Multifamily Takeoffs
Unit-mix counts, typical floor repeats, balcony and amenity scope for Atlanta podium and wrap projects.
UNIT · SF · EAWe produce CSI MasterFormat takeoffs and estimates for Atlanta contractors, developers and owners. Metro multifamily, warehouse and data-center work dominates, so we price framing, MEP and sitework with ZIP-code-adjusted material and labor.
Atlanta bids turn on red-clay sitework, steep multifamily unit mixes, warehouse tilt-wall panels, data-center MEP density and Georgia's adopted code editions. Multifamily permits were 90% of 2025 city residential units, so unit-mix takeoffs and MEP counts drive most estimates more than single-family square-foot pricing.
Atlanta's permitting mix tells you where the estimating work is. In 2025 the city issued 5,622 new privately-owned residential units, down 31% from 8,109 in 2024, and 5,061 of those were multifamily — about 90% of the total. Permitted value was $947M, an average of $168,500 per unit. That ratio matters: a 300-unit podium project in Fulton or DeKalb carries a unit-mix takeoff, not a square-foot guess.
We price with RSMeans data adjusted to the project ZIP code, build takeoffs in PlanSwift and mark up plan sets in Bluebeam Revu, then deliver Excel and PDF organized by CSI MasterFormat division. Most projects return in 24–48 hours, with rush available. If you bid across the metro, start with our Georgia construction estimating page, or see Augusta, Columbus and Macon coverage for outlying work.
For bidders. We turn your plan set into a division-by-division takeoff with quantities and waste factors you can carry into a bid, so you are not the contractor who missed the rebar or the roof edge metal.
For builders. Use us for budget updates, change-order pricing and scope-gap checks on Atlanta multifamily, warehouse and data-center jobs where MEP and sitework swing the number.
For owners. We give you a cost basis organized by CSI division and a marked-up plan set, so you can compare bids and see what each contractor actually included.
Select a bar to compare Atlanta with the largest Georgia markets we cover.
5,622 new housing units in 2025 (-30.7% vs 2024).
561 single-family · 5,061 multifamily (90%).
The 2025 permit data makes the priority clear: 5,061 multifamily units against 561 single-family units in the city. At an average permitted value of $168,500 per unit, the money is in podium, wrap and high-rise residential, plus the parking decks and amenity packages that come with them. For bidders, that means unit-mix takeoffs — kitchen and bath counts, appliance schedules, balcony railings, elevator stops — and MEP counts that repeat per floor. It also means checking the adopted Georgia code edition and local amendments before you price life-safety and energy scope. Our multi-family estimating services page covers the unit-mix workflow in detail.
Atlanta's role as a logistics and data-center hub shows up in tilt-wall warehouses, distribution buildings and mission-critical shells. These estimates live or die on sitework and structure: red-clay cut and fill, undercut, erosion control, slab thickness, panel reinforcing and the MEP density inside a data hall. A warehouse bid that prices only the shell misses dock equipment, fire protection and the electrical service. We build those scopes in sitework estimating, concrete estimating and industrial estimating formats so the quantities carry through to your bid form. Statewide, Atlanta is 43.1% of the 13,037 units permitted across the cities we cover.
We estimate the scopes that drive Atlanta bids, from red-clay sitework to multifamily MEP counts.
Unit-mix counts, typical floor repeats, balcony and amenity scope for Atlanta podium and wrap projects.
UNIT · SF · EARed-clay cut and fill, undercut, erosion control and utility trench quantities for Georgia sites.
CY · LF · TONSlab-on-grade, mat, podium deck and spread-footing takeoffs with reinforcing and formwork.
CY · SF · TONWood and light-gauge studs, joists, sheathing and truss counts for Atlanta residential and mixed-use.
LF · SF · EAPlumbing fixture counts, HVAC tonnage and electrical device counts for multifamily and data halls.
EA · TON · LFTPO, modified bitumen and shingle areas with edge metal, flashing and insulation quantities.
SQ · LF · SFDivision 9 and 10 scope for office and retail fit-outs in Midtown, Buckhead and Perimeter.
SF · LF · EATilt-wall panels, dock equipment, slab flatness and fire protection for warehouse and data-center shells.
SF · CY · EAAtlanta's 2025 permits were about 90% multifamily. You need unit-mix takeoffs, common-area splits and a clean Division 03 and 05 basis before you carry a podium number to a Fulton or DeKalb owner.
Metro Atlanta is a logistics hub, so tilt-wall, slab-on-grade and racking-adjacent work dominate. We take off slab thicknesses, reinforcement, dock equipment and PEMB vs. conventional steel so your bid holds.
