Bid Estimating Services

Send us your bid documents and we return a unit-priced estimate organized by CSI division, with marked-up plans and a clear scope narrative.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"1,240LF9.2 CY
Spread footing 6' × 6' × 12"18EA24.0 CY
Slab-on-grade 6" thick18,400SF341 CY
Elevated slab 8" thick9,800SF242 CY
Column 16" × 16", 10' tall24EA47.4 CY
Total concrete663.6 CY
Illustrative quantities. Waste factor applied as a separate line.
Rebar laps included

What is bid estimating?

Bid estimating is the process of producing a unit-priced construction estimate from bid documents, organized by CSI MasterFormat division, so a general contractor or subcontractor can submit a competitive hard bid. It includes quantity takeoff, material and labor pricing, general conditions, and a scope narrative listing inclusions, exclusions, and clarifications.

  • Quantities are taken off in CY, LF, SF, EA, and TON by CSI division.
  • Typical waste factors range from 5% for concrete to 10% for drywall.
  • The most costly miss is omitted Division 01 general conditions and requirements.

A bid estimate is only as good as the takeoff behind it. When you are chasing a hard bid, you need every line item accounted for — from Division 03 concrete footings to Division 26 electrical feeders — before the bid deadline. We produce unit-priced estimates organized by CSI MasterFormat division, with quantities you can trace back to the drawings. Whether you are a general contractor building a bid from scratch or a subcontractor pricing a single scope, we work from your bid documents and return a complete estimate in 24–48 hours for most projects. If you need help earlier in the process, our preliminary and conceptual estimating service can set a budget before drawings are complete. For hard bid support, we coordinate directly with your team through bid day support. We also provide material takeoff services and labor cost estimating as standalone scopes when you only need part of the estimate.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Our construction estimating company works from the plans and specifications you issue, whether they are IFC drawings or a BIM model. We set up each project in Bluebeam Revu and PlanSwift for on-screen takeoff, then price material and labor separately using RSMeans data adjusted by ZIP code. Every bid estimate preparation package includes a detailed scope narrative, marked-up plan sets, a trade breakdown by division, and a list of clarifications to request before bid submission. Where the documents are thin, we flag the item and carry it as an allowance or unit price rather than guessing.

We also support the pricing side of the bid. If you receive multiple quotes, our bid leveling services compare them line by line so you can see what each subcontractor included. For owners and GCs who want a check before submission, a bid estimate review tests quantities, labor productivity assumptions, crew size, equipment cost, overhead and profit, and contingency. We track RFIs and addenda during the bid period so the version you price is the version you submit. With 24–48 hour turnaround on most projects, you can focus on subcontractor coverage and bid strategy while we handle the quantities.

Services

What our bid estimating services cover

We take off and price the full scope shown in your bid documents, from general conditions through closeout. Each line item is tied to a spec section and a drawing reference, so you can see exactly where the quantity came from. We price material and labor separately, apply ZIP-code-adjusted rates, and flag any scope that relies on an allowance or unit price.

Concrete & Sitework

Footings, slabs, walls, and site utilities measured and priced by volume, length, and area.

CY · LF · SF

Masonry & Steel

CMU walls, brick veneer, structural steel, and misc. metals taken off by count and weight.

SF · TON · EA

Rough & Finish Carpentry

Framing, sheathing, blocking, doors, and millwork measured by linear feet and piece count.

LF · SF · EA

Thermal & Moisture

Insulation, waterproofing, roofing, and sealants priced by area and linear feet.

SF · LF

Drywall & Ceilings

Gypsum board, metal studs, acoustical ceilings, and finishes measured by square foot.

SF

Specialties & Equipment

Toilet accessories, fire extinguishers, appliances, and owner equipment counted and priced.

EA

Mechanical & Plumbing

Ductwork, piping, fixtures, and equipment priced by length, count, and capacity.

LF · EA · TON

Electrical & Low Voltage

Conduit, wire, devices, panels, and lighting taken off by length and count.

