Scope Precision EstimateContact Us

Small Contractor Estimating

Send your plans, specs and bid date in one email. We return a CSI MasterFormat takeoff with marked-up drawings in 24–48 hours, priced for your ZIP code.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"412LF30.5 CY
Stem wall 8" × 36"286LