higher sitework and utility costs. If you are bidding a Draper job, the takeoff has to reflect the actual site, not a county average.

We work from your plan set and specs in Bluebeam Revu and PlanSwift, price material and labor with ZIP-code-adjusted RSMeans data, and deliver Excel and PDF quantities organized by CSI MasterFormat division, with marked-up drawings so your team can trace every line. Most projects turn around in 24–48 hours, with rush available. You can see how this fits our statewide work on the Utah construction estimating page, or send plans through get an estimate to start.

Coverage
Draper and nearby Utah communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Draper ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need quantities you can defend at a bid opening. We break out concrete, framing, roofing, MEP, and sitework by division with units and waste factors stated, so you can adjust labor and markup without rebuilding the takeoff.

02

For builders. On active Draper jobs, change-order pricing and partial takeoffs matter as much as the original bid. Send a revised sheet and we will reprice the affected scope and flag what moved. Framing and foundation scopes are the usual culprits on bench lots.

03

For owners. Owners and developers use our estimates to compare contractor bids and validate budgets before construction. We show assumptions, exclusions, and unit costs so you can see where a bid is thin and where it is padded.

Draper by the numbers

Draper's residential construction pipeline

Select a bar to compare Draper with the largest Utah markets we cover.

280New housing units, 2025
2.4%Of all units in the Utah cities we cover
$120MPermitted residential value
21%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Draper

280 new housing units in 2025 (-6.7% vs 2024).

222 single-family · 58 multifamily (21%).

Draper permit volume and what it means for bidders

Draper issued 280 new privately-owned residential units in 2025, down about 7% from 300 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family accounted for 222 of those units, with 58 multifamily — a 21% multifamily share. Permitted value was $120M, or $427,200 per unit on average. For bidders, that mix matters: Draper is still a single-family town, so most of your competition is chasing custom and semi-custom homes on bench lots, not podium apartments. The multifamily share is real but selective, and those jobs tend to be larger, longer, and more MEP-heavy. Draper ranked 14 of 25 among the covered Utah cities by units and took 2.4% of the 11,785 covered state total. If you are pricing here, watch the single-family pipeline for volume and the multifamily permits for the bigger scopes. Our residential estimating services and multi-family estimating services cover both sides.

Wasatch Front growth and where Draper fits

Utah has one of the fastest-growing populations in the U.S., and the Wasatch Front carries most of that construction — single-family subdivisions and tech-campus buildouts along the I-15 corridor. Draper's position between Salt Lake City and Utah County puts it in the path of both. That shows up in estimates as a split market: hillside residential on the east bench, commercial and light industrial near the freeway, and a steady stream of tenant improvements in the tech corridors. Neighboring cities like Riverton, Herriman, and Taylorsville share the same labor pool, so wage assumptions travel across city lines. If you bid in more than one of these, keep one pricing basis and adjust for site conditions, not for the city name.

Services

Construction estimating services in Draper

We price the scopes that actually drive cost on Draper projects, from bench-lot foundations to tech-corridor tenant improvements.

Sitework and grading

Cut and fill, import, retaining walls, and utility trenching for steep east-bench lots and freeway-corridor pads.

CY · LF · TON

Concrete and foundations

Spread footings, stem walls, slab-on-grade, and pier schedules priced for expansive Salt Lake Valley clays.

CY · SF · LF

Wood framing

Floor, wall, and roof framing takeoffs with stud, plate, joist, and sheathing counts for Draper single-family plans.

LF · EA · BF

Roofing

Architectural shingle, underlayment, flashing, and ventilation quantities for steep-slope Wasatch Front roofs.

SQ · LF · EA

MEP systems

Mechanical, electrical, and plumbing rough and finish counts for residential and tech-campus tenant improvements.

EA · LF · TON

Commercial estimating

Full-division takeoffs for Draper office, retail, and light industrial projects along the I-15 and Bangerter corridors.

SF · EA · LS

Industrial estimating

Process piping, equipment pads, and structural steel for warehouse and manufacturing work near the Draper freeway exits.

LF · TON · CY

Multi-family estimating

Unit-mix takeoffs for Draper apartment and townhome projects, with per-unit and per-building cost breakdowns.

