Scope Precision EstimateContact Us
Texas · TX

Construction estimating services in Texas

We prepare quantity takeoffs and CSI-organized estimates for general contractors, subcontractors, builders and developers bidding work across Texas. Every estimate is priced with ZIP-code-adjusted material and labor rates, delivered in Excel and PDF with marked-up plan sets, so your number reflects the city you are actually building in.

25 Texas citiesHouston to Waco
24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Local pricingAdjusted to each ZIP code
Census BPS · 2025
New housing units permittedTop 6 Texas cities
Houston11,878
Fort Worth9,437
Austin8,893
Dallas6,993
Frisco5,652
San Antonio5,320
U.S. Census Bureau, Building Permits Survey, 2025 annual place data.
Real permit data

What affects construction estimates in Texas construction?

Expansive clay soils and post-tensioned slab design, locally adopted IBC and IRC editions, wind and hail exposure along the Gulf and in North Texas, prevailing-wage rules on public work, and material haul distances between Houston, Dallas, Austin and the Permian Basin all move your cost per square foot.

  • The 25 Texas cities we track permitted 72,008 new housing units in 2025.
  • About 53% of those units were in buildings with two or more units; 47% were single-family.
  • Houston: the biggest pipeline: 11,878 new housing units in 2025, flat against 2024, with about 60% in multifamily buildings.

Texas is the largest construction market in the country, and the work is not uniform. A slab in Houston, a tilt-wall warehouse in Dallas, a mid-rise in Austin and a production subdivision in Fort Worth each carry different soil conditions, wind loads, inspection schedules and labor rates. An estimate built from a national cost book will miss those differences by enough to lose the job or lose the margin.

We take off your drawings by CSI MasterFormat division, quantify each line item, and price it with ZIP-code-adjusted material and labor data. You get Excel and PDF files, a marked-up plan set, and a clear scope narrative. Most projects turn around in 24–48 hours, with rush available when a bid date is close. Send plans through our blueprint takeoff and estimating team or start with a full construction takeoff.

Coverage
25 cities across Texas
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
ZIP-code-adjusted material and labor pricing
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You are pricing a hard bid or negotiated proposal and need quantities you can defend. We deliver division-level takeoffs with waste factors, unit costs and assumptions listed, so you can adjust markups and still submit on time.

02

For builders. You build the same product repeatedly across Texas metros. We keep your assemblies consistent, price each city with local rates, and flag scope gaps between trades before they become change orders on site.

03

For owners. You need a budget before design is complete. We estimate from schematic drawings, note what is excluded, and give you a division-level cost model you can compare against contractor bids as the documents develop.

Texas construction market

Texas construction market and permit activity

Texas leads the nation in residential construction volume, and the 2025 permit data shows where the work is concentrated. Understanding which metros are growing and which are cooling helps you decide where to chase bids and how to staff takeoffs.

72,008New housing units permitted, 2025
−2.4%vs. 73,772 units in 2024
$16.2BPermitted residential construction value
53%In multifamily buildings (2+ units)

Source: U.S. Census Bureau, Building Permits Survey, annual place-level data for 2024 and 2025. Covers new privately-owned residential units in 25 of the 25 Texas cities on this page; commercial and industrial work is not included.

Houston: the biggest pipeline

11,878 new housing units in 2025, flat against 2024, with about 60% in multifamily buildings.

Frisco: fastest growth

From 1,333 units in 2024 to 5,652 in 2025, a 324% increase.

Fort Worth leads single-family

5,887 single-family units in 2025, the most of any city we cover in the state.

What the 2025 permit numbers say

Across the 25 Texas cities we track, 72,008 new privately-owned residential units were permitted in 2025, down 2.4% from 73,772 in 2024. Multifamily accounted for 38,166 units, about 53% of the total, while single-family totaled 33,842 units. Permitted value reached $16.2B. For bidders, the headline is mix: multifamily volume means more Type III and Type V wood-frame and podium work, more unit-mix repetition, and more takeoff hours per project than scattered single-family. Single-family still drives the trade-by-trade bid volume in the suburbs. The 2.4% dip is a flattening, not a collapse, and the city-level swings matter more than the state total.

Where the pipeline is moving

Houston remains the largest pipeline at 11,878 units in 2025, flat against 2024, with roughly 60% in multifamily buildings. Fort Worth permitted 9,437 units, down 28%, but led all cities we cover in single-family with 5,887 units. Austin permitted 8,893 units, down 6%, and skewed heavily multifamily at 6,814 units. Dallas grew 16% to 6,993 units. Frisco was the outlier, rising from 1,333 units in 2024 to 5,652 in 2025, a 324% increase. San Antonio permitted 5,320 units, down 15%. If you bid in Frisco or Dallas, expect active multifamily pricing; in Fort Worth and San Antonio, single-family trade bids are the steadier volume.

2024 vs. 2025

Where Texas residential permits are rising and falling

Total new housing units by city. Sort by volume or by change to see which markets are heating up.

Houston11,8780%
Fort Worth9,437-28%
Austin8,893-6%
Dallas6,993+16%
Frisco5,652+324%
San Antonio5,320-15%
Denton3,438+74%
McKinney3,040-22%
Lubbock2,382+29%
El Paso1,722-9%
Arlington1,576-7%
McAllen1,504-13%
20242025
Cities we cover

Construction estimates in 25 Texas cities

Each city page covers local permit activity, the projects contractors are bidding there, and the code and site factors that change the estimate.

Houston

#1
11,878 units in 2025
Flat vs 2024
4,774 single-family · 7,104 multifamily

Dallas

#2
6,993 units in 2025
▲ 16% vs 2024
2,026 single-family · 4,967 multifamily

San Antonio

#3
5,320 units in 2025
▼ 15% vs 2024
3,888 single-family · 1,432 multifamily

Austin

#4
8,893 units in 2025
▼ 6% vs 2024
2,079 single-family · 6,814 multifamily

Fort Worth

#5
9,437 units in 2025
▼ 28% vs 2024
5,887 single-family · 3,550 multifamily

El Paso

#6
1,722 units in 2025
▼ 9% vs 2024
1,466 single-family · 256 multifamily

Arlington

#7
1,576 units in 2025
▼ 7% vs 2024
532 single-family · 1,044 multifamily

Corpus Christi

#8
1,384 units in 2025
▲ 7% vs 2024
1,220 single-family · 164 multifamily

Plano

#9
313 units in 2025
▼ 61% vs 2024
138 single-family · 175 multifamily

Laredo

#10
1,340 units in 2025
▼ 7% vs 2024
1,029 single-family · 311 multifamily

Lubbock

#11
2,382 units in 2025
▲ 29% vs 2024
1,561 single-family · 821 multifamily

Garland

#12
159 units in 2025
▼ 71% vs 2024
107 single-family · 52 multifamily

Irving

#13
103 units in 2025
▼ 81% vs 2024
69 single-family · 34 multifamily

Frisco

#14
5,652 units in 2025
▲ 324% vs 2024
1,090 single-family · 4,562 multifamily

McKinney

#15
3,040 units in 2025
▼ 22% vs 2024
1,649 single-family · 1,391 multifamily

Amarillo

#16
865 units in 2025
▼ 29% vs 2024
529 single-family · 336 multifamily

Grand Prairie

#17
664 units in 2025
▼ 58% vs 2024
356 single-family · 308 multifamily

Brownsville

#18
1,421 units in 2025
▲ 33% vs 2024
812 single-family · 609 multifamily

Killeen

#19
910 units in 2025
▼ 20% vs 2024
490 single-family · 420 multifamily

Denton

#20
3,438 units in 2025
▲ 74% vs 2024
898 single-family · 2,540 multifamily

Pasadena

#21
87 units in 2025
▲ 85% vs 2024
87 single-family · 0 multifamily

McAllen

#22
1,504 units in 2025
▼ 13% vs 2024
786 single-family · 718 multifamily

Mesquite

#23
491 units in 2025
▼ 32% vs 2024
491 single-family · 0 multifamily

Midland

#24
1,317 units in 2025
▼ 12% vs 2024
1,317 single-family · 0 multifamily

Waco

#25
1,119 units in 2025
▲ 59% vs 2024
561 single-family · 558 multifamily
Single-familyMultifamily (2+ units)
Local factors

What changes a construction estimate in Texas

These are the cost drivers we adjust for on every Texas takeoff. They are the reason a square-foot number from another state will not hold here.

Code adoption by jurisdiction

Texas has no statewide commercial building code; each city adopts its own edition of the IBC and IRC, and amendments differ between Houston, Dallas, Austin and the smaller metros. Wind-borne debris, energy code stringency and fire sprinkler thresholds can all change scope. We read the adopted edition noted on your permit set and price to it, but confirm the current edition with the local building department before you lock a bid, because amendments change mid-cycle.