LF · EA

What every bid estimating takeoff includes

  • Full quantity takeoff from architectural, structural, civil, and MEP drawings
  • Unit pricing for material, labor, and equipment by CSI division
  • General conditions and Division 01 requirements pricing
  • Allowances and unit-price items clearly identified
  • Sales tax by material category and jurisdiction
  • Bond and insurance cost inclusion
  • Escalation adjustment based on bid date and market
  • Marked-up plan sets showing takeoff dimensions and counts
  • Scope narrative listing inclusions and exclusions
  • Bid form summary with alternates and addenda
  • Electronic deliverables in Excel and PDF
  • Coordination with your team on clarifications before bid submission
How we work

How we prepare your construction bid estimate

  1. Document review and setupWe log all bid documents, addenda, and clarifications. We set up a takeoff file in Bluebeam Revu and PlanSwift, overlay the architectural and structural grids, and confirm the drawing scale on each sheet. Any missing sheets or illegible details are flagged immediately so you can request them before the deadline. We also check that the addenda are incorporated and note any discrepancies between the drawings and specifications.
  2. Quantity takeoff by divisionWe take off quantities in CSI order, starting with Division 01 general requirements and moving through Divisions 02–33. For each line item we record the drawing sheet, grid line, and dimension used. Concrete is measured by volume, steel by weight, and finishes by area — each with the correct unit of measure. We apply waste factors as separate line items, typically 5–10% for concrete and 10–15% for gypsum board, so you can see the allowance.
  3. Scope gap reviewWe compare the drawings against the specifications to catch items that are specified but not shown, or shown but not specified. Common gaps include fire-rated assemblies, seismic bracing for MEP, and temporary facilities. We list every gap with a recommended allowance or clarification request. For example, if the specs require firestopping but the drawings do not show penetration details, we add a line item and note the UL system to be confirmed.
  4. Pricing and adjustmentsWe apply ZIP-code-adjusted material and labor rates from RSMeans data, then add sales tax by material category. For items not covered by RSMeans, we use recent quote data or your own historical costs. Escalation is applied based on the bid date and known market trends in your region. We also adjust labor rates for prevailing wage or union requirements if they apply to your project location.
  5. Quality check and deliveryA second estimator reviews the takeoff for math errors, unit consistency, and missed scope. We cross-check totals against similar projects and flag any outliers. The final estimate is delivered in Excel and PDF, organized by CSI division, with marked-up plan sets and a scope narrative. The marked-up plans show the dimensions and counts used for each line item, so you can trace any quantity back to the drawings.
  6. Bid day support and clarificationsWe remain available through bid day to answer questions, adjust quantities if addenda are issued, and provide backup detail for your bid form. If you need to level subcontractor quotes, we can assist with that as a separate service. Our goal is to ensure your submitted bid is complete and defensible. We can also provide a bid form summary with alternates and unit prices, ready for submission.

What we need from you

  • Bid documentsArchitectural, structural, civil, and MEP drawings, plus specifications and addenda. Incomplete sets lead to assumptions that may not match the final bid.
  • Bid date and timeWe schedule our work backward from your submission deadline. Rush turnaround is available for a premium.
  • Scope of workWhich divisions you are bidding, and whether you are the GC or a subcontractor. This determines what we include and exclude.
  • Project locationZIP code for material and labor pricing, plus any local wage requirements such as prevailing wage or union agreements.
  • Site conditionsGeotechnical report, existing conditions survey, and any known utility or environmental issues that affect cost.
  • Bonding and insuranceYour bond rate and insurance requirements so we can include these costs accurately in the general conditions.
Sample output

Sample bid estimate format and estimate summary

The table below shows a typical excerpt from our bid estimate, with CSI section numbers and drawing references. Quantities are illustrative.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Cast-in-place concrete, slab-on-grade, 6" thick18,400SFS-101
05 12 00Structural steel, W14×22 beams12,500LBS-201
07 21 00Thermal insulation, batt, R-13 walls9,200SFA-501
08 11 00Hollow metal door and frame, 3'0" × 7'0"42EAA-601
09 29 00Gypsum board, 5/8" Type X, one layer22,000SFA-401
22 11 00Domestic water piping, Type L copper, 1"1,850LFP-101
23 31 00Ductwork, galvanized steel, 24" × 12"480LFM-201
26 05 00Conduit, EMT, 3/4"3,200LFE-101
09 51 00Acoustical panel ceilings, 2' × 2' lay-in5,600SFA-701
22 42 13Commercial water closet, floor-mounted12EAP-301

Units of measure in a bid takeoff

We measure each scope in the unit that matches how it is bought, installed, and priced. The table below shows the units you will see in our estimates and how we derive them.

