Sitework takeoff
Clearing, excavation, fill and spoil haul for Valley sites with caliche and high water tables.
CY · LF · TONWe prepare quantity takeoffs and cost estimates for McAllen contractors, developers and owners. Plans come back in Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets. Most projects turn around in 24–48 hours, and rush service is available.
McAllen pricing is driven by Hidalgo County labor and material supply, a hot-humid climate that pushes roofing and HVAC quantities, expansive clay soils that drive foundation and sitework costs, and a permit mix that runs about 48% multifamily. ZIP-code-adjusted pricing matters more here than in inland Texas markets.
McAllen sits in Hidalgo County at the southern end of the Rio Grande Valley, where the building season runs nearly year-round and the climate loads are different from the rest of Texas. Roofing assemblies take more UV and wind exposure, HVAC systems run longer cooling hours, and slab-on-grade foundations have to account for expansive clay and caliche. Those conditions change quantities, not just unit prices, so a takeoff copied from a Dallas or Austin job will miss scope. We build estimates from the drawings up: measured quantities by assembly, waste factors, and ZIP-code-adjusted material and labor pricing for the McAllen area.
Residential work here leans toward single-family subdivisions and low-rise multifamily, while commercial construction follows retail, medical office, education and light industrial along the expressway corridors. We cover both. If your project is part of a broader Texas program, start with our Texas construction estimating page, and if you are bidding against crews from other Valley or Central Texas markets, our Pasadena and Mesquite pages show how we handle those pricing areas.
For bidders. You need a number you can defend in a bid opening. We deliver line-item quantities, waste factors and ZIP-adjusted pricing so your labor and material assumptions hold up under review.
For builders. You are buying out trades and scheduling crews. Our takeoffs break scope by CSI division so you can issue clean bid packages to framing, concrete, roofing and MEP subcontractors without overlap.
For owners. You want a budget before design is finished. We estimate from schematic plans and mark assumptions clearly, so you can compare options and hold the design team to a target.
Select a bar to compare McAllen with the largest Texas markets we cover.
1,504 new housing units in 2025 (-12.7% vs 2024).
786 single-family · 718 multifamily (48%).
McAllen issued 1,504 new privately-owned residential units in 2025, down 13% from 1,722 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family accounted for 786 units and multifamily 718, so multifamily was about 48% of the total. Permitted value was $255M, averaging $169,500 per unit. That mix matters when you bid: a market that is nearly half multifamily means more podium and wrap construction, more Type III and Type V wood framing over concrete, and more MEP coordination per square foot than a subdivision-heavy market. It also means fewer repeat single-family plans, so takeoff accuracy on each new set carries more weight. McAllen ranked 12th of 25 covered Texas cities by units and took 2.1% of the 72,008 covered state total, so you are competing in a mid-size market where a missed quantity is hard to absorb across a small pipeline.
The commercial side runs along the expressway and retail corridors, with medical office, education, warehouse and light industrial projects. Residential infill and subdivision work spreads north and west of the city. Both sides price differently in the Valley: concrete and masonry supply is regional, roofing and drywall crews are in demand, and haul-off distances for spoil affect sitework. We use Bluebeam Revu and PlanSwift for takeoff and RSMeans data with ZIP-code adjustment for pricing, so your McAllen estimate reflects local material and labor rather than a national average. If you are also tracking work in Midland, Waco, Killeen or Denton, we price each market separately because the labor and haul costs do not transfer.
We estimate the trades that drive cost in Hidalgo County, from dirt to MEP trim-out.
Clearing, excavation, fill and spoil haul for Valley sites with caliche and high water tables.
CY · LF · TONSlab-on-grade, paving, curb and tilt-wall quantities with formwork and reinforcement.
CY · SF · LBPost-tension slabs and grade beams sized for expansive clay movement.
SF · CY · LBWood and light-gauge framing for single-family and low-rise multifamily buildings.
LF · EA · BFTPO, modified bitumen and shingle systems with Valley wind and UV exposure in mind.
SQ · LF · EAHVAC, plumbing and electrical quantities for long cooling seasons and code-driven ventilation.
TON · LF · EAProduction and custom home takeoffs priced for McAllen subdivision construction.
SF · LF · EARetail, medical office, education and light industrial estimates by CSI division.
SF · CY · TONYou bid Hidalgo County schools, retail shells and city work against Rio Grande Valley competitors. We return division-level quantities you can carry into a bid form and defend line by line.
