Scope Precision EstimateContact Us

Dedicated Construction Estimator

Send us your plans and your bid calendar. We assign one estimator who prices your work in 24–48 hours, in your format, every time.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"412LF30.5 CY
Spread footing 6' × 6' × 12"24EA32.0 CY
Foundation wall 8" thick × 9' high286LF63.6 CY
Slab on grade 5" thick18,400SF284.0 CY
Elevated slab 8" thick9,800SF242.0 CY
Total concrete652.1 CY
Illustrative quantities. Waste factor applied as a separate line.
Formwork and rebar included

What is a dedicated construction estimator?

A dedicated construction estimator is a named estimator assigned to your account under a monthly retainer. They produce line-item pricing by CSI MasterFormat division, with quantities in units such as CY, SFCA, TON, and SF, delivered in Excel and PDF with marked-up plan sets, typically within 24–48 hours.

  • Quantities are measured in trade units: CY concrete, SFCA formwork, TON rebar, SF board.
  • Typical waste factors range from 5% to 10% for most materials, depending on trade.
  • The most costly miss is unpriced Division 01 general conditions and special inspections.

A dedicated construction estimator is a named estimator who works on your projects every month under a retainer. Instead of sending each job to a different bid desk, you get one person who learns your assemblies, your markups, and your bid calendar. When a new set of plans and specifications arrives, it goes into a queue and comes back priced in 24–48 hours, in Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets. This service fits general contractor estimating teams and subcontractor estimating services that bid steadily and are tired of re-explaining their scope, their labor rates, and their general conditions on every project. It also fits developers who need a consistent cost basis across multiple buildings. If you already use our Construction Cost Estimating Services per project, the retainer removes the setup time on each new bid. If you outsource takeoff only, our Construction Takeoff Services can feed quantities into the same estimator. For firms that want the full back office, see Outsource Estimating Services.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

Your estimator works on-screen in Bluebeam Revu and PlanSwift, with RSMeans data and ZIP-code-adjusted material and labor pricing behind the rates. They measure formwork in SFCA, rebar in TON, concrete in CY, gypsum board in SF by board type and level of finish, and ductwork in LB by gauge. They price Division 01 general conditions as duration-based line items, not a percentage, and apply your overhead, profit, bond, and insurance consistently. They also log each addendum, price alternates, and flag scope gaps like missing testing and special inspections or winter conditions. Quantities roll up into a cost breakdown structure that mirrors your work breakdown structure, so a line in the estimate maps to a line in your schedule of values.

When you win a project, the same estimator prices change orders using the same rates and markup, so your pricing stays consistent from bid through closeout. You get a single point of contact, a predictable monthly capacity, and a queue that respects your bid dates. Send the drawings and we will return the first estimate in the standard format.

Services

What the dedicated estimator retainer covers

Your assigned estimator handles the full takeoff and pricing cycle for every project you send, using Bluebeam Revu, PlanSwift, and RSMeans data with ZIP-code-adjusted material and labor pricing. We carry your standard general conditions, markup structure, and labor rates across all projects so you do not re-key them. You get a single point of contact and a predictable monthly capacity.

Concrete & Formwork

Footings, walls, slabs, and elevated decks priced by mix design, thickness, and formwork system.

CY · SFCA · TON

Masonry & Stone

CMU, brick veneer, stone, and reinforcement measured by wall type, height, and opening deductions.

SF · EA · TON

Structural Steel

Columns, beams, joists, deck, and connection materials priced by shape, weight, and coating.

TON · LF · EA

Carpentry & Drywall

Framing, sheathing, gypsum board, and ceilings by board type, thickness, and finish level.

SF · LF · EA

Mechanical & Plumbing

Ductwork, piping, fixtures, and equipment priced by gauge, size, and connection type.

LB · LF · EA

Electrical Systems

Conduit, wire, devices, panels, and lighting priced by circuit, voltage, and mounting condition.

LF · EA · CY

General Conditions

Division 01 items such as supervision, temporary facilities, and permits built as duration-based line items.

MO · LS · EA

Change Order Pricing

Added or deleted work priced with the same rates, markups, and waste factors as the original estimate.