ItemUnitHow it's measured
Concrete footings and slabsCYVolume from plan dimensions, converted from cubic feet to cubic yards
Structural steelTONWeight from member sizes and lengths, using AISC manual weights
Roofing membraneSQArea in square feet divided by 100, with laps and waste added
DuctworkLBWeight from gauge, size, and length per SMACNA standards
Plumbing pipeLFCenterline length from riser diagrams and floor plans
Electrical conduitLFRoute length from panel schedules and device locations
Doors and framesEACount from door schedules and hardware sets
Gypsum board partitionsSFWall area from room dimensions, both sides where applicable

Worked example: Division 09 gypsum board takeoff for a small office fit-out

This example walks through a gypsum board takeoff for a 2,400 SF office tenant improvement. All dimensions are illustrative and for demonstration only.

Step 1 — Establish wall lengths and heights. From the architectural floor plan, measure interior partition lengths on each wall type. Assume:

  • Type A: 1-hour rated corridor wall, 180 LF, 10 ft high
  • Type B: non-rated office partition, 320 LF, 10 ft high

Step 2 — Calculate wall area per side.

  • Type A: 180 LF × 10 ft = 1,800 SF per side. Two sides = 3,600 SF.
  • Type B: 320 LF × 10 ft = 3,200 SF per side. Two sides = 6,400 SF. Total wall area = 10,000 SF.

Step 3 — Deduct openings.

  • Doors: 8 doors at 3 ft × 7 ft = 21 SF each. Total = 168 SF.
  • Windows: 4 windows at 6 ft × 5 ft = 30 SF each. Total = 120 SF.
  • Total deductions = 288 SF. Net wall area = 10,000 − 288 = 9,712 SF.

Step 4 — Add waste factor. Typical waste for gypsum board is 10–15%. Use 12%. Waste = 9,712 SF × 0.12 = 1,165 SF. Total board to purchase = 9,712 + 1,165 = 10,877 SF.

Step 5 — Break down by board type.

  • Type A (1-hour rated): Use 5/8" Type X. Area = 3,600 SF − (doors/windows in Type A). Assume 4 doors and 2 windows in Type A: deductions = (4×21) + (2×30) = 84 + 60 = 144 SF. Net Type A = 3,600 − 144 = 3,456 SF. Add 12% waste = 3,456 × 1.12 = 3,871 SF.
  • Type B (non-rated): Use 1/2" regular. Net Type B = 6,400 − 144 = 6,256 SF. Add 12% waste = 6,256 × 1.12 = 7,007 SF.

Step 6 — Accessories and finishes.

  • Joint compound: estimate 1 gallon per 300 SF of board. Total board = 10,877 SF → 36 gallons.
  • Tape: 1 roll per 500 SF → 22 rolls.
  • Screws: 1 box per 1,000 SF → 11 boxes.
  • Corner bead: measure outside corners. Assume 40 LF. Add 10% waste = 44 LF.
  • Level of finish: Level 4 for painted areas, Level 5 for critical lighting. Note in scope.

Step 7 — Labor and pricing. Apply ZIP-code-adjusted labor rate. Assume $1.20/SF for hang, finish, and tape. Labor = 10,877 SF × $1.20 = $13,052. Material cost: 5/8" Type X at $0.55/SF, 1/2" at $0.40/SF. Material = (3,871 × $0.55) + (7,007 × $0.40) = $2,129 + $2,803 = $4,932. Add accessories $800. Total = $13,052 + $4,932 + $800 = $18,784.

Step 8 — Scope notes. Include fire-rated assembly UL design number, firestopping at penetrations, and cut-and-patch for MEP rough-in. Exclude painting unless specified.

This level of detail lets you trace every quantity back to the drawings and adjust if addenda change wall types or heights.

Cost drivers

What drives the cost of outsourced bid estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Document completeness

A full set of coordinated drawings and specs reduces the number of assumptions we must make. Missing details force us to carry allowances, which can inflate your bid or leave you exposed if the scope is larger than expected. For example, if the structural drawings lack footing schedules, we must assume a size, which may not match the final design.

