Scope Precision EstimateContact Us

Sitework Estimating Services

Send your site civil plans, geotech report and utility profiles. We return a Division 31 and 33 takeoff in Excel and PDF with marked-up sheets in 24–48 hours.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 31 & 33 — SiteworkSample format
Line itemQtyUnitQuantity
Bulk cut to subgrade12,400CY12,400 CY
Structural fill 95% compaction8,200CY8,200 CY
8" PVC SDR-35 sanitary sewer1,850LF1,850 LF
48" RCP storm drainage620LF620 LF
2" asphalt surface course1,250TON1,250 TON
Total measured quantities12,400 CY / 8,200 CY / 1,850 LF / 620 LF / 1,250 TON
Illustrative quantities. Waste and swell factors applied separately.
Pipe bedding and backfill included

What is sitework estimating?

Sitework estimating measures and prices Division 31 earthwork and Division 33 utilities, plus supporting paving, curb, and erosion control scopes. Quantities are taken off in bank cubic yards for cut and fill, linear feet by pipe diameter and depth band, and tons for asphalt from the mix design unit weight. Deliverables are Excel and PDF takeoffs organized by CSI MasterFormat division with marked-up plan sets.

  • Cut and fill balanced in bank cubic yards; pipe runs by invert and depth band
  • Typical waste factors: 5–10% for aggregates, 3–5% for asphalt tonnage
  • Most costly miss: unclassified excavation and rock not separated in the bid

Sitework estimating covers everything from the first tree cleared to the last stripe painted. If you are bidding a subdivision, a commercial pad, or a utility extension, the quantities that decide your number are cut and fill balanced in bank cubic yards, pipe runs measured by invert and depth band, and paving tonnage computed from compacted thickness. We take off CSI Division 31 and CSI Division 33 work, and we fold in the supporting sections that usually ride with the site package: 32 10 00 bases and paving, 32 16 00 curbs and sidewalks, 32 80 00 irrigation, and 02 41 00 demolition when the scope includes it. Our takeoffs are organized by CSI MasterFormat division so your estimator can drop them straight into a bid form. We use Bluebeam Revu for plan markup, PlanSwift for linear and area takeoff, and RSMeans data with ZIP-code-adjusted material and labor pricing. Every pipe run is measured from structure to structure, every manhole is counted by depth and rim type, and every ton of asphalt is computed from the mix design's unit weight, not from a rule of thumb. If you are also carrying concrete or structural steel, we can coordinate those scopes through our concrete estimating services and structural steel estimating teams so the divisions line up. For a full list of what we cover by division, see trade estimating services by CSI division.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

As a sitework estimating company, we also handle the items that decide whether your bid holds up: fine grading, subgrade preparation, backfill and compaction tested to a Proctor density, and soil bearing capacity checks against the geotechnical report. We read plan and profile sheets, not just the site plan, so invert elevations, HDPE pipe and RCP pipe runs, riprap aprons, erosion control blanket, and geotextile fabric are all measured in place. Our on-screen takeoff runs in PlanSwift and Bluebeam Revu, and we can align quantities with Trimble Business Center, AGTEK, or InSite software output when your team already models the dirt. If your bid package is subject to prevailing wage or Davis-Bacon, tell us at kickoff so labor lines carry the right rate basis. We also track the RFI log and flag missing details before they become change orders. For a sitework estimate for contractors working across state lines, see our Texas estimating, California estimating, Florida estimating, and New York estimating pages, or get an estimate to start.

Services

What our sitework quantity takeoff includes

We measure the site package the way a site contractor buys it: clearing by acre, dirt by bank cubic yard, pipe by linear foot with bedding and backfill, and paving by ton. Each line lands in its CSI section with the plan sheet reference so you can trace it back.

Clearing & Grubbing

Clearing by acre, tree removal by diameter class, topsoil strip and stockpile volume.

AC · EA · CY

Bulk Earthwork

Cut and fill by grid or cross-section with shrink/swell factors applied.

