Sitework and grading
Cut-fill balances, engineered fill, and detention for clay subgrades on Pasadena lots and industrial pads.
CY · SFPasadena sits in Harris County with black clay soils, Gulf humidity and a heavy industrial corridor along the Houston Ship Channel. We produce CSI MasterFormat takeoffs for residential, commercial and industrial projects here, delivered in Excel and PDF within 24–48 hours.
Three drivers shape Pasadena numbers: expansive clay subgrades that push pier and grade-beam quantities higher than regional averages, Gulf Coast wind and flood requirements that add strapping, sheathing and elevation costs, and a petrochemical-adjacent industrial base that drives tilt-wall, pipe rack and structural steel scopes alongside single-family infill.
Pasadena is a Harris County city of roughly 150,000 people, bordered by Houston to the west and Deer Park to the east, with the Houston Ship Channel forming its southern edge. Construction here splits into three buckets: single-family infill and replacement housing on the north side, retail and light commercial along Spencer Highway and Shaver Street, and industrial maintenance and expansion work tied to the refineries and chemical plants. Each bucket prices differently, and a takeoff that ignores the local subgrade or wind zone will miss quantities that matter.
We build estimates from your plan set, not from square-foot averages. Every takeoff is organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor, and returned with marked-up plan sets so you can see exactly where each quantity came from. If you are bidding work across the metro, our Texas construction estimating page covers how we handle the state's prevailing-wage and code variations. For scopes that lean industrial, see industrial estimating services; for residential infill, residential estimating services.
For bidders. You need quantities you can defend in a bid review. We return line items by division with waste factors, unit costs and marked-up plans, so your bid holds up when the GC asks how you got 340 CY of pier concrete.
For builders. You are buying out subs and ordering material. We produce takeoffs you can hand to a concrete or framing crew, with quantities broken by area, elevation and pour, so your purchase orders match what actually gets installed.
For owners. You are comparing bids or checking a budget. We reconcile contractor proposals against an independent quantity takeoff and flag scope gaps, so you know whether a low number is a real price or a missing line item.
Select a bar to compare Pasadena with the largest Texas markets we cover.
87 new housing units in 2025 (+85.1% vs 2024).
87 single-family · 0 multifamily (0%).
Pasadena issued 87 new privately-owned residential units in 2025, up from 47 in 2024 — about 85% growth — with a permitted value of $15M and an average of $170,300 per unit. All 87 were single-family; multifamily share was zero. Among the 25 covered Texas cities in our dataset, Pasadena ranks 25th by units and accounts for 0.1% of the state's 72,008 permitted units. For bidders, that means the residential pipeline is real but thin: a handful of builders control most of the lots, and winning work often depends on being the second or third bidder a builder calls. The $170,300 average unit value suggests modest finish levels and straightforward plans, so your estimate has to be tight on framing, slab and roofing quantities rather than loaded with contingency. Compare this to Denton or Killeen, where unit counts run higher and multifamily is a larger share.
Residential permits tell only part of the story. Pasadena's industrial corridor along the Ship Channel and its commercial strips on Spencer Highway generate tilt-wall warehouses, pipe racks, tank foundations, and tenant build-outs that never appear in residential permit counts. These scopes price on steel tonnage, concrete yardage, and process piping linear feet, not on square-foot averages. If you are bidding plant maintenance or a warehouse shell, the estimate needs separate line items for engineered fill, pier foundations, structural steel, metal building systems, and fire protection. We cover those scopes under commercial estimating services and industrial estimating services, and we price them with the same ZIP-adjusted labor and material basis. Nearby Mesquite and Midland show similar industrial-residential splits.
We produce quantity takeoffs and cost estimates for the scopes that dominate Pasadena and the surrounding Harris County industrial corridor.
Cut-fill balances, engineered fill, and detention for clay subgrades on Pasadena lots and industrial pads.
CY · SFGrade beams, drilled piers, and slab-on-grade quantities sized for expansive clay and high water tables.
CY · LFWall, floor and roof framing with waste factors for wind-braced residential and light commercial structures.
BF · LFTPO, modified bitumen and shingle systems with flashing and edge metal for Gulf Coast wind uplift.
SQ · LFHVAC, plumbing and electrical takeoffs for tenant build-outs and plant support buildings.
LF · EABeams, columns, bracing and connection quantities for tilt-wall and pipe rack scopes.
TON · EAUnit-by-unit quantities for garden-style and townhome projects when the multifamily pipeline returns.
SF · EALine-by-line comparison of subcontractor bids against our takeoff to expose missing scope before award.
LSBidding Deer Park and Pasadena industrial packages means pricing tank pads, pipe racks and structural steel against plant shutdown schedules. You need division-level quantities that survive a bid review with a refinery owner's engineer.
