Scope Precision EstimateContact Us

Subcontractor Estimating Services

Send your bid invitation, plans, and the GC's scope letter. We return a division-scoped takeoff and priced estimate in Excel and PDF within 24–48 hours.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 09 — Finishes (Drywall / Acoustical)Sample format
Line itemQtyUnitBoard
1/2" gypsum board walls18,400SF18,400 SF
5/8" Type X shaftwall3,200SF3,200 SF
Suspension grid4,800SF4,800 SF
Acoustical tile 2x24,800SF4,800 SF
Corner bead1,250LF—
Total board21,600 SF
Illustrative quantities. Waste factor applied as a separate line.
Blocking and backing included

What is subcontractor estimating?

Subcontractor estimating is a division-scoped quantity takeoff and priced estimate for the trade you bid, measured from the plan set and specs and organized by CSI MasterFormat division. Deliverables are an Excel workbook and PDF with marked-up plans. Units follow the trade: SF, LF, CY, EA, and tons.

  • Units vary by trade: drywall in SF, pipe in LF, concrete in CY, fixtures in EA.
  • Typical waste factors range from 5% for drywall to 10% for roofing and tile.
  • The most costly miss is a scope gap between your bid and the GC's scope letter.

You are a subcontractor with a bid due date and a scope letter that assigns you one or two CSI divisions. You need a takeoff you can check, adjust for your own labor and markup, and send back to the GC without re-measuring every sheet. We produce division-scoped quantity takeoffs and priced estimates from your plan set, specifications, and the GC's scope letter. The takeoff is organized by CSI MasterFormat division and delivered in Excel and PDF, with marked-up plan sets showing exactly where each quantity came from. If you are a general contractor looking for a full-project estimate, that is a different scope. For subs, the work is always one trade: drywall, electrical, plumbing, HVAC, concrete, roofing, painting, or another single division.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We measure from the drawings, apply waste factors by material, and show sales tax, bond, and markup as separate lines so you can adjust to your own accounting. Most projects return in 24–48 hours. Rush service is available when the bid date is tight. If you are also bidding work in another state, we adjust material and labor pricing by ZIP code and can reference our Texas or California estimating pages for regional pricing notes. To start, send your plans and scope letter through our get an estimate page.

Our subcontractor estimating company works from the same plans and specifications you bid from, including every addendum. We do not guess at quantities. On-screen takeoff in Bluebeam Revu and PlanSwift lets us trace each wall, pipe run, or conduit length, then tag it to the sheet it came from. That matters when the GC asks how you arrived at 4,200 square feet of 5/8-inch drywall or 38 cubic yards of concrete. A subcontractor quantity takeoff you can defend is the difference between a clean award and a scope argument after the contract is signed.

If you are a smaller shop without an in-house estimator, our small contractor estimating page covers the same process at a scale that fits your bid volume. We also support subcontractor bid preparation for multiple divisions when you are bidding as a prime sub, and we can break the estimate into a schedule of values that matches the GC's pay application format. The goal is a subcontractor estimate for contractors who need to price fast, document their assumptions, and keep their labor productivity assumptions visible on the page.

Services

What our subcontractor takeoff covers for your division

Your scope is defined by the GC's scope letter and the specification sections that apply to your trade. We measure every line item from the drawings, apply the correct unit of measure, and price material and labor using ZIP-code-adjusted RSMeans data. The estimate shows what you carry, what you exclude, and where the quantities came from.

Division Takeoff

We measure quantities for your assigned CSI division from architectural, structural, and MEP sheets, showing boundaries on marked-up plans.

SF · LF · CY · EA

Material Pricing

We price materials by ZIP code using RSMeans data, with sales tax and freight shown as separate lines for your review.

$/unit

Labor Hours

We calculate labor hours by line item using RSMeans data adjusted for your trade, crew size, and project conditions.

hr/unit

Waste Factors

We apply waste factors per material as separate lines, so you can adjust for your purchasing and offcut practices.

%

Scope Letter Review

We compare the GC's scope letter against the drawings and specs, flagging inclusions and exclusions that affect your bid.

EA

Alternates & Unit Prices

We break out alternates and unit prices when the bid form requires them, with quantities and pricing ready to plug in.

