Multifamily estimating
Typical-unit takeoffs multiplied across floors, with podium, deck and amenity scopes separated for mid-rise Fort Lauderdale projects.
SF · EA · FLWe prepare quantity takeoffs and construction estimates for Fort Lauderdale contractors, developers and owners — multifamily, coastal residential, commercial and sitework — delivered in Excel and PDF by CSI MasterFormat division, with marked-up plan sets.
Broward County pricing, high water table and dewatering, windborne debris and coastal exposure requirements, pile and auger-cast foundation systems, and a multifamily-heavy permit mix. These drive cost more than any single trade line item, so takeoffs must separate sitework, foundations, structural framing and envelope scope clearly.
Fort Lauderdale sits in Broward County, where the water table is high, the wind code is strict, and the permit mix skews toward multifamily. City permits for new privately-owned residential units totaled 1,372 in 2025, up 438% from 255 in 2024 — 1,110 of those units were multifamily, or about 81% of the total. For bidders, that means most of the work in front of you is mid-rise and podium construction, not one-off houses.
We build takeoffs around that reality. A Fort Lauderdale estimate typically separates dewatering and pile caps from slab-on-grade, then carries wind-rated envelope assemblies and impact glazing as their own line items rather than burying them in the general conditions. If you are pricing a project along the Intracoastal, in Flagler Village, or west toward Plantation and Sunrise, the same discipline applies. Start with our Florida construction estimating overview, or send plans straight through get an estimate.
For bidders. You need a bid-ready takeoff fast. We return quantities by division with waste factors shown, so you can apply your own labor and markup without rebuilding the scope from scratch.
For builders. You want budget checks during design and a buyout list once drawings firm up. We price in Bluebeam Revu, PlanSwift and RSMeans data with ZIP-code-adjusted material and labor rates.
For owners. You need a defensible number before you commit. We show assumptions, exclusions and allowances line by line, so you can see exactly what the estimate covers and what it does not.
Select a bar to compare Fort Lauderdale with the largest Florida markets we cover.
1,372 new housing units in 2025 (+438% vs 2024).
262 single-family · 1,110 multifamily (81%).
The 2025 permit data tells a clear story: 1,372 new privately-owned residential units in Fort Lauderdale, of which 1,110 were multifamily. That is about 81% of the total, against a 2024 base of 255 units. Permitted value reached $368M, or roughly $268,400 per unit. For bidders, that means your estimating capacity should be tuned to mid-rise and podium scopes — post-tension slabs, auger-cast or pile foundations, elevated decks, and repeating unit plans. Repetition is your friend: a correct typical-unit takeoff multiplied across floors beats a floor-by-floor re-measure every time. If you also bid in neighboring markets, our Hollywood construction estimating and Pembroke Pines construction estimating pages cover similar Broward scopes.
Fort Lauderdale ranked 11th of 25 covered Florida cities by residential units permitted in 2025, at about 3.6% of the 38,215-unit covered total. Single-family still matters — 262 units — but it is the smaller share. Statewide, Florida leads the nation in new housing investment, with in-migration and resort development pushing both multifamily and coastal residential. Practically, that means bid competition is tight and scope gaps get punished. Coastal trades like impact glazing, waterproofing and roofing carry more risk here than inland, so we break them out rather than lumping them. See our Florida construction estimating page for statewide coverage, or compare nearby markets in Miramar and Cape Coral.
We cover the divisions that actually carry cost in Broward County work — from dewatering and piles through envelope and finishes.
Typical-unit takeoffs multiplied across floors, with podium, deck and amenity scopes separated for mid-rise Fort Lauderdale projects.
SF · EA · FLAuger-cast piles, pile caps, grade beams and elevated slabs priced against Broward's high water table and dewatering needs.
CY · LF · EAFormwork, reinforcing, post-tension and slab-on-grade quantities for podium decks, garages and structural frames.
CY · SF · TONCMU, structural steel and cold-formed framing takeoffs with wall types, openings and sheathing counted by assembly.
SF · LF · EATPO, modified bitumen and tile roof systems with insulation, flashing and wind-uplift attachment scheduled by area.
SQ · SF · LFPlumbing, HVAC and electrical takeoffs from fixture counts and riser diagrams, including impact-rated equipment pads.
EA · LF · TONClearing, excavation, dewatering, utilities and paving quantities for tight urban lots and coastal sites.
CY · LF · TONTenant improvements, retail and office scopes priced by division with allowances flagged separately from measured work.
SF · EA · LSBidding podium and mid-rise work against other GCs in Broward, you need division-level quantities fast enough to hold your subcontractor coverage window before the bid date.
With 1,110 multifamily units permitted in 2025, your pro forma turns on cost per unit and per-key. We break out structure, envelope and MEP separately so you can test scenarios.
High water table and pile-supported designs mean your scope starts at dewatering and mat foundations. We quantify formwork, rebar and concrete by pour sequence, not by lump sum.
Wind-rated assemblies and impact glazing drive your material takeoff. We count studs, sheathing, WRB and opening protection by elevation so your bid reflects the actual envelope scope.
Resort and multifamily work carries large plumbing counts and rooftop mechanical. We take off fixture counts, pipe runs by diameter and ductwork by size from the drawings you receive.
You need a check on a contractor's number or a budget before drawings are complete. We show assumptions and exclusions line by line so you can compare apples to apples.
We estimate projects across Broward County and the surrounding South Florida market, from beachside redevelopment to inland infill. If your project is in or near one of these areas, send the plans and we will confirm scope.
The 2025 permit mix was 81% multifamily, so our Fort Lauderdale work leans toward attached and mid-rise construction. We also price the single-family, commercial and industrial projects that come through Broward County.
Podium and wrap buildings with four to eight stories over parking. We take off structural concrete, light gauge framing, exterior insulation and finish systems, and full MEP distribution by floor.
Watch for: Podium transfer slabs and unit-mix changes drive cost.
Beach-area renovations and new limited-service hotels. Scope includes impact glazing, balcony railings, commercial kitchens and large domestic water systems sized for peak occupancy.
Watch for: Balcony and railing replacement often exceeds budget.
Infill and tear-down builds in Victoria Park, Rio Vista and Coral Ridge. We quantify pile caps, elevated slabs, standing-seam roofing and impact window and door schedules by opening size.
Watch for: Elevation certificates change foundation and fill quantities.
Tenant improvements and shell buildings along Federal Highway and in Flagler Village. Takeoff covers storefront glazing, demising walls, ceiling systems and rooftop packaged units.
Watch for: Landlord versus tenant scope splits are a common gap.
Small-bay flex and distribution space near the airport and port. We price slab thickness, tilt-up or CMU walls, dock equipment and fire protection by square foot and by bay.
Watch for: Slab flatness and dock count change concrete and door costs.
Schools, clinics and public safety buildings in Broward County. These carry prevailing wage, hurricane shelter criteria and detailed division 1 requirements that affect labor and general conditions.
Watch for: Prevailing wage and shelter glazing add hard costs.
Fort Lauderdale pricing is not Miami pricing, and it is not Naples pricing. Six local conditions move the number more than anything else on the drawings.
Broward County sits in the High Velocity Hurricane Zone, so the Florida Building Code and local amendments govern roof attachments, opening protection and structural connections. Plan review through the city and county can add comments that change scope after bid. Confirm the adopted code edition and any local amendments with the building department before you lock your number.
Florida Building Code · High Velocity Hurricane Zone · Broward CountyMuch of Fort Lauderdale sits on Biscayne aquifer sands with a water table often within a few feet of grade. Dewatering, auger-cast piles or driven piles, and elevated structural slabs are common. The geotechnical report drives pile length and cap size, so an estimate without it carries real risk. We flag those quantities as allowances until the report is issued.
Biscayne aquifer · geotechnical report · auger-cast pilesWind-borne debris regions require impact-rated glazing or shutters, and flood zones drive elevation, breakaway walls and flood vents. Roofing assemblies must meet uplift requirements that change fastener schedules and underlayment. These items are easy to miss in a fast takeoff and expensive to add later. We list them as separate line items by elevation and opening.
wind-borne debris region · FEMA flood zones · uplift requirementsSouth Florida labor rates reflect a tight market for concrete formwork, rebar and MEP trades, especially when several multifamily projects bid at once. Crew sizes and overtime assumptions affect productivity more than material prices in this market. We price labor separately from material so you can adjust to your own crews and agreements.
concrete formwork · rebar · MEP tradesFlat terrain and sandy soils mean storm drainage, exfiltration systems and fill import are significant line items. City land development regulations and Broward County drainage requirements can limit impervious coverage and require on-site retention. We take off excavation, fill, pipe and structures from the civil drawings, not from a square-foot allowance.
storm drainage · exfiltration · impervious coverageMost materials arrive by truck from outside the region, and concrete and masonry supply is regional. Sales tax treatment differs between residential and commercial contracts, and impact fees are set by the city and county. We note the tax basis and fee assumptions in the estimate so your bid reflects the correct jurisdiction. Confirm current rates with your accountant and the city.
sales tax · impact fees · regional supplyFort Lauderdale sits on limestone and sand with a high water table, so the trades below carry line items you will not see on an inland job. Each section lists what we measure and what typically drives the quantity.