BCY · CCY

Trenching & Backfill

Trench excavation by depth band, bedding, backfill, and compaction in lifts.

LF · CY

Site Utilities

Water, sanitary, and storm pipe by material and diameter; manholes and inlets by each.

LF · EA · VF

Aggregate Base

Base course by ton or square yard at compacted depth, with waste factor.

TON · SY

Asphalt Paving

Binder and surface course by ton using mix design unit weight; striping by linear foot.

TON · LF

Curb & Sidewalk

Concrete curb, gutter, sidewalk, and ADA ramps by linear foot and square foot.

LF · SF

Erosion Control

Silt fence, inlet protection, stabilized construction entrance, and SWPPP items.

LF · EA

What every sitework estimating takeoff includes

  • Clearing and grubbing by acre, with tree removal by diameter class
  • Topsoil strip at specified depth (typically 6–12 in.) and stockpile volume
  • Bulk cut and fill by grid or cross-section, with shrink/swell factors applied
  • Structural fill and select granular material placed and compacted in lifts
  • Trench excavation for water, sanitary sewer, and storm, by depth band
  • Pipe runs by material and diameter: PVC SDR, RCP, DIP, HDPE
  • Manholes, inlets, catch basins, headwalls, and end sections by each
  • Water main appurtenances: gate valves, hydrants, tees, restrained joints
  • Aggregate base course by ton or square yard at compacted depth
  • Asphalt binder and surface course by ton using the mix design unit weight
  • Concrete curb, gutter, sidewalk, and ADA ramps by linear foot and square foot
  • Erosion control: silt fence, inlet protection, stabilized construction entrance
How we work

How we take off a site package

  1. Review civil plans and geotechWe start with the grading plan, utility profiles, and geotech report. The geotech gives us shrink and swell factors, groundwater elevation, and rock depth. We note the limit of work, the benchmark, and any phasing shown on the civil sheets. We also check for utility company notes, easements, and right-of-way limits that affect excavation and haul routes.
  2. Digitize existing and proposed surfacesIn Bluebeam and PlanSwift we trace the existing grade contours and the proposed finish grade. We build a grid at 50 ft or 100 ft spacing, depending on the plan scale, and compute cut and fill volumes by the average-end-area or borrow-pit method. We check the balance point and flag any areas where the design requires import or export.
  3. Measure pipe runs by invertEvery storm, sanitary, and water run is measured from structure to structure along the pipe centerline. We record diameter, material, and depth band from the profile sheet, then add bedding stone, backfill, and trench excavation as separate lines. Manholes and inlets are counted by type and depth, with rim elevations taken from the plan and profile.
  4. Compute paving tonnageWe measure the paving area from the site plan, subtract curb returns and islands, and multiply by the compacted thickness from the typical section. The result is converted to tons using the mix design's unit weight, with a waste factor applied as a separate line. We also measure aggregate base by ton or square yard at the specified compacted depth.
  5. Apply shrink/swell and waste factorsCut volumes are adjusted to loose cubic yards for hauling, and fill volumes are adjusted to bank cubic yards for purchase. Paving waste typically runs 3–8% depending on mix and placement method. We show these as separate lines so you can see the raw quantity and the adjusted quantity. Swell factors are taken from the geotech report, not assumed.
  6. Assemble by CSI divisionThe final takeoff is organized by MasterFormat division, with each line tied to a plan sheet reference. We deliver Excel and PDF with marked-up plan sets, so your estimator can check any quantity back to the drawing. We also include a cut/fill balance summary and a pipe run schedule by diameter, material, and depth band.