Document completeness

A full set of coordinated drawings and specs reduces the number of assumptions we must make. Missing details force us to carry allowances, which can inflate your bid or leave you exposed if the scope is larger than expected. For example, if the structural drawings lack footing schedules, we must assume a size, which may not match the final design.

Project type and complexity

A warehouse with tilt-up walls prices differently from a hospital with seismic bracing and medical gas. Complexity increases takeoff time and the number of line items, which affects both our fee and the construction cost. For instance, a hospital requires detailed takeoff of Division 22 and 23 systems, including medical gas piping and isolation panels.

Location and labor market

Material and labor rates vary by ZIP code. Prevailing wage, union agreements, and local availability of trades all change the labor component. We adjust rates to your specific project location. For example, a project in a prevailing wage area may have labor rates 20–30% higher than a non-prevailing wage area.

Market conditions

Steel, lumber, and copper prices fluctuate. We apply escalation based on the bid date and current market indices. If your bid is months out, we can carry an escalation allowance to protect against price increases. We track indices such as the Producer Price Index for steel and the Random Lengths lumber index.

Bid deadline

A tight deadline may require a rush fee and additional estimator hours. We prioritize accuracy over speed, but we can meet most deadlines with 24–48 hours notice for standard projects. If you have a deadline within 24 hours, we can often accommodate with a rush fee and a focused scope.

Scope of work

The number of CSI divisions you ask us to price directly affects the estimate cost. A single-division subcontractor bid takes less time than a full general contractor estimate covering Divisions 01–33. We scope the effort to your bid form. For example, a drywall subcontractor bid covering Division 09 only takes about half the time of a full GC estimate.

Number of addenda

Each addendum requires us to review changes, adjust quantities, and update pricing. Multiple addenda can increase turnaround time and cost, especially if they affect major scopes like structural or MEP systems. For instance, an addendum that changes the roof system from TPO to modified bitumen requires a full re-takeoff of Division 07.

Level of detail required

Some clients need a lump-sum bid form, while others require unit prices for every line item. A detailed unit-price estimate takes longer to produce but gives you more flexibility during bid leveling and change order negotiations. For example, a unit-price estimate for concrete will break out formwork, rebar, and concrete separately.

Scope gaps

Scope gaps we catch before they cost you the bid

Missed scope is the most common reason bids fail. We review every set for these gaps and flag them with a recommended action.

  • Fire-rated assemblies are often shown on architectural plans but not detailed in the specs. We cross-check UL designs and firestopping requirements, then add them as line items so you are not carrying an unknown.
  • Seismic and wind bracing for MEP systems is frequently omitted from mechanical and electrical drawings. We look for seismic notes on structural sheets and add bracing, snubbers, and wire as a separate scope.
  • Roof screen walls, equipment curbs, and penetration flashing are typically shown on roof plans but missed in the takeoff. We measure them from the roof plan and add them under Division 07.
  • Temporary power, lighting, and heat are often buried in Division 01. We read the general requirements carefully and include them as separate line items, especially for winter construction.
  • Testing and inspection requirements appear in the specs but not on the drawings. We list special inspections, concrete cylinder tests, weld tests, and duct leakage tests, and price them as a lump sum.
  • Cut and patch for MEP rough-in is usually a Division 09 scope but is sometimes left out. We include patching, firestopping at penetrations, and painting of patched areas.
  • Utility coordination and tap fees are often owner-furnished, but the contractor may still be responsible for coordination. We clarify the responsibility and add an allowance if needed.
  • Landscaping and irrigation are sometimes shown on civil drawings but not included in the bid form. We measure planting beds, sod, and irrigation zones and add them under Division 32 if they are in your scope.
  • Signage and wayfinding are often specified in Division 10 but missed in the takeoff. We count room signs, directional signs, and ADA-compliant signage from the signage schedule and add them as a line item.

Material comparisons that affect bid pricing services

Your bid changes with material selection. The table below shows how we compare common options on an installed cost basis per unit.