IBC · IRC · IECC · local building department

Expansive soils and foundations

Much of North and Central Texas sits on expansive clay that shrinks and swells with moisture. That drives post-tensioned slab design, deeper beam sections, pier and beam alternatives, and soil treatment or over-excavation in some lots. On the Gulf Coast, you also price for high water tables and occasional piling. We take off slab thickness, beam depth, reinforcement and post-tension cable by area, and carry a separate line for geotechnical recommendations so the foundation scope is not buried in the concrete number.

post-tensioned slab · geotechnical report · pier and beam · expansive clay

Wind, hail and flood exposure

Gulf Coast counties carry wind-borne debris requirements and floodplain elevation rules, while North Texas hailstorms push roofing specifications toward Class 4 impact-rated shingles and heavier underlayment. Wind uplift changes roof fastener schedules, deck attachment and shear wall nailing. We quantify roofing squares, underlayment, fasteners and sheathing by roof plane, and note the wind speed and exposure category assumed so your [roofing estimate](/roofing-estimating-services/) matches the design criteria.

wind-borne debris region · floodplain · Class 4 shingles · wind uplift

Labor rates and wage rules

Craft wages vary between metros and between residential and commercial work, and public projects can carry prevailing-wage requirements. Open-shop residential framing in the suburbs prices differently from commercial work in downtown Austin or Houston. We price labor by trade and by ZIP code rather than applying one state average, and we separate material from labor so you can test your own crew rates. If a project is publicly funded, tell us at intake so the wage basis is set correctly.

prevailing wage · open shop · craft labor rates · ZIP-code pricing

Permitting and inspection timelines

Permit review times and inspection sequences differ by city and can affect general conditions, temporary power and equipment rental duration. A project that sits in review for months carries carrying costs that belong in your estimate, not in your contingency. We build general conditions from a stated schedule assumption and flag long-lead items. Verify current review times and fee schedules with the permitting authority, since they change with staff levels and volume.

permit review · inspection sequence · general conditions · long-lead items

Materials and haul logistics

Texas is large enough that freight matters. Ready-mix, structural steel, masonry and drywall deliveries price differently in the Permian Basin than in Dallas, and remote sites add haul and mobilization. We take off quantities by assembly, apply typical waste factors, and note where freight or a second mobilization should be carried. For sitework, we quantify cut, fill, import and haul separately, which you can review in our [sitework estimating](/sitework-estimating-services/) scope.

ready-mix · freight · cut and fill · mobilization
Texas estimating guide

How Texas conditions show up in a takeoff, trade by trade

Texas takes off differently by trade because soil, wind, code and labor vary by metro. Here is where we adjust quantities and line items on the drawings you send.

Concrete and foundations

We take off post-tensioned slab thickness, beam depth, reinforcement tonnage and cable by area, not by a square-foot allowance. In expansive clay areas of Dallas, Fort Worth and Austin, we carry over-excavation, select fill and soil treatment as separate lines from the geotechnical report. On the Gulf Coast around Houston and Corpus Christi, we price high water tables, occasional piling and thicker slab edges. Grade beams, pier and beam alternatives and slab penetrations are quantified individually. Our [concrete estimating](/concrete-estimating-services/) scope separates ready-mix, rebar, post-tension materials and finishing labor so you can see where the foundation cost actually sits.

Roofing

Hail exposure in North Texas drives Class 4 impact-rated shingles and heavier underlayment, and Gulf Coast wind-borne debris rules change fastener schedules and deck attachment. We take off roofing squares by roof plane, underlayment by square, ridge and hip length, valley flashing, drip edge and fasteners by count. On commercial low-slope work, we quantify membrane area, insulation thickness, cover board and edge metal separately. We note the wind speed and exposure category assumed so your [roofing estimate](/roofing-estimating-services/) matches the design criteria stamped on the drawings.

Interior finishes and drywall

Drywall thickness, fire-rated assemblies and finish level vary by building type and code. We take off board by square foot with typical waste, joint compound and tape by area, and studs by wall length. In multifamily work, unit repetition lets us count one unit type and multiply, but we still take off corridor and common-area ceilings separately because they often carry different fire ratings. Texture, paint and flooring are quantified by room or by unit, with transition strips and base counted by linear foot. Our [drywall estimating](/drywall-estimating-services/) and [flooring](/flooring-estimating-services/) teams use the same marked-up plan set so quantities tie out across trades.

Framing and lumber

Texas residential framing is mostly dimensional lumber with engineered floor systems, but wind and seismic detailing in some areas changes nailing, hold-downs and sheathing. We count studs by wall length and height with typical waste factors, take off headers, trusses or joists by span, and list sheathing by panel count. In multifamily work in Houston, Austin and Frisco, we take off repetitive unit plans and multiply, then add common-area framing separately. Roof pitch and overhang change rafter and truss quantities, so we read the roof plan rather than assume. See our [lumber takeoff](/lumber-takeoff-services/) format for how these quantities are organized.