Atlanta's data-center corridor pulls conduit, switchgear, cooling and redundant power. We quantify feeders, busway, piping and equipment pads by division so electrical and mechanical scopes do not double-count.
You bid the same plan against five competitors. A division-level takeoff with waste factors and marked-up sheets lets you check quantity gaps before you drop your number, not after award.
The city permitted 561 single-family units in 2025 against 5,061 multifamily. Custom infill and teardown work turns on framing, roof geometry and finish allowances that a square-foot price cannot capture.
You need a cost basis you can read. We deliver Excel and PDF by CSI MasterFormat division with marked-up plan sets, so you can see what each bidder included and where the scope gaps sit.
We estimate projects across the city and the surrounding metro counties, from intown infill to industrial parks along the interstates. Send the plan set and the project address so we can adjust pricing to the ZIP code.
The 2025 permit mix was 5,622 new privately-owned residential units, 5,061 of them multifamily, with $947M in permitted value. That is a multifamily and industrial market first, with a steady single-family and retrofit tail.
Five-over-one and wrap buildings dominate Atlanta multifamily permits. We take off by unit type, count plumbing fixtures and kitchen sets, and separate podium concrete from wood-frame upper floors so the Division 03 and 06 numbers stand on their own.
Watch for: Podium slab thickness, unit-mix counts, common-area MEP, balcony and railing linear feet.
Metro Atlanta's logistics corridor drives tilt-wall and PEMB warehouse work. We quantify slab area and thickness, reinforcement, dock pits, bollards, racking loads and office build-out separately, because those scopes price very differently per square foot.
Watch for: Slab flatness, dock equipment count, ESFR sprinkler coverage, site paving quantities.
Data-center and advanced-manufacturing projects concentrate MEP cost. We take off feeders, busway, switchgear, cooling loops and equipment pads by division, then reconcile against the electrical and mechanical schedules so quantities tie to the design.
Watch for: Redundant power paths, equipment pad reinforcement, process piping, commissioning scope.
Atlanta's 561 single-family permits in 2025 landed on infill lots and teardowns. We take off foundation type, framing, roof geometry and finish allowances per plan, so a narrow-lot custom home is not priced off a generic per-square-foot rate.
Watch for: Steep-lot retaining walls, roof pitch and valleys, window and door counts.
Intown Atlanta has a deep stock of older brick and concrete-frame buildings. We measure selective demolition, structural reinforcement, new MEP distribution and finishes, and flag where existing conditions need a contingency rather than a firm line.
Watch for: Existing structure capacity, hazardous-material allowance, MEP tie-in points.
Grading, utilities, retaining walls and paving carry real money on Atlanta sites. We take off cut and fill, storm and sanitary runs, curb and sidewalk, and flatwork by area and thickness so the site package is not a lump-sum guess.
Watch for: Rock excavation, undercut depth, utility tie-in lengths, sidewalk and ADA ramp counts.
Two bids on the same Atlanta plan can differ by more than the contractor's margin. These are the cost drivers we check before we publish a number.
Atlanta and its surrounding counties adopt the International Building Code, International Residential Code and International Energy Efficiency Code, but the adopted edition and local amendments vary by jurisdiction and change on their own cycle. Energy-code envelope requirements and fire-resistance ratings on podium construction move insulation, glazing and sprinkler cost. Confirm the adopted edition with the local building department before you lock the estimate.
IBC · IRC · IECC · NFPA 13Metro Atlanta sits on residual soils and saprolite with pockets of expansive clay and shallow rock, and the Piedmont geology changes over short distances. That drives footing size, undercut, backfill and sometimes deep foundations. We price foundation scope from the geotechnical report and the structural sheets, not from a per-square-foot allowance, because the spread between a spread-footing job and a rock job is large.
Geotechnical report · Spread footings · Undercut · Rock excavationAtlanta's hot, humid summers and frequent heavy rain affect roofing assemblies, waterproofing, sealants and exterior finishes, and they drive stormwater detention and erosion-control scope. Wind-borne debris and uplift requirements can change roof edge metal and attachment details. We carry these as line items rather than burying them in general conditions.
Stormwater detention · Erosion control · Roof uplift · WaterproofingAtlanta's construction labor pool is large but tight for skilled trades, and wage rates differ between intown high-rise work and outlying industrial parks. Overtime, per-diem and crew-size assumptions change the labor column more than material pricing does. We adjust labor to the project ZIP code and state the productivity basis so you can challenge it.
RSMeans labor rates · ZIP-code adjustment · Overtime · Crew productivityIntown infill lots are tight, with limited laydown, lane closures and utility conflicts; suburban greenfield sites carry their own grading and extension costs. Tree ordinances, stream buffers and local zoning conditions can add survey, arborist and permitting scope. We read the civil set for cut and fill, retaining and utility runs before we price the site package.