Material / SystemUnitInstalled cost driverTakeoff impact
Structural steel vs. cast-in-place concrete frameTON vs. CYSteel: mill price, fabrication, erection, fireproofing. Concrete: formwork, rebar, pumping, finishing.Steel measured by weight from member sizes; concrete by volume from dimensions.
Brick veneer vs. EIFS vs. metal panelSFBrick: masonry labor, ties, flashing. EIFS: substrate, mesh, finish. Metal panel: framing, panel gauge, sealants.Brick requires brick count and mortar; EIFS requires substrate board; metal panel requires panel layout.
TPO vs. EPDM vs. modified bitumen roofingSQ (100 SF)TPO: membrane, heat-welded seams, insulation. EPDM: adhesive, seams, insulation. Mod-bit: torch or cold-applied, multiple plies.TPO/EPDM measured by area with laps; mod-bit measured by area with ply layers.
Copper vs. PEX vs. CPVC domestic water pipingLFCopper: material cost, soldering labor. PEX: material cost, crimp fittings, manifold. CPVC: material cost, solvent welding.Copper measured by diameter and fitting count; PEX by length and manifold locations.
Black steel vs. PVC vs. cast iron sanitary pipingLFBlack steel: threading, hangers, firestop. PVC: solvent weld, expansion joints. Cast iron: heavy, no-hub couplings, firestop.Black steel requires hanger spacing and firestop; PVC requires expansion fittings; cast iron requires coupling count.
Galvanized vs. stainless steel ductworkLBGalvanized: standard SMACNA gauges, slip joints. Stainless: higher material cost, welding, special supports.Galvanized measured by gauge and size; stainless requires weld count and passivation.
Codes and standards

Codes and standards that affect your bid estimate

Model codes

Model codes set minimum requirements that change quantities. The International Building Code (IBC) governs occupancy, fire ratings, and egress, which drive rated wall assemblies, door hardware, and sprinkler coverage. The International Energy Code (IECC) sets insulation R-values and lighting power densities, affecting Division 07 and 26 quantities. The NEC (NFPA 70) dictates conduit fill, wire sizing, and device counts. The IPC or UPC governs plumbing fixture counts and pipe sizing. NFPA 13 determines sprinkler head spacing and pipe sizes. Confirm the adopted editions with your local building department.

Industry standards

Industry standards define how materials are measured and installed. ACI 318 for concrete strength and rebar detailing affects concrete volume and steel weight. ASTM standards for steel (A992), gypsum board (C840), and roofing (D4434) set quality but not quantity. SMACNA duct construction standards determine gauge and reinforcement, which changes duct weight. GA-216 for gypsum board application affects waste and finish level. NRCA roofing manuals specify flashing details that add linear feet. These standards are referenced in specs and must be read to price correctly.

Specification sections

CSI MasterFormat sections contain the scope that drives cost. Division 01 general requirements include temporary facilities, testing, and closeout, which are often overlooked. Division 03 30 00 cast-in-place concrete specifies mix designs, curing, and finish, affecting labor. Division 05 12 00 structural steel includes connection details and shop primer. Division 07 21 00 thermal insulation gives R-values and thickness. Division 09 29 00 gypsum board specifies thickness, type, and finish level. Division 22 11 00 plumbing fixtures lists counts and types. Division 26 05 00 electrical includes conduit and wire specs. Read each section for quantity-affecting clauses.

Local amendments

Local jurisdictions adopt model codes with amendments that change cost. For example, some cities require stricter seismic bracing, higher insulation R-values, or additional firestopping. Coastal areas may have wind-borne debris requirements for glazing. States with prevailing wage laws set minimum labor rates. Some municipalities require fire sprinklers in smaller buildings than the model code. Always verify the adopted code edition and local amendments with the local building department before finalizing your bid, as these can add line items or increase quantities.

Who we provide estimates for

Who uses our bid estimator for contractors

General contractors

You need a complete estimate to submit a competitive bid. We provide the takeoff and pricing so your team can focus on subcontractor coverage and bid strategy.

Subcontractors

You bid one or two divisions and need accurate quantities for your scope. We take off your trade from the drawings and price it with your labor rates or ours.

Owners and developers

You want a third-party estimate to validate a contractor's bid or set a budget before construction. We provide an independent takeoff and pricing basis.

Architects and engineers

You need cost feedback during design to keep the project on budget. We provide estimates at schematic, design development, and construction document stages.

Where we provide estimates

Bid Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Bid Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The takeoff scope and level of detail shift by project type. Here is what we adjust for common bid categories.

Commercial office fit-out

Focus on Division 09 finishes, Division 08 doors, and Division 26 electrical devices; measure partition types and ceiling grid.