EA · $/unit

Bond & Insurance

We add bond and insurance cost lines when your bid includes them, shown separately from material and labor.

$

RFI Clarifications

We list items that need a written RFI before bid day, so you can document assumptions and protect your price.

EA

What every subcontractor estimating takeoff includes

  • Quantity takeoff for your CSI division(s) from architectural, structural, and MEP sheets
  • Material pricing by ZIP code with sales tax shown separately
  • Labor hours by line item using RSMeans data adjusted for your trade
  • Waste factor applied per material as a separate line
  • Marked-up plan sets showing measurement boundaries and assumptions
  • Excel workbook with formulas you can adjust for your own labor and markup
  • PDF estimate organized by CSI MasterFormat division
  • Scope letter review to confirm what the GC assigned to you
  • Alternate and unit-price breakdowns when the bid form requires them
  • Bond and insurance cost lines if your bid includes them
  • Clarification list for items that need a written RFI before bid day
How we work

How we build your subcontractor estimate

  1. Review scope letter and specsWe start with the GC's scope letter and the specification sections for your division. We highlight inclusions, exclusions, and any language that assigns work you might not expect, such as firestopping or temporary heat. This review becomes the checklist we measure against. We also flag any conflicts between the scope letter and the drawings for your written RFI.
  2. Measure from drawingsUsing Bluebeam Revu and PlanSwift, we measure quantities directly from the plan set. For drywall, we trace wall runs and ceiling areas, subtracting openings over 10 SF. For electrical, we follow conduit routes and count devices from the power and lighting plans. Every measurement is tied to a sheet number. We also note any dimensions that are missing or unclear.
  3. Apply waste and convert unitsWe apply typical waste factors by material: 10 percent for drywall, 10–15 percent for tile, 10 percent for roofing, 5–10 percent for rebar, and 5 percent for paint. Rebar is converted from LF to LB by bar size. Ductwork is converted from area to LB by gauge. Waste is shown as a separate line so you can adjust it. We also convert quantities to the units your suppliers use.
  4. Price material and laborMaterial and labor pricing comes from RSMeans data adjusted for your ZIP code. Sales tax is calculated on material only and shown separately. Labor hours are priced at the trade rate for your division. If your bid includes bond or insurance, those lines are added based on the rate you provide. We also include a line for small tools and consumables if it is typical for your trade.
  5. Mark up plan sets and checkWe produce marked-up plan sets showing exactly where each quantity came from, including measurement boundaries and assumptions. A second estimator checks the takeoff against the scope letter and specification before the estimate is released. Discrepancies are resolved before delivery. The marked-up sets are delivered as a separate PDF for your records and for any post-bid discussions.
  6. Deliver Excel and PDFYou receive an Excel workbook with formulas you can adjust, and a PDF estimate organized by CSI MasterFormat division. The Excel file lets you change labor rates, markup, and waste factors to match your own accounting. Marked-up plan sets are included as a separate PDF. We also provide a clarification list of items we excluded and where they belong.

What we need from you

  • Plan setArchitectural, structural, and MEP sheets in PDF. The more complete the set, the fewer assumptions we make.
  • Scope letterThe GC's written scope assignment. This defines what you carry and what you exclude.
  • SpecificationsThe spec sections for your division, so we price the correct material types and installation methods.
  • Bid formIf the GC requires alternates or unit prices, send the form so we format the estimate to match.
  • Labor ratesYour crew's hourly rates if you want the estimate priced at your own labor cost rather than RSMeans averages.
  • Markup and bondYour overhead and profit percentages, plus bond and insurance rates if you carry them.
  • Bid due dateSo we can schedule the takeoff and flag any long-lead items that need early pricing.
Sample output

Sample takeoff format — Division 09

This is an excerpt from a drywall and acoustical takeoff for a mid-size commercial project. The Ref. column points to the sheet where the quantity was measured.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
09 21 001/2" gypsum board, walls, painted18,400SFA-201
09 21 005/8" Type X gypsum board, shaftwall3,200SFA-202
09 21 00Corner bead, metal1,250LFA-201
09 21 00Control joint, zinc420LFA-201
09 21 00Acoustical sealant, perimeter1,800LFA-201
09 51 00Suspension grid, 15/16" exposed tee4,800SFA-301
09 51 00Acoustical tile, 2x2, NRC 0.704,800SFA-301
09 21 00Blocking and backing, plywood320LFA-201
09 21 00Firestopping at rated penetrations85EAA-202
09 21 00Joint compound and tape21,600SFA-201

Units we use for your trade

Every line item is measured in the unit your trade actually buys, installs, and bills. Here is how we measure the common ones.