Tree ordinance · Stream buffer · Cut and fill · Utility conflictsAtlanta is a distribution hub, so structural steel, ready-mix and tilt-wall materials are generally available, but delivery windows and fuel surcharges still move the number. Sales tax treatment differs between a direct-purchase owner and a contractor purchase, and that difference belongs in the estimate. We price material at the project ZIP code and note the tax basis used.
Ready-mix · Structural steel · Sales tax · FreightAtlanta's red clay, steep lots, and hot-humid climate change quantities in ways a generic national template will miss. Here is how we adjust five trades when we build a takeoff from your plan set.
Piedmont red clay does not drain, so most Atlanta footings sit on undisturbed soil or engineered fill with positive drainage away from the building. We take off continuous footings in linear feet, pad footings by count, and slab-on-grade in square feet, then add vapor retarder, welded wire or fiber mesh, and dowels at control joints. For crawl spaces we carry pier footings and block, not slab. On steep lots in places like Vinings or Druid Hills, retaining walls and stepped footings add formwork and backfill that a flat-lot template omits. If your project is foundation-heavy, our foundation estimating services break these items out by CSI division.
Metro Atlanta's rolling topography means cut and fill rarely balance on site. We take off clearing by acre, mass excavation by cubic yard from the grading plan, and structural fill in compacted cubic yards with a shrink factor. Stormwater detention, riprap, and erosion control blanket are measured from the civil sheets, and we note where a Georgia EPD notice of intent may require additional BMPs. On warehouse and data-center pads, undercut and replacement of unsuitable clay can add significant yardage. Our sitework estimating services quantify these moves so your earthwork subcontractor bids the same scope you do.
Atlanta's hail and wind exposure drives roof assembly choices. We take off roof area in squares, then add ridge, hip, valley, and eave trim in linear feet, plus underlayment, ice-and-water at valleys, and drip edge. Standing-seam metal, TPO, and architectural shingle systems each carry different waste factors and fastener counts. For walls, we count sheathing, house wrap, flashing at openings, and sealant joints. On multi-family and commercial buildings, we also include roof drains, scuppers, and overflow. Our roofing estimating services and multi-family estimating services cover both steep-slope and low-slope scopes.
Atlanta's mix of 2x4 and 2x6 walls, engineered floor systems, and wind-rated roof framing drives the lumber takeoff. We count studs at 16 inches on center plus plates, headers, and blocking, then convert to board feet with a typical 5–10 percent waste factor for cuts and culls. Roof trusses or rafters are taken off by span and pitch, with hurricane straps and continuous load path hardware listed separately. On multi-family podium jobs, we separate light-gauge metal studs from wood framing because the two price differently. Our framing estimating services itemize each wall type so your lumber yard quote can be checked line by line.
Hot, humid summers and occasional freezes push Atlanta mechanical designs toward higher sensible and latent capacity, which means larger ductwork and more condensate management than a dry-climate template. We take off supply and return duct by linear foot and pound, fittings by count, and refrigerant line sets by size. Plumbing is counted by fixture and by linear foot of pipe, with backflow preventers and cleanouts called out. Electrical includes devices, panels, feeders, and conduit by trade size. For industrial and data-center work, our MEP estimating services separate process piping, medium-voltage distribution, and cooling loops from standard commercial systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Slab on grade, 5 in. reinforced | 18500 | SF |
| 03 30 00 | Podium slab, 8 in. post-tensioned | 9200 | SF |
| 05 12 00 | Structural steel, podium framing | 44 | TON |
| 06 10 00 | Wood framing, 2x6 walls, 16 in. OC | 31000 | BF |
| 07 21 00 | Batt insulation, exterior walls | 28000 | SF |
| 09 21 00 | Gypsum board, 5/8 in. type X | 42000 | SF |
| 23 31 00 | Ductwork, galvanized, all sizes | 6800 | LB |
| 26 05 19 | Conduit and wire, branch circuits | 14500 | LF |
This example shows how we build a slab-on-grade quantity from a plan set. Dimensions are illustrative; your actual slab areas come from the foundation plan. We assume a 5-inch slab over 6-mil vapor retarder and 4-inch granular base, with a typical 5 percent waste factor on concrete.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Building footprint | 120 ft × 80 ft | 9,600 | SF |
| Deduct elevator pit | 12 ft × 12 ft | 144 | SF |
| Net slab area | 9,600 − 144 | 9,456 | SF |
| Concrete volume at 5 in. | 9,456 × (5 ÷ 12) | 3,940 | CF |
| Convert to cubic yards | 3,940 ÷ 27 | 145.9 | CY |
| Add 5% waste | 145.9 × 1.05 | 153.2 | CY |
| Vapor retarder | 9,456 × 1.10 overlap | 10,402 | SF |
| Granular base at 4 in. | 9,456 × (4 ÷ 12) ÷ 27 × 1.15 | 134.3 | CY |
The concrete line item is priced by the cubic yard with a separate line for finishing, which is measured in square feet. Vapor retarder is taken off with a 10 percent overlap allowance at laps and penetrations. Base course carries a 15 percent compaction factor because clay subgrade in Atlanta often needs additional stone to reach grade. We then add dowels at construction joints by linear foot, cure and seal by square foot, and pump or crane charges as a lump sum. If you send us the foundation plan and geotech report, we will return this takeoff organized by CSI division, with marked-up sheets showing where each quantity came from. Our concrete estimating services cover this scope for both residential and commercial projects.