What we need from you

  • Civil plan setGrading, utility, erosion control, and paving sheets. The grading plan drives cut/fill; the utility profiles drive pipe depth and bedding.
  • Geotech reportShrink and swell factors, groundwater elevation, and rock depth. Without these, cut/fill balance is reported in the wrong unit.
  • Spec bookDivision 31 and 33 sections for pipe material, bedding, compaction, and paving mix. The spec tells us whether it is SDR-35 or SDR-26, RCP or HDPE.
  • Typical sectionsPaving, curb, and trench details. These give us compacted thicknesses and bedding dimensions we cannot scale reliably from the plan.
  • Bid formIf you have one, send it. We will map our takeoff lines to your bid items so you can transfer numbers without re-keying.
  • Site constraintsPhasing, lane closures, off-hours work, and staging areas. These drive traffic control and dewatering costs that are easy to miss.
Sample output

Sample takeoff format

Below is a sample of how we present sitework quantities. Each line references the plan sheet so you can trace it back.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
31 10 00Clearing and grubbing, including tree removal by diameter class4.2ACC-101
31 23 00Bulk cut to subgrade, adjusted for swell12,400CYC-201
31 23 00Structural fill, 95% compaction, on-site material8,200CYC-201
33 30 008" PVC SDR-35 sanitary sewer, 0-6 ft depth1,850LFC-301
33 40 0048" RCP storm drainage, Class III, with bedding stone620LFC-401
32 12 002" asphalt surface course, Superpave, 12.5 mm1,250TONC-501
32 16 0024" concrete curb and gutter, including radii3,400LFC-501
31 25 00Silt fence, 36" height, including maintenance1,800LFC-601
31 23 00Trench excavation for 8" sanitary sewer, 0-6 ft depth1,850LFC-301
33 11 008" DIP water main, including fittings and restrained joints950LFC-701
31 23 00Rock excavation allowance, if encountered500CYC-201
32 11 006" aggregate base course, compacted2,100TONC-501

Units of measure we use

Sitework quantities are only useful if the unit matches how the work is bought and paid for. Here is how we measure the main items.

ItemUnitHow it's measured
Bulk cut and fillCYMeasured in bank cubic yards from cross-sections, then adjusted for shrink or swell
Topsoil stripCYArea times specified depth, converted from cubic feet to cubic yards
Pipe runsLFMeasured along the pipe centerline from structure to structure, by diameter and depth
Manholes and inletsEACounted by type, depth, and rim elevation from the utility plan
Aggregate baseTONCompacted volume times unit weight of the specified stone
Asphalt pavingTONArea times compacted thickness times mix unit weight, plus waste
Curb and gutterLFMeasured along the face of curb, including radii and transitions
Erosion controlLF / EASilt fence by linear foot; inlet protection and entrances by each
ClearingACMeasured from the limit of work shown on the clearing plan

Worked example: sanitary sewer run with trench excavation and bedding

This example takes one 8-inch PVC SDR-35 sanitary sewer run between two manholes and shows every step from plan dimensions to adjusted quantities. The dimensions are illustrative and do not represent any specific project.

Given from the plan and profile:

  • Run length: 180 LF (station 0+00 to 1+80)
  • Average depth to invert: 7.5 ft
  • Trench width: 3.0 ft (pipe OD plus 12 in. each side)
  • Pipe diameter: 8 in. (0.67 ft)
  • Bedding: 6 in. below pipe, 12 in. above pipe (initial backfill)
  • Geotech: swell factor 1.25, shrink factor 0.90
  • Waste factor for pipe: 2%

Step 1 — Pipe quantity with waste

  • Net pipe: 180 LF
  • Waste: 180 × 0.02 = 3.6 LF
  • Order pipe: 183.6 LF, round to 184 LF

Step 2 — Trench excavation volume

  • Cross-section area: 3.0 ft × 7.5 ft = 22.5 SF
  • Volume: 22.5 SF × 180 LF = 4,050 CF
  • Convert to CY: 4,050 ÷ 27 = 150 CY (bank cubic yards, bcy)

Step 3 — Bedding stone

  • Bedding area: 3.0 ft × 0.5 ft = 1.5 SF
  • Volume: 1.5 SF × 180 LF = 270 CF
  • Convert to CY: 270 ÷ 27 = 10 CY
  • Add 5% waste: 10.5 CY, round to 11 CY