Framing, concrete and roofing crews in McAllen price from plan sets, not from lump sums. We isolate your scope, including waste and laps, so your quote covers what you actually install.
You are underwriting subdivision phases and low-rise multifamily near the expressways. We estimate from schematic plans so your pro forma reflects real unit costs before you commit land.
Your McAllen details drive quantities: roof slopes, wall assemblies, slab thickness. We read them the same way and flag where drawings leave scope undefined for bidders.
You are budgeting a clinic, warehouse or school addition in Hidalgo County. We give you a cost basis tied to ZIP-adjusted pricing so you can compare bids against a real number.
You handle repairs and tenant improvements across McAllen retail and office. We price small-scope work by division so you can approve a scope without overpaying for it.
We estimate projects across McAllen and the surrounding Rio Grande Valley, from central commercial corridors to the growing residential edges of Hidalgo County.
McAllen's 2025 permit activity was split almost evenly between single-family and multifamily units, with commercial work following the expressway and medical corridors. We estimate all of it.
Production and custom homes in Hidalgo County subdivisions. We take off slab, framing, roofing, insulation and MEP by plan, with waste factors for the roof pitch and wall heights shown.
Watch for: Roof underlayment, wind-rated shingles, slab vapor barrier
Multifamily was 48% of permitted units in 2025, mostly garden-style and walk-up buildings. We estimate shared walls, breezeways, stair framing and per-unit mechanical rough-in.
Watch for: Fire separation, common-area MEP, unit mix quantities
Tenant-ready shells and pad buildings along McAllen's commercial corridors. We price structure, storefront glazing, roof screening and utility stubs to the tenant meter.
Watch for: Storefront framing, grease interceptor, ADA restroom count
Clinics, imaging suites and professional offices near the medical district. We take off exam-room partitions, medical gas rough-in, specialty HVAC and casework from the plan set.
Watch for: Lead-lined walls, medical gas, dedicated exhaust
Classroom additions, gyms and municipal facilities in Hidalgo County. We estimate masonry, structural steel, roofing and finishes by division for public bid forms.
Watch for: Prevailing wage, masonry reinforcement, roof drainage
Distribution and light manufacturing buildings near the expressway. We price slab thickness, tilt-wall or metal panels, dock equipment and racking-ready power distribution.
Watch for: Slab flatness, dock levelers, fire sprinkler density
McAllen pricing is not Austin or Dallas pricing. Six local conditions move quantities and unit costs on almost every job we take off.
McAllen and Hidalgo County enforce adopted editions of the IBC, IRC, IECC and NEC, and the city reviews plans before issuing permits. Wind and energy provisions in the adopted editions can change roof attachment schedules, wall bracing and insulation values, which changes quantities. Confirm the adopted code edition and local amendments with the McAllen building department before you lock your bid.
IBC · IRC · IECC · NECExpansive clay and caliche are common in Hidalgo County, and a geotechnical report often drives the foundation design. That can mean deeper pier embedment, thicker slab edges or post-tensioned slabs instead of conventional reinforcement. The takeoff changes in concrete volume, rebar tonnage and excavation, not just in the unit price for a square foot of slab.
Expansive clay · Caliche · Post-tensioned slab · Geotechnical reportMcAllen runs long cooling seasons and sits in a high-wind region, so roofing assemblies and HVAC equipment take more load than in north Texas. Shingle ratings, underlayment and attachment schedules follow the wind zone, and condenser sizing reflects cooling hours. Those choices change material counts and equipment capacity, which show up in the estimate.
Wind zone · Cooling hours · Roof underlayment · HVAC sizingCrews in the Rio Grande Valley move between residential subdivisions, commercial shells and industrial work, and availability shifts by season and by trade. Masonry, drywall and roofing labor can tighten when several large projects overlap. We price labor from ZIP-adjusted data for the McAllen area and note where a trade is likely to carry a premium.
Rio Grande Valley crews · Masonry · Drywall · RoofingThe Valley is flat, and storm drainage is a major cost driver on any site larger than a few lots. Detention, swales, culverts and paving quantities depend on the drainage study and the city's requirements. We take off site work separately from the building so you can see how much of your budget is underground before you bid.
Detention · Swales · Culverts · Drainage studyMost building materials reach McAllen by truck from San Antonio, Houston or Monterrey-area suppliers, so freight and lead times affect pricing. Concrete, masonry and steel can be sourced locally, but specialty equipment may carry longer delivery. We note where freight or a substitution changes the number, and we price from current ZIP-adjusted material data.