Watch for: Watch for tenant coordination, after-hours work, and building standard requirements.

K-12 school

Includes Division 11 equipment, Division 10 specialties, and extensive Division 22/23 systems; measure classroom casework and science lab piping.

Watch for: Watch for summer break schedule, prevailing wage, and owner-furnished equipment.

Healthcare clinic

Detailed takeoff of medical gas (Division 22), isolation panels, and Division 23 air changes; measure lead-lined walls and special finishes.

Watch for: Watch for ICRA requirements, infection control, and OSHPD or state health department amendments.

Warehouse distribution

Emphasis on Division 03 slab, Division 05 steel, and Division 31 earthwork; measure racking foundations and dock equipment.

Watch for: Watch for slab flatness, fire pump, and ESFR sprinkler requirements.

Multifamily residential

Takeoff of Division 06 wood framing, Division 07 roofing, and Division 09 finishes per unit type; count fixtures and appliances per unit.

Watch for: Watch for fire-rated separations, sound ratings, and balcony waterproofing.

Restaurant

Includes Division 11 food service equipment, Division 22 grease interceptor, and Division 23 exhaust hoods; measure kitchen hood duct and make-up air.

Watch for: Watch for health department grease trap sizing, fire suppression, and utility capacity.

Retail shell

Core and shell takeoff: Division 03 slab, Division 05 steel, Division 08 storefront, and Division 26 service; measure white box conditions.

Watch for: Watch for landlord work letter, tenant improvement allowance, and signage.

Industrial plant

Heavy Division 03 foundations, Division 05 structural steel, Division 22/23 process piping; measure equipment pads and pipe racks.

Watch for: Watch for process loads, specialty coatings, and owner specifications.

Deliverables

What you receive

  • A unit-priced bid estimate in Excel, organized by CSI MasterFormat division, with material, labor, and equipment broken out.
  • A PDF version of the estimate with the same line items, suitable for sharing with your team or owner.
  • Marked-up plan sets in Bluebeam Revu showing takeoff dimensions, counts, and references for every line item.
  • A scope narrative listing what is included, what is excluded, and any assumptions or allowances.
  • A bid form summary with alternates, unit prices, and addenda acknowledged.
  • A list of scope gaps and clarifications needed before bid submission.
  • Electronic files delivered via secure link within 24–48 hours of receiving complete documents.
Checklist

Pre-bid checklist for your estimate

  • Confirm bid date, time, and submission method.
  • Verify all addenda are incorporated and acknowledged.
  • Check that drawings and specs are the same edition.
  • Identify your scope: which CSI divisions you are bidding.
  • Note any owner-furnished or contractor-furnished equipment.
  • Review geotechnical report for earthwork and foundation impacts.
  • Check for prevailing wage or union labor requirements.
  • Confirm sales tax rates for material categories.
  • List any allowances or unit prices in the bid form.
  • Identify long-lead items that affect schedule and escalation.
  • Review site logistics: access, laydown, and hoisting.
  • Confirm bonding and insurance requirements.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

FAQ

Bid Estimating questions

How do you handle addenda issued during the bid period?

We log each addendum as it is issued, review the changes, and adjust quantities and pricing accordingly. If an addendum affects a major scope, such as a roof system change, we re-takeoff that portion. We note the addendum number in the estimate and update the bid form summary. We recommend sending us addenda as soon as you receive them so we can incorporate them before the deadline.

Can you price my bid using my own labor rates instead of RSMeans?

Yes. If you provide your labor rates by trade or your historical cost data, we will apply those instead of RSMeans. This is common for subcontractors who have their own crews and want the estimate to reflect their actual costs. We will still use RSMeans for material pricing unless you provide quote data. Just send your rates in a spreadsheet or note them in your scope of work.

What if I only need a takeoff and will do the pricing myself?

We offer stand-alone quantity takeoff services. You receive the same marked-up plans and Excel takeoff with quantities by CSI division, but without unit prices. This is useful if you have your own pricing database or want to plug in subcontractor quotes. Many clients use our takeoff as a check against their own. You can request this through our material takeoff services page.

How do you handle unit-price items and allowances in the bid form?