Pasadena sits on clay soils that shrink and swell, so your bid has to carry pier depth, grade beams and slab reinforcement accurately. We take off by pour and area so your rebar and concrete orders match the plans.
North-side infill lots and replacement homes along Shaver Street require framing, roofing and MEP quantities at a scale big builders ignore. We price the whole house by division so you can buy out trades cleanly.
Spencer Highway and Fairmont Parkway retail shells go up fast, and tenant improvements follow. We take off demising walls, storefront, MEP rough-in and ceiling systems so your fit-out bid is complete.
Ship Channel plants run turnarounds and small capital projects on short cycles. We produce quantity takeoffs from P&IDs, isometrics and site plans when there is no full architectural set to work from.
You need a second opinion on a contractor's proposal before you sign. We reconcile bids against an independent takeoff, flag missing scope and confirm whether the low number reflects a real price.
We price work across Pasadena and the surrounding Harris County industrial corridor, from Vince Bayou to the Ship Channel. If your project sits in one of these areas, send the plan set and we will take it off by division.
The 2025 permit data shows 87 new privately-owned residential units, all single-family, with no multifamily permits and an average value of $170,300 per unit. Industrial and commercial work moves through separate permitting and does not appear in that count.
Replacement and new homes on scattered lots across north Pasadena. We take off framing, slab-on-grade, roofing and MEP by house, then apply waste factors by trade so your material order matches the plan set.
Watch for: Pier depth on clay soils, wind-rated roof sheathing, and full MEP rough-in quantities.
Strip centers, restaurants and service buildings along Spencer Highway and Fairmont Parkway. Takeoffs cover shell construction, storefront glazing, MEP distribution and site work, with tenant improvements priced separately for landlord and tenant scopes.
Watch for: Demising wall assemblies, grease interceptor and hood duct scope, ADA parking counts.
Maintenance, expansion and small capital projects tied to Ship Channel refineries and chemical plants. We take off structural steel, concrete foundations, pipe racks and equipment pads from civil, structural and piping drawings.
Watch for: Anchor bolt templates, embeds, fireproofing thickness and pipe support spacing.
Tilt-wall and pre-engineered metal buildings used for storage, fabrication and truck terminals near the port. Quantities include slab thickness, panel reinforcement, dock equipment and office build-out inside the shell.
Watch for: Slab joint layout, dock leveler pits, and racking load allowances on the slab.
Small apartment and townhome projects are rare in the current permit mix, but when they appear we price them by building type. Takeoffs separate unit interiors from common areas, stairs, elevators and site improvements.
Watch for: Unit mix repetition, fire-rated separations, and shared MEP riser quantities.
Older housing stock and commercial buildings need selective demolition, structural repair and system replacement. We quantify demolition, new work and temporary protection so your bid reflects the actual scope rather than a full replacement.
Watch for: Asbestos and lead survey allowances, structural patch quantities, temporary power.
Pasadena is not priced like the rest of Houston. Soil, wind exposure, industrial permitting and the Ship Channel supply chain all move numbers, and an estimate that ignores them will be short.
Pasadena enforces the adopted International Building Code and International Residential Code editions along with local amendments, and industrial work may also require Harris County and Texas Commission on Environmental Quality approvals. Permit review timelines and inspection sequencing affect your general conditions and schedule. Confirm the adopted code edition and any local amendments with the Pasadena building department before you lock your bid.
International Building Code · International Residential Code · Pasadena building department · TCEQMuch of Pasadena sits on expansive clay that swells when wet and shrinks in drought, so foundation design usually means drilled piers or a post-tensioned slab with deepened beams. Pier depth, bell size and reinforcement quantities drive cost more than slab area. Without a geotechnical report, we price from typical local depths and flag the foundation line for confirmation.
Expansive clay · drilled piers · post-tensioned slab · geotechnical reportThe Texas Gulf Coast wind zone requires roof sheathing attachment, continuous load path connectors and impact-rated glazing on some occupancies. These items add framing hardware, fasteners and window cost that a generic takeoff will miss. Floodplain limits near Vince Bayou and the Ship Channel can also trigger elevation and flood-vent requirements.
Wind zone · load path connectors · impact glazing · floodplainPasadena competes for craft labor with the Houston Ship Channel plants, where turnaround and maintenance work pays premium wages. Industrial rates run higher than residential, and specialty trades such as millwrights and pipefitters are scheduled around plant outages. Your estimate should carry the labor rate and shift assumptions the project actually requires.
Ship Channel turnarounds · millwrights · pipefitters · shift premiumsFlat terrain and clay soils mean grading, detention and storm drainage are real line items on almost every Pasadena project. We take off excavation, lime stabilization, storm sewer, inlets and detention volume from the civil drawings. On tight infill lots, limited laydown and truck access add to the site work cost.
