Residential takeoffs
Single-family and townhome takeoffs from slab through finish, priced for Duval County subdivisions and infill lots.
SF · EA · LFJacksonville permitted 5,890 new privately-owned residential units in 2025, with 39% multifamily. We produce CSI-organized takeoffs and estimates for Duval County contractors, priced with ZIP-code-adjusted material and labor data.
Jacksonville pricing is driven by Duval County's flat, sandy terrain and high water table, which push foundation and dewatering scope; wind-borne debris and flood zone requirements that vary by parcel; the 39% multifamily share of permitted units; and labor competition across a metro that ranked 2 of 25 covered Florida cities by units.
Jacksonville is the largest city by land area in the contiguous U.S., and that geography shows up in your takeoff. Duval County parcels range from the Beaches and Intracoastal Waterway to inland tracts in Mandarin, Arlington, and the Westside, and each comes with different soil, flood zone, and wind exposure assumptions. We build those assumptions into the estimate rather than leaving them as a footnote.
The 2025 permit data tells you where the volume is: 3,611 single-family and 2,279 multifamily units, $1.1B in permitted value, and an average of $180,100 per unit. That mix means most Jacksonville estimates need residential and multi-family pricing on the same desk, often with commercial sitework and MEP scope attached. We cover that range through our Florida construction estimating services and our multi-family estimating services.
What that means in practice: a 120-unit podium apartment in the Southside corridor and a 40-lot subdivision in Clay County do not share a pricing basis, even though they sit 20 miles apart. The apartment needs elevated-deck formwork, fire-rated assemblies, and a unit-mix matrix; the subdivision needs per-lot sitework, utility trenching, and repetitive floor-plan pricing. We keep those scopes separate in the takeoff so your buyout packages match how you actually subcontract.
We work from the plans and specs you send, whether that is a full permit set or a schematic package with a design narrative. Turnaround is 24–48 hours for most projects, with rush available. Deliverables come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the sheet it came from.
Select a bar to compare Jacksonville with the largest Florida markets we cover.
5,890 new housing units in 2025 (-7.9% vs 2024).
3,611 single-family · 2,279 multifamily (39%).
Jacksonville issued 5,890 new privately-owned residential units in 2025, down 8% from 6,398 in 2024, with $1.1B in permitted value and an average of $180,100 per unit. Single-family accounted for 3,611 units; multifamily for 2,279, or 39% of the total. That is a market where subdivision work and apartment work compete for the same crews. If you are bidding single-family, your production rates matter more than ever because unit counts are down. If you are bidding multifamily, the 39% share means your competition is pricing the same stick-frame and podium scopes you are. We see both sides through our residential estimating services and commercial estimating services.
Jacksonville's 5,890 permitted units rank 2 of 25 covered Florida cities and represent 15.4% of the 38,215-unit covered state total. Only one covered city permits more. That concentration matters for subcontractor pricing: mechanical, electrical, and plumbing subs in Duval County are working backlog from the same pool of projects, and their numbers reflect it. When you compare a Jacksonville bid to one in Miami or Tampa, the labor component is the line that moves most. We adjust material and labor by ZIP code so the comparison is real, not a statewide average.
We produce takeoffs and estimates for the scopes that dominate Duval County work, organized by CSI MasterFormat division and delivered in Excel and PDF.
Single-family and townhome takeoffs from slab through finish, priced for Duval County subdivisions and infill lots.
SF · EA · LFPodium and garden-style apartment estimates with unit-mix matrices, typical-floor duplication, and separate site and building scopes.
SF · EA · UNITMonolithic slab, stem wall, and pile-supported foundations quantified for Jacksonville's sandy soils and high water table.
CY · SF · LFFootings, slabs-on-grade, elevated decks, and tilt-up panels with formwork, reinforcement, and finish broken out per division.
CY · SF · TONStick-frame and truss takeoffs with lumber, sheathing, hardware, and waste factors separated by floor and roof system.
BF · SF · EAMechanical, electrical, and plumbing quantities for residential and commercial scopes, including fixture counts and distribution runs.
LF · EA · TONClearing, grading, storm drainage, and utility trenching quantities for flat Duval County sites and fill requirements.
CY · LF · ACShingle, metal, and low-slope membrane systems quantified with flashing, underlayment, and wind-uplift attachment details.
SQ · LF · EAYou are bidding Duval County work against three or four other GCs and need a division-by-division takeoff you can defend line by line at buyout, not a lump sum.
Your podium and garden-style deals in the Southside and Northside corridors live or die on unit-mix pricing, deck formwork, and fire-rated assembly counts that lenders want itemized.
With 3,611 single-family units permitted in 2025, you need repetitive floor-plan pricing that holds across Beaches, Mandarin, and Westside lots with different soil and wind exposure.
Flatwork, foundations, and utility trenching in Jacksonville turn on bearing capacity and water table, so you need quantities tied to the geotech, not a per-square-foot guess.
You need a budget before the permit set is finished, and a takeoff organized by CSI division gives you a cost model you can update as drawings change.
Warehouse, flex, and light industrial work along the I-10 and I-95 corridors needs steel, tilt-wall, and MEP quantities priced to Jacksonville ZIP codes, not a national average.
We price projects across Duval County and the surrounding Northeast Florida counties. If your site is inside one of these areas, the takeoff reflects the local soil, flood, and wind assumptions that apply there.
The 2025 permit mix in Jacksonville is roughly 61 percent single-family and 39 percent multifamily, with $1.1B in permitted residential value. Commercial and industrial work rides alongside that residential volume, so we keep both pricing bases ready.
Repetitive plans across Beaches, Mandarin, and Westside lots. We price per-plan and then apply lot-specific adjustments for foundation type, driveway length, and utility runs so your model home budget holds.
Watch for: Per-plan takeoff, lot-specific foundation and sitework adders, wind-borne debris glazing.
Three- and four-story garden buildings and podium wraps common in the Southside and Northside corridors. We break out unit-mix matrices, elevated deck formwork, fire-rated demising walls, and common-area MEP separately.
Watch for: Unit-mix matrix, elevated deck formwork, fire-rated assemblies, trash and elevator MEP.
Intracoastal and riverfront houses in San Marco, Avondale, and the Beaches carry pile foundations, elevated first floors, and impact glazing. Those items drive cost far more than finish selections.
Watch for: Pile caps, elevated structural slab, impact glazing, flood-zone elevation certificates.
Retail, medical, and office fit-outs along the Southside and Downtown corridors. We take off demising walls, storefront, ceiling and lighting grids, and HVAC distribution from the architectural and MEP sets.
Watch for: Demising wall types, storefront systems, HVAC tonnage and distribution, ADA restroom counts.
Distribution and flex buildings near the port and the I-10 and I-95 corridors. Tilt-wall panels, structural steel, slab flatness, and dock equipment are the quantities that move the number.
Watch for: Tilt-wall panel counts, steel tonnage, slab flatness, dock levelers and seals.
Schools, churches, and municipal buildings across Duval and the surrounding counties. These jobs need division-by-division takeoffs for public bid forms, including allowances and unit-price schedules.
Watch for: Bid form divisions, allowances, unit-price schedule items, prevailing wage flags.
Jacksonville pricing is not a single number. These six factors move the estimate more than finish selections, and each one shows up in the takeoff before you ever get to buyout.
Jacksonville and Duval County enforce the Florida Building Code, which carries the High-Velocity Hurricane Zone provisions and wind-borne debris requirements that affect glazing, roof attachment, and structural connections. The adopted edition changes on a state cycle, so confirm the current edition with the local building department before you lock the estimate. Those requirements add real line items: impact-rated windows, enhanced roof sheathing attachment, and continuous load path hardware.
