Scope Precision EstimateContact Us
Florida · FL

Construction estimating services in Florida

For Florida contractors, builders and developers bidding residential and mixed-use work. Estimates here start with wind, flood and soil conditions that drive foundation, roofing and envelope quantities before a single labor hour is priced.

25 Florida citiesMiami to Plantation
24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Local pricingAdjusted to each ZIP code
Census BPS · 2025
New housing units permittedTop 6 Florida cities
Miami7,219
Jacksonville5,890
Port St. Lucie3,028
Orlando2,986
Tampa2,818
Gainesville2,665
U.S. Census Bureau, Building Permits Survey, 2025 annual place data.
Real permit data

What affects construction estimates in Florida?

Florida estimates turn on high water table and muck soils, wind-borne debris and flood zone requirements, the Florida Building Code edition your jurisdiction has adopted, hurricane-season scheduling, and ZIP-code-adjusted material and labor pricing. Each one changes quantities, unit costs or both.

  • The 25 Florida cities we track permitted 38,215 new housing units in 2025.
  • About 61% of those units were in buildings with two or more units; 39% were single-family.
  • Miami: the biggest pipeline: 7,219 new housing units in 2025, up 20% against 2024, with about 98% in multifamily buildings.

Florida permitted 38,215 new privately-owned residential units across the 25 cities we cover in 2025, up 12.9% from 33,857 in 2024. About 61% of that is multifamily, and the permitted value sits at $10.3B. That mix matters when you bid: a Miami high-rise and a Port St. Lucie subdivision pull from different divisions, different crews and different unit costs even though both are residential.

We produce takeoffs and estimates in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets returned alongside. Pricing is ZIP-code-adjusted for material and labor, using RSMeans data with PlanSwift and Bluebeam Revu for quantity extraction. Most projects turn in 24–48 hours, and rush turnaround is available. If you are bidding in Florida, the estimate has to reflect what the plans actually show against the code edition your building department enforces. Confirm that edition locally before you lock a number.

Coverage
25 cities across Florida
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
ZIP-code-adjusted material and labor pricing
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need quantities you can defend line by line at a bid opening. We return division-organized takeoffs with marked-up plans so you can trace every square foot of roofing, drywall and concrete back to the sheet it came from.

02

For builders. You are buying out trades and scheduling crews. ZIP-adjusted pricing and CSI division structure let you drop our numbers straight into your buyout spreadsheet and compare subcontractor quotes against the same scope.

03

For owners. You are testing a pro forma before land closing. We break the estimate into divisions so you can see which scope carries the risk, and we flag where Florida wind and flood requirements add cost.

Florida construction market

Florida residential construction demand

Florida leads the nation in new housing investment, driven by in-migration and sustained multifamily and resort development. The permit data below covers new privately-owned residential units only, not commercial work.

38,215New housing units permitted, 2025
+12.9%vs. 33,857 units in 2024
$10.3BPermitted residential construction value
61%In multifamily buildings (2+ units)

Source: U.S. Census Bureau, Building Permits Survey, annual place-level data for 2024 and 2025. Covers new privately-owned residential units in 25 of the 25 Florida cities on this page; commercial and industrial work is not included.

Miami: the biggest pipeline

7,219 new housing units in 2025, up 20% against 2024, with about 98% in multifamily buildings.

Hialeah: fastest growth

From 305 units in 2024 to 1,053 in 2025, a 245% increase.

Jacksonville leads single-family

3,611 single-family units in 2025, the most of any city we cover in the state.

Multifamily carries the pipeline

Of 38,215 residential units permitted across our 25 Florida cities in 2025, 23,332 were multifamily, about 61%. Miami alone accounted for 7,219 units, up 20% against 2024, and roughly 98% of that was multifamily. For bidders this means more podium and high-rise work: post-tension slabs, curtain wall, fire-rated assemblies and elevator scope. Gainesville rose 119% to 2,665 units, almost all multifamily, and Orlando climbed 52% to 2,986. If you price multifamily in Florida, your estimate has to carry the divisions that dominate those buildings, not the single-family template.

