Scope Precision EstimateContact Us

Plumbing Estimating Services

Send your plumbing drawings and specs. Get back a Division 22 takeoff — fixtures, DWV, domestic water, gas, and specialty systems — in Excel and PDF with marked-up plans.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 22 — PlumbingSample format
Line itemQtyUnitQuantity
WC, floor-mount, 1.28 gpf48EA48 EA
Lav, wall-hung, 20×1852EA52 EA
DWV, PVC Sch 40, 3 in1,850LF1,850 LF
Dom water, Type L, 1 in1,240LF1,240 LF
Water heater, gas, 100 gal3EA3 EA
Total items3,193 EA/LF
Illustrative quantities. Waste factor applied as a separate line.
Fixture rough-in counts verified

What is plumbing estimating?

Plumbing estimating is the quantity takeoff and pricing of Division 22 scope: fixtures by rough-in type, DWV and domestic water piping by material and size, water heaters, gas piping, and underground rough-in. Deliverables are Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing each fixture or pipe run.

  • Units: EA for fixtures and valves, LF for pipe by material and size.
  • Typical waste factor for DWV and water piping runs 5–10%, but confirm with your spec.
  • The most costly miss is vent piping and roof penetrations omitted from the DWV takeoff.

A plumbing estimate fails at bid time for one of two reasons: the fixture count is wrong, or the pipe runs are measured off the wrong sheet. We take off Division 22 from the plumbing plans, riser diagrams, and specs — fixture counts by rough-in type, DWV by material and size, domestic water by material and size, plus the gas, vent, and specialty systems that ride with the plumbing contract. Our plumbing takeoff services follow CSI MasterFormat sections 22 00 00 plumbing, 22 10 00 plumbing piping, 22 30 00 plumbing equipment, and 22 40 00 plumbing fixtures so nothing in the plumbing scope is left uncounted. If your scope crosses into hydronics or process piping, our Piping Estimating Services page covers that package. For the full MEP set, start at MEP Estimating Services.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We work in Bluebeam Revu and PlanSwift with RSMeans data, priced to your ZIP code. Deliverables are Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly which fixture or pipe run each line came from. Most projects turn in 24–48 hours; rush is available when your bid date moves. Every takeoff includes a bill of materials, pipe sizing checks against the fixture schedule, and a submittal-ready line list you can hand to your purchasing desk. Our plumbing bid preparation covers pipe takeoff, fitting takeoff, valve takeoff, fixture takeoff, hanger and support takeoff, and insulation takeoff, with labor and material pricing built into each line.

You need this when a plumbing scope lands on your desk with a due date and no in-house estimator has capacity, when you are the GC and need a check number against a subcontractor's quote, or when you are an owner or developer testing a budget before design is complete. We do not guess at jurisdiction-specific code requirements — we flag them for your local building department to confirm. For sanitary drainage and vent systems, we check slope and DFU counts against the fixture schedule before the numbers leave our desk.

If your package also includes ductwork, hydronic equipment, or power and lighting, our Mechanical Estimating Services, HVAC Estimating Services, and Electrical Estimating Services pages cover those scopes. Regional work is handled the same way, with ZIP-code-adjusted pricing and the same marked-up plan sets; see our Texas estimating and California estimating pages for how we approach those markets. To start a takeoff, send the plans and specs through Get an estimate.

Services

What the Division 22 plumbing takeoff covers

The takeoff follows CSI MasterFormat Division 22 sections from 22 05 00 through 22 45 00, plus the Division 21, 23, and 31/33 interface items that touch the plumbing contract. Every line carries a spec section, a unit, and a sheet reference. Where the drawings show a fixture but the schedule omits the carrier, we note it rather than assume.

Fixture Takeoff

Count and price water closets, urinals, lavatories, sinks, drinking fountains, showers, and tubs by rough-in type and trim.

EA

DWV Piping

Measure drain, waste, and vent pipe runs by material (PVC, ABS, cast iron, copper) and size from 1-1/2 in through 4 in and larger.