Step 4 — Initial backfill (above pipe)

  • Backfill area: 3.0 ft × 1.0 ft = 3.0 SF
  • Volume: 3.0 SF × 180 LF = 540 CF
  • Convert to CY: 540 ÷ 27 = 20 CY

Step 5 — Remaining backfill

  • Remaining depth: 7.5 ft − 0.67 ft pipe − 0.5 ft bedding − 1.0 ft initial = 5.33 ft
  • Area: 3.0 ft × 5.33 ft = 16.0 SF
  • Volume: 16.0 SF × 180 LF = 2,880 CF
  • Convert to CY: 2,880 ÷ 27 = 106.7 CY, round to 107 CY

Step 6 — Adjust for swell and shrink

  • Excavated material (bcy): 150 CY
  • Loose volume for hauling: 150 × 1.25 = 187.5 CY (lcy)
  • Backfill required (compacted): 11 + 20 + 107 = 138 CY
  • Bank volume needed for backfill: 138 × 0.90 = 124.2 CY
  • Surplus to haul off: 150 − 124.2 = 25.8 CY (bcy), or 32.3 CY (lcy)

Step 7 — Manholes

  • Two manholes, 4-ft diameter, average depth 8 ft
  • Count as each, with depth noted for pricing

Summary table

ItemQuantityUnit
8" PVC SDR-35 pipe184LF
Trench excavation150CY (bcy)
Bedding stone11CY
Initial backfill20CY
Remaining backfill107CY
Surplus haul-off26CY (bcy)
Manholes2EA

This is the level of detail we provide for every pipe run. We show raw quantities, waste, and swell/shrink adjustments as separate lines so you can see exactly how the number was built. For a full site package, we repeat this for each utility run and combine with cut/fill and paving takeoffs. If you need masonry or structural steel scopes coordinated, see our masonry estimating services and structural steel estimating pages.

Cost drivers

What drives sitework cost estimating

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Cut/fill balance

If the site balances, you avoid haul-off and import. If it does not, every cubic yard of export carries trucking, tipping fees, and cycle time. We report cut and fill separately in bank and loose cubic yards so you can see the balance point. A site that is 500 CY short of fill is a different bid than one that is 5,000 CY long.

Cut/fill balance

If the site balances, you avoid haul-off and import. If it does not, every cubic yard of export carries trucking, tipping fees, and cycle time. We report cut and fill separately in bank and loose cubic yards so you can see the balance point. A site that is 500 CY short of fill is a different bid than one that is 5,000 CY long.

Rock excavation

Rock is the largest single risk in sitework. If the geotech shows rock at 6 ft and your trench goes to 10 ft, you are blasting or hoe-ramming. We flag rock depth on the profile and carry a separate allowance line, not a lump sum buried in trench excavation. The allowance is based on the depth and area of rock shown in the test borings.

Dewatering

Groundwater above the pipe invert means you are pumping. The cost is in the equipment, the discharge permit, and the labor to keep the trench dry. We measure it by depth band and add a line for temporary bypass pumping during tie-ins. The volume of water and the duration of pumping drive the equipment size and fuel cost.

Haul distance

Off-site disposal is priced by the load, not the yard. A 10-mile round trip at 20 mph average is a different number than a 30-mile trip. We ask for the disposal site location and carry trucking as a separate line. Cycle time, loading method, and road restrictions all affect the hourly cost of the haul.

Paving thickness and mix

A 2-inch surface over 4-inch base is not the same as a 3-inch surface over 6-inch base. The mix design (Superpave vs. Marshall, binder vs. surface) changes the unit weight and the price per ton. We compute tonnage from the actual section. The aggregate base gradation and compaction requirement also affect the cost per ton.

Erosion control and SWPPP

Silt fence, inlet protection, stabilized construction entrance, and inspection labor are permit-driven. The quantities come from the erosion control plan, but the maintenance cost is time-based. We carry both. The frequency of inspections and the duration of construction determine the labor component.