ItemUnitHow it's measured
Drywall boardSFMeasured by wall and ceiling area from elevations and reflected ceiling plans, minus openings over 10 SF
Metal studsLFMeasured along wall runs from plan dimensions, by gauge and depth, with track counted separately
ConcreteCYCalculated from footing, slab, and wall dimensions on structural sheets, divided by 27
RebarLBConverted from LF by bar size and multiplied by weight per foot, with laps added
ConduitLFMeasured along homerun and feeder routes on electrical plans, by trade size and type
PipeLFMeasured along plumbing and HVAC plans by material and diameter, with fittings counted as EA
DuctworkLBCalculated from duct area and gauge from mechanical schedules, converted to sheet weight
RoofingSQMeasured from roof plan area divided by 100, with hips, ridges, and waste added separately
FlooringSFMeasured from floor finish plans by material, with transitions and base counted in LF
PaintSFMeasured from wall and ceiling areas, with trim and doors counted in LF or EA

Worked takeoff example — Division 09 drywall for a small tenant fit-out

This walk-through uses illustrative dimensions to show how we build a drywall takeoff. Your plan set will have different numbers, but the sequence and unit conversions are the same.

Step 1 — Measure wall area. Two partition types: Type A is 1/2" gypsum board on both sides of 3-5/8" metal studs; Type B is 5/8" Type X on both sides for a 1-hour rated corridor. From the floor plan, Type A runs total 420 LF at 10 ft ceiling height, with two door openings (3 ft x 7 ft each) and one window opening (6 ft x 4 ft). Gross wall area = 420 LF x 10 ft = 4,200 SF. Deduct openings: doors = 2 x 21 SF = 42 SF; window = 24 SF. Net wall area = 4,200 − 66 = 4,134 SF. Board is double-sided, so board SF = 4,134 x 2 = 8,268 SF.

Step 2 — Type B corridor. Corridor length 180 LF at 10 ft high. Gross area = 1,800 SF. One door opening (3 ft x 7 ft = 21 SF). Net area = 1,779 SF. Double-sided board = 3,558 SF. Because it is Type X, we list it as a separate line: 5/8" Type X, 3,558 SF.

Step 3 — Studs and track. For Type A, studs at 16 in. on center: 420 LF x 0.75 studs per LF = 315 studs. Add 10% for waste and corners = 347 studs. Track: top and bottom = 420 LF x 2 = 840 LF. Type B: 180 LF x 0.75 = 135 studs; add 10% = 149 studs. Track = 360 LF.

Step 4 — Corner bead and control joints. Corner bead at all outside corners: 18 corners x 10 ft = 180 LF. Add 5% waste = 189 LF. Control joints at 30 ft on center: 420 LF / 30 = 14 joints x 10 ft = 140 LF. Add 5% = 147 LF.

Step 5 — Acoustical sealant and firestopping. Perimeter sealant at head and floor: Type A = 420 LF x 2 = 840 LF; Type B = 180 LF x 2 = 360 LF. Total = 1,200 LF. Firestopping at rated penetrations: assume 12 penetrations through Type B wall; each takes 1 EA of firestop sealant or collar. List as 12 EA.

Step 6 — Waste as a separate line. Board waste: 10% of total board (8,268 + 3,558 = 11,826 SF) = 1,183 SF. Stud waste: already added in Step 3. Bead and joint waste: already added. Sealant waste: 5% of 1,200 LF = 60 LF.

Step 7 — Unit conversion and pricing. Board is priced per SF; studs per LF; bead per LF; sealant per LF; firestop per EA. We apply ZIP-code-adjusted material and labor rates, then show sales tax, bond, and markup as separate lines. The final Excel workbook lists each line with the sheet reference so you can trace every quantity back to the drawing. Dimensions here are illustrative only.