LF

Domestic Water

Take off water mains, risers, branches, and stops by material and size, including fittings, valves, and pressure-reducing valves.

LF · EA

Water Heaters

Price gas, electric, and indirect water heaters with venting, expansion tanks, pans, and recirculation pumps.

EA

Gas Piping

Measure gas piping from meter to appliances with regulators, sediment traps, and shutoffs, sized per code.

LF · EA

Underground Rough-In

Quantify excavation, bedding, backfill, sleeves, and thrust blocks for below-slab and exterior plumbing runs.

CY · LF · EA

Specialty Systems

Take off backflow preventers, grease interceptors, sump pumps, and specialty valves with testable assemblies.

EA

Hangers & Supports

Count hangers, supports, and seismic restraints by pipe size and spacing per code and spec.

EA

What every plumbing estimating takeoff includes

  • Water closets, urinals, lavatories, sinks, and drinking fountains by type and rough-in
  • Showers, tubs, and tub/shower combinations with mixing valves and drain assemblies
  • Floor drains, floor sinks, and trench drains with trap primers and sediment buckets
  • DWV pipe runs by material and size, 1-1/2 in through 4 in and larger
  • Vent piping, vent stacks through roof, and air admittance valves where allowed
  • Domestic water piping by material and size, including mains, risers, branches, and stops
  • Water heaters — gas, electric, or indirect — with venting, expansion tanks, and pans
  • Recirculation pumps, booster pumps, and pressure-reducing valves
  • Backflow preventers (RPZ, DCVA) and testable valve assemblies
  • Gas piping from meter to appliances with regulators, sediment traps, and shutoffs
  • Underground rough-in: excavation, bedding, backfill, sleeves, and thrust blocks
  • Hangers, supports, and seismic restraints by pipe size and spacing
How we work

How we prepare a plumbing estimate for contractors

  1. Fixture count and cross-checkWe count every fixture from the floor plans and cross-check against the fixture schedule and riser diagram. Wall-hung versus floor-mounted, top spud versus flush valve, and carrier type are recorded per fixture, because each changes the rough-in labor and the carrier line. Any fixture on plan but missing from the schedule is flagged before pricing.
  2. DWV routing and sizingWe trace the building drain, building sewer, and horizontal branches on the underground and floor plans, then the vertical stacks on the riser. Pipe is measured by material and size — cast iron no-hub, PVC, or ABS — with fittings, vent stacks, and roof penetrations taken as separate lines. DFU totals are summed to verify the building drain size shown.
  3. Domestic water and gasDomestic water is measured from the entry point through mains, risers, and branches to fixture stops by material and size — Type L copper, PEX, or CPVC. Gas piping is traced from the meter to each appliance, with regulators, sediment traps, and shutoffs counted. WSFU totals are summed to check the water main and riser sizes against the schedule.
  4. Underground and specialty systemsUnderground rough-in is measured from the civil and plumbing plans: trench length, width, and depth for excavation, bedding, and backfill, plus sleeves and thrust blocks. Specialty items — grease interceptors, acid neutralization, lab waste, and storm drainage leaders — are taken off from the schedules and details, with the Division 03 and 31/33 interface lines called out.
  5. Pricing and assemblyQuantities are priced with RSMeans data adjusted to your ZIP code, with material and labor split. Pipe is priced per LF by material and size with a fitting allowance; fixtures are priced per EA with carrier and trim. Insulation, hangers, and seismic restraints are priced by size and spacing. A waste factor is applied as a visible separate line, not buried in the unit price.
  6. QA and deliveryA second estimator reviews the takeoff against the marked-up plans: fixture counts re-added, pipe runs re-measured on a sample of sheets, and DFU/WSFU totals re-checked. Deliverables are Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets showing each fixture and pipe run. Most projects turn in 24–48 hours.