Utility conflicts and relocations

Existing utilities shown on the plan may need potholing, protection, or relocation. We flag conflicts where the new pipe crosses existing lines and carry an allowance for potholing and hand excavation. Relocation costs are often borne by the utility owner, but the contractor still carries the delay and coordination.

Scope gaps

Common scope gaps we catch

These are the items that most often fall between the cracks on a site package. We check for each one and either include it or note it as excluded.

  • Swell and shrink factors ignored, so cut/fill balance is reported in the wrong unit. We apply geotech factors and show both bank and loose cubic yards.
  • Haul-off disposal fees, tipping costs, and truck cycle time not carried as a separate line. We ask for the disposal site location and price the haul.
  • Rock excavation allowance or a defined rock-removal clause missing from the bid form. We flag rock depth on the profile and carry an allowance line.
  • Dewatering and temporary bypass pumping during utility tie-ins. We measure groundwater depth and add a line for pumping equipment and discharge permit.
  • Traffic control, lane closures, and off-hours work windows required by the permit. We read the notes on the civil sheets and carry these as separate items.
  • Utility potholing, test pits, and survey/staking by a licensed surveyor. These are often owner-furnished but not stated; we list them as exclusions if not in scope.
  • Bedding and backfill stone for pipe counted as pipe only. We measure bedding stone by trench length and depth, and backfill by volume.
  • Compaction testing, density tests, and third-party inspection fees. These are typically owner-furnished but must be carried if the spec requires the contractor to provide them.
  • Temporary seeding, stabilized construction entrance maintenance, and SWPPP inspection labor. We carry these as time-based items, not just installation quantities.
  • Asphalt tonnage computed from plan area without adjusting for compaction and waste. We apply typical waste factors of 3–8% depending on mix and placement.
  • Stripping and stockpiling topsoil for later reuse, versus importing topsoil. We measure stockpile volume and compare against the import quantity.
  • Fire line, domestic water, and irrigation sleeves under paving, plus casing pipe. These are often shown on the utility plan but missed in the takeoff.
  • Connection fees, tap fees, and utility company charges that sit outside the contract. We list them as owner costs, not contractor costs.
  • Restoration of disturbed areas, fencing, and landscaping outside the limit of work. We measure from the limit of work and note any off-site restoration.

Material choices that change quantities and cost

The material specified for pipe, base, asphalt, and erosion control changes both the unit price and the quantity calculation. Here is how we compare common options.

Material / productTypical applicationUnit of measureQuantity impact / waste factor
PVC SDR-35Sanitary sewer and storm drainage, gravity flowLFLightweight, easy to cut; waste 2–3% for fittings and cuts
PVC SDR-26Sanitary sewer, deeper bury or higher loadLFThicker wall, same takeoff length; check bedding requirements
RCP (reinforced concrete pipe)Storm drainage, heavy loads, deep buryLFHeavier, requires more bedding and lifting equipment; waste 1–2%
DIP (ductile iron pipe)Water main, fire lines, high pressureLFRestrained joints add fittings; waste 2–4% for cut lengths
HDPE (high-density polyethylene)Directional drilling, force mainsLFFused joints, fewer fittings; waste 1–2%
Crushed stone base (e.g., #57, #21A)Under paving, pipe beddingTONCompacted volume × unit weight (approx. 1.4–1.6 TON/CY); waste 5%
Recycled concrete aggregate (RCA)Base course, temporary roadsTONSimilar unit weight to stone; check spec allowance
Superpave asphalt (binder/surface)Parking lots, roadwaysTONCompacted thickness × area × unit weight (approx. 145–150 lb/SY per inch); waste 3–8%
Silt fencePerimeter erosion controlLFInstallation plus maintenance; quantity from plan
Compost filter sockInlet protection, ditch checksLFAlternative to silt fence; check spec
Straw wattleSlope protection, ditch checksLFBiodegradable; may require replacement
Codes and standards

Codes, standards, and spec sections that affect sitework quantities

Sitework quantities are governed by a mix of model codes, utility standards, and project specifications. The adopted editions vary by jurisdiction, so always confirm with the local building department and utility authority before finalizing your bid.