Because the water table sits close to grade across Broward County, most projects here start with dewatering and a stabilized working mat before any foundation work. On our sitework takeoffs we carry clearing, mass excavation, lime-rock or crushed-concrete base, dewatering pumps and discharge piping, and trench safety. For the foundation package we measure pile counts and lengths separately from caps and grade beams, since pile lengths are driven by limestone depth and the geotech report rather than by plan dimensions. Our foundation estimating services break out auger-cast piles, precast square piles, pile caps, and elevated structural slabs by square foot and by linear foot so your concrete and rebar buyout is not blended into one number.
Residential and low-rise work here is mostly wood frame and truss over masonry or concrete podiums, and wind uplift governs the connection schedule. Framing takeoffs need wall area by height, plate counts, header schedules, and truss or joist counts, plus sheathing by panel size and thickness. Roofing is where Fort Lauderdale differs from most markets: we measure roof area, perimeter, and all flashing linear footage, then list underlayment, tile or shingle, and secondary water barrier separately because the Florida Building Code wind provisions drive fastening patterns. Our roofing estimating services and framing estimating services both produce marked-up plan sets so your superintendent can verify counts in the field.
Interior packages on Fort Lauderdale multifamily and hospitality jobs are repetitive, so we take off one unit type completely and then multiply by the unit mix, flagging any units that flip or mirror. Line items include drywall by square foot and by sheet count, tape and finish by level, paint by coat and substrate, flooring by material and transition, and casework by linear foot. On the exterior we measure stucco, fiber cement, or rainscreen by area, windows and doors by count and size, and waterproofing at balconies and landings, all of which see wind-driven rain and salt air. Our residential estimating services use the same unit-type method for townhomes and single-family work.
Elevated construction in Fort Lauderdale means a lot of cast-in-place columns, shear walls, and post-tensioned slabs, plus CMU for stair and elevator cores. We take off concrete by volume with separate formwork areas by contact surface, and we split reinforcing steel by bar size and by ton so you can compare quotes from different suppliers. Typical waste factors run 5 to 10 percent on rebar and 3 to 5 percent on ready-mix, and we state which factor applies to each line. Our concrete estimating services cover footings, pile caps, slab-on-grade, elevated decks, and tilt-wall panels, with formwork, shoring, and curing listed as separate line items.
Multifamily and resort projects in Fort Lauderdale typically run a central chiller or VRF system, a fire sprinkler system designed under NFPA 13, and one or more elevators. MEP takeoffs are driven by fixture counts, linear feet of pipe by material and diameter, duct area by gauge, and device counts by type. We measure sprinkler head counts by hazard classification and branch line lengths separately from mains, since the underground and the standpipe risers are often a separate contract. Our MEP estimating services and multi-family estimating services coordinate these scopes so the mechanical, electrical, plumbing, and fire protection packages do not double-count shared supports and sleeves.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, elevated slab | 18,400 | SF |
| 03 30 00 | Cast-in-place concrete, columns and shear walls | 410 | CY |
| 05 12 00 | Structural steel, podium and amenity framing | 34 | TON |
| 06 10 00 | Wood framing, wall and floor systems | 62,500 | SF |
| 07 21 00 | Roof underlayment and secondary water barrier | 21,300 | SF |
| 08 53 00 | Impact-rated windows and sliding doors | 386 | EA |
| 21 13 19 | Fire sprinkler heads, NFPA 13 light hazard | 1,240 | EA |
| 09 29 00 | Gypsum board, unit interiors | 148,000 | SF |
This example shows how we build a pile cap quantity from the foundation plan. The dimensions below are illustrative and are not from a specific project; your geotech report and structural drawings govern.
Assume 48 pile caps, each 4 ft 0 in by 4 ft 0 in in plan and 2 ft 6 in thick, with the top of cap at the underside of the slab-on-grade. The first step is one cap's volume, then multiply by count, then apply a waste factor.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Plan area, one cap | 4.00 × 4.00 | 16.00 | SF |
| Volume, one cap | 16.00 × 2.50 | 40.00 | CF |
| Volume, one cap | 40.00 ÷ 27 | 1.48 | CY |
| Volume, 48 caps | 1.48 × 48 | 71.11 | CY |
| With 5% waste | 71.11 × 1.05 | 74.67 | CY |
| Formwork, one cap | 4 × 4.00 × 2.50 | 40.00 | SF |
| Formwork, 48 caps | 40.00 × 48 | 1,920 | SF |
We round the order quantity to 75 CY and carry 1,920 SF of formwork as a separate line, because formwork and concrete are almost never priced by the same subcontractor. Rebar is taken off separately from the cap schedule: a typical cap of this size might carry a mat top and bottom with vertical dowels, and we list it by bar size and total weight rather than as a percentage of concrete volume.