Electrical

Texas adopts the NEC edition by local jurisdiction, so we read the permit set for the adopted year before pricing. We count devices, fixtures, panelboards, feeders and branch circuits by type and length, and separate gear from rough-in labor. In data center and semiconductor work, power density and redundancy change feeder sizes and raceway fill, which we take off from the one-line diagram and equipment schedules. Residential multifamily in Houston, Dallas and Austin repeats unit panels, so we take off one unit and multiply, then add house panels and site lighting. See our [electrical estimating](/electrical-estimating-services/) page for the division-level breakdown.

Scope gaps we see on Texas bids

  • Soil treatment, over-excavation and select fill left out of the concrete scope, then added as a change order after the geotechnical report is issued.
  • Wind uplift fasteners and sheathing attachment not carried in the roofing or framing bid, discovered at inspection.
  • Temporary power, dewatering and dust control excluded from general conditions on Gulf Coast and remote sites.
  • Fire-rated assembly substitutions where the drywall contractor prices a generic board instead of the listed assembly.
  • Freight and second mobilization not carried for Permian Basin or South Texas projects far from material suppliers.
  • Permit fee and plan review cost assumed by the owner but actually paid by the contractor under the bid form.
  • Final cleaning, punch list labor and touch-up paint omitted from the finish trades on multifamily turns.
Services in Texas

Estimating services for Texas projects

Order a single trade or the whole building. Every estimate is organized by CSI MasterFormat and priced to your Texas ZIP code.

Property types

Property types we estimate in Texas

The 2025 permit mix shows where volume sits: 72,008 new privately-owned residential units across the 25 cities we track, with multifamily at 53% and single-family at 33,842 units. Here is how we approach the property types behind those numbers.

Multifamily

Houston permitted 11,878 units in 2025, about 60% multifamily, and Austin skewed to 6,814 multifamily units. Frisco jumped to 5,652 units, mostly multifamily. We take off repetitive unit plans, then common areas, amenity decks and parking separately.

Watch for: Unit-mix repetition, fire-rated assemblies, and amenity MEP loads.

Single-family

Fort Worth led our Texas cities with 5,887 single-family units in 2025, and San Antonio permitted 3,888. Production builders repeat plans across subdivisions, so we build assemblies once and price each city with local rates.

Watch for: Plan repetition, option pricing, and lot-specific foundation depth.

Data centers and industrial

Texas demand drivers include data centers and semiconductor plants, mostly in the Dallas, Austin and Houston corridors. These projects carry heavy electrical, mechanical and structural scopes with long-lead equipment.

Watch for: Equipment schedules, raceway fill, and redundancy in feeders.

Commercial and retail

Dallas grew 16% to 6,993 residential units in 2025, and commercial work follows rooftops. Tilt-wall warehouses, retail shells and tenant improvements each have different division splits and inspection sequences.

Watch for: Shell versus TI scope, sprinkler thresholds, and site utilities.

Who we provide estimates for

Who we estimate for in Texas

General contractors

You need division-level quantities to compare subcontractor bids and defend your number. We deliver CSI-organized Excel files with marked-up plans so your buyout matches the estimate.

Subcontractors

You bid concrete, framing, drywall or electrical on short cycles. We take off your trade only, with waste factors and unit costs, so you can mark up and submit before the bid date.

Production builders

You build the same plans across Houston, Dallas, Austin and Fort Worth. We keep assemblies consistent and price each ZIP code with local material and labor rates.

Developers

You need a budget before design is complete. We estimate from schematic drawings, state exclusions, and give you a division-level model to compare against contractor bids.

Architects

You want a cost check during design. We quantify from your drawings and flag scope gaps between trades before they become change orders in construction.

Owners and facility teams

You are planning a capital project or renovation. We estimate from existing conditions and drawings, note what is excluded, and organize the number by CSI division for your review.

How it works

From Texas plans to a bid-ready estimate

  1. Upload your plansPDF, DWG or a plan-room link, with specs, the geotechnical report and addenda if you have them.
  2. Get a quoteWe review the set and reply with a price and a delivery date before any work starts.
  3. We take off and priceQuantities by CSI section, priced to your Texas ZIP code or your own supplier and labor rates.
  4. Receive your estimateExcel estimate and color-coded plans, checked by a second estimator.
Deliverables

What you receive

  • Excel estimate organized by CSI division with material, labor and equipment columns
  • Marked-up PDF plans, color-coded by trade so every quantity traces to a sheet
  • Texas-specific line items where they apply, shown separately for review
  • Material lists ready for supplier quotes
  • Written scope, assumptions and exclusions to attach to your bid
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

FAQ

Texas construction estimating questions

What does a Texas construction estimate cost?