What we need from you

  • Plumbing plansFloor plans, underground plans, and roof plans showing fixture locations and pipe routing.
  • Riser diagramsSanitary, vent, and domestic water risers with pipe sizes and stack locations.
  • Fixture scheduleFixture types, rough-in configurations, carrier requirements, and trim options.
  • SpecificationsDivision 22 spec sections, including pipe materials, insulation thickness, and hanger requirements.
  • Equipment schedulesWater heaters, pumps, backflow preventers, and specialty equipment with capacities and connection sizes.
  • Bid date and formatYour due date for turnaround, and whether you need a labor breakdown or a material-only number.
  • ZIP codeThe project ZIP code, so material and labor pricing is adjusted to the local market.
Sample output

Sample plumbing material takeoff format

A partial Division 22 takeoff from a mid-size commercial project. Each line carries a CSI section, a quantity, a unit, and the sheet it was measured from.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
22 42 00Water closet, floor-mount, 1.28 gpf, flush valve48EAP-101
22 42 00Lavatory, wall-hung, 20 × 18 in, with carrier52EAP-101
22 13 16Sanitary waste, PVC Schedule 40, 3 in1,850LFP-201
22 11 16Domestic water, Type L copper, 1 in1,240LFP-301
22 33 00Water heater, gas, 100 gal, with expansion tank3EAP-401
22 13 19Floor drain, 4 in, with trap primer18EAP-101
22 07 00Pipe insulation, 1 in thick, on domestic hot water980LFP-301
22 11 19Hanger, clevis, for 3 in pipe120EAP-201
22 05 00Backflow preventer, RPZ, 2 in2EAP-301
22 13 16Vent through roof, 3 in, with flashing6EAP-201
22 11 16Hose bibb, 3/4 in, with vacuum breaker14EAP-101

Units of measure in the plumbing quantity takeoff

Every line is measured in the unit the trade buys and installs in. DFU and WSFU are used to cross-check fixture counts against the riser diagram, not as a substitute for counting.

ItemUnitHow it's measured
Fixtures, valves, water heaters, pumpsEACounted by type and rough-in configuration from the fixture schedule and floor plans
DWV pipe by material and sizeLFMeasured along the run centerline on plan and riser, including fittings as a separate allowance
Domestic water pipe by material and sizeLFMeasured from the entry point through mains, risers, and branches to fixture stops
Pipe insulation by size and thicknessLFMeasured on the same runs as the pipe, split by hot and cold and by thickness
Drainage fixture unitsDFUSummed from the fixture schedule to verify the building drain and sewer sizing
Water supply fixture unitsWSFUSummed from the fixture schedule to verify the domestic water main and riser sizing
Pumps and recirculationGPMRead from the equipment schedule, with head and control type noted
Water heater capacityGALRead from the equipment schedule, with recovery rate and fuel type
Underground excavation and beddingCYComputed from trench length, width, and depth shown on the underground plans
Hangers and supportsLBComputed from pipe size, spacing, and the hanger schedule or code table

Worked example: plumbing cost estimate for a restroom group

This example walks through a takeoff for a single commercial restroom group with two water closets, two lavatories, one floor drain, and the associated DWV and domestic water piping. All dimensions are illustrative and do not represent a specific project. The goal is to show how a plumbing estimator moves from plan dimensions to priced quantities.

Step 1: Count fixtures from the plan and schedule.

  • Water closets: 2 EA, floor-mounted, flush valve, 1.28 gpf.
  • Lavatories: 2 EA, wall-hung, 20 × 18 in, with carrier.
  • Floor drain: 1 EA, 4 in, with trap primer. Cross-check against the fixture schedule: all fixtures match; no missing carriers.

Step 2: Measure DWV piping. From the plan, the horizontal branch from the water closets to the stack is 12 ft of 3 in PVC. The lavatory branch is 8 ft of 1-1/2 in PVC. The floor drain branch is 6 ft of 2 in PVC. The vent stack through the roof is 10 ft of 3 in PVC. Total DWV by size:

  • 1-1/2 in: 8 LF
  • 2 in: 6 LF
  • 3 in: 12 + 10 = 22 LF Add a 10% waste factor as a separate line: 1-1/2 in: 0.8 LF; 2 in: 0.6 LF; 3 in: 2.2 LF.