Florida Building Code · Duval County building department · wind-borne debris regionNortheast Florida soils range from loose beach sand near the Intracoastal to organic muck and clay inland. Bearing capacity drives whether you price spread footings, auger-cast piles, or a raised structural slab, and the difference is one of the largest swings in the estimate. We take the geotech report as the basis and flag where the drawings assume a foundation type the report does not support. See our [foundation estimating services](/foundation-estimating-services/) for how we handle that scope.
geotechnical report · auger-cast piles · spread footings · structural slabJacksonville sits in a wind-borne debris region, and the design wind speed for a given site depends on exposure category, which changes between open beachfront and wooded inland lots. That affects roof nailing patterns, window and door ratings, and garage door reinforcement. Flood zones add elevation, breakaway wall, and flood-vent requirements. We price those items from the drawings rather than assuming a default, because the exposure category alone can move the envelope cost.
design wind speed · exposure category · flood zone AE · impact-rated glazingJacksonville is the second-largest city in Florida by permitted residential units in our covered set, and that volume keeps concrete, framing, and drywall crews busy. Labor pricing reflects the local market through ZIP-code-adjusted rates rather than a state average, and we separate trade labor from material so you can see where the exposure is. If your schedule compresses, the premium shows up in the labor column, not buried in a general conditions line.
ZIP-code-adjusted labor rates · trade labor vs. material · crew availabilityMuch of Duval County is flat and near sea level, so stormwater management drives sitework quantities. You are pricing retention ponds, exfiltration systems, and fill to reach finished grade, and the cut-fill balance often decides whether the dirt moves once or twice. Utility trenching for water, sewer, and reuse lines adds depth and dewatering where the water table is high. Our [sitework estimating services](/sitework-estimating-services/) cover that scope separately from the building.
retention ponds · cut-fill balance · utility trenching · dewateringJacksonville has port access and a broad supplier base, so most standard materials price competitively. The variables are haul distance for fill and aggregates, concrete plant proximity to the site, and whether your project needs specialty items like impact glazing or pile sections that ship from outside the region. We price material from ZIP-code-adjusted data and note where a long haul or a single-source item creates risk. Sales tax treatment on materials should be confirmed with your accountant.
port access · haul distance · concrete plant proximity · ZIP-code-adjusted material pricingJacksonville's mix of coastal wind requirements, high water table, and infill lot constraints changes quantities and detailing across every division. Here is how those drivers show up line by line.
Jacksonville sits on flat coastal plain with a seasonally high water table, so mass grading quantities are driven by cut/fill balance and undercut rather than steep slopes. Expect line items for stripping topsoil, proofrolling, and lime-stabilized subgrade where the geotech calls for it. Storm drainage runs long and shallow, which raises trench excavation and pipe bedding quantities. If your project is on the Southside or near the Intracoastal, verify the limits of jurisdictional wetlands before we price clearing. A proper sitework takeoff separates unsuitable-material removal from borrow fill, because those two lines price very differently. Confirm the adopted stormwater manual with the local building department.
Jacksonville is in a wind-borne debris region, so framing takeoffs must reflect the design wind speed on the drawings and the resulting nailing schedules, hold-downs, and continuous load path hardware. We count studs by wall segment including plates and blocking, then add hardware by type and quantity from the shear wall schedule. Roof framing on hip-heavy Florida plans uses more ridge and hip members than a simple gable, and truss bracing is a separate line. If you are comparing bids, a framing takeoff that lists hardware separately exposes the gaps that lump-sum proposals hide.
Jacksonville's flat terrain means sanitary sewer often needs lift stations or long gravity runs with deep manholes, which affects site utility pricing. In the building, we count plumbing fixtures by type, then take off pipe by diameter and material from riser diagrams. HVAC tonnage is driven by block load, not square footage alone, so equipment counts should match the mechanical schedule. Electrical takeoff runs from service size and panel schedules to device counts and home runs. Our MEP estimating services organize these by system so your subs can price against the same quantities.
Most Jacksonville residential and low-rise commercial uses slab-on-grade with turned-down footings, so concrete quantities are dominated by slab area, thickened edges, and any pile caps where the geotech requires deep foundations. We take off formwork by contact area, not by concrete volume, and separate vapor barrier, welded wire or fiber reinforcement, and anchor bolts. On multifamily podium work, transfer slabs and post-tensioned decks change the reinforcing schedule significantly. Coastal exposure also triggers higher cover and possibly sulfate-resistant mix designs. See our foundation estimating services for how we break out footings, grade beams, and slab separately.
Roofing quantities in Jacksonville are straightforward — squares by plane, plus hip and ridge, valley, and starter — but the underlayment and flashing details carry the risk. Wind-driven rain requirements push secondary water barriers and peel-and-stick at eaves and valleys. On commercial low-slope, we take off insulation by thickness and board count, cover board, membrane, and terminations separately. Flashing at parapets, curbs, and pipe boots is counted by linear foot, not lumped. A roofing estimating services takeoff that separates membrane from flashings will price more accurately than one that does not.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab-on-grade concrete, 4 in. | 42.5 | CY |
| 03 20 00 | Reinforcing steel, slab and footings | 3,850 | LB |
| 03 11 00 | Vapor barrier under slab | 5,200 | SF |
| 06 10 00 | Framing lumber, walls and roof | 1,950 | BF |
| 06 05 00 | Wind-load hardware and connectors | 1 | LOT |
| 07 30 00 | Roofing, architectural shingles | 32 | SQ |
| 22 10 00 | Plumbing rough-in, fixtures and pipe | 1 | LOT |
| 23 00 00 | HVAC equipment and ductwork | 1 | LOT |
This example uses illustrative dimensions for a 1,800 SF one-story house on a slab-on-grade foundation, typical of Jacksonville infill lots. We are calculating concrete volume for the slab and the turned-down edge. Actual thicknesses and footing sizes must come from your structural drawings and the geotechnical report.
Step 1 — Slab area. The building footprint is 45 ft x 40 ft = 1,800 SF. Add a 1 ft overhang at the perimeter for the slab edge. Perimeter is 2 x (45 + 40) = 170 LF. Overhang area is 170 LF x 1 ft = 170 SF. Total slab area = 1,970 SF.
Step 2 — Slab volume. At 4 in. thick, volume = 1,970 SF x (4/12) ft = 656.7 CF. Convert to cubic yards: 656.7 / 27 = 24.3 CY.
Step 3 — Turned-down edge. The thickened edge is 12 in. wide by 18 in. deep below slab. Cross-section area = 1 ft x 1.5 ft = 1.5 SF. Volume = 170 LF x 1.5 SF = 255 CF = 9.4 CY.
Step 4 — Total concrete. 24.3 + 9.4 = 33.7 CY. Apply a typical 5% waste factor for slab-on-grade: 33.7 x 1.05 = 35.4 CY. Order 36 CY.
Step 5 — Reinforcement. Using #4 bars at 16 in. on center each way for the slab: bars in one direction = 45 ft / 1.33 ft = 34 bars at 40 ft long; bars in other direction = 40 ft / 1.33 ft = 30 bars at 45 ft long. Total linear feet = (34 x 40) + (30 x 45) = 1,360 + 1,350 = 2,710 LF. At 0.668 lb/LF for #4 bar, weight = 1,811 lb. Add 10% for laps and waste: 1,992 lb.
Step 6 — Vapor barrier. Slab area plus 6 in. laps: 1,970 SF x 1.10 = 2,167 SF.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 45 x 40 + perimeter overhang | 1,970 | SF |
| Slab volume | 1,970 x 0.333 / 27 | 24.3 | CY |
| Edge volume | 170 x 1.5 / 27 | 9.4 | CY |
| Concrete with 5% waste | 33.7 x 1.05 | 35.4 | CY |
| Rebar #4 | 2,710 LF x 0.668 x 1.10 | 1,992 | LB |
| Vapor barrier | 1,970 x 1.10 | 2,167 | SF |
These quantities feed directly into a concrete estimating services takeoff organized by CSI division. If your project is multifamily, the same logic applies but with additional line items for pile caps and elevated decks. For a full residential scope, see our residential estimating services.