We list allowances separately and clearly state what they cover. For unit-price items, we provide a unit rate and the estimated quantity so you can adjust if the actual quantity differs. We also note any items that are owner-furnished or contractor-furnished. If the bid form has specific unit-price lines, we match our estimate to that format. This prevents surprises during bid leveling.

Do you provide a bid form summary that I can submit directly?

Yes. We prepare a bid form summary that mirrors the owner's bid form, with totals by division, alternates, and unit prices. We also include a list of clarifications and exclusions to attach to your bid. This summary is in Excel and PDF. You can use it as-is or transfer the numbers to your own form. We recommend reviewing it with your team before submission.

What is your turnaround time for a rush bid?

Standard turnaround is 24–48 hours for most projects. Rush service is available for an additional fee, often within 12–24 hours depending on scope and document completeness. We prioritize rush bids by assigning additional estimators. To meet a rush deadline, send complete documents and a clear scope as early as possible. We will confirm feasibility before starting.

How do you handle sales tax on materials?

We apply sales tax by material category and jurisdiction based on the project ZIP code. Some states exempt certain materials or have different rates for construction. We use the most current rates available and note the tax basis in the estimate. If you are tax-exempt, provide your certificate and we will remove the tax. Always confirm with your accountant, as tax laws change.

Can you help me level subcontractor quotes after I receive them?

Yes, we offer subcontractor bid leveling as a separate service. We compare each quote against our estimate and the scope narrative, identify gaps or overlaps, and prepare a leveling sheet. This helps you select the lowest responsible bid and avoid change orders. It is often used in conjunction with our bid estimating service. Contact us for a quote on leveling.

What if the drawings are incomplete or missing details?

We flag missing information immediately and request clarification. If details are not available, we carry a reasonable allowance and note it in the scope narrative. For example, if footing sizes are not shown, we assume a size based on similar projects and list it as an assumption. You can then confirm with the design team. We never guess silently; all assumptions are documented.

Do you provide estimates for both GCs and subcontractors?

Yes. For GCs, we take off all divisions and price general conditions. For subcontractors, we focus on your trade divisions and can use your labor rates. We also provide independent estimates for owners and architects. The scope and level of detail are adjusted to your role. Tell us which divisions you are bidding and whether you are the prime or a sub.

How do you handle escalation for projects bidding months out?

We apply escalation based on the bid date and current market indices. If your project will be built 6–12 months after the bid, we can include an escalation allowance for materials like steel, lumber, and copper. We track indices such as the Producer Price Index and Random Lengths. The allowance is shown as a separate line item so you can adjust it as market conditions change.

What software do you use for takeoff and pricing?

We use Bluebeam Revu for plan markup and quantity extraction, PlanSwift for detailed takeoff, and RSMeans data for unit pricing. We also use Excel for estimate compilation. This combination allows us to produce accurate, traceable estimates with marked-up plans. If you have a preferred format, we can adapt. All deliverables are in Excel and PDF.

Do you provide quantity takeoff for bids as a standalone service?

Yes. If you only need quantities, we deliver a bid takeoff by CSI division with units, waste factors, and a marked-up plan set, and you price it yourself. We can also hand off an on-screen takeoff file from Bluebeam Revu or PlanSwift, or a quantity schedule keyed to a BIM model. Typical waste-factor ranges are shown per material so your pricing reflects what you actually buy. Many contractors pair this with our material takeoff services when the bid form separates material and labor.

Can you handle trade-specific bid estimating for a single scope?

Yes. Subcontractors send us one division or a few sections — Division 05 metals, Division 09 gypsum board, Division 22 plumbing, Division 26 electrical — and we return quantities and pricing for that scope only. We work from the plans and specifications, note any RFI items, and flag scope that depends on an allowance. The estimate summary lists labor hours by crew size and equipment cost where it applies, so you can compare the result against your own production rates.

What does a bid estimate review include?

A bid estimate review is a second-opinion check on an estimate you already have. We re-measure key quantities, test labor productivity assumptions, verify overhead and profit and contingency, and confirm the pricing basis. You receive a written list of variances, the divisions affected, and the items that need an RFI before submission. It is useful before a hard bid or a negotiated proposal, and it pairs with our estimate review and second-opinion audit service.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to bid with confidence?

Send us your bid documents and we will return a complete, unit-priced estimate in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us