Single-family is uneven by city

Single-family permits totaled 14,883 statewide, and Jacksonville led with 3,611 units even as its overall count fell 8% to 5,890. Port St. Lucie dropped 20% to 3,028 units but stayed heavily single-family at 2,814. Hialeah posted the fastest growth, from 305 units in 2024 to 1,053 in 2025, a 245% increase. The lesson for bidders is that a single state-level number hides city-level swings. Pull the city you are actually bidding, then check whether the mix is tract housing or mid-rise, because the divisions and waste factors are not the same.

2024 vs. 2025

Where Florida residential permits are rising and falling

Total new housing units by city. Sort by volume or by change to see which markets are heating up.

Miami7,219+20%
Jacksonville5,890-8%
Port St. Lucie3,028-20%
Orlando2,986+52%
Tampa2,818+11%
Gainesville2,665+119%
St. Petersburg2,641+64%
Palm Bay2,455-20%
Cape Coral2,406-29%
Tallahassee1,898+30%
Fort Lauderdale1,372+438%
Hialeah1,053+245%
20242025
Cities we cover

Construction estimates in 25 Florida cities

Each city page covers local permit activity, the projects contractors are bidding there, and the code and site factors that change the estimate.

Miami

#1
7,219 units in 2025
▲ 20% vs 2024
152 single-family · 7,067 multifamily

Jacksonville

#2
5,890 units in 2025
▼ 8% vs 2024
3,611 single-family · 2,279 multifamily

Tampa

#3
2,818 units in 2025
▲ 11% vs 2024
948 single-family · 1,870 multifamily

Orlando

#4
2,986 units in 2025
▲ 52% vs 2024
945 single-family · 2,041 multifamily

St. Petersburg

#5
2,641 units in 2025
▲ 64% vs 2024
629 single-family · 2,012 multifamily

Hialeah

#6
1,053 units in 2025
▲ 245% vs 2024
0 single-family · 1,053 multifamily

Port St. Lucie

#7
3,028 units in 2025
▼ 20% vs 2024
2,814 single-family · 214 multifamily

Cape Coral

#8
2,406 units in 2025
▼ 29% vs 2024
2,013 single-family · 393 multifamily

Tallahassee

#9
1,898 units in 2025
▲ 30% vs 2024
468 single-family · 1,430 multifamily

Fort Lauderdale

#10
1,372 units in 2025
▲ 438% vs 2024
262 single-family · 1,110 multifamily

Pembroke Pines

#11
31 units in 2025
31 single-family · 0 multifamily

Hollywood

#12
22 units in 2025
▼ 19% vs 2024
22 single-family · 0 multifamily

Miramar

#13
192 units in 2025
▼ 57% vs 2024
4 single-family · 188 multifamily

Gainesville

#14
2,665 units in 2025
▲ 119% vs 2024
218 single-family · 2,447 multifamily

Coral Springs

#15
2 units in 2025
▼ 86% vs 2024
2 single-family · 0 multifamily

Palm Bay

#16
2,455 units in 2025
▼ 20% vs 2024
1,908 single-family · 547 multifamily

West Palm Beach

#17
101 units in 2025
▼ 56% vs 2024
99 single-family · 2 multifamily

Clearwater

#18
55 units in 2025
▼ 65% vs 2024
45 single-family · 10 multifamily

Lakeland

#19
796 units in 2025
▲ 109% vs 2024
492 single-family · 304 multifamily

Pompano Beach

#20
356 units in 2025
▲ 13% vs 2024
73 single-family · 283 multifamily

Miami Gardens

#21
79 units in 2025
▲ 427% vs 2024
11 single-family · 68 multifamily

Davie

#22
41 units in 2025
▼ 70% vs 2024
37 single-family · 4 multifamily

Boca Raton

#23
84 units in 2025
▲ 12% vs 2024
84 single-family · 0 multifamily

Sunrise

#24
4 units in 2025
2 single-family · 2 multifamily

Plantation

#25
21 units in 2025
▲ 50% vs 2024
13 single-family · 8 multifamily
Single-familyMultifamily (2+ units)
Local factors

What changes a construction estimate in Florida

Six items move Florida numbers more than anything else on the plans. Each one changes quantities, unit costs or both.

Code edition and wind requirements

The Florida Building Code governs most construction, but the edition your jurisdiction enforces and its local amendments vary. Wind-borne debris regions, product approval numbers and impact glazing requirements change window, door and shutter counts. Before pricing openings, confirm the adopted edition and any local amendment with the building department. Roofing fastening schedules and underlayment requirements also shift with the wind speed map, which changes material quantities per square.