Cost drivers

What drives subcontractor cost estimation on your bid

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Labor hours per unit

Labor is the largest line in most sub bids. RSMeans data gives hours per unit by trade, but productivity varies with ceiling height, access, and building type. We adjust hours for the conditions shown on the drawings and note where we assumed normal access.

Material type and spec

A 5/8" Type X shaftwall assembly costs more per SF than 1/2" standard board, and the labor to install it is higher. The specification and fire-rating schedule force the choice. We price the assembly the spec calls for, not a generic board.

Labor hours per unit

Labor is the largest line in most sub bids. RSMeans data gives hours per unit by trade, but productivity varies with ceiling height, access, and building type. We adjust hours for the conditions shown on the drawings and note where we assumed normal access.

Waste factor

Waste varies by material and layout. Drywall waste is typically 10 percent, but a building with many small rooms can run higher. Tile waste is 10–15 percent depending on pattern. We apply waste as a separate line so you can see and adjust it.

Access and staging

Work above 12 feet, occupied spaces, and limited staging areas add labor. If the drawings show a scissor lift or scaffold requirement, we include it as a separate line. If the GC's scope letter assigns temporary power or heat to you, we price it.

Escalation on long-lead items

Switchgear, rooftop units, and custom millwork can escalate if the bid is held open past 30 days. We note long-lead items and can carry an escalation allowance if you specify the percentage. Otherwise, we flag it for your review.

Sales tax and jurisdiction

Sales tax on materials varies by state and sometimes by county. We apply the rate for the project ZIP code. Permit fees are not included and must be confirmed with the local building department because they vary across a metro area.

Project schedule and phasing

A compressed schedule or phased occupancy can require overtime or additional crews, which increases labor cost. If the bid documents specify a completion date or phasing plan, we adjust labor hours accordingly and note any assumptions about shift work.

Scope gaps

Common scope gaps we catch in bid package review

These are the items that most often fall between trades or get left out of a sub's bid. We review the scope letter and drawings for each one and note it in the estimate.

  • Fire-rated assemblies assigned to the drywall sub without a separate line. The scope letter may not call out 5/8" Type X or shaftwall, so the sub prices 1/2" board. We check the fire-rating schedule and price the correct assembly.
  • Blocking and backing for toilet accessories, grab bars, and casework. These are drawn but rarely dimensioned. We measure the linear feet from the equipment schedules and add it to the drywall scope.
  • Acoustical sealant at head-of-wall and floor-of-wall joints, plus firestopping at rated penetrations. These belong to the drywall scope but are often assumed to sit with the GC. We include them as separate lines.
  • Conduit and wiring for fire alarm, security, and data. The electrical sub's bid must state whether low-voltage is in or out. We list it as an exclusion unless the scope letter assigns it to you.
  • Roof drains, scuppers, and overflow. The plumber and the roofer each assume the other carries them. We identify the responsible trade from the drawings and note it in the clarification list.
  • Test and balance (TAB) for HVAC, plus commissioning support hours required by the spec. These are often omitted from the mechanical bid. We add them if the specification requires them.
  • Cutting and patching of your own work, and who pays for the other trade's patching after your rough-in. The scope letter usually assigns this, but it is easy to miss. We flag it for your review.
  • Temporary heat, temporary power, and final cleaning. These are usually general conditions lines, but the scope letter sometimes pushes them to the sub. We price them only if assigned to you.
  • Permit and inspection fees by jurisdiction. These are not the same across a metro area. We exclude them and note that you must confirm with the local building department.
  • Sales tax on materials when you buy direct versus the GC buying and issuing the material. The tax treatment differs. We apply sales tax only to materials you purchase.

Material choices that change your bid

For drywall, the board type, stud gauge, and joint treatment drive both material and labor. This table shows how we compare them.