Step 3: Measure domestic water piping. From the riser diagram, the hot and cold branches to the lavatories are 15 ft each of 1/2 in Type L copper. The cold branch to the water closets is 12 ft of 1/2 in copper. Total: 1/2 in: 15 + 15 + 12 = 42 LF. Add 10% waste: 4.2 LF.

Step 4: Count fittings and specialties.

  • Water closet flush valves: 2 EA.
  • Lavatory faucets: 2 EA.
  • Trap primers: 1 EA.
  • Floor drain trap: 1 EA.
  • Pipe insulation on hot water: 15 LF of 1/2 in, 1 in thick.
  • Hangers: 3 in pipe at 10 ft spacing: 22 LF / 10 = 3 hangers; 1-1/2 in and 2 in at 6 ft spacing: 14 LF / 6 = 3 hangers. Total 6 hangers.

Step 5: Apply pricing. Using RSMeans data adjusted to the project ZIP code, the estimator prices each line with material and labor split. The waste factor is shown as a separate line, not buried in the unit price. The final takeoff is organized by CSI MasterFormat section (22 13 16 for DWV, 22 11 16 for domestic water, 22 42 00 for fixtures).

This example shows the level of detail in our takeoffs. For your project, send us the plans and we will apply the same process to your actual dimensions and specifications.

Cost drivers

What drives the mechanical plumbing estimating number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Pipe material

Cast iron no-hub costs more per LF than PVC or ABS for DWV, and Type L copper costs more than PEX or CPVC for domestic water. The spec section decides which system you price, and the material choice changes both the unit cost and the labor rate per LF.

Pipe material

Cast iron no-hub costs more per LF than PVC or ABS for DWV, and Type L copper costs more than PEX or CPVC for domestic water. The spec section decides which system you price, and the material choice changes both the unit cost and the labor rate per LF.

Fixture count and type

Wall-hung fixtures need carriers and blocking; floor-mounted fixtures need floor flanges and closet bolts. Top-spud versus flush-valve rough-in changes the water connection. A fixture schedule with mixed types takes longer to take off and prices higher per unit than a uniform count.

Building height and risers

Tall buildings add riser offsets, expansion compensation on long hot water runs, and pressure-reducing valves at lower floors. Each riser offset adds fittings and labor. A 10-story stack costs more per LF than the same pipe laid horizontally on one floor.

Underground scope

Trench excavation, bedding, and backfill for underground plumbing can be a significant share of the plumbing number, and it is often assumed to be in the site or concrete package. The depth and soil conditions shown on the civil plans drive the CY of excavation and the bedding material.

Specialty systems

Grease interceptors, acid neutralization, lab waste, and medical gas add equipment, venting, and testing requirements. Each specialty system carries its own spec section and inspection hold point, which adds labor for testing and documentation beyond the pipe and fixtures.

Code and inspection

Adopted code editions vary by jurisdiction — IBC, IPC or UPC, and local amendments — and they change venting methods, trap primer requirements, and seismic restraint spacing. Confirm the adopted edition with the local building department; we flag the items that depend on it.

Labor market and ZIP code

Plumbing labor rates vary by market; we adjust material and labor to the project ZIP code using RSMeans data. A union market with high prevailing wage will price differently than a right-to-work market for the same pipe and fixtures. The ZIP code you provide sets the labor base.

Access and ceiling height

Rough-in above hard ceilings, in occupied spaces, or in tight chases adds labor for layout, coordination, and inspection access. High ceilings require lifts and additional hanger labor. These conditions are noted from the architectural plans and priced as labor adjustments.

Scope gaps

Common scope gaps we catch in plumbing bid preparation

These are the lines that most often go missing between the plumbing drawings and the bid form. We flag each one on the marked-up plans so you can decide whether to carry it.