Detention · lime stabilization · storm sewer · tight infill lotsPasadena is inside the Houston metro, so concrete, steel and pipe are available from local suppliers, but plant projects often specify approved manufacturer lists and special coatings. Freight, coating systems and inspection hold points add cost beyond the bare material price. We price to the specification section, not to a generic commodity rate.
Approved manufacturer lists · special coatings · inspection hold points · Houston suppliersPasadena sits in Harris County's industrial corridor along the Houston Ship Channel, where clay soils, high water tables, and wind-driven rain shape what you actually measure. The five trades below are where local conditions change quantities, not just unit prices.
Near the ship channel and the older grid south of Spencer Highway, you are usually stripping 6 to 12 inches of organic material and hauling it off, then importing select fill because the in-situ clay will not compact to 95 percent Standard Proctor. Measure stripping by square yard at the building pad plus a 5-foot working edge, and import by compacted cubic yard, not loose. Detention is another measurable line: many lots need an on-site pond sized to the local drainage criteria, so take off excavation, side slopes, and outfall pipe separately. Confirm the adopted drainage criteria with the city engineering department. Our sitework takeoff breaks these into separate bid items so your subcontractor pricing lines up.
Wood-frame walls dominate the residential work here, and wind bracing drives the hardware count. Measure wall area by square foot, then pull out plates, studs at 16 inches on center, headers, and the hold-down and strap schedule by count. Roof framing is where the pitch and overhang change the number: a 6:12 hip and a 4:12 gable on the same footprint do not share a rafter count. Sheathing goes by square foot of surface, not floor area, so wall and roof sheathing are separate lines. We mark sheathing, blocking, and hardware on the plan set so your framer can see what the number covers. See our framing takeoff service for the line-item breakdown.
MEP is where residential bids in Pasadena most often miss scope. Take off fixtures and devices by count, not by allowance: receptacles, switches, light fixtures, exhaust fans, hose bibbs, water closets, and lavatories each get a line. Then measure the rough-in: branch wiring by linear foot, supply and drain lines by linear foot and diameter, and gas piping by linear foot. Attic and wall insulation go by square foot of conditioned area with the R-value noted. HVAC equipment is by tonnage and count, with ductwork by linear foot and size. Our MEP takeoff separates rough-in from trim-out so you can see labor and material independently.
Most Pasadena residential and light commercial work lands on post-tension slabs or stiffened rafts because the expansive clay moves with moisture. Take off the slab by square foot of footprint, then break out the beam perimeter in linear feet, the tendons in linear feet, and the anchor bolts by count. Flatwork is separate: driveways, walks, and aprons each get their own square footage and thickness, because 4-inch walks and 6-inch drives price differently. For tilt-wall or warehouse pads, add the thickened slab edges and the saw-cut joints by linear foot. A foundation takeoff that lumps slab and flatwork together is the fastest way to lose money on a Pasadena bid.
Roofing in Pasadena takes hail and wind-uplift ratings seriously, so the underlayment and attachment schedule matter as much as the field area. Measure roof area by square (100 square feet), then add ridge, hip, valley, and eave in linear feet, plus starter course, drip edge, and pipe boots by count. Steep-slope sections need a waste factor; typical waste runs 10 to 15 percent on cut-up roofs and less on simple gables. For commercial low-slope, take off insulation board by square foot, cover board, membrane, and flashing separately. Confirm the wind-uplift requirements your jurisdiction has adopted before you price fasteners and adhesives.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab on grade, 4 in., 3,000 psi | 2,150 | SF |
| 03 30 00 | Beam perimeter, 12x24 in. | 248 | LF |
| 03 10 00 | Vapor barrier, 10 mil | 2,320 | SF |
| 06 10 00 | Wall framing, 2x4 at 16 in. OC | 1,840 | SF |
| 06 10 00 | Roof framing, 2x6 rafters | 2,480 | SF |
| 06 16 00 | Wall and roof sheathing, 7/16 in. OSB | 4,320 | SF |
| 07 30 00 | Asphalt shingles, 30-year | 26.4 | SQ |
| 22 00 00 | PEX supply and PVC drain rough-in | 1,050 | LF |
This example sizes the concrete for a one-story house on a post-tension slab. The dimensions are illustrative, not taken from a specific plan. You should replace them with the actual footprint and beam schedule from your drawing set.
Start with the field area. A rectangular footprint of 50 ft by 43 ft gives 2,150 SF. Add a 1 ft overhang at the perimeter for the slab edge, which adds 2 x (50 + 43) x 1 = 186 SF. Total slab surface is 2,336 SF.