Pricing depends on project type, size and drawing completeness. We do not publish a flat rate because a 4,000-square-foot custom home and a 200-unit multifamily building take different hours. Send your plans through our get an estimate page and we will quote the takeoff and estimate before we start. Most projects turn around in 24–48 hours, with rush available when a bid date is close. We confirm the scope and fee in writing so there are no surprises.

How fast can you turn around a Texas takeoff?

Most projects are delivered in 24–48 hours from receipt of complete drawings. Rush service is available for tight bid dates. Timing depends on drawing completeness and project size; a full multifamily set with MEP takes longer than a single-family plan. We confirm the schedule when we quote so you know when to expect the Excel and PDF files. If drawings are incomplete, we note assumptions and can start with what you have, then update when the full set is available.

Do you price with Texas labor and material rates?

Yes. We use ZIP-code-adjusted material and labor pricing so a Houston slab and a Midland slab carry different costs. We separate material from labor so you can test your own crew rates. For public projects with prevailing-wage requirements, tell us at intake so the wage basis is set correctly before we price. We use RSMeans data as a baseline and adjust for local market conditions. If you have recent supplier quotes or crew rates, we can incorporate them.

What format do you deliver?

We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. The Excel file includes quantities, units, unit costs and extensions. The PDF is for review and submission. You can sort and adjust the Excel file to match your own bid form. We also include a summary tab by division and a detail tab for each trade. If you need a different format, tell us at intake and we will accommodate.

Which Texas cities do you cover?

We estimate projects across Texas, including Houston, Dallas, San Antonio, Austin, Fort Worth, El Paso, Arlington, Corpus Christi, Plano, Laredo, Lubbock, Garland, Irving, Frisco, McKinney, Amarillo, Grand Prairie, Brownsville, Killeen, Denton, Pasadena, McAllen, Mesquite, Midland and Waco. Pricing is adjusted by ZIP code within each market. If your project is outside these cities, we can still estimate it using the nearest market data and adjust for local conditions. Tell us the project address at intake.

Do you handle both residential and commercial?

Yes. We take off single-family, multifamily, commercial, industrial and institutional work. The 2025 permit data we track covers new privately-owned residential units only, but our estimating scope covers all CSI divisions for commercial and residential projects. Tell us the project type at intake so we apply the right assemblies and waste factors. For commercial work, we often need specifications and equipment schedules in addition to drawings. For residential, plan repetition and option pricing are key.

What do you need to start an estimate?

Send the complete drawing set, including architectural, structural, MEP and civil if available, plus the geotechnical report for foundation work. Specifications and finish schedules help. If drawings are schematic, tell us so we can note assumptions and exclusions. The more complete the set, the fewer qualifications in the estimate. We also need the project address to apply ZIP-code-adjusted pricing. If you have a bid form or scope sheet, include it so we can organize the estimate to match.

How do you handle Texas code differences?

Texas has no statewide commercial building code; each jurisdiction adopts its own IBC and IRC edition with local amendments. We read the adopted edition noted on your permit set and price to it. Because amendments change, confirm the current edition and local amendments with the building department before you lock a bid. We note the code basis assumed in the estimate. For electrical, we follow the NEC edition adopted by the local jurisdiction. For plumbing and mechanical, we follow the adopted IPC/UPC and IMC/UMC editions.

Where does the permit data on this page come from?

The figures come from the U.S. Census Bureau Building Permits Survey, annual place-level data for 2025, covering new privately-owned residential units only. Across the 25 Texas cities we track, 72,008 units were permitted, down 2.4% from 73,772 in 2024. The data does not include commercial or non-residential construction. We use it to show where residential volume is concentrated, not as a measure of total construction activity. For commercial and industrial market data, we rely on other sources and our own project experience.

Can you estimate from schematic drawings for a budget?

Yes. We estimate from schematic drawings when design is incomplete, using typical assemblies and clearly stating assumptions and exclusions. The result is a division-level cost model you can compare against contractor bids as documents develop. Expect wider ranges than a full construction set, and plan to update the estimate when design advances. We can also provide a list of missing information that would improve accuracy. For early budgets, we often use parametric ratios for MEP and finishes based on building type and size.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Other states we cover

Send your Texas plans for a takeoff

Send your drawings through our [get an estimate](/get-estimate/) page and we will return a CSI-organized takeoff with ZIP-code-adjusted pricing, usually within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us