Florida Building Code · local building department · wind-borne debris region · product approval

Soils, muck and water table

Much of peninsular Florida sits on sandy soils over limestone, with organic muck layers in former wetland areas. Those conditions drive foundation type: spread footings, auger-cast piles, or a raised structural slab. The high water table affects dewatering, slab elevation and utility bedding. A geotechnical report changes the concrete and sitework divisions more than any finish selection. If you are bidding without a soils report, price the foundation as an allowance and say so in your proposal.

geotechnical report · muck · limestone · high water table

Hurricane season and flood zones

FEMA flood zones determine finished floor elevation, foundation height and flood vents, which feed directly into concrete, framing and sitework quantities. Hurricane season runs June through November and compresses the schedule, so labor may carry premium time and material lead times stretch. Coastal exposure also pushes roofing to higher wind ratings and more fasteners. Check the effective FIRM panel for the parcel and confirm local floodplain requirements before you finalize the estimate.

FEMA flood zone · FIRM panel · hurricane season · floodplain administrator

Labor rules and wage requirements

Florida has no state prevailing wage law for private work, but public projects can carry federal Davis-Bacon requirements, and some local jurisdictions attach wage or apprenticeship conditions to incentives. Those conditions change the labor rate you plug into each division. Crew availability also swings with the season and with how many multifamily towers are under construction in the same metro. Confirm any wage determination or local labor condition in the bid documents before you price labor.

Davis-Bacon · wage determination · local incentive agreement · craft availability

Permitting, impact fees and taxes

Permit fees, impact fees and concurrency requirements vary by county and city, and they are frequently revised. They are not part of a CSI division takeoff, so they belong in a separate line in your estimate. Florida has no state personal income tax, but sales tax applies to many materials, and how you document and claim exemptions affects your buyout. Confirm current fee schedules and sales tax treatment with the local building department and the Florida Department of Revenue before you finalize.

impact fees · concurrency · Florida Department of Revenue · sales tax exemption

Materials and logistics

Concrete, rebar, CMU and roof tile move by truck, and South Florida, the Panhandle and the I-4 corridor do not price the same. Rail and port access in Miami and Jacksonville changes some material costs, while inland cities pay more for the last mile. We price with ZIP-code-adjusted material and labor data so the same scope carries different unit costs in Miami and Gainesville. Waste factors for tile, drywall and roofing follow typical ranges, but confirm them against your supplier's actual packaging.

ZIP-code-adjusted pricing · RSMeans data · port access · waste factor
Florida estimating guide

How Florida conditions show up in a takeoff, trade by trade

Each trade carries Florida-specific quantities that a generic template misses. Here is what we extract differently across five scopes.

Sitework and foundations

We take off clearing limits, muck excavation and structural fill separately because organic layers in former wetland areas change the foundation type. If the geotechnical report calls for auger-cast piles, we count pile lengths and cap quantities instead of spread footings. Dewatering, wellpoint runs and utility bedding depths follow the high water table. In Miami and Tampa, where multifamily dominates, we price mat slabs and post-tension foundations; in Port St. Lucie and Jacksonville single-family work, we count stem walls and slab-on-grade square footage. You can send sitework plans through our sitework estimating services for a division-organized takeoff.

Roofing and waterproofing

The wind speed map drives roofing quantities more than roof area does. Higher design pressures mean more fasteners per square, ring-shank nails, and in some zones a secondary water barrier. We count underlayment squares, drip edge, valley metal and tile or shingle bundles separately, and we carry typical waste factors for cut-up hips and valleys. On Miami and Fort Lauderdale projects, we check product approval numbers against the plans before pricing. Roof-to-wall connections and secondary waterproofing under balconies appear on multifamily work. Roofing estimating services cover steep-slope and low-slope systems.

Electrical, plumbing and mechanical

Florida electrical takeoffs carry more devices per square foot in multifamily because of code-required receptacles, GFCI protection and emergency lighting. We count panel schedules, feeder lengths and conduit runs by size, not just fixture counts. Plumbing quantities follow the adopted plumbing code and local amendments; in coastal areas, we check backflow and corrosion-resistant materials. HVAC sizing depends on the IECC edition and Florida's humidity loads, so we count tonnage, duct linear feet and insulation separately. Our electrical estimating services and blueprint takeoff services return device and fixture counts you can trace to the sheet.