Jacksonville's size and geography mean you can be on a coastal high-wind site in the morning and an inland rural lot in the afternoon. The wind-borne debris region, flood zones, and soil conditions change within a few miles. We adjust material and labor pricing by ZIP code and check the design wind speed on every set of drawings. That matters for framing hardware, roofing underlayment, and window ratings. If you are comparing bids from contractors who work across the state, make sure they are pricing the Jacksonville-specific requirements, not a generic Florida template.
We do not guess. If the geotechnical report calls for undercut, dewatering, or a specific foundation system, we include those line items. If there is no geotech report, we flag the risk and price a base scope with an alternate for unsuitable material removal. For slab-on-grade, we separate vapor barrier, capillary break, and any base course. For deep foundations, we take off piles by type and length, pile caps, and grade beams separately. The goal is to show you where the water table risk sits so you can carry the right contingency.
For a reliable takeoff, we need the architectural, structural, civil, and MEP drawings, plus the specifications and any addenda. If you only have architectural plans, we can still produce a partial takeoff for divisions like concrete, framing, and roofing, but we will note exclusions for MEP and sitework. For renovation work, existing conditions drawings or a site visit report help. Send what you have and we will tell you what is missing before we start.
We cover all 50 CSI MasterFormat divisions, from Division 01 general requirements through Division 48 electrical power generation. For Jacksonville commercial work, the most common packages are Divisions 02 existing conditions, 03 concrete, 05 metals, 06 wood and plastics, 07 thermal and moisture protection, 08 openings, 09 finishes, and 22/23/26 plumbing, HVAC, and electrical. We organize the estimate by division and subdivision so your subcontractors can price their scopes directly from our quantities.
We read the wind speed and exposure category from the structural drawings and apply the corresponding nailing schedules, hardware counts, and sheathing requirements. For roofing, we include secondary water barrier and enhanced flashing details. For openings, we note the design pressure ratings required for windows and doors. If the drawings do not specify, we list the requirement as a clarification and recommend you confirm the adopted code edition with the local building department. We do not add wind-load hardware as a lump sum; it is counted by type and quantity.
Yes. Multifamily is a significant part of the Jacksonville market, and we take off those projects by building type and level. We separate podium and wrap construction, count units by type, and break out common areas, amenity decks, and parking structures. For MEP, we take off riser diagrams and unit counts. Our multi-family estimating services are set up for this. If your project has a repeat unit mix, we can build a unit matrix and multiply quantities, which speeds up the takeoff and reduces errors.
Most projects are delivered within 24 to 48 hours. Rush service is available for a premium if you have a bid deadline. The turnaround depends on the size and complexity of the project and how complete the drawings are. For a single-family home, we can often turn it around in a day. For a mid-rise multifamily or commercial building, allow two days. We will confirm the schedule when you send the plans.
We use ZIP-code-adjusted material and labor pricing from RSMeans data, cross-checked with local supplier quotes when available. That means the labor rates and material costs reflect Jacksonville, not a national average. We also account for Florida-specific items like wind-load hardware, termite treatment, and high-wind roofing details. If you have recent supplier quotes or subcontractor bids, send them and we will incorporate them into the estimate.
The permit numbers we cite come from the U.S. Census Bureau's Building Permits Survey. The survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits, renovations, or additions. For Jacksonville, the 2025 survey year shows 5,890 total residential units, with 3,611 single-family and 2,279 multifamily. That is a decrease of about 8% from the previous year. We use this data to understand market volume, not to size your project.
Yes. Jacksonville has a strong industrial and logistics sector, and we estimate warehouses, distribution centers, and manufacturing facilities. Those takeoffs emphasize sitework, slabs-on-grade, structural steel, and MEP systems. We also account for local code requirements for high-piled storage and fire protection. If your project is in an industrial park near the port or along I-10, we can factor in the typical soil conditions and utility availability. See our industrial estimating services for more detail.
Email your drawings and specifications, and we will return a CSI-organized takeoff in Excel and PDF within 24–48 hours.