Material / assemblyUnitTypical waste factorWhat forces the choice
1/2" standard gypsum boardSF10%Interior non-rated walls and ceilings; lowest cost.
5/8" Type X gypsum boardSF10%1-hour or 2-hour rated assemblies per fire-rating schedule.
5/8" moisture-resistant boardSF10%Wet areas, restrooms, and kitchens; spec section 09 29 00.
5/8" abuse-resistant boardSF10%Corridors, gyms, and high-traffic areas; spec may require.
Shaftwall assemblySF10%Elevator and mechanical shafts; fire-rated from both sides.
3-5/8" metal stud, 25 gaLF7%Non-structural interior partitions up to 10 ft; standard.
6" metal stud, 20 gaLF7%Taller walls or higher load; structural engineer may require.
Joint compound and tapeSF5%Level of finish (Level 3, 4, or 5) drives coats and quantity.
Codes and standards

Codes, standards, and spec sections that affect your drywall quantities

The quantities you carry for drywall are set by the fire-rating schedule, the specification, and the adopted building code. The most common driver is the required fire-resistance rating of an assembly. The fire-rating schedule on the architectural sheets tells you whether a wall is 1-hour or 2-hour, and that determines board type and number of layers. The assembly may be listed in the UL Fire Resistance Directory or the GA-600 Fire Resistance Design Manual. You need to confirm that the assembly you price matches the one the architect specified; substituting a generic 1/2" board for a 5/8" Type X assembly is a common and expensive error.

Specification sections that affect quantity include 09 21 00 Gypsum Board Assemblies, 09 29 00 Gypsum Board, and 09 51 00 Acoustical Ceilings. Section 09 21 00 typically covers framing, board, joint treatment, and accessories. Section 09 29 00 may be used for specialty board. The level of finish (Level 3, 4, or 5) is defined in ASTM C840 and affects joint compound and labor. A Level 5 finish requires a skim coat over the entire surface, which adds material and hours per SF.

Acoustical sealant at head-of-wall and floor-of-wall joints is required by the assembly listing and by the sound transmission requirements in the code. Firestopping at rated penetrations is required by the International Building Code (IBC) Chapter 7 and by ASTM E814 or UL 1479. The adopted edition of the IBC varies by jurisdiction, so confirm with the local building department which edition applies to your project. The same applies to the International Energy Code (IECC) if the project includes exterior insulation or air barriers that interface with your scope.

Seismic requirements affect bracing and blocking. In higher seismic design categories, the structural drawings may require additional bracing, and the code may require that certain walls be full-height. You need to check the structural general notes for bracing details and include them in your takeoff. Local amendments can add requirements beyond the model code. Always confirm the adopted code edition and any local amendments with the local building department before you finalize your bid.

Who we provide estimates for

Who this service is for

Electrical subcontractors

You need conduit and wire takeoffs by trade size, device and panel counts, and a clear statement on whether low-voltage is in your scope. You use the estimate to set your bid number and to check the GC's scope letter against the drawings.

Mechanical and plumbing subcontractors

You need pipe and duct takeoffs by material and size, equipment counts, and a list of exclusions for TAB, commissioning, and controls. The estimate helps you decide whether to bid and what to carry for long-lead equipment.

Drywall and acoustical subcontractors

You need board SF by type, corner bead and control joint LF, and a separate line for fire-rated assemblies. You also need blocking and sealant quantities that are often left out of the bid.

Concrete subcontractors

You need formwork contact area, rebar weight by bar size, and concrete volume by mix design. The estimate shows waste and laps separately so you can adjust for your own forming methods.

Roofing subcontractors

You need roofing squares by system, flashing and edge metal LF, and a note on warranty terms that affect material choice. The estimate helps you compare TPO, EPDM, and modified bitumen on a bid.

Painting and flooring subcontractors

You need wall and ceiling SF, trim LF, and door counts for painting, or flooring SF by material with substrate prep. The estimate separates surface prep and adhesive so you can price the job accurately.

Where we provide estimates

Subcontractor Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Subcontractor Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The same trade scope behaves differently by building type. Here is what we adjust for each.

Commercial office fit-out

Openings over 10 SF deducted; demountable partitions counted separately; ceiling height drives lift need.

Watch for: Verify if existing walls stay; blocking for monitors and casework often missing from plans.

Multifamily residential

Unit-to-unit repetition; corridor and shaftwall assemblies priced separately; bathroom and kitchen backing added.

Watch for: Fire-rated separations between units; acoustical sealant at party walls is often omitted.

K-12 school

High ceiling areas in gyms and commons; abuse-resistant board in corridors; extra blocking for casework.

Watch for: Summer schedule compresses labor; confirm if work is occupied or vacant.

Healthcare clinic

Lead-lined board in imaging rooms; moisture-resistant board in exam and procedure rooms; more firestopping.