Red clay holds water and shrinks when dry, so footings often bear on undisturbed soil or engineered fill rather than topsoil. We take off over-excavation and replacement stone separately from the footing concrete, and we note where a geotech report calls for a specific bearing capacity. If your plan does not show a drainage detail, we flag it as a scope gap. Confirm the required bearing and drainage details with your geotechnical engineer and the local building department before you bid.
Yes. We use ZIP-code-adjusted material and labor pricing from RSMeans data, so a takeoff for a project in Midtown prices differently from one in a suburban county. That adjustment covers wage scales, sales tax, and freight. We do not publish a single Atlanta price per square foot because the spread across project types is too wide. Send your plans and we will price your specific scope.
Most projects return in 24–48 hours. Rush service is available if you are bidding a hard deadline. Turnaround depends on the completeness of your documents; a full set with architectural, structural, and MEP sheets moves faster than a partial set with RFIs outstanding. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets showing where each quantity was taken.
Yes. Atlanta permitted 5,622 new privately-owned residential units in 2025, and about 90 percent of those were multifamily, so podium and wrap construction is common here. We break out podium concrete, structural steel, light-gauge framing, wood framing, and MEP separately because each trade prices differently. Our multi-family estimating services cover garden-style, podium, and high-rise scopes. Send the full set and we will organize the takeoff by building type and level.
We measure silt fence, inlet protection, construction entrance, and temporary sediment basins from the civil sheets, then add them as separate line items under CSI Division 31. Permanent stormwater structures such as detention ponds, riprap, and outlet protection are taken off by volume or area. Because Georgia EPD permit thresholds vary by acreage disturbed, we tell you to confirm the specific BMP requirements with the local issuing authority and your civil engineer before finalizing the bid.
We cover all 50 CSI MasterFormat divisions, from Division 01 general requirements through Division 48 electrical power generation. For Atlanta industrial and warehouse projects, we frequently take off Divisions 03, 05, 08, 09, 22, 23, 26, and 31. For data-center work, we add Division 27 and process cooling scopes. Our commercial estimating services page lists the full breakdown. If your project has a division you are unsure about, include it in the documents and we will price it.
Yes. We cover single-family and small multi-family projects across metro Atlanta, including nearby cities such as Augusta, Columbus, and Macon. Residential takeoffs include foundation, framing, roofing, siding, insulation, drywall, and MEP rough-in, each under its CSI division. We use the same ZIP-code-adjusted pricing for residential material and labor. Our residential estimating services page has more detail. Send your plans and we will return a division-organized estimate.
The permit figures come from the U.S. Census Bureau, Building Permits Survey, for 2025. The survey counts new privately-owned residential units permitted by the city itself, not the metro area, and it does not include commercial or industrial permits. Atlanta issued 5,622 residential units in 2025, down from 8,109 in 2024, a 31 percent decrease. Of those, 561 were single-family and 5,061 were multifamily. The permitted value was $947 million, averaging $168,500 per unit.
Yes. We cover those cities and the surrounding counties. Each market has different labor availability, material logistics, and local amendments, so we adjust pricing by ZIP code rather than using one Georgia rate. If your project is outside metro Atlanta, include the site address with your plans so we can apply the correct cost data. Our Georgia construction estimating services page lists the areas we cover, or you can request a quote directly.
We need the architectural, structural, civil, and MEP drawings, plus any specifications, addenda, and geotech report you have. A complete set lets us take off quantities by CSI division without assumptions. If you only have a partial set, we will list the missing sheets as exclusions so your bid is clear. Send PDFs or native files through our get an estimate page and we will confirm scope and turnaround within one business day.
Upload your plans and we will return a division-organized takeoff in 24–48 hours.