Concrete and masonry

Florida concrete quantities shift with wind and flood elevation. We count elevated slabs, stem walls and flood vents where FEMA zones require finished floor height. CMU counts include reinforced cells and grout volume per the structural sheets, not just wall area. In coastal counties, we add stainless or hot-dip galvanized embed quantities and check cover requirements for salt exposure. Post-tension slabs in Miami and Orlando high-rises carry tendon and anchor counts that a cast-in-place takeoff would miss. Our concrete estimating services return quantities by mix and placement method.

Drywall, framing and insulation

We take off drywall by sheet size and thickness, then add corner bead, joint compound and fastener quantities by wall type. Florida requires specific assemblies where wind-borne debris or flood zones apply, so we match each wall to its UL or Florida product approval listing. Insulation quantities follow the IECC edition your jurisdiction has adopted, and we count batt, blown and rigid board separately. Lumber takeoff covers studs, plates, headers and truss counts; in Jacksonville and Port St. Lucie single-family tracts, that means repetitive floor plans with per-plan counts. Drywall estimating and lumber takeoff return board-by-board quantities.

Scope gaps we see on Florida bids

  • Missing flood vents and elevated slab quantities where FEMA zones require finished floor height above base flood elevation.
  • No allowance for muck excavation or structural fill when the geotechnical report is not issued at bid time.
  • Roofing priced by square without the extra fasteners and secondary water barrier the wind speed map requires.
  • Impact glazing and shutter counts left out of the openings takeoff, then added as a change order.
  • Dewatering and wellpoint runs omitted from sitework because the high water table was not read from the soils report.
  • Permit fees, impact fees and concurrency costs mixed into a CSI division instead of a separate line item.
  • Hurricane-season schedule compression not reflected in labor rates or material lead times.
Services in Florida

Estimating services for Florida projects

Order a single trade or the whole building. Every estimate is organized by CSI MasterFormat and priced to your Florida ZIP code.

Property types

Florida property types we estimate

The 2025 permit mix is 61% multifamily, and the city-level split changes which divisions carry the risk. Here is how we treat four property types.

Multifamily mid-rise

Miami permitted 7,219 units in 2025, about 98% multifamily, and Gainesville rose 119% to 2,665 units. These buildings carry post-tension slabs, curtain wall, fire-rated assemblies and elevator scope.

Watch for: Post-tension tendon counts, balcony waterproofing, fire-rated shaft walls

Single-family tract

Jacksonville led with 3,611 single-family units, and Port St. Lucie stayed heavily single-family at 2,814 units. Repetitive plans let us build per-plan counts and multiply.

Watch for: Per-plan waste factors, truss counts, impact window schedules

Coastal high-rise

Miami, Fort Lauderdale and West Palm Beach carry wind-borne debris requirements and salt exposure. Product approval numbers and cover requirements drive material selection.

Watch for: Product approvals, stainless embeds, higher wind-rated roofing

Inland subdivisions

Orlando climbed 52% to 2,986 units and Tampa rose 11% to 2,818, with a mix of single-family and multifamily. Inland sites often need more sitework for retention and utility runs.

Watch for: Retention ponds, utility bedding, fill volumes

Who we provide estimates for

Who we estimate for in Florida

General contractors

You need division-organized quantities to compare subcontractor bids. We return marked-up plans so every line traces to a sheet.

Subcontractors

You bid one trade and need accurate counts fast. We price your scope with ZIP-adjusted labor and material for your metro.

Developers

You test pro formas before land closing. We break the estimate into divisions so you see which scope carries the risk.

Builders

You buy out trades and schedule crews. Our CSI structure drops into your buyout spreadsheet without reformatting.

Architects

You need a cost check during design. We take off from your drawings and flag where wind or flood requirements add scope.

Owners

You want a defensible number before you commit. We separate permit and impact fees from construction divisions.