Freight · Lead times · Concrete · MasonryThe numbers below reflect how Hidalgo County's climate, soils, and building stock change what you count and how you price it. Each section names the line items that move most on McAllen-area plans.
McAllen sits on expansive clay soils that shrink and swell with moisture, so a takeoff here starts with over-excavation and lime or cement stabilization, not just cut and fill. Count the depth of treatment the geotech report requires, then add haul-off for the unsuitable material. Flat grades across much of the city mean long drainage runs, so storm sewer, trench excavation, and backfill quantities run higher than the building footprint suggests. You also need to carry dust control and watering during dry spells. If you are pricing site packages, our sitework estimating services can break out these items by area and depth.
Wood-frame construction dominates McAllen's residential permits, but commercial work often shifts to light-gauge steel or CMU. For wood, count studs at 16 inches on center plus plates, headers, and blocking, then add sheathing and housewrap. Wind uplift requirements in this part of Texas mean more connectors, straps, and hold-downs than a typical inland market. Drywall takeoffs should separate moisture-resistant board for bathrooms and kitchens. Ceiling heights in newer commercial shells run taller, which increases both stud length and drywall square footage. Framing estimating services can return a stud-by-stud count with waste built in.
Cooling loads in McAllen run high for most of the year, so HVAC tonnage and duct sizing are larger than the same square footage in a milder climate. A takeoff should count condenser pads, line sets, drain pans, and the extra insulation on ducts in unconditioned spaces. Electrical work includes more panel capacity for air conditioning and, on commercial jobs, for refrigeration. Plumbing counts depend on fixture groups, but also on the backflow and grease interceptor requirements that come with food service. Our MEP estimating services organize these by system so you can see where the cost sits.
Post-tension slabs are standard for both single-family and low-rise commercial work in McAllen because they handle the clay movement better than conventional rebar mats. A takeoff needs tendon count and length, anchorages, and the added concrete volume for thicker slab edges. Grade beams and pier-and-beam systems appear on larger commercial jobs where the geotech calls for deeper support. Watch the waste factor on ready-mix: typical waste runs 5 to 10 percent, but small pours and pump setups push it higher. Our foundation estimating services cover slab, pier, and grade beam takeoffs with the reinforcing separated.
The combination of high heat, UV, and occasional hurricane-season wind drives roofing specifications here. Standing seam metal and modified bitumen are common on commercial; architectural shingles dominate residential. A takeoff must include underlayment, ice and water shield at valleys and penetrations, drip edge, and the fastening pattern the wind rating requires. Insulation thickness in the roof assembly is set by the energy code, so confirm the adopted edition with the local building department before you price R-values. Roofing estimating services can separate the membrane, flashing, and metal trim so your bid matches the spec section.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Post-tension slab, 5 in. thick | 1,850 | SF |
| 03 20 00 | Rebar, #4, slab and beams | 4,200 | LB |
| 05 12 00 | Structural steel, lintels and posts | 380 | LB |
| 06 10 00 | Framing, studs and plates | 2,100 | LF |
| 07 21 00 | Batt insulation, R-13 walls | 1,900 | SF |
| 09 29 00 | Drywall, 1/2 in., hung and finished | 3,400 | SF |
| 23 31 00 | Ductwork, insulated flex | 220 | LF |
| 26 00 00 | Electrical rough-in, devices and fixtures | 1 | LOT |
Dimensions are illustrative. You are pricing a one-story house with a 50 ft by 37 ft footprint and a 2 ft slab overhang on all sides. The slab is 5 in. thick with a 12 in. by 12 in. edge beam.
Step 1 — Slab area. Add the overhang to each dimension: 50 + 2 + 2 = 54 ft; 37 + 2 + 2 = 41 ft. Area = 54 × 41 = 2,214 SF.
Step 2 — Concrete volume. Slab: 2,214 SF × (5/12) ft = 922.5 CF. Edge beam: perimeter = 2 × (54 + 41) = 190 LF; beam volume = 190 LF × 1 ft × 1 ft = 190 CF. Total = 922.5 + 190 = 1,112.5 CF. Convert to cubic yards: 1,112.5 ÷ 27 = 41.2 CY.
Step 3 — Waste. Ready-mix waste typically runs 5 to 10 percent. At 7 percent: 41.2 × 1.07 = 44.1 CY. Round to 45 CY.