LS · SF · CY

What every dedicated construction estimator takeoff includes

  • Full quantity takeoff from architectural, structural, MEP, and civil sheets
  • Line-item pricing by CSI MasterFormat division with ZIP-adjusted material and labor
  • Division 01 general conditions built as duration-based line items, not a percentage
  • Your markup structure applied consistently: overhead, profit, bond, insurance
  • Bid-day support: clarifications, addenda pricing, and scope comparison against competing bids
  • Change order pricing during construction using the same rates as the original estimate
  • Monthly capacity agreed in advance, with a queue for new projects
  • Marked-up plan sets showing what was measured and where
  • Excel and PDF deliverables with a summary sheet and division detail
  • Direct access to your estimator for scope questions and clarifications
How we work

How outsourced construction estimating works day to day

  1. Onboarding and setupWe start with a kickoff call to capture your standard assemblies, labor rates, markup structure, and preferred Excel format. You send two or three past estimates so we can mirror your line-item structure. Your estimator builds a template with your Division 01 general conditions, your bond and insurance rates, and your ZIP-code pricing basis. This setup happens once.
  2. Project intake and queueWhen you send a new set of drawings, you include the bid date, the scope you want priced, and any alternates. Your estimator logs it in the queue and confirms the delivery date, usually within 24–48 hours. If you have a rush, we flag it and adjust the queue. You get a single point of contact for questions.
  3. Quantity takeoffYour estimator opens the drawings in Bluebeam Revu and PlanSwift, sets the scale, and measures each assembly. For concrete, that means formwork SFCA, rebar TON, and concrete CY. For gypsum board, SF by board type and level of finish. Marked-up plan sets show every measurement. We cross-check quantities against the architectural and structural sheets to catch discrepancies.
  4. Pricing and assembly build-upWe price each line item using RSMeans data adjusted by ZIP code, then apply your labor rates and markup. Assemblies are built from components: for a metal stud partition, that is studs at 16 in. on center, track, gypsum board both sides, insulation, and screws. We add waste factors by material type. Your general conditions are priced as duration-based line items, not a percentage.
  5. Review and deliveryYour estimator reviews the estimate against the drawings and specifications for scope gaps, then sends you an Excel file with a summary sheet and division detail, plus a PDF with marked-up plans. You get a chance to ask questions before you submit your bid. If addenda come out, we price the changes and update the estimate.
  6. Post-bid and change order supportAfter you submit your bid, your estimator remains available for scope clarifications and negotiation support. If you win the project, we price change orders during construction using the same rates and markup as the original estimate, so your pricing stays consistent. We also track addenda and clarifications that carry through to the contract documents.

What we need from you

  • Plan setsArchitectural, structural, MEP, and civil drawings in PDF. Include the latest revision and a sheet index.
  • SpecificationsProject manual with CSI sections. We need Division 01 for general requirements and Division 03–48 for technical specs.
  • Bid date and scopeYour bid due date and the specific scopes you want priced. Tell us if you are bidding as a prime or subcontractor.
  • Markup structureYour overhead and profit percentages, bond rate, insurance rate, and any CCIP or SDI wrap costs.
  • Labor ratesYour trade-specific labor rates and burden, or we use RSMeans ZIP-adjusted rates as a baseline.
  • General conditions templateYour standard Division 01 line items, including supervision, temporary facilities, and closeout.
  • Addenda and clarificationsAny addenda, RFI responses, or clarifications issued during the bid period. We price them as they come.
Sample output

Sample material takeoff format

This is how your dedicated estimator presents quantities. Each line references the drawing sheet and spec section so you can trace every number.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Continuous footing 24" × 12", 3,000 psi412LFS-101
03 30 00Spread footing 6' × 6' × 12", 3,000 psi24EAS-102
03 30 00Foundation wall 8" thick × 9' high, 4,000 psi286LFS-103
03 30 00Slab on grade 5" thick, 4,000 psi, WWF18,400SFS-104
03 30 00Elevated slab 8" thick, 4,000 psi, #5 @ 12" o.c.9,800SFS-105
03 10 00Formwork to continuous footing, 2' high824SFCAS-101
03 20 00Reinforcing steel, #4 and #5, including laps18.6TONS-101
03 30 00Concrete slab on grade, 5" thick, 3,500 psi12,300SFS-106
03 30 00Concrete slab on metal deck, 6" thick, 4,000 psi8,200SFS-107
03 10 00Formwork to foundation wall, 9' high5,148SFCAS-103
03 20 00Reinforcing steel, #6, including laps12.4TONS-103
03 30 00Concrete stairs, 4' wide, 10 risers6EAS-108

Units we price in: cubic yard, square foot, linear foot

Every line item carries a unit of measure that matches how the work is bought and installed. Here are the units you will see most in our estimates.

ItemUnitHow it's measured
Cast-in-place concreteCYVolume of concrete placed, calculated from form dimensions
FormworkSFCASquare feet of contact area between concrete and form
Reinforcing steelTONWeight of rebar including laps and waste
Structural steelTONWeight of members and connections, including shop primer
Rough carpentryMBFThousand board feet of lumber, or LF for wall framing
Gypsum boardSFSurface area of board installed, by type and level of finish
HVAC ductworkLBWeight of duct by gauge, or SF of surface area
ExcavationCYBank volume of soil excavated, plus backfill and haul-off
Domestic water pipingLFLinear feet by material and diameter
Conductors and cablesLFLinear feet by raceway type and wire size

Worked example: takeoff and pricing of a concrete footing and wall

This example shows how your dedicated estimator takes off a continuous footing and foundation wall. Dimensions are illustrative.

Step 1: Measure footing

  • Footing: 24 in. wide × 12 in. deep, length 100 LF.
  • Volume per LF: 2 ft × 1 ft = 2 CF/LF.
  • Total CF: 100 LF × 2 CF/LF = 200 CF.
  • Convert to CY: 200 ÷ 27 = 7.41 CY.

Step 2: Measure wall

  • Wall: 8 in. thick × 9 ft high, length 100 LF.
  • Volume per LF: (8/12) ft × 9 ft = 6 CF/LF.
  • Total CF: 100 LF × 6 CF/LF = 600 CF.
  • Convert to CY: 600 ÷ 27 = 22.22 CY.

Step 3: Add waste

  • Concrete waste factor: typical 5% for footings and walls.
  • Footing: 7.41 CY × 1.05 = 7.78 CY.
  • Wall: 22.22 CY × 1.05 = 23.33 CY.
  • Total concrete: 7.78 + 23.33 = 31.11 CY.

Step 4: Formwork

  • Footing formwork: both sides, 12 in. high. Contact area per LF: 2 sides × 1 ft = 2 SFCA/LF.
  • Total: 100 LF × 2 SFCA/LF = 200 SFCA.
  • Wall formwork: both sides, 9 ft high. Contact area per LF: 2 sides × 9 ft = 18 SFCA/LF.
  • Total: 100 LF × 18 SFCA/LF = 1,800 SFCA.
  • Total formwork: 200 + 1,800 = 2,000 SFCA.

Step 5: Reinforcing steel

  • Footing: #4 bars, 4 continuous, plus #4 ties at 12 in. o.c.
  • Continuous bars: 4 × 100 LF = 400 LF. Weight: 400 LF × 0.668 lb/LF = 267.2 lb.
  • Ties: 100 LF ÷ 1 ft = 100 ties. Each tie length ~4 ft (perimeter). Total tie length: 100 × 4 = 400 LF. Weight: 400 × 0.668 = 267.2 lb.
  • Footing rebar total: 267.2 + 267.2 = 534.4 lb = 0.27 TON (with 10% laps: 0.30 TON).
  • Wall: #5 vertical bars at 12 in. o.c., #5 horizontal bars at 12 in. o.c.
  • Vertical bars: 100 LF ÷ 1 ft = 100 bars. Height 9 ft. Total length: 100 × 9 = 900 LF. Weight: 900 × 1.043 lb/LF = 938.7 lb.
  • Horizontal bars: 9 ft height ÷ 1 ft = 9 rows. Length 100 LF each. Total length: 9 × 100 = 900 LF. Weight: 900 × 1.043 = 938.7 lb.
  • Wall rebar total: 938.7 + 938.7 = 1,877.4 lb = 0.94 TON (with 10% laps: 1.03 TON).
  • Total rebar: 0.30 + 1.03 = 1.33 TON.