SF · EA · UNIT
Who we provide estimates for

Who we build estimates for in Draper

General contractors

Bidding Draper hillside homes and tenant improvements along the I-15 and Bangerter corridor. We deliver division-level quantities with waste factors stated, so you can adjust labor and markup before submission.

Subcontractors

Foundation, framing, concrete, and roofing crews working bench lots and flatland subdivisions. Send a scope and we return quantities with units, so your bid covers retainage and site conditions.

Developers

Evaluating land in Draper and nearby Herriman or Riverton. Our estimates show sitework, utility, and vertical cost drivers so you can compare parcel yields before committing to a purchase.

Architects

Designing custom homes and small commercial buildings in Draper. We price your drawings early with marked-up plan sets, so you can adjust details before the bid set is finalized.

Owners and facility managers

Planning additions, repairs, or tenant fit-outs on Draper properties. We provide a clear scope and unit costs to validate contractor bids and budget reserves.

Property investors

Acquiring or repositioning residential and light commercial assets in Draper. Our estimates show renovation scope and cost by trade, helping you underwrite before closing.

Where we provide estimates

Draper areas and nearby communities we cover

Draper extends from the Jordan River bottoms to the Wasatch bench, and each area carries different sitework, foundation, and hauling costs. We also cover the surrounding south valley and northern Utah County communities.

Draper and immediate surroundings

  • Draper
  • SunCrest
  • South Mountain
  • Draper Peaks
  • Steeplechase

South valley cities

Utah County and north

Property types

Types of Draper properties we estimate

Draper's 2025 permit data shows 280 new residential units, with 222 single-family and 58 multifamily, reflecting the city's mix of custom hillside homes and attached housing. We estimate all property types below.

Custom hillside homes

East-bench homes in SunCrest and South Mountain with walkout basements, retaining walls, and long driveways. We take off excavation, shoring, and import fill by the cubic yard, plus deeper stem walls and pier footings.

Watch for: Rock excavation and haul-off; retaining wall design; utility trenching depth.

Production single-family

Tract homes on flatland parcels near Bangerter Highway and the Jordan River bottoms. We price standard foundation, framing, roofing, and MEP scopes with typical waste factors for production builders.

Watch for: Pad certification; utility stubs; lot-specific drainage swales.

Multifamily and townhomes

Attached townhome and apartment projects making up about 21% of Draper's 2025 residential permits. We estimate shared walls, fire separations, and parking structures, with quantities broken out by building type.

Watch for: Fire-rated assemblies; podium decks; parking ratio; trash and mail areas.

Small commercial and retail

Tenant improvements and ground-up retail along the Draper Peaks and I-15 corridor. We price storefronts, restrooms, HVAC, and electrical by division, with allowances for landlord work and signage.

Watch for: ADA upgrades; grease interceptors; hood and make-up air; panel capacity.

Office and tech campus

Office build-outs and light industrial spaces serving Draper's growing tech employment base. We estimate raised floors, data cabling, and mechanical systems, with quantities tied to occupancy and load requirements.

Watch for: Server room cooling; emergency power; ceiling plenum depth; security rough-in.

Additions and remodels

Second-story additions, kitchen expansions, and basement finishes on Draper's older housing stock. We measure existing conditions from your plans and photos, then price selective demolition and new work by trade.

Watch for: Load path for added floors; match existing finishes; temporary weather protection.

Local factors

What changes a construction estimate in Draper

Draper's location between the Wasatch bench and the Jordan River creates cost drivers that flatland estimates miss. Here are six factors we adjust for on every takeoff.

Permitting and code

Draper follows Utah's adopted building codes, including the IRC and IBC families, with local amendments for hillside and floodplain areas. Permit fees and review times vary by project type. We include plan review and inspection line items in soft costs, but you should confirm the adopted code edition and current fee schedule with the Draper building department before finalizing your budget.

Draper Building Department · Utah Uniform Building Code · IRC/IBC

Soils and foundations

Bench lots on the east side often carry expansive clays and colluvium, requiring over-excavation, engineered fill, and deeper footings. Flatland parcels near the river bottoms may need dewatering or aggregate piers. We take off excavation and foundation quantities from the geotech report when available, and carry typical waste factors for concrete and rebar.