Model codes and standards:

  • International Building Code (IBC) and International Residential Code (IRC) for grading, excavation, and foundation drainage.
  • International Energy Conservation Code (IECC) for insulation and air sealing, which can affect frost depth and foundation design.
  • National Electrical Code (NEC) for underground conduit and grounding.
  • International Plumbing Code (IPC) or Uniform Plumbing Code (UPC) for sanitary sewer and water piping.
  • NFPA 13 for fire protection, which may require site fire lines and hydrant spacing.
  • Local amendments to these codes often add stricter requirements for stormwater management and erosion control.

Specification sections (CSI MasterFormat):

  • Division 31: Earthwork (31 00 00), Site Clearing (31 10 00), Earth Moving (31 20 00), Excavation and Fill (31 23 00), Erosion and Sedimentation Controls (31 25 00), Shoring and Underpinning (31 40 00).
  • Division 33: Water Utilities (33 10 00), Sanitary Sewerage Utilities (33 30 00), Storm Drainage Utilities (33 40 00), Subdrainage (33 46 00).
  • Division 32: Bases, Ballasts, and Paving (32 10 00), Flexible Paving (32 12 00), Rigid Paving (32 13 00), Curbs, Gutters, Sidewalks (32 16 00), Irrigation (32 80 00), Planting (32 90 00).
  • Division 02: Demolition (02 41 00) when the site package includes removal of existing structures or pavement.

Utility authority standards:

  • Water and sewer mains are often governed by the local municipality or utility district, not just the building code. Their standards dictate pipe material, bedding, trench width, and minimum cover. Always request the utility's standard details and specifications.

Environmental regulations:

  • Stormwater Pollution Prevention Plan (SWPPP) requirements under the Clean Water Act (NPDES) drive erosion control quantities and inspection frequency. Check with the state environmental agency for permit thresholds.

Because these requirements vary, we recommend you confirm the adopted code editions and utility standards with the local building department and utility owner before submitting your bid. Our takeoffs flag where a specification or standard may affect quantities, but we do not provide code compliance review.

Who we provide estimates for

Who uses our sitework estimate for contractors

General contractors

You need a site package number to complete your bid. We give you Division 31 and 33 quantities you can drop into your bid form, with marked-up sheets so you can defend the number.

Site subcontractors

You are pricing the dirt, pipe, and paving directly. Our takeoff gives you a second set of eyes on quantities, especially cut/fill balance and pipe bedding, so you can bid with confidence.

Developers and owners

You are comparing sitework bids and need to know if they are apples to apples. Our takeoff shows the quantities behind each bid so you can see who missed what.

Civil engineers

You designed the site and want a contractor's perspective on constructability and cost. Our takeoff flags items that are shown on the plans but not specified, or vice versa.

Estimators

You are carrying multiple trades and need the sitework done fast. We deliver in 24–48 hours with a format that matches your bid form, so you spend time on pricing, not measuring.

Where we provide estimates

Sitework Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Sitework Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

Sitework estimating varies by project type because the scope, phasing, and risk profile change. Here is how we adjust our approach for common project types.

Subdivision (residential lots)

Mass grading by phase, lot-by-lot utility stubs, and street paving. Cut/fill balance across the entire development, not per lot.

Watch for: Phasing and lot release schedules affect haul routes and temporary erosion control.

Commercial pad site

Building pad cut/fill, parking lot paving, and utility extensions to the building. Often includes demolition of existing improvements.

Watch for: Rock excavation and dewatering are common risks; check geotech for depth to rock and groundwater.

Industrial warehouse

Large flat pad with strict tolerances, extensive storm drainage, and truck court paving. May include rail spurs or special foundations.