  • Trench excavation, bedding, and backfill for underground plumbing — often assumed to be in the site or concrete package. We measure it from the civil and plumbing plans and call it out as a separate line.
  • Fire-rated and smoke-rated penetration seals for DWV and vent stacks through rated assemblies. They hide in the architectural wall types and the firestop spec section, not on the plumbing sheets. We flag each rated penetration.
  • Seismic restraints and hanger spacing beyond standard clevis supports on large-diameter DWV. The requirement sits in the structural or code notes, and the hanger schedule may not show it. We price it by pipe size and spacing.
  • Roof drain and overflow scupper tie-ins, including flashing coordination with the roofing scope. They appear on the roof plan and the roofing details. We note the Division 07 interface so it is not double-counted.
  • Expansion compensation on long hot water runs and riser offsets in tall buildings. The riser diagram shows the offsets but not the expansion loops. We add them where the run length exceeds the code threshold.
  • Trap primers and their water supply piping — frequently left off floor drain counts. The floor drain schedule may list the drain without the primer. We count both and price the supply piping to each primer.
  • Gas piping capacity checks, regulator sizing, and appliance connection details. The gas riser may show pipe sizes without the regulator schedule. We check the connected load against the pipe size and flag undersized runs.
  • Insulation on concealed cold water lines where condensation control is specified. The insulation spec may require it on cold lines in humid spaces, but the plumbing plans do not show it. We apply it by pipe size and thickness.
  • Backflow preventer and RPZ assemblies with their drain and freeze protection. The assembly is on the domestic water riser, but the drain and freeze protection are in the details. We include both in the assembly line.
  • Testing, chlorination, and disinfection of domestic water systems before turnover. This is a spec requirement in Division 22 05 00, not a plan item. We add it as a separate line with the labor hours.
  • Sleeves, firestop, and coordination with structural and mechanical penetrations. They are shown on the structural and mechanical sheets, not the plumbing sheets. We cross-reference the penetration schedules and count them.
  • Final fixture trim, carriers, and wall-blocking coordination with drywall and tile. The trim is in the fixture schedule; the blocking is in the architectural details. We flag the blocking so it is not missed in the carpentry scope.

Pipe material systems: DWV and domestic water

The choice of pipe material for DWV and domestic water drives both material cost and labor rate. Here is how the common systems compare on the takeoff.

SystemTypical applicationsUnit cost per LF (material + labor)Takeoff notes
Cast iron no-hub (DWV)Commercial, high-rise, areas requiring sound attenuationHigher than PVC/ABSHeavier, requires more hangers; coupling count is higher.
PVC Schedule 40 (DWV)Residential, light commercial, above-ground drainageLower than cast ironSolvent-weld joints; check local code for above-ground use.
ABS (DWV)Residential, where permitted by codeSimilar to PVCCheck local code acceptance; not allowed in some jurisdictions.
Type L copper (domestic water)Commercial, high-pressure, hot water recirculationHighest among common materialsRequires soldering or press fittings; more labor-intensive.
PEX (domestic water)Residential, light commercial, retrofitLower than copperRequires manifolds and crimp rings; check local code for potable water use.
CPVC (domestic water)Commercial, hot water distributionBetween copper and PEXSolvent-weld joints; may require special support spacing.
Codes and standards

Codes, standards, and spec sections that affect plumbing quantities

Plumbing takeoffs are shaped by the adopted model codes and the project specifications. The International Plumbing Code (IPC) and the Uniform Plumbing Code (UPC) are the two main model codes in the U.S., and local jurisdictions adopt one with amendments. The edition in force varies by state and city, so confirm the adopted edition with the local building department before finalizing quantities. Key code-driven items include venting methods (air admittance valves are allowed under some editions but not others), trap primer requirements for floor drains, and seismic restraint spacing for pipe supports in seismic zones. The International Building Code (IBC) and International Residential Code (IRC) also contain plumbing provisions that may supersede the plumbing code for certain occupancies. For domestic water, the Safe Drinking Water Act and local lead-free requirements affect fixture and pipe material selection. The International Energy Conservation Code (IECC) may require insulation on domestic hot water piping and sometimes on cold water lines in certain conditions. On the specification side, CSI MasterFormat Division 22 sections define the scope. Section 22 05 00 (Common Work Results for Plumbing) sets general requirements like testing, chlorination, and disinfection. Section 22 07 00 (Plumbing Insulation) specifies thickness and locations. Section 22 11 00 (Facility Water Distribution) covers domestic water piping, and 22 13 00 (Facility Sanitary Sewerage) covers DWV. Section 22 30 00 covers water heaters, and 22 40 00 covers fixtures. Section 22 45 00 covers emergency fixtures like eyewash and shower units. Where a standpipe or sprinkler system ties into the domestic main, Division 21 (Fire Protection) may apply. Water heating specified under HVAC falls under Division 23. Site utilities outside 5 ft of the building are Division 33. We flag code-dependent items in the takeoff and note where the local building department must confirm the adopted edition.