Geotechnical report · Engineered fill · Aggregate piers · Stem walls

Climate and hazards

Draper sees snow loads, freeze-thaw cycles, and summer wildfire smoke. Roof framing must meet the ground snow load adopted for the site, and exterior concrete needs air entrainment. We include snow guards where required and price freeze protection for plumbing in unheated spaces. Confirm the site-specific snow load and wildfire zone with the local building department.

Ground snow load · Freeze-thaw · Air-entrained concrete · Wildfire zone

Labor market

The Wasatch Front's strong construction market keeps skilled trades in demand, and labor rates in Draper reflect that. We price labor using ZIP-code-adjusted RSMeans data, but you should verify current crew rates and availability for your project timeline. Overtime or shift work can add cost on fast-track jobs.

RSMeans data · ZIP-code adjustment · Crew rates · Overtime

Sitework and drainage

Hillside lots need retaining walls, swales, and storm drainage to manage runoff, while flatland sites may require a lift station or detention basin. We take off sitework by the cubic yard for cut and fill, and by the linear foot for utilities. Land disturbance over certain thresholds may trigger a stormwater permit, so confirm requirements with the city.

Retaining walls · Storm drainage · Detention basin · Stormwater permit

Materials and logistics

Most materials reach Draper from Salt Lake Valley suppliers, but hillside sites can add delivery and crane costs. We price common materials from RSMeans data and note where specialty items, such as long-span trusses or custom windows, may have lead times that affect the schedule. Sales tax applies to materials in Utah; verify current rates.

RSMeans data · Long-span trusses · Sales tax · Delivery costs
Draper estimating guide

How Draper conditions show up in a takeoff, trade by trade

Draper sits on the east bench of Salt Lake County, where sloping lots, expansive clays and a short frost season change how quantities are figured. Here is how that shows up in each division of a takeoff.

Division 31 — Sitework and drainage

Most Draper lots on the bench have some grade, so cut and fill is never a single balanced number. We take off mass excavation by contour band, then separate structural fill under footings from general grading, because the two carry different compaction and testing line items. Rock excavation is a common overrun: the Wasatch foothills carry limestone and conglomerate lenses, so a rock allowance is usually carried as a bid item rather than buried in the dirt price. Storm drainage is driven by the county's requirement to detain and slowly release runoff, which adds a detention basin or underground vault. See our sitework takeoff scope for how those items are broken out.

Division 06 — Framing and wood structures

Utah's snow load governs roof framing across the Wasatch Front, and Draper's elevation on the bench pushes ground snow load above what a valley-floor plan might assume. A takeoff that copies a Salt Lake Valley truss package without checking the jurisdiction's adopted snow load will come up short on roof members and connectors. We count studs, plates, headers, joists, sheathing and hardware by floor, then add waste by member type rather than one blanket percentage. Engineered lumber and hangers are listed as separate line items so a supplier quote can be compared line by line. Framing takeoffs for this market are on our framing estimating services page.

Division 07 and 09 — Roofing, envelope and finishes

Roofing quantities in Draper are driven by pitch, hips and valleys, and by the ice-dam protection required at eaves — a detail that is easy to omit when a takeoff is done from a floor plan alone. We measure roof area from the elevation and roof plan, then add waste for hips, valleys and ridge, and list underlayment, ice barrier, flashing and ventilation separately. On the interior, drywall is taken off by sheet count with a waste factor for board size, and finishes are organized room by room so a change in one bath does not force a re-takeoff of the whole house. Roofing scope is broken out on our roofing estimating services page.

Division 03 — Concrete and foundations

Draper's bench soils include expansive clays, and the standard response is over-excavation and recompaction beneath footings, plus continuous footings with reinforcing sized for the soil report. That means your concrete takeoff has to carry two quantities: the footing concrete itself and the structural fill that replaces unsuitable material. Flatwork is a separate exposure — driveways on sloped lots are often stepped or steep enough to require thicker sections and more control joints. We price foundation and flatwork separately because they are usually different crews and different bid days. Our foundation estimating services cover both.