Watch for: ICRA and infection control requirements may add labor; confirm with facility.

Retail shell and white box

Minimal interior partitions; more exterior wall and storefront coordination; restroom build-out included.

Watch for: Landlord scope vs. tenant scope line is often blurred; get the lease exhibit.

Warehouse and distribution

High walls; structural studs vs. non-structural; less drywall, more insulation and fire-rated sheathing.

Watch for: Wall height over 20 ft drives lift and scaffold cost; check bracing requirements.

Deliverables

What you receive

  • Excel workbook with takeoff quantities, material and labor pricing, waste factors, sales tax, bond, and markup as separate, adjustable lines.
  • PDF estimate organized by CSI MasterFormat division, formatted to match your bid form if one is provided.
  • Marked-up plan sets in PDF showing measurement boundaries, assumptions, and sheet references for every quantity.
  • Scope letter review notes highlighting inclusions, exclusions, and items that need a written RFI before bid day.
  • Clarification list of items we excluded and where they belong, so you can state your exclusions in writing.
  • Alternate and unit-price breakdowns when the bid form requires them, priced separately from the base bid.
Checklist

Pre-bid checklist for subcontractors

  • Confirm the bid due date and time, and whether the GC requires a specific bid form.
  • Read the scope letter line by line and highlight every item assigned to you.
  • Compare the scope letter against the specification sections for your division.
  • Check the fire-rating schedule and price the correct assemblies, not generic board.
  • Measure openings over 10 SF and deduct them from wall and ceiling areas.
  • Count blocking and backing for accessories, grab bars, and casework.
  • Include acoustical sealant and firestopping at rated penetrations if in your scope.
  • List exclusions in writing: low-voltage, TAB, commissioning, temporary heat.
  • Confirm who carries permit and inspection fees; these vary by jurisdiction.
  • Identify long-lead items and note escalation if the bid is held past 30 days.
  • Check if sales tax applies to materials you buy direct vs. GC-furnished.
  • Verify access and staging: lift, scaffold, or occupied-space restrictions.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

RW
Robert WilliamsEstimating Manager

Professional and reliable estimating service. The detailed quantity takeoff helped us reduce pricing errors and submit our proposal on time.

JR
James RichardsonConstruction Project Manager

Excellent construction estimating service. The team provided a comprehensive takeoff and cost breakdown that saved us hours of manual work.

KM
Kevin MartinezCivil Contractor

Great experience from start to finish. The detailed material takeoff and cost estimate helped us prepare a much more accurate project budget.

DT
Daniel ThompsonCommercial Contractor

Very impressed with the accuracy and turnaround time. Their estimate gave us a clear picture of material and labor costs before starting the project.

FAQ

Subcontractor Estimating questions

How do you handle the GC's scope letter if it conflicts with the drawings?

We review the scope letter against the specification and the drawings. When they conflict, we price to the more stringent requirement and note the conflict in the clarification list. You can then issue an RFI before bid day. We do not silently choose one over the other. The estimate will show both the scope letter language and the drawing condition so you can decide what to carry or exclude in writing.

Can you price my bid using my own labor rates instead of RSMeans?

Yes. Send your crew's hourly rates by trade and classification, and we will replace the RSMeans labor rates with yours. We keep the labor hours per unit from RSMeans adjusted for your project conditions, then apply your rates. The Excel workbook has a separate labor rate column so you can adjust it yourself after delivery. If you do not have rates, we use ZIP-code-adjusted RSMeans averages.

What if I only have a partial plan set or a design-build scope?

Send what you have. We will take off the available sheets and list the assumptions we made for missing information. For design-build, we price to a typical assembly for the building type and note where the final design may change quantities. The clarification list will state exactly what we assumed so you can qualify your bid. If the missing information is significant, we may recommend a unit-price allowance.

Do you provide takeoff for multiple divisions if I am bidding as a prime sub?

Yes. We can produce a multi-division takeoff and priced estimate for a prime subcontractor or a sub bidding a package that includes several trades. Each division is priced separately with its own waste factors and labor rates. The Excel workbook is organized by CSI MasterFormat division so you can roll up or separate the scopes. Tell us which divisions you carry when you send the plans.

How do you handle alternates and unit prices on the bid form?