At a 4 in. thickness, the field volume is 2,336 x 0.333 ft = 778 CF. Divide by 27 to get 28.8 CY.
Now add the beams. The same perimeter of 186 LF at 12 in. wide and 24 in. deep gives 186 x 1 x 2 = 372 CF, or 13.8 CY. Interior beams, if any, would be added the same way.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab surface | 50 x 43 + perimeter overhang | 2,336 | SF |
| Field volume | 2,336 x 0.333 / 27 | 28.8 | CY |
| Beam volume | 186 x 1 x 2 / 27 | 13.8 | CY |
| Subtotal | 28.8 + 13.8 | 42.6 | CY |
| Waste at 5% | 42.6 x 1.05 | 44.7 | CY |
| Order | Round to whole yards | 45 | CY |
Waste on a formed slab typically runs 5 to 10 percent, higher when the truck cannot chute directly to the pour. Confirm the mix design, slump, and any fiber or admixture requirements with your ready-mix supplier and the adopted local code before you order. If the lot is tight, add a pump charge and a small over-order for the last beam.
That is the arithmetic a concrete takeoff should show. If your current estimate lists one round number for slab and beams, you cannot tell whether the beams were counted at all. Our concrete takeoff service breaks field, beams, and flatwork into separate lines so the supplier quote matches the plan.
For an accurate takeoff, send the architectural, structural, and MEP sheets you have, plus the civil plan if there is one. If the structural sheets are missing, we can still measure the architectural footprint and note the foundation and framing lines as assumptions. Marked-up plan sets come back with the takeoff so you can see exactly which sheets each line came from. Missing sheets are the most common reason a bid comes back short.
We separate the soil-related items from the structure. Stripping, import fill, and moisture conditioning are their own lines, and the foundation is measured as a post-tension or stiffened slab with beams, tendons, and anchor bolts counted individually. That way you can see what the geotechnical report is asking for and price it, rather than carrying a single foundation allowance that hides the risk. Confirm the geotechnical recommendations with the engineer of record.
Most projects come back in 24 to 48 hours, and rush turnaround is available when a bid date is close. Turnaround depends on the size of the set and how complete the drawings are. A single-family house with a full set is faster than a tilt-wall warehouse with a partial structural package. Send the plans and the bid date together so we can schedule around it.
Yes. We use ZIP-code-adjusted material and labor pricing, so the numbers reflect the Pasadena and greater Harris County market rather than a national average. That matters for concrete, framing labor, and MEP rough-in, where local rates move independently of material prices. We work in Bluebeam Revu, PlanSwift, and RSMeans data, and deliver Excel and PDF files organized by CSI MasterFormat division.
Yes. Industrial and commercial work in the ship channel corridor usually means large slabs, tilt-wall panels, and heavy sitework, and those are measured differently from residential. We take off slab area and thickness, panel area and reinforcement, dock equipment, and the site utilities as separate bid packages. Send the structural and civil sheets together, because the panel layout and the foundation schedule have to agree.
The permit figures come from the U.S. Census Bureau Building Permits Survey, which counts permits issued by the city itself for new privately-owned residential units only. That means commercial, industrial, and remodel permits are not included, so the residential unit count understates total construction activity in Pasadena. Use the numbers as a residential trend indicator, not as a measure of the whole market.
We cover Pasadena and the surrounding region, including the nearby cities listed on our Texas construction estimating page. If your project is in a suburb or an unincorporated part of Harris County, send the address with the plans so we can apply the right ZIP-code pricing and note the correct jurisdiction for code and permitting. The adopted code edition can differ between the city and the county, so confirm it with the local building department.
A takeoff counts the materials and quantities from the drawings: square feet of slab, linear feet of pipe, counts of fixtures. An estimate applies labor, material, and equipment pricing to those quantities. We deliver both, with the takeoff organized by CSI MasterFormat division so you can check the math and plug in your own pricing where you have better numbers. The marked-up plan set shows where each quantity came from.
Waste is added as a visible line, not buried in the unit price. Typical waste runs 5 to 10 percent on concrete, 10 to 15 percent on cut-up roofing, and 5 to 10 percent on framing lumber, but the right number depends on the plan complexity and the site. If you want to bid tighter, you can reduce the waste line and take the risk yourself. We note the assumption on the takeoff so nothing is hidden.
Yes. We can split the takeoff into sitework, concrete, framing, roofing, and MEP packages so you can send each subcontractor only the scope they are pricing. That reduces the overlap and the gaps that come from sending a full set to everyone. Each package keeps the same CSI MasterFormat divisions and the same marked-up sheets, so the quantities reconcile back to the master takeoff.
Email your drawings and bid date, and we will return a division-organized takeoff in 24 to 48 hours.