Division 22/23 — Plumbing and mechanical

Draper's climate drives two mechanical realities: a real heating season and a cooling season that runs long. Residential plans typically show a high-efficiency furnace with a coil and condenser, plus a 50-gallon or larger water heater; on larger homes, two systems or a zoned setup is common. We take off equipment, ductwork by pound and linear foot, refrigerant line sets, condensate routing, gas piping by developed length, and venting. Kitchen and bath fixture counts come straight off the plan, but we cross-check against the plumbing riser because fixture counts on marketing plans are frequently wrong. MEP takeoff detail is described on our MEP estimating services page.

Scope gaps we see on Draper bids

  • Over-excavation and structural fill beneath footings, listed as a separate bid item instead of buried in the footing concrete price.
  • Rock excavation allowance for bench lots, where limestone and conglomerate can stop a trencher and force a change order.
  • Detention or retention for stormwater, which the county requires but many site plans show only as a note.
  • Snow-load-specific roof framing and connectors, when a truss package was copied from a valley-floor plan.
  • Ice-dam protection at eaves and in valleys, frequently missing when roofing is priced from square footage alone.
  • Final grade, topsoil and landscaping restoration after utility trenching, which no trade wants to own.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Draper project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Draper conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to DraperMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: single-family home on a sloped Draper bench lot

Sample format — illustrative quantities
SectionLine itemQtyUnit
31 23 16Mass excavation, cut to subgrade1,850CY
31 23 23Structural fill under footings, compacted420CY
03 30 00Continuous footing concrete, 24x1238CY
03 30 00Foundation stem wall concrete, 8in22CY
03 20 00Footing and stem wall reinforcing steel6,400LB
06 10 00Wall framing, 2x6 studs at 16in oc2,340LF
06 10 00Roof and floor sheathing, 7/16 OSB118SHT
07 30 00Asphalt shingles with ice barrier at eaves42SQ

Worked example: footing concrete for a Draper single-family home

This example uses illustrative dimensions for a typical Draper bench home with a walkout basement. Confirm actual dimensions against the plan and the geotechnical report before pricing.

Assume a continuous footing 24 inches wide by 12 inches deep, running 280 linear feet around the perimeter and under two interior bearing walls.

StepCalculationResult
Footing cross-section24 in x 12 in = 288 sq in2.00 SF
Volume per linear foot2.00 SF x 1 LF = 2.00 CF2.00 CF/LF
Total footing volume2.00 CF/LF x 280 LF560 CF
Convert to cubic yards560 CF ÷ 2720.74 CY
Add waste and overpour20.74 CY x 1.0521.78 CY

The 5 percent adder covers spillage, footing depth variation and small overpour at the pump. On a sloped lot, add a step-down allowance where the footing follows grade; each 12-inch step in a 24-inch footing adds roughly 2 CF, so eight steps add about 0.6 CY. Keep that as a separate line so a change in step count does not force a re-takeoff of the whole foundation.

Reinforcing runs with the footing: assume four continuous #4 bars and #4 stirrups at 16 inches on center. Four bars x 280 LF = 1,120 LF of #4, and 280 LF ÷ 1.33 LF per stirrup gives about 210 stirrups at roughly 3 LF each, or 630 LF. Combined, that is about 1,750 LF of #4 bar. At 0.668 LB per LF, that is roughly 1,170 LB, plus 10 percent for laps and ties, or about 1,287 LB.

Two things move this number on Draper bench lots. First, over-excavation: if the geotechnical report calls for two feet of unsuitable material removed under the footings, that fill is a separate Division 31 quantity, not concrete. Second, frost depth: confirm the depth the jurisdiction requires for exterior footings, because it changes both the trench and the concrete volume. Both items should appear as their own lines so a reviewer can see what was and was not included.

FAQ

Draper construction estimating questions

Where does the Draper permit data on this page come from?

It comes from the U.S. Census Bureau Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. Draper issued 280 such units, down about 7 percent from 300 the prior year, with 222 single-family and 58 multifamily units. The survey does not capture commercial or industrial permits, so do not read it as total construction volume. For a commercial or industrial project, ask the city's building division for the current permit activity.