Step 6: Pricing

  • Concrete: 31.11 CY × $150/CY (ZIP-adjusted) = $4,666.50.
  • Formwork: 2,000 SFCA × $8.50/SFCA = $17,000.
  • Rebar: 1.33 TON × $1,200/TON = $1,596.
  • Total direct cost: $23,262.50.

Your dedicated estimator performs these steps for every element, applies your markup, and delivers the estimate in your format.

Cost drivers

What drives cost in a construction estimator company retainer

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Monthly volume

The retainer price depends on how many projects you send per month and their average size. A firm bidding three projects a month needs less capacity than one bidding ten. We agree on a monthly capacity and a queue priority so you know what to expect. Volume commitments also let us assign your estimator consistently and reduce onboarding time for each new project.

Monthly volume

The retainer price depends on how many projects you send per month and their average size. A firm bidding three projects a month needs less capacity than one bidding ten. We agree on a monthly capacity and a queue priority so you know what to expect. Volume commitments also let us assign your estimator consistently and reduce onboarding time for each new project.

Scope breadth

Estimating a full building across all divisions takes more time than a single-trade package. If you only need Division 09 finishes, your retainer covers that scope. If you need all divisions including MEP and civil, the capacity is higher. We track the divisions you send most often and staff accordingly, so your estimator becomes familiar with your typical scope.

Turnaround expectations

Standard turnaround is 24–48 hours for most projects. Rush requests are available but may shift other work in the queue. We agree on which projects are rush and which can follow the normal schedule. Frequent rush requests may require additional capacity, which we will discuss and adjust in your retainer agreement.

Deliverable format

If you need estimates in a specific Excel template or with custom cost codes, we build that during onboarding. More complex formats take more setup time but reduce your internal rework. We can also map our line items to your accounting system's cost codes, so you can import estimates directly without manual re-keying.

Addenda and bid-day support

Frequent addenda, multiple alternates, and live bid-day support add hours. We track these as part of the retainer so you are not surprised by extra charges. If addenda volume is high, we adjust the capacity. Bid-day support includes pricing last-minute clarifications and comparing your numbers against competing bids when you need a quick check.

Number of trades

If you bid as a general contractor, your estimator must price multiple trades and coordinate scopes. If you are a subcontractor, the scope is narrower but may require deeper detail in your trade. The number of trades affects the time per estimate and the level of cross-checking we perform against specifications and drawings.

Plan quality and completeness

Well-coordinated drawings with clear dimensions and details take less time to measure. Incomplete or conflicting drawings require more assumptions and clarifications, which add time. We document our assumptions in the estimate and flag items that need architect confirmation, so you can follow up before bid day.

Historical data integration

If you have past project cost data, we can integrate it into your pricing to reflect your actual production rates. This takes setup time but improves accuracy. We use your data alongside RSMeans to build assemblies that match how you build, not just industry averages.

Scope gaps

Common scope gaps we catch in a bid package

These are items that regularly go missing in estimates. Your dedicated estimator checks for them on every project.

  • General conditions carried at a percentage instead of a duration-based line item. This hides in Division 01 as a lump sum. We build Division 01 from the schedule and your standard list, so supervision and temporary facilities are priced by duration.
  • Sales tax applied to material only, not to the correct taxable categories. It hides in the material pricing column. We check your state and local rules and apply tax to the right line items, including equipment rental in some states.
  • Escalation on material pricing between bid date and expected buyout. It hides in the material cost when you lock in the current price. We add an escalation line based on your buyout schedule and current market indices.
  • Freight, small tools, and consumables not allocated to a division. They hide in overhead or get omitted entirely. We add these as separate line items in the appropriate division or in Division 01, so they are not buried.
  • Overtime and shift premiums in the labor rate for accelerated schedules. They hide in the base labor rate when you use a standard 40-hour week. If your schedule requires overtime, we adjust the labor rate and show it as a separate line.
  • Bond and insurance cost as a separate line, not buried in overhead. It hides in the markup percentage. We list bond and insurance explicitly so you can see the cost and pass it through if needed.
  • Winter conditions, temporary heat, and hoarding for cold-weather work. They hide in the general conditions percentage. We add these to Division 01 based on the project schedule and climate.
  • Permit fees, plan check, and utility connection charges. They hide in the owner's budget or get omitted. We include allowances for these in Division 01 and note where they are reimbursable.
  • Testing and special inspection allowances. They hide in the spec book and are often not priced. We add a line for special inspections required by the code and note who pays for them.
  • Allowances and unit prices listed as Division 01 line items. They hide in the bid form or get lumped into a trade. We set up allowances and unit prices per CSI 01 21 00 and 01 22 00 so they are tracked separately.
  • Cleanup, punch list, and closeout documentation labor. They hide in the general conditions percentage or get omitted. We include these in Division 01 as duration-based items, not a percentage.
  • Subcontractor default insurance or CCIP wrap cost where applicable. It hides in the insurance line or is omitted. We add these as separate lines when your project requires them.