How it works

From Florida plans to a bid-ready estimate

  1. Upload your plansPDF, DWG or a plan-room link, with specs, the geotechnical report and addenda if you have them.
  2. Get a quoteWe review the set and reply with a price and a delivery date before any work starts.
  3. We take off and priceQuantities by CSI section, priced to your Florida ZIP code or your own supplier and labor rates.
  4. Receive your estimateExcel estimate and color-coded plans, checked by a second estimator.
Deliverables

What you receive

  • Excel estimate organized by CSI division with material, labor and equipment columns
  • Marked-up PDF plans, color-coded by trade so every quantity traces to a sheet
  • Florida-specific line items where they apply, shown separately for review
  • Material lists ready for supplier quotes
  • Written scope, assumptions and exclusions to attach to your bid
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

FAQ

Florida construction estimating questions

What affects a construction estimate in Florida?

Six items move Florida numbers: the Florida Building Code edition your jurisdiction has adopted, wind-borne debris and product approval requirements, FEMA flood zones and finished floor elevation, high water table and muck soils, hurricane-season scheduling, and ZIP-code-adjusted material and labor pricing. Each one changes quantities, unit costs or both. Confirm the adopted code edition and any local amendments with your building department before you lock a number.

Do you price with Florida-specific labor and material rates?

Yes. We price with ZIP-code-adjusted material and labor data using RSMeans, so the same scope carries different unit costs in Miami and Gainesville. Concrete, rebar, CMU and roof tile move by truck, and port access in Miami and Jacksonville changes some material costs while inland cities pay more for the last mile. We do not publish a rate sheet because rates change; we price to the ZIP code on your project.

How do you handle wind-borne debris and impact glazing in a takeoff?

We match each opening to the product approval number shown on the plans, then count impact glazing, shutters or laminated glass separately from standard units. The wind-borne debris region boundary and the design wind speed drive the count, so we check the wind speed map for the project address. If the plans do not list product approvals, we flag the openings as an allowance and say so in the estimate.

What do you need from me to start a Florida estimate?

Send the architectural, structural, civil and MEP sheets as PDFs, plus any geotechnical report, flood zone determination and the local code edition if you have it. If you have a bid date, tell us. Most projects turn in 24–48 hours, and rush turnaround is available. We return Excel and PDF organized by CSI MasterFormat division with marked-up plan sets.

Do you cover both Miami and Jacksonville?

Yes. We cover 25 Florida cities including Miami, Jacksonville, Tampa, Orlando, St. Petersburg, Hialeah, Port St. Lucie, Cape Coral, Tallahassee, Fort Lauderdale, Gainesville, West Palm Beach, Boca Raton and others. The permit mix differs sharply by city: Miami is about 98% multifamily, while Jacksonville led single-family with 3,611 units in 2025. We price to the ZIP code on your project, not a statewide average.

How do you treat muck and high water table in a takeoff?

If a geotechnical report is available, we take off the foundation type it recommends, whether that is spread footings, auger-cast piles or a raised structural slab. We count dewatering, wellpoint runs, structural fill and utility bedding depths separately. If no soils report is issued at bid time, we price the foundation as an allowance and note the assumption, because muck excavation can change the sitework division substantially.

Are permit and impact fees included in your estimate?

No. Permit fees, impact fees and concurrency costs vary by county and city and are frequently revised, so they belong in a separate line outside the CSI divisions. We can carry a placeholder if you give us the current fee schedule, but you should confirm amounts with the local building department. Construction divisions cover the work, not the jurisdiction's fees.

What software do you use for Florida takeoffs?

We use Bluebeam Revu and PlanSwift for quantity extraction, and RSMeans data for ZIP-code-adjusted material and labor pricing. Deliverables are Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets returned alongside. That structure lets you trace every square foot of roofing, drywall and concrete back to the sheet it came from, which matters when you defend a number at a bid opening.

Where does the permit data on this page come from?

The numbers come from the U.S. Census Bureau Building Permits Survey, annual place-level data, and they count new privately-owned residential units only. They do not include commercial construction or total project counts. For 2025, the 25 Florida cities we cover permitted 38,215 residential units, up 12.9% from 33,857 in 2024, with a permitted value of $10.3B.

Can you estimate a project outside the 25 cities listed?

Yes. The 25 cities are the ones we track permit data for, but we estimate projects anywhere in Florida. ZIP-code-adjusted pricing means the unit costs follow the project location, not a metro average. Send the plans and the project address, and we will confirm coverage and turnaround. Most projects turn in 24–48 hours, and rush turnaround is available.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Other states we cover

Send your Florida plans for a takeoff

Send your plans and the project ZIP code, and we will return a division-organized estimate with marked-up plan sets in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us