Sitework and utilities
Mass rock, cut and fill, detention, and Metro stormwater scope taken off from the civil set.
CY · LF · TONYou have plans in front of you and a bid date on the calendar. We produce CSI-organized quantity takeoffs and estimates for Nashville projects in 24–48 hours, priced with ZIP-code-adjusted material and labor rates.
Nashville pricing turns on Davidson County rock excavation and undercut, steep infill lots in 12South and East Nashville, stormwater and detention scope tied to Metro review, a 52% multifamily share of permitted units, and healthcare and hospitality interiors with heavy MEP and finish schedules.
Nashville is the busiest residential permit market in Tennessee. In 2025 the city issued 5,555 new privately-owned residential units, down 18% from 6,799 in 2024, with 2,683 single-family and 2,872 multifamily units and a permitted value of $1.2B. That mix matters to your bid: a 2,872-unit multifamily pipeline means podiums, post-tension decks, and unit-turn finish schedules, while the single-family half spreads across infill lots and subdivision phases in Davidson and surrounding counties.
We build takeoffs from the same documents you bid from — architectural, structural, civil, and MEP sets — measured in Bluebeam Revu and PlanSwift and priced with RSMeans data adjusted to the project ZIP code. Deliverables come back in Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity. If you are pricing a mixed-use podium or a hillside custom home, start with our Tennessee construction estimating services and send the set through the estimate request form.
For bidders. You need quantities you can defend in a bid review. We return line items by division with waste factors, unit costs, and marked-up drawings so you can check scope coverage before you sign a proposal.
For builders. You need buyout and change-order support after award. We re-measure revised sets, price addenda, and keep a division-sorted baseline you can update as RFIs and ASIs land.
For owners. You need a budget before design is complete. We estimate from concept and schematic sets, flag the assumptions, and separate hard cost from owner soft cost so the pro forma holds.
Select a bar to compare Nashville with the largest Tennessee markets we cover.
5,555 new housing units in 2025 (-18.3% vs 2024).
2,683 single-family · 2,872 multifamily (52%).
At 5,555 permitted units, Nashville is the top city in our Tennessee coverage by units and accounts for 28.4% of the 19,558 units permitted statewide — first of 24 cities. The 18% drop from 2024 does not mean less estimating; it means more competition per job. Multifamily is 52% of permitted units, so expect podium and wrap construction, type III and V over concrete, and unit interiors repeated floor to floor. Average permitted value is $220,400 per unit, which tells you buyers are pricing finish packages and MEP above the state norm. If you also bid outside Davidson County, our Memphis and Knoxville pages cover those markets separately.
Two Nashville sites with identical buildings can differ by six figures before the foundation is poured. Davidson County sits on limestone and shale that often requires hoe-ram or blasting, and mass rock excavation is priced by the cubic yard, not the square foot. Steep infill lots in 12South, East Nashville, and along the Cumberland plateau edges need retaining walls, shoring, and sometimes drilled piers. Metro Nashville stormwater requirements can add detention, water-quality units, and underdrain scope that never appears on the architectural set. We take off cut and fill, rock quantities, wall footings, and utility runs from the civil drawings, and we flag when the geotechnical report is missing so you can carry a stated allowance instead of a guess. Our sitework estimating services and foundation estimating services cover that scope.
We measure and price the scopes that decide Nashville bids, from rock excavation to unit-turn finishes.
Mass rock, cut and fill, detention, and Metro stormwater scope taken off from the civil set.
CY · LF · TONPodium decks, post-tension slabs, drilled piers, and retaining walls priced by volume and formwork area.
CY · SF · TONWood and light-gauge framing for infill homes and multifamily, counted by member and sheet.
LF · EA · SFHealthcare, hospitality, and multifamily mechanical, electrical, and plumbing scope by fixture and run.
LF · EA · TONTPO, modified bitumen, and steep-slope shingle systems with insulation and flashing quantities.
SQ · LF · SFUnit-turn schedules, common area finishes, and amenity scope repeated across floors and buildings.
EA · SF · LSTenant fit-out, demising walls, and MEP tie-ins for office and retail spaces in Davidson County.
SF · LF · EACustom and production homes priced with ZIP-code-adjusted labor and material rates.
SF · EA · LSYou bid podium multifamily, healthcare tenant build-outs, and school work across Davidson and Williamson counties. We return division-sorted quantities and marked-up sheets you can defend line by line in a bid review.
You need one trade measured cleanly — concrete, framing, roofing, MEP — from a set that may be 60% complete. We scope only your divisions and show the sheet and detail each quantity came from.
You are underwriting land in Davidson, Rutherford, or Wilson County before design is finished. We estimate from concept and schematic sets and separate hard cost from soft cost so the pro forma holds.
You need a cost check while the set is still moving. We price the current issue, flag the assemblies that drive cost, and re-measure when the next revision lands.
You are budgeting a renovation, an addition, or a roof replacement on an occupied building. We measure existing conditions from your drawings and photos and price the work by division.
You manage scattered residential and commercial assets around Nashville and need repair and turnover scopes quantified consistently. We produce repeatable formats so bids from different contractors compare.
We take off projects across Davidson County and the surrounding counties where most of the region's permit activity sits. Send the set and the project address, and we price materials and labor to that ZIP code.
The 2025 permit mix was 2,683 single-family and 2,872 multifamily units, so our work here splits between production housing and vertical multifamily. We measure both from the same kind of documents you bid from.
Four to six wood-framed levels over a concrete podium, with post-tension decks and a unit-turn finish schedule. We measure by building type and unit plan so you can compare cost per unit across the mix.
Watch for: Podium transfer beams, deck reinforcing, unit-turn quantities
Tear-downs and narrow-lot builds in East Nashville, 12South, and similar close-in neighborhoods. Tight sites, alley access, and existing utility conflicts change the sitework and concrete quantities.
Watch for: Demolition, haul-off, tight-access concrete placement
Production housing in Davidson, Rutherford, and Wilson County, priced by phase and by plan. We carry lot-specific quantities for grading, utilities, and flatwork rather than averaging across the plat.
Watch for: Lot grading balance, utility runs, plan repeats
Tenant improvements in the healthcare and corporate corridors, including exam rooms, imaging suites, and open office. We measure partitions, ceilings, and MEP rough-in by room and by system.
Watch for: Lead-lined walls, med gas, above-ceiling coordination
Hotels, restaurants, and music-venue build-outs where finish schedules and MEP density drive cost. Kitchen equipment, grease duct, and hood suppression are scoped separately from base building work.
Watch for: Kitchen exhaust, grease duct, finish schedule density
Distribution and light-manufacturing buildings on the I-24 and I-40 corridors. We take off slab-on-grade, tilt or metal panel, and racking-ready electrical from the civil and structural sets.
Watch for: Slab flatness, dock equipment, service capacity
Nashville sits on a mix of limestone, shale, and clay that behaves differently lot to lot, and the region's permit volume keeps subcontractor pricing moving. These are the items that move a number here.
Metro Nashville issues permits through its own codes department, and Davidson County projects also pass through local stormwater and public works review. Tennessee adopts the IBC, IRC, IECC, NEC, IPC, and NFPA families, but the edition in force and local amendments change what you build. Confirm the adopted edition and any overlay requirements with the local building department before you price. Review timelines affect escalation, so carry a date on the estimate.
Metro Nashville Codes · IBC · IECC · local stormwater reviewMiddle Tennessee soil alternates between residual clay, weathered shale, and limestone with sinkhole potential, so foundation type is rarely the same two lots in a row. Geotechnical reports drive whether you price spread footings, drilled piers, or a mat, and rock excavation can appear as a bid item. On hillside lots, retaining walls and undercut are separate scopes. We price foundations from the geotech and structural sheets, not from a default assumption.
Geotechnical report · drilled piers · rock excavation · retaining wallsNashville sees humid summers, freeze-thaw cycles, and severe wind and hail events, which shows up in envelope and roof detailing. Wind uplift ratings, ice and water shield coverage, and drainage details are specified more heavily than in milder markets. Roofing takeoffs here need the full underlayment and flashing scope, not just squares of shingle. We measure roofing and waterproofing to the specified assemblies and note the code-driven items.
Wind uplift · ice and water shield · freeze-thaw · hailThe region's construction volume keeps crews busy, and trade pricing reflects it. Framing, concrete, and MEP labor can swing between bid cycles, and prevailing-wage or certified-payroll requirements on public work change the labor line entirely. We price with RSMeans data adjusted to the project ZIP code and separate labor from material so you can update one without redoing the other. If you carry your own crew rates, we can apply them.
RSMeans data · ZIP-code adjustment · certified payroll · crew ratesDavidson County's steep lots, streams, and combined-sewer areas drive sitework quantities. Grading balance, erosion control, retaining walls, and storm drainage are often the least predictable part of a Nashville estimate. On urban infill, limited laydown and alley access change concrete and crane logistics. We take off sitework from the civil set and flag the items that depend on a contractor's means and methods rather than the drawings.
Erosion control · storm drainage · grading balance · combined sewerTennessee has no state income tax, which supports demand but does not change your sales tax on materials. Suppliers and fabrication shops are concentrated along the I-24, I-40, and I-65 corridors, so delivery distance and lead times vary by project location. Structural steel, switchgear, and specialty finishes may carry long lead times that affect escalation. We note the material items with extended lead times so your bid can carry the right allowance.
Sales tax on materials · I-24 · I-40 · lead timesNashville's mix of steep lots, clay soils, and dense infill work changes what you measure and how you price it. These are the trades where the local conditions hit the numbers hardest.
Davidson County sites rarely come flat. On hillside lots in areas like Forest Hills or along the Cumberland River bottoms, you are measuring cut and fill by cross-section, not by a single pad elevation. We take off mass excavation in cubic yards with a swell factor, then price structural fill, undercut, and offsite haul separately. Rock excavation is carried as an allowance until a geotech report confirms depth. Erosion control is its own line: silt fence by linear foot, inlet protection by each, and temporary seeding by square foot, all tied to the approved grading permit. Because drainage falls toward the river and its tributaries, we check finished floor elevations against the local floodplain map before the footings are priced. See our sitework takeoff services for how we structure this.
Most Nashville residential and low-rise commercial framing is wood, and the takeoff has to account for the region's wind and seismic provisions. We count studs by wall run and height, adding plates, headers, and blocking, then convert to board feet or pieces with a typical waste factor. Floor and roof systems are measured by area with joist and rafter spacing noted. Sheathing is taken off by sheet count, not square footage, because panel layout and cut waste drive the order. Engineered lumber, LVL, and trusses are listed as separate bid packages so you can compare a framed roof against a truss package. Framing estimating services walks through the sequence we use.
Mechanical, electrical, and plumbing takeoffs in Nashville follow the adopted codes, and you should confirm the current code edition with the local building department before pricing. We count fixtures, devices, and equipment by type, then measure pipe and duct runs by linear foot with fittings, valves, and hangers as separate items. For commercial work, we break out the service entrance, panelboards, feeders, and branch circuits, and for plumbing we separate domestic water, sanitary, vent, and gas. Rooftop units, curbs, and crane picks are listed so the general contractor sees the rigging cost. Insulation and duct sealing are measured by area. Our MEP estimating services organize this by system so nothing hides in a lump sum.
Middle Tennessee clay shrinks and swells with moisture, so foundation design here often runs to drilled piers, grade beams, or post-tensioned slabs rather than simple spread footings. A takeoff that assumes strip footings will miss the pier count, the pier depth, and the reinforcing cages. We measure concrete in cubic yards by element, formwork in square feet of contact area, and rebar by bar size and lap length. Vapor barrier, granular base, and capillary break each get their own line because they are commonly dropped. For slab-on-grade, we separate the building slab from exterior flatwork, driveways, and sidewalks so the general contractor can see what the site package actually carries. Our concrete estimating services cover the full division 03 breakdown.
Nashville's hail and wind exposure means roofing specs often call for Class 4 impact-rated shingles or standing-seam metal, and the takeoff has to match the specified system. We measure roof area by slope and pitch, then break out underlayment, ice and water shield at valleys and eaves, drip edge, valley metal, and ridge vent by linear foot. Penetrations, pipe boots, and step flashing are counted individually. On commercial low-slope work, we separate membrane, insulation thickness, cover board, and tapered insulation crickets. Decking replacement is carried as a unit-price line because you cannot know the extent of rot until tear-off. Roofing estimating services shows the format we deliver.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab-on-grade concrete, 4 in. | 96 | CY |
| 03 20 00 | Rebar, #4, slab and footings | 7.8 | TON |
| 05 10 00 | Structural steel columns and beams | 1.4 | TON |
| 06 10 00 | Wood framing, walls and floors | 18,400 | BF |
| 06 16 00 | Sheathing, 7/16 in. OSB | 142 | SHT |
| 07 30 00 | Asphalt shingles, Class 4 | 6,800 | SF |
| 09 29 00 | Gypsum board, 1/2 in. | 12,600 | SF |
| 22 11 00 | Domestic water piping, PEX | 1,150 | LF |
This example prices the slab for a two-unit duplex on a level infill lot in Davidson County. Dimensions are illustrative; your plans govern. We assume a 4-inch slab over a 6-mil vapor barrier and 4 inches of granular base, with a thickened edge at the perimeter.
The building footprint is 48 feet by 30 feet, giving 1,440 square feet. The thickened edge runs the full perimeter: 2 × (48 + 30) = 156 linear feet, 12 inches wide and 12 inches deep below the slab.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 48 ft × 30 ft | 1,440 | SF |
| Slab volume | 1,440 SF × 4 in ÷ 12 | 480 | CF |
| Slab volume | 480 CF ÷ 27 | 17.8 | CY |
| Thickened edge | 156 LF × 1 ft × 1 ft | 156 | CF |
| Thickened edge | 156 CF ÷ 27 | 5.8 | CY |
| Subtotal | 17.8 + 5.8 | 23.6 | CY |
| Waste at 5% | 23.6 × 1.05 | 24.8 | CY |
We round the order to 25 cubic yards. Vapor barrier is taken off at 1,440 SF plus 10 percent for laps and perimeter turn-up, or about 1,585 SF. Granular base is measured at 1,440 SF × 4 in ÷ 12 = 480 CF, or 17.8 CY, with a typical 10 percent compaction allowance, bringing it to about 19.6 CY. Rebar at #4 on 18-inch centers each way works out to roughly 7.8 tons including chairs and lap.
Two Nashville-specific adjustments matter here. First, the mix design and any fiber reinforcement should be confirmed against the structural drawings, because Middle Tennessee clay subgrades often require a vapor retarder and a base course that a generic slab takeoff will omit. Second, flatwork outside the building line — driveway, walks, and patios — belongs in a separate line so it does not inflate the building slab number. If you want this level of breakdown for your project, send the plans through our get an estimate page.
Pricing depends on project type, square footage, and how many trades are involved. A single-trade takeoff for a residential addition is a smaller engagement than a full commercial bid package with sitework, structure, and MEP. We quote each project after reviewing the plans, so there is no flat rate to publish. Send the drawings and specifications through our estimate request and we will return a scope and price for the takeoff itself.
Most projects turn around in 24 to 48 hours, and rush service is available when a bid date is close. The schedule depends on the number of sheets, whether the drawings are complete, and how many trades you want separated. If you send a partial set, tell us which divisions you need first so we can sequence the delivery around your bid deadline.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, covering permits issued by the city itself for new privately-owned residential units only. That means the 5,555 units and the $1.2 billion in permitted value exclude commercial, industrial, and non-residential work, and they exclude renovations. Use the numbers as a demand signal, not as a measure of total construction activity in Davidson County.
Yes. We cover the full state through our Tennessee construction estimating services, and we regularly work on projects in Memphis, Knoxville, and Chattanooga. Pricing is adjusted by ZIP code for material and labor, so a takeoff for a project in one of those markets reflects local costs rather than a Nashville average. If your project sits in a smaller Middle Tennessee town, send the address and we will confirm coverage.
Nashville and Davidson County enforce the International Building Code family along with the International Energy Conservation Code, the International Plumbing Code, the International Mechanical Code, and NFPA 13 for sprinklered buildings, but the adopted editions and local amendments change on a cycle. Confirm the current edition and any Metro amendments with the local building department before you price. We take off to the drawings you provide and flag code-driven items such as fire-rated assemblies and egress components.
We do not guess at foundation type. If the drawings show drilled piers, grade beams, or a post-tensioned slab, we take off exactly that and list the pier count, diameter, and estimated depth as separate lines. Where the geotech report is not yet available, we carry rock excavation and over-excavation as allowances and label them clearly. That way the bid shows what is known and what is still a risk.
Yes, and on Nashville hillside lots we recommend it. Clearing, mass excavation, structural fill, retaining walls, drainage, and erosion control are measured and priced as Division 31 and 33 items, while the building shell starts at the footings. Splitting the packages lets you compare site contractors on the same quantities and keeps a rock or haul-off overrun from distorting the building bid.
We deliver Excel and PDF organized by CSI MasterFormat division, with the marked-up plan sets included so you can trace every quantity back to the sheet. We work in Bluebeam Revu and PlanSwift and price with RSMeans data adjusted by ZIP code. If your team uses a different estimating platform, tell us at kickoff and we will match the column structure you need.
Yes. Multifamily is a large share of Nashville's residential permit volume, and those projects need unit-by-unit quantity separation rather than a single building average. We break out typical units, corner units, and amenity areas, then measure shared systems such as corridors, elevators, and the roof separately. Multi-family estimating services covers how we structure that takeoff.
Send the complete drawing set, specifications, and any addenda, plus the bid date and the divisions you want priced. A geotech report helps on foundation work, and a survey or civil set helps on sitework. If you have a target format or a bid form the owner requires, include it. We will confirm scope in writing before we start so there is no ambiguity about what the number covers.
Send your drawings and bid date, and we will return a division-by-division takeoff with marked-up plans, usually within 24 to 48 hours.