Material and assembly choices that swing cost

Your dedicated estimator prices these common alternatives so you can compare first cost. Each is priced in its natural unit with ZIP-adjusted material and labor.

AssemblyCommon optionsUnitCost driver
Structural framingStructural steel vs. cast-in-place concrete vs. woodTON, CY, MBFSpan, load, fire rating, and connection complexity
Exterior wallBrick veneer vs. metal panel vs. EIFSSFSubstrate, insulation, and finish system
Roof systemTPO vs. modified bitumen vs. standing seam metalSFSlope, insulation, and warranty
Interior partitionMetal stud and gypsum vs. CMU vs. demountableSFFire rating, acoustic rating, and finish
HVAC distributionDuctwork vs. VRF pipingLB, LFZoning, ceiling plenum, and efficiency
Codes and standards

Codes and standards that affect quantities and cost

Your dedicated estimator applies the code editions adopted in your jurisdiction. Always confirm the adopted edition with the local building department.

Structural concrete is governed by ACI 318, which sets minimum reinforcement, cover, and strength requirements. These affect rebar tonnage and concrete mix design. For example, ACI 318 requires a minimum of #4 bars at 12 in. o.c. for temperature and shrinkage in slabs, which your estimator includes.

Fire protection requirements come from NFPA 13 (sprinklers) and the IBC. If your project is sprinklered, your estimator prices the sprinkler system, including mains, heads, and fire pump if needed. The IBC also sets fire-rated assembly requirements that affect wall and floor/ceiling assemblies.

Energy codes such as IECC or ASHRAE 90.1 set insulation R-values and glazing U-factors. Your estimator uses these to price insulation, windows, and HVAC equipment. State and local amendments can be stricter.

Accessibility standards (ADA) affect door widths, hardware, and site slopes. Your estimator includes these in Division 08 and Division 31.

Electrical work follows NFPA 70 (NEC). Your estimator prices conductors, raceways, and devices by size and type. The NEC also requires specific wiring methods in certain occupancies.

Plumbing and mechanical codes (IPC, UPC, IMC) set pipe sizes, materials, and venting. Your estimator uses these to price domestic water, waste, and vent piping.

CSI MasterFormat sections that affect quantities include Division 01 (general requirements), Division 03 (concrete), Division 05 (metals), Division 08 (openings), Division 09 (finishes), Division 22 (plumbing), Division 23 (HVAC), and Division 26 (electrical). Your estimator references these sections in the estimate so you can trace each line item to the specification.

Because codes vary by state and city, your estimator confirms the local amendments during onboarding and updates the pricing basis accordingly. If your project is in a high-wind or seismic zone, additional requirements may apply.

Who we provide estimates for

Who uses a dedicated estimator for contractors

General contractors

You bid multiple projects a month and need consistent pricing across all divisions. Your dedicated estimator learns your assemblies and markups, so you spend less time reviewing estimates and more time building relationships with owners.

Subcontractors

You bid several trades or one trade across many projects. Your estimator knows your labor rates and production factors, so quantities come back priced the way you install. You can bid more projects without adding office staff.

Developers

You need a consistent cost basis across multiple buildings or phases. Your estimator keeps a running cost model and updates it as design progresses, so you can compare options and lock in budgets early.