Step 4 — Tendons. Assume tendons at 4 ft on center each way. Long direction: 54 ÷ 4 = 13.5, round to 14 tendons at 41 ft = 574 LF. Short direction: 41 ÷ 4 = 10.25, round to 11 tendons at 54 ft = 594 LF. Total tendon length = 574 + 594 = 1,168 LF. Add 2 ft per tendon for anchorage tails: 25 tendons × 2 ft = 50 LF. Total = 1,218 LF.
Step 5 — Rebar. Edge beam uses four #4 bars continuous: 190 LF × 4 = 760 LF. Convert to pounds: #4 bar weighs 0.668 lb/ft, so 760 × 0.668 = 508 LB. Add slab temperature steel if the design calls for it; on a typical post-tension slab it may be omitted, so confirm with the structural sheets.
| Step | Calculation | Result |
|---|---|---|
| Slab area | 54 ft × 41 ft | 2,214 SF |
| Concrete volume | 922.5 CF + 190 CF | 1,112.5 CF |
| Volume in CY | 1,112.5 ÷ 27 | 41.2 CY |
| With 7% waste | 41.2 × 1.07 | 44.1 CY |
| Tendon length | 1,168 LF + 50 LF | 1,218 LF |
| Edge beam rebar | 760 LF × 0.668 lb/ft | 508 LB |
Carry these quantities into your pricing with McAllen ZIP-code-adjusted material and labor rates. If you need the full division-by-division takeoff, our concrete estimating services team can return it in Excel and PDF within 24 to 48 hours.
Expansive clay moves with moisture, so most designs call for either post-tension slabs or pier-and-beam foundations. A takeoff must include the over-excavation depth and stabilization method the geotech report specifies, plus the reinforcing or tendons that resist movement. If the report is not available at bid time, we price a range and flag the stabilization as an allowance so you can adjust when the report arrives.
High UV and hurricane-season wind drive both material choice and fastening. Metal and modified bitumen are common on commercial roofs; architectural shingles on residential. Count underlayment, ice and water shield at valleys and penetrations, drip edge, and the fastening pattern the wind rating requires. Insulation thickness depends on the adopted energy code edition, so confirm that with the local building department before pricing R-values.
Yes, the architectural, structural, civil, and MEP sheets let us produce a complete takeoff by CSI division. If only part of the set is available, we can estimate the divisions you have and mark the rest as pending. Marked-up plan sets come back with your Excel and PDF so you can see exactly where each quantity came from.
Most projects return in 24 to 48 hours. Larger commercial or multi-family jobs may take longer depending on sheet count and the number of divisions. Rush service is available if your bid deadline is tight. Send the plans and we will confirm the turnaround before we start.
We use Bluebeam Revu for plan markup, PlanSwift for quantity extraction, and RSMeans data for pricing. Material and labor rates are adjusted by ZIP code so the numbers reflect McAllen, not a national average. Deliverables are Excel and PDF organized by CSI MasterFormat division, with the marked-up plan set attached.
Yes. Multi-family work in McAllen often includes post-tension slabs, CMU or wood framing, and larger MEP systems. We break out quantities by building and by floor so you can phase the buyout. Our multi-family estimating services cover everything from site work through finishes, with separate line items for each division.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. The survey does not include commercial or industrial permits, so it is a residential indicator only. We use it to show the volume and mix of housing activity, not to price any specific project.
We cover all 50 CSI MasterFormat divisions, from Division 01 general requirements through Division 48 electrical power generation. On a typical McAllen commercial job, the heaviest divisions are 03 concrete, 05 metals, 08 openings, 09 finishes, and 23 HVAC. If a spec section is unusual, we flag it and explain how we priced it.
Waste factors are applied by material and installation method. Typical ranges are 5 to 10 percent for ready-mix concrete, 10 percent for framing lumber, and 10 to 15 percent for drywall and tile. We show the waste line separately in the Excel file so you can adjust it to your own purchasing and storage practices. Nothing is buried in a lump sum.
Yes. We cover McAllen and the surrounding Hidalgo County area, plus other Texas cities such as Killeen, Denton, Pasadena, Mesquite, Midland, and Waco. If your project is in a different ZIP code, we adjust material and labor pricing accordingly. The takeoff method stays the same; only the rates change.
Upload your drawings and we will return a division-by-division takeoff in Excel and PDF within 24 to 48 hours.