Watch for: Compaction requirements and tolerance for floor slabs drive select fill quantities and testing costs.

Utility extension (water/sewer main)

Linear takeoff by station, with pipe, trench, bedding, and appurtenances. Often includes road bores and casing pipe.

Watch for: Depth bands, rock, and dewatering vary along the alignment; measure by segment, not average.

Parking lot / paving rehabilitation

Milling, overlay, striping, and ADA upgrades. Limited earthwork but detailed phasing for traffic control.

Watch for: Existing base condition and utility conflicts under pavement; potholing may be required.

Landscape and irrigation

Planting beds, irrigation main and laterals, controllers, and hardscape. Often tied to sitework but priced separately.

Watch for: Water source and backflow requirements; check local codes for irrigation permits.

Deliverables

What you receive

  • Excel workbook organized by CSI MasterFormat division, with each line tied to a plan sheet reference.
  • PDF takeoff report with the same quantities, formatted for printing and mark-up.
  • Marked-up plan sets in Bluebeam showing what we measured and where.
  • Cut/fill balance summary showing bank and loose cubic yards with shrink/swell factors applied.
  • Pipe run schedule by diameter, material, and depth band, with bedding and backfill quantities.
  • Paving tonnage calculation by mix type and compacted thickness, with waste factor shown separately.
  • Erosion control and SWPPP item list with quantities and notes on maintenance items.
Checklist

Pre-bid sitework checklist

  • Confirm the limit of work and clearing limits on the civil plans.
  • Obtain the geotech report for shrink/swell, groundwater, and rock depth.
  • Check utility profiles for pipe depth bands and bedding requirements.
  • Verify the disposal site location and haul distance for surplus material.
  • Review erosion control plan for SWPPP items and maintenance frequency.
  • Confirm paving typical sections for thickness, mix design, and base course.
  • Identify any existing utilities that require potholing or relocation.
  • Check for phasing, lane closures, and off-hours work restrictions.
  • Verify whether compaction testing and survey staking are contractor or owner furnished.
  • Review bid form for unit price items and allowances.
  • Confirm connection fees and tap fees are excluded from your contract.
  • Check for restoration requirements outside the limit of work.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

FAQ

Sitework Estimating questions

What is the difference between bank cubic yards and loose cubic yards, and why does it matter?

Bank cubic yards (bcy) measure material in its natural, undisturbed state. Loose cubic yards (lcy) measure it after excavation, when it has swelled. The swell factor (typically 1.10–1.35 depending on soil type) converts bcy to lcy. If you ignore swell, you will under-order trucks and underprice haul-off. We apply the geotech's swell factor and show both units on every cut and fill line.

How do you handle rock excavation in a sitework takeoff?

We flag rock depth from the geotech borings and carry a separate allowance line, not a lump sum buried in trench excavation. The allowance is based on the area and depth of rock shown. If the geotech does not define rock, we note it as a risk and recommend a defined rock-removal clause in your bid. Rock removal methods (blasting, hoe-ramming) change the unit price significantly.

Can you estimate dewatering and bypass pumping?

Yes. We measure groundwater elevation from the geotech and compare it to pipe invert depths. Where groundwater is above the invert, we add a line for dewatering equipment, discharge permit, and labor. For utility tie-ins, we add temporary bypass pumping. The cost is driven by the volume of water and duration of pumping, which we estimate from the construction schedule.

How do you compute asphalt tonnage?

We measure the paving area from the site plan, subtract islands and curb returns, and multiply by the compacted thickness from the typical section. That volume is converted to tons using the mix design's unit weight (typically 145–150 lb per square yard per inch of thickness). We apply a waste factor of 3–8% as a separate line, because compaction and placement method affect the final quantity.

What is a typical waste factor for pipe and stone?