Send the bid form with your plans. We will format the estimate to match the form and price each alternate separately. Unit prices are calculated from the same takeoff quantities, with a clear basis for each unit. If the bid form requires a breakdown by system or phase, we will structure the Excel workbook to match. This avoids reformatting after you receive the estimate.

What is your turnaround time and do you offer rush service?

Most projects return in 24–48 hours after we receive a complete plan set and scope letter. Rush service is available when your bid date is tight; contact us with the due date and we will confirm whether we can meet it. Turnaround depends on the size and complexity of the scope. For large or multi-division packages, we will give you a specific delivery time when we review the documents.

How do you apply sales tax to materials?

We apply sales tax only to materials you purchase directly. If the GC furnishes and issues the material, we do not add sales tax to that material line. The tax rate is based on the project ZIP code, and we show it as a separate line in the estimate. Sales tax rules vary by state and sometimes by county, so confirm the rate with your accountant or the state tax authority. We do not include permit fees.

What do you need from me to start the takeoff?

Send the plan set in PDF (architectural, structural, and MEP sheets), the GC's scope letter, the specification sections for your division, and the bid form if one is required. Also send your labor rates if you want the estimate priced at your own cost, and your markup and bond percentages. Tell us the bid due date so we can schedule the work and flag long-lead items.

Do you mark up the plan set to show where quantities came from?

Yes. We deliver marked-up plan sets in PDF showing measurement boundaries, sheet references, and assumptions for every quantity. This lets you trace each line back to the drawing. The marked-up sets are useful if the GC asks how you arrived at a number, or if you need to adjust the takeoff after a scope clarification. They are included as a separate PDF with the Excel and PDF estimate.

Can you help me decide whether to bid a job?

We provide the quantities and pricing so you can make that decision. The estimate shows the major cost drivers, long-lead items, and scope gaps that could affect your risk. We do not tell you whether to bid, but we give you the numbers and a clarification list so you can compare the opportunity against your backlog and crew availability. Many subs use the takeoff to decide whether the job fits their capacity.

What if the GC's scope letter assigns work I normally exclude?

We flag it. If the scope letter assigns temporary heat, final cleaning, or firestopping that you normally exclude, we will price it as a separate line and note it in the clarification list. You can then decide whether to carry it, exclude it in writing, or issue an RFI. The goal is to make sure your bid reflects the scope letter you signed up for, not an assumption.

Do you provide estimates for residential or light commercial projects?

Yes. We take off residential and light commercial scopes for trades like drywall, painting, flooring, and concrete. The units and waste factors are the same, but the assemblies and code requirements may be simpler. For residential work, confirm whether the local jurisdiction uses the IRC or IBC, as this affects fire-rated assemblies and other requirements. Send the plans and we will price to the applicable code.

Do you provide subcontractor bid estimating for multiple divisions?

Yes. When you bid as a prime sub, we can take off and price more than one division from the same plan set. Each division is measured separately and organized by CSI MasterFormat, so Division 03 concrete, Division 05 metals, Division 09 finishes, Division 22 plumbing, and Division 26 electrical stay on their own tabs. We keep a shared cost database for labor and equipment costs so the divisions reconcile. Send the full bid package and the GC's scope letter, and we will tell you which divisions we can price.

What does outsourced subcontractor estimating support include?

You get a quantity takeoff in Excel, a priced PDF, and marked-up plans showing where each quantity came from. We measure from the plans and specifications, apply typical waste factors, and list material, labor, and equipment costs as separate lines. Sales tax, bond, and markup are shown separately so you can adjust to your own accounting. We use Bluebeam Revu, PlanSwift, and RSMeans data, and we adjust pricing by ZIP code. Turnaround is 24–48 hours for most projects, with rush available.

Can you handle a subcontractor quantity takeoff from a partial plan set?

Yes, with a caveat. If you only have a partial set or a design-build scope, we take off what is drawn and flag the gaps in a written assumptions list. We note which sheets were missing, which addendum was not included, and where a dimension had to be scaled. That list goes into the estimate so you can qualify your bid. We cannot price what is not shown, but we can show you exactly what is missing before you send the number to the GC.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your plans and scope letter

Get a division-scoped takeoff and priced estimate in Excel and PDF within 24–48 hours — start by sending your plans and the GC's scope letter through our get an estimate page.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us