How does the east bench slope affect my takeoff?

Sloped lots create two extra quantities that flat-lot takeoffs miss: structural fill placed under footings and stepped or thicker flatwork. On a walkout basement, the retaining side of the foundation also carries more backfill and drainage than the uphill side. We take off cut and fill by contour band rather than as one balanced number, so you can see where the overrun risk sits. If your geotechnical report calls for over-excavation, that volume belongs in Division 31, not in the footing concrete line.

What snow load should a Draper roof takeoff use?

Use the ground snow load adopted by the jurisdiction, not a valley default. Draper sits higher on the bench than the Salt Lake Valley floor, so a truss package copied from a valley plan can come up short on top chord size, connectors and blocking. The adopted code edition and the snow load map change over time, so confirm the current requirement with the Draper building department and put the number you used in the takeoff notes. That note is what protects you if the plan reviewer applies a different figure.

Do you take off multifamily projects in Draper?

Yes. Multifamily units were 58 of the 280 residential units permitted in 2025, about 21 percent of the total, and that work has different takeoff logic than single-family. We take off a typical unit once, then apply a unit-mix multiplier, and keep the common areas — corridors, stairs, elevator, clubhouse, parking structure — as separate scopes. Plumbing and mechanical counts are checked against the riser diagram, not the marketing plan. Multi-family takeoff scope is described on our multi-family estimating services page.

How do you handle Utah sales tax and prevailing wage on a Draper estimate?

Material pricing is adjusted by ZIP code, and we keep taxable material and non-taxable services on separate lines so your accounting can apply the correct treatment. On public work, wage determinations change the labor burden, and those rates are set by the awarding agency, so we price to the determination you provide rather than assuming one. If your project is private, say so, and we will price labor at market rates. Tell us at the start which basis applies so the estimate is not revised twice.

What do you need from me to start a Draper takeoff?

Send the plan set, elevations, the structural sheets and the geotechnical report if you have one. The geotech report matters in Draper because it drives over-excavation, footing size and drainage. If you have specifications, addenda or a bid form, include those too, because the bid form controls how the estimate has to be organized. We return Excel and PDF organized by CSI MasterFormat division with marked-up plan sets, typically in 24 to 48 hours for most projects, with rush available.

Can you estimate a project in a nearby city as well?

Yes. We cover the surrounding market, including Taylorsville, Murray, Riverton, Herriman, Bountiful and Logan. Pricing is adjusted by ZIP code, so a Riverton or Herriman estimate uses its own material and labor basis rather than Draper's. If you are bidding several cities at once, send the plans together and we will keep the takeoffs separate so you can compare them line by line. Statewide scope is summarized on our Utah construction estimating page.

How do you treat rock excavation on bench lots?

We carry it as a separate bid item with an assumed quantity, then note the basis. Limestone and conglomerate lenses in the Wasatch foothills can stop a trencher, and if rock is buried inside a general excavation price, the first change order eats your margin. The alternative is to price a rock allowance and disclose it, so the owner sees the risk before bid day. Either way, the assumption belongs in writing on the estimate, not in a verbal conversation.

What waste factors do you apply to framing and drywall?

Waste is applied by member type, not as one blanket percentage. Dimensional lumber typically carries a lower factor than sheet goods, and drywall waste depends on board size and ceiling height. Roof sheathing carries more waste on hip-and-valley roofs than on gables. We show the factor on the line so you can see what was assumed and change it if your crew's history differs. Typical industry ranges exist, but your own field data beats any published number.

Do you price concrete, framing and MEP as separate scopes?

Yes, and we keep them separate in the deliverable. Foundation concrete, framing, and plumbing and mechanical are usually different crews and different bid days, so combining them hides where your number is soft. Each scope gets its own division, its own quantities and its own assumptions. If you only need one trade priced, say so and we will scope the takeoff to that division. Concrete work is described on our concrete estimating services page.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Draper project plans for a quote

Send your plan set and specifications and we will return a division-organized Excel and PDF takeoff, typically within 24 to 48 hours.

  1. We review the set and check for missing sheets or addenda.