Pipe waste typically runs 2–4% for PVC and DIP, and 1–2% for RCP and HDPE. Bedding stone waste is typically 5%. These factors cover cuts, fittings, and minor over-excavation. We show waste as a separate line so you can see the net quantity and the adjusted order quantity. Your supplier's packaging and minimum order quantities may also affect the final number.

Do you estimate erosion control and SWPPP items?

Yes. We measure silt fence, inlet protection, stabilized construction entrance, and other items from the erosion control plan. We also carry maintenance and inspection labor as time-based items, because SWPPP permits require regular inspection and repair. The frequency and duration come from the permit and the construction schedule, which we ask you to provide.

How do you handle utility conflicts and potholing?

We overlay the new utility plan on existing utility drawings and flag crossings. Where a new pipe crosses an existing line, we note the conflict and carry an allowance for potholing and hand excavation. Relocation costs are often borne by the utility owner, but the contractor still carries coordination and delay. We list these as exclusions if they are not in your scope.

What is the turnaround time for a sitework takeoff?

Most sitework takeoffs are delivered in 24–48 hours. Rush service is available for an additional fee. The actual time depends on the size and complexity of the site package, and on how quickly you can provide the civil plans, geotech report, and specifications. We will confirm the schedule when we receive your documents.

What formats do you deliver?

We deliver an Excel workbook organized by CSI MasterFormat division, a PDF takeoff report, and marked-up plan sets in Bluebeam. Each line is tied to a plan sheet reference so you can trace it back. We can also map our lines to your bid form if you send it to us, so you can transfer numbers without re-keying.

Do you price the work or just take off quantities?

We provide both quantities and pricing. We use RSMeans data with ZIP-code-adjusted material and labor pricing, and we apply productivity factors based on the site conditions you describe. Our pricing is a budget-level estimate, not a firm bid. You should apply your own labor rates, crew mix, and markup to the quantities we provide.

Can you estimate sitework for a project in a different state?

Yes. We estimate sitework nationwide. We adjust material and labor pricing by ZIP code, and we account for regional differences in soil conditions, utility standards, and code requirements. For projects in specific states, see our Texas estimating, California estimating, Florida estimating, New York estimating, and North Carolina estimating pages.

What information do you need to start a sitework takeoff?

We need the civil plan set (grading, utility, erosion control, paving), the geotech report, the specification book for Divisions 31 and 33, and typical sections. If you have a bid form, send it. Also tell us about site constraints such as phasing, lane closures, and off-hours work. The more information you provide, the more accurate the takeoff. You can upload documents through our get an estimate page.

Can you provide excavation estimating services for a deep utility trench with a high water table?

Yes. We measure trench excavation by depth band from plan and profile sheets, then separate bedding, backfill and compaction, and haul-off. Where the geotech report shows groundwater, we add dewatering and bypass pumping as separate line items. OSHA excavation standard sloping and shoring requirements are noted so your production rate reflects the real bench width. If rock is expected, we carry rock excavation as its own bid item rather than burying it in the soil rate.

Do you offer grading takeoff services for mass earthwork and fine grading?

We do. Mass earthwork is taken off by grid or cross-section, reported in bank cubic yards, with a cut/fill balance and a borrow pit or waste area line if the site does not balance. Fine grading is measured by area at the finished subgrade, separate from subgrade preparation and compaction. We note the Proctor density the spec requires, because that drives the number of passes and the water the contractor has to add.

What does your site utilities estimating cover on a typical land development project?

Site utilities estimating covers sanitary sewer, water, and storm systems in CSI Division 33. We measure RCP pipe and HDPE pipe from structure to structure, count manholes and inlets by depth and rim type, and take off riprap, geotextile fabric, and erosion control blanket by area. Detention and retention basins are measured separately. We also flag utility conflicts shown on the plan and profile sheets so your RFI log is current before the bid package goes out.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Related services

Ready to get your sitework takeoff?

Send your civil plans, geotech report, and specs through our [get an estimate](/get-estimate/) page, and we will return a Division 31 and 33 takeoff in Excel and PDF within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us