The reason this matters in Fort Lauderdale is that pile caps here are often thicker and more heavily reinforced than the same building would be inland, and the excavation around them usually sits below the water table. We add a line for dewatering during cap construction and a line for backfill and compaction, both of which are commonly left out of a foundation bid that only prices concrete. If your structural drawings show pile caps at a different thickness or count, the same sequence applies with your numbers. Send the foundation and structural sheets with your quote request and we will run the takeoff at the actual dimensions.
Most projects are delivered in 24 to 48 hours, and rush service is available when your bid date is tight. Pricing depends on the square footage, the number of trades, and whether you need a full estimate or a quantity takeoff only. We return Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets, so your team can see exactly where each quantity came from. Send the drawings through our get an estimate page and we will confirm scope and timing before we start.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means the totals cover single-family and multifamily housing and exclude commercial, industrial, and renovation permits. For Fort Lauderdale, the survey shows 1,372 total units in 2025 against 255 in 2024, with 1,110 of the 2025 units in multifamily buildings. Treat the numbers as a demand signal, not as a count of every permit issued in the city.
Yes. We use ZIP-code-adjusted material and labor pricing, so a concrete or framing line in Fort Lauderdale reflects the local market rather than a national average. That matters here because South Florida labor rates and material delivery costs differ from other parts of the state. We also carry the line items that local conditions require, such as dewatering, pile foundations, and impact-rated glazing, so your bid does not come back short when the scope is compared against the drawings.
Yes, and that is the fastest way to work through a Fort Lauderdale apartment or condo job. We take off one unit type completely, including drywall, paint, flooring, casework, fixtures, and MEP rough-in, then multiply by the unit mix and adjust for mirrored or flipped plans. Common areas, the podium, the amenity deck, and the parking levels are taken off separately. Our multi-family estimating services page describes the unit-type method in more detail, and the output is organized so your buyout packages line up with your subcontractor list.
Send the architectural, structural, civil, and MEP drawings, plus any specifications, geotech report, and addenda. If you have a bid form or a scope sheet from the general contractor, include it so we match the required divisions. For sitework and foundations, the geotech report and the pile layout are the two documents that most affect the quantity. For roofing, the roof plan and the wind-uplift schedule are essential. You can send everything through our get an estimate page, and we will confirm receipt and turnaround the same day.
We list impact-rated windows, doors, and glazing as separate line items by count and size rather than carrying an allowance, because the cost difference against non-rated units is significant. On the roof, we take off the secondary water barrier, underlayment, and fastening separately from the finish roofing so a change in the wind-uplift schedule does not require a full re-takeoff. The Florida Building Code edition adopted in Fort Lauderdale and the wind-borne debris region boundaries should be confirmed with the local building department, since those determine which assemblies apply to your project.
Yes. We cover Broward County and the surrounding market, including Pembroke Pines, Hollywood, and Miramar, as well as other Florida cities such as Port St. Lucie, Cape Coral, and Tallahassee. The takeoff method is the same, but the code edition, wind zone, and soil conditions can change from one jurisdiction to the next, so we confirm those before pricing. Our Florida construction estimating services page lists the coverage and the trades we handle across the state.
Every takeoff comes with a marked-up plan set so you can audit the quantities. We color-code or tag each line item on the drawings, label dimensions and counts, and cross-reference the tag to the Excel line. That makes it straightforward to check a pile count, a window schedule, or a roof area against the sheets. If a subcontractor questions a quantity, you can point to the exact location on the plan. The plan set and the spreadsheet are delivered together in the same package.
Yes. We handle commercial estimating services for office, retail, hospitality, and mixed-use work, and industrial estimating services for warehouse and light manufacturing projects. Commercial jobs here often involve elevated decks, podium parking, and complex MEP systems, so the takeoff is organized by CSI division and by bid package. If your project includes a large site package, our sitework estimating services cover clearing, grading, utilities, and paving. Send the drawings and we will confirm which divisions you need priced.
We apply a stated waste factor to each material line rather than one blanket percentage, because the right factor differs by trade. Typical waste runs 3 to 5 percent on ready-mix concrete, 5 to 10 percent on rebar and structural steel, and 8 to 12 percent on tile and flooring. We show the factor in the spreadsheet so you can see the raw quantity and the order quantity side by side. Rounding is done at the order quantity, not at the intermediate step, so the arithmetic stays auditable.
Send your drawings, specs, and geotech report through our get an estimate page and we will confirm scope, turnaround, and deliverables the same day.