Who we provide estimates for

Who uses outsourced plumbing estimating

General contractors

You need a check number against the plumbing subcontractor's quote before you carry it into the bid. The takeoff gives you fixture counts and pipe quantities to compare line by line, so you can see whether the sub missed the underground or the trap primers.

Plumbing subcontractors

You have more bid invitations than estimating capacity. Sending us the plans lets you keep your estimators on the jobs you are already running, and the marked-up plans show exactly where each quantity came from if the GC asks.

Developers and owners

You are testing a budget before design is complete or comparing two contractors' numbers. The takeoff gives you a quantity-based estimate you can carry forward as the design develops, with the assumptions listed so you know what changed.

Architects and engineers

You need a cost check on a plumbing design before it goes out for bid. The takeoff shows which spec sections drive the number, so you can adjust the fixture schedule or pipe material before the documents are final.

Where we provide estimates

Plumbing Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Plumbing Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Plumbing takeoffs by project type

The plumbing takeoff changes with building type, code requirements, and system complexity. Here is what we adjust for common project types.

Multifamily residential

Fixture counts per unit type, stacked risers, and branch piping repeated per floor. Domestic water sizing based on WSFU per unit.

Watch for: Watch for unit mix changes and shared riser offsets that affect expansion compensation.

Commercial office

Core restrooms, break rooms, and janitor closets. Domestic water and DWV sized for peak occupancy. Often includes grease interceptors for break room sinks.

Watch for: Confirm fixture counts against occupancy load and check for ADA clearances that change rough-in.

Healthcare or lab

Medical gas, acid neutralization, lab waste, and specialty fixtures. Extensive venting and cleanout requirements. More insulation and testing.

Watch for: Medical gas requires certification and separate spec sections; confirm scope with Division 22 45 00.

Restaurant or food service

Grease interceptor, floor sinks, and heavy-duty DWV. Gas piping to kitchen equipment. Often high hot water demand.

Watch for: Grease interceptor sizing depends on fixture count and local pretreatment requirements; confirm with the local health department.

Industrial or warehouse

Large-diameter DWV, floor drains, and process water. Often includes backflow preventers and fire protection interface.

Watch for: Process water quality and pressure requirements may demand special materials; check with the process engineer.

K-12 school

Group restrooms with high fixture counts, drinking fountains, and janitor closets. Domestic water sizing for peak class change periods.

Watch for: Lead-free requirements for drinking water fixtures; confirm with the local school district and code.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat Division 22 section, with quantities, units, and unit costs split into material and labor.
  • PDF takeoff report with the same line items, formatted for printing and for attaching to a bid package.
  • Marked-up plan sets showing each fixture count and pipe run measured, with sheet references matching the takeoff lines.
  • DFU and WSFU summaries cross-checked against the riser diagram, with any sizing discrepancies flagged.
  • A scope-gap list calling out items that sit on other divisions, such as Division 03 pads, Division 07 flashing, and Division 21 sprinkler interface.
  • ZIP-code-adjusted pricing using RSMeans data, with the waste factor shown as a separate line rather than buried in the unit price.
  • Turnaround in 24–48 hours for most projects, with rush available when your bid date moves.
Checklist

Pre-bid plumbing takeoff checklist

  • Verify fixture count against floor plans and fixture schedule.
  • Confirm pipe materials and sizes from the specifications.
  • Measure DWV runs from underground and floor plans.
  • Measure domestic water runs from riser diagrams.
  • Count valves, backflow preventers, and specialty assemblies.
  • Check for trap primers on all floor drains and floor sinks.
  • Confirm hanger and seismic restraint requirements.
  • Review insulation thickness and locations from spec.
  • Identify underground excavation and bedding scope.
  • Check gas piping from meter to appliances.
  • Note any fire-rated penetration seals required.
  • Confirm testing, chlorination, and disinfection requirements.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

FAQ

Plumbing Estimating questions

Can you take off a plumbing scope from a PDF set with no CAD files?

Yes. We work from PDF drawings, scanned plans, and even marked-up sketches. We use Bluebeam Revu to measure and mark up the plans, and PlanSwift for quantity takeoff. If you have CAD files, we can use them, but they are not required. The key is that the drawings are legible and show the plumbing layout, riser diagrams, and schedules. If a sheet is missing, we will flag it and tell you what we need to complete the takeoff.

How do you handle fixture counts when the schedule and floor plans disagree?

We count from the floor plans first, then cross-check against the fixture schedule. If there is a discrepancy, we flag it on the marked-up plans and in a separate note. We do not assume one is correct; instead, we show both counts and let you decide which to carry. In many cases, the schedule is a typo or the plans show a future phase. We will also check the riser diagram to see which count the engineer used for sizing.

Do you include the underground plumbing excavation and backfill?

Yes, we measure trench excavation, bedding, and backfill for underground plumbing from the civil and plumbing plans. This scope often falls between the plumbing and site packages, so we call it out as a separate line. We compute cubic yards from trench length, width, and depth, and we note the bedding material specified. If the civil plans do not show the trench, we will note that and ask for the underground plumbing plan.

What is the difference between DFU and WSFU, and do you use them?

DFU (drainage fixture units) and WSFU (water supply fixture units) are code-defined values assigned to each fixture type. They are used to size the building drain, sewer, and domestic water main. We sum DFU and WSFU from the fixture schedule and cross-check them against the pipe sizes shown on the riser diagram. If the totals exceed the capacity of the shown pipe size, we flag it as a potential design issue. We do not use them as a substitute for counting fixtures.

Can you price the plumbing takeoff with union labor rates?

Yes. Our pricing uses RSMeans data adjusted to the project ZIP code. RSMeans data includes both union and open-shop labor rates, and we can adjust to the prevailing wage or union rate for your market. If you have a specific labor rate you want us to use, provide it and we will apply it. We also split material and labor on every line so you can see the labor component separately.

How do you handle gas piping in the takeoff?

We trace gas piping from the meter to each appliance, measuring length by material and size. We count regulators, sediment traps, and shutoffs. We also check the connected load against the pipe size using the gas code tables and flag any runs that appear undersized. Gas piping is often specified in Division 22 or Division 23, depending on the project. We will follow the spec section and note the interface with the mechanical contractor.

What is your turnaround time for a plumbing takeoff?

Most plumbing takeoffs turn in 24 to 48 hours. Larger or more complex projects may take longer, and we will give you a firm delivery time when we review the scope. Rush service is available when your bid date moves up. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets. If you need a partial takeoff for a specific area, we can prioritize that.

Do you take off plumbing insulation?

Yes. We measure pipe insulation by size and thickness on the same runs as the pipe, split by hot and cold. We follow the insulation spec section (22 07 00) for thickness and locations. If the spec requires insulation on concealed cold water lines for condensation control, we include it. We also count insulation on fittings and valves if specified. Insulation is priced per LF by size and thickness.

Can you provide a labor breakdown by task?

Yes. If you request a labor breakdown, we provide labor hours by task, such as fixture setting, pipe installation, and testing. We use standard labor units from RSMeans and adjust for project conditions. The breakdown is delivered in Excel so you can sort and filter. This is useful for scheduling and for comparing against your own crew's productivity. We can also provide a material-only number if you prefer.

How do you handle medical gas or lab waste systems?

Medical gas and lab waste are specialty systems with their own code requirements (NFPA 99 for medical gas) and spec sections. We take them off separately and flag the certification and testing requirements. Medical gas piping must be installed by certified installers, and the takeoff includes the specific materials and fittings required. Lab waste may require acid neutralization and special pipe materials. We will note the scope and ask for the specialty specs if they are not in the set.

What if I only have architectural plans and no plumbing drawings?

We can still provide a preliminary takeoff based on fixture counts from the architectural plans, but we cannot measure pipe runs without plumbing drawings. We will clearly state the assumptions and limitations. In many cases, we can infer fixture locations and estimate pipe runs from the architectural layout, but this is less accurate. We recommend waiting for the plumbing drawings for a bid-level takeoff. If you need a budget number, we can provide a range based on typical installations.

Do you check for code compliance in the takeoff?

We do not perform a code compliance review, but we flag items that appear to conflict with common code requirements, such as missing trap primers or undersized vent pipes. We base our flags on the model codes (IPC, UPC) and note that the local adopted edition may differ. You should confirm all code items with the local building department and the engineer of record. Our takeoff is a quantity and cost document, not a code review.

What does a plumbing material takeoff include?

A plumbing material takeoff lists pipe by material and size in linear feet, fittings by type and diameter, valves, hangers and supports, insulation, and fixtures by rough-in type. We organize it by CSI MasterFormat sections 22 10 00, 22 30 00, and 22 40 00 so your purchasing desk can issue a bill of materials directly. Pipe sizing is checked against the fixture schedule, and any addendum or request for information that changes quantities is flagged on the marked-up set.

Can you provide a plumbing cost estimate for subcontractors?

Yes. Plumbing estimating for subcontractors is most of what we do. We price labor and material separately using ZIP-code-adjusted RSMeans data, so you can see the labor hours by task and the material dollars by system. The deliverable is Excel and PDF with a marked-up plan set, which makes it easy to compare against your own historical unit costs or a GC's budget number before you commit to a bid.

How does a plumbing estimating company handle outsourced plumbing estimating?

We work from your PDF or CAD set, plumbing plans, riser diagrams, and specs. You send the bid documents and your bid date; we return a plumbing quantity takeoff and cost estimate in 24–48 hours, organized by CSI MasterFormat division. Outsourced plumbing estimating works best when you send the full set at once, including any addendum, so we can catch scope changes before the bid instead of after.

Can you provide plumbing estimating services for a single restroom remodel?

Yes. Small scopes are taken off the same way as a full building: fixture count by rough-in type, DWV and domestic water measured by material and size, plus vent, gas, and specialty items that ride with the plumbing contract. We return an Excel and PDF bill of materials organized by CSI MasterFormat Division 22, with marked-up plan sets showing each fixture and pipe run. Turnaround is 24–48 hours for most projects, with rush available when your bid date moves.

How do you handle plumbing takeoff for a design-build or design-assist delivery?

On design-build work the drawings are often incomplete, so we take off what is shown and list the assumptions in a separate column: pipe sizes assumed where the riser diagram is silent, fixture counts taken from the schedule where the floor plan disagrees, and any system left as an allowance. You get a bill of materials you can carry into a GMP or budget number, plus a written list of items to confirm once the design firms up. We do not guess at jurisdiction-specific code requirements; we flag them for your local building department.

Do you offer plumbing estimating for general contractors checking a subcontractor quote?

Yes. GCs use our takeoff as a check number against a plumbing subcontractor's bid. We measure the same scope from the same set — fixture counts, DWV and domestic water by material and size, gas piping, and specialty systems — and return a line list you can compare against the quote line by line. Differences usually show up as missed fixture types, pipe material substitutions, or excluded underground and excavation. We price with RSMeans data adjusted to your ZIP code and deliver Excel and PDF in 24–48 hours for most projects.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to price your plumbing scope?

Send your plans and specs for a Division 22 takeoff in Excel and PDF, delivered in 24–48 hours with ZIP-adjusted pricing.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us