Architects

You provide cost estimates to owners during design. Your estimator prices your documents and flags scope gaps early, so you can adjust details before they become change orders.

Owners

You want to validate contractor bids or establish a budget before soliciting proposals. Your estimator gives you an independent quantity takeoff and pricing basis to compare against bids.

Where we provide estimates

Dedicated Construction Estimator in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Dedicated Construction Estimator in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The retainer model applies across project types, but the takeoff emphasis and risk areas shift. Here is what your dedicated estimator watches for.

Single-family residential

Takeoff focuses on repetitive framing, simple MEP layouts, and standard finishes; quantities per unit are low but repetition is high.

Watch for: Watch for waste factors on lumber and drywall; typical 10% for framing, 10-15% for drywall.

Multi-family low-rise

Multiple identical units allow quantity multipliers; takeoff must account for unit mix and common areas.

Watch for: Watch for fire-rated assemblies, sound isolation details, and sprinkler coverage that add cost.

Commercial office fit-out

Takeoff emphasizes interior partitions, ceilings, HVAC distribution, and electrical; base building work is limited.

Watch for: Watch for tenant coordination, after-hours work premiums, and existing conditions that require demolition.

Retail shell

Takeoff covers structural shell, exterior walls, roof, and MEP rough-in; interior finishes are minimal.

Watch for: Watch for long-span roof framing, storefront glazing, and utility capacity for future tenants.

Industrial warehouse

Takeoff focuses on slab-on-grade, tilt-up or metal panel walls, and minimal MEP; large flat areas dominate.

Watch for: Watch for slab flatness tolerances, column spacing, and fire protection for high-piled storage.

Deliverables

What you receive

  • Excel estimate organized by CSI MasterFormat division, with a summary sheet and detailed line items.
  • PDF estimate with the same content, plus marked-up plan sets showing what was measured.
  • Quantity takeoff sheets showing how each line item was derived, including dimensions and calculations.
  • Division 01 general conditions built as duration-based line items, not a percentage.
  • Bid-day support: clarifications, addenda pricing, and scope comparison against competing bids.
  • Change order pricing during construction using the same rates and markup as the original estimate.
  • Direct access to your assigned estimator for questions and scope clarifications.
Checklist

Pre-bid checklist for your remote construction estimator

  • Confirm bid date and scope of work with your estimator.
  • Send latest drawings and specifications, including all addenda.
  • Verify sheet index and revision dates match the bid documents.
  • Provide your markup structure and labor rates.
  • Review Division 01 general conditions for duration-based items.
  • Check for allowances and unit prices per CSI 01 21 00 and 01 22 00.
  • Confirm sales tax rules for material and equipment.
  • Identify any overtime or shift work requirements.
  • List special inspections and testing required by code.
  • Note any owner-furnished equipment or materials.
  • Review schedule for winter conditions or temporary heat.
  • Confirm bond and insurance requirements, including CCIP or SDI.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

FAQ

Dedicated Construction Estimator questions

How does the retainer pricing work?

We agree on a monthly capacity based on the number and size of projects you send. The retainer covers a set number of projects or hours per month. If you exceed that, we bill additional projects at a pre-agreed rate. You get a predictable monthly cost and a queue priority. We review capacity quarterly and adjust as your bid volume changes. This model works best when you have a steady flow of estimates and want consistent turnaround without renegotiating each project.

Can I switch estimators if the fit isn't right?

Yes. If your assigned estimator is not meeting your expectations, we will reassign your projects to another estimator with similar experience. We will transition your templates and project history so the new estimator can maintain consistency. We ask for feedback during onboarding and after the first few projects to make sure the fit is right. If a switch is needed, we handle it promptly to avoid disruption to your bid schedule.

What happens if I need a rush estimate?

Rush requests are available. We will confirm if we can meet your deadline without affecting other projects. If we need to shift resources, we will tell you. Frequent rush requests may require additional capacity, which we will discuss. Rush fees may apply, and we will agree on them in advance. Our standard turnaround is 24–48 hours for most projects, so rush is typically for very large or complex estimates that would otherwise take longer.

Do you sign a non-disclosure agreement?

Yes. We sign NDAs before you send any drawings or cost data. Your project information is kept confidential and is not shared outside your assigned estimator and our internal quality review. We can also use your own NDA template if you prefer. This protects your bid strategy and client relationships. If you have specific confidentiality requirements, let us know during onboarding and we will accommodate them.

How do you handle projects in multiple states?

We adjust material and labor pricing by ZIP code using RSMeans data. Your estimator will confirm the local code editions and tax rules for each state. If you have projects in different regions, we may assign an estimator with experience in that area. We track state-specific requirements like licensing and prevailing wage. For projects in multiple states, we can provide a consolidated estimate with separate pricing for each location.

Can you integrate with our estimating software?

We deliver in Excel and PDF. If you use estimating software like Sage, Timberline, or ProEst, we can format our line items to match your cost codes for import. We will need your cost code structure and a sample export. This is set up during onboarding and reduces your manual re-keying. Integration ensures that our quantities and prices flow directly into your system without transcription errors.

What is the typical turnaround for a full estimate?

Most projects are delivered in 24–48 hours. Larger or more complex projects may take longer, and we will confirm the schedule when you send the drawings. The retainer includes a queue so you know when to expect delivery. If you have a hard bid date, we prioritize accordingly. We will communicate any potential delays as soon as we become aware of them.

Do you provide bid-day support?

Yes. Your estimator is available on bid day to price last-minute clarifications, review addenda, and compare your numbers against competing bids if you need a quick check. We can also help you level subcontractor quotes. This is included in the retainer for projects we have estimated. Bid-day support helps you avoid costly omissions and ensures your final number is competitive.

How do you handle change orders during construction?

We price change orders using the same rates and markup as the original estimate. You send the change request and supporting documents, and we provide a priced change order within the agreed turnaround. This keeps your pricing consistent and helps you negotiate with the owner. We also track change orders against the original estimate to help you monitor cost growth.

What if I only need takeoff, not full pricing?

We can provide takeoff-only services under the retainer. Your estimator will deliver quantities in Excel with marked-up plans, and you apply your own pricing. This works well if you have in-house pricing but need help with measurement. We can also switch between takeoff-only and full pricing as your needs change. Takeoff-only is often used for design-assist or when you have a preferred pricing method.

How do you ensure accuracy?

Your estimator measures each assembly and cross-checks quantities against architectural, structural, and MEP sheets. We use Bluebeam Revu and PlanSwift for takeoff, and RSMeans for pricing. Every estimate goes through a quality review before delivery. We document assumptions and flag items that need confirmation. If we find discrepancies in the documents, we will note them and ask for clarification before finalizing the estimate.

Can you help with value engineering?

Yes. If your bid is over budget, your estimator can suggest value engineering options, such as alternative materials or assemblies, and price them. We can compare first cost and life-cycle cost. This is often done during the preconstruction phase or after bid opening if you need to reduce scope. We focus on practical alternatives that maintain the project's intent and performance requirements.

Do you provide quantity takeoff services separately from full pricing?

Yes. You can order a material takeoff or labor takeoff on its own, delivered as measured quantities by CSI MasterFormat division with no unit rates attached. That suits contractors who price in house and only need the measuring done. Quantities come from an on-screen takeoff in Bluebeam Revu or PlanSwift, with cubic yard, square foot, and linear foot units labeled per line. If you later want pricing added, the same quantities feed the full estimate without re-measuring.

How does your construction estimating company handle a mid-bid addendum?

Send the addendum the day it is issued and we log it against the bid package, then re-measure only the affected sheets. Revised quantities are shown as a delta line so you can see what moved, and superseded pages are removed from the marked-up set. If the addendum is unclear, we issue a request for information rather than assume a scope. Addenda received close to bid day are handled as a rush item so your number is current when you submit.

Can you serve as a remote construction estimator on Davis-Bacon projects?

Yes, with the wage determination supplied up front. We build the labor takeoff by trade classification and apply the applicable Davis-Bacon rates and fringe to the hours, keeping certified payroll categories aligned with the estimate. Because rates vary by county and by determination, send the current wage decision with the plans and specifications. Confirm the adopted code edition and any local amendments with the local building department before we lock quantities.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to work with a dedicated estimator?

Send us your plans and bid calendar to get started with a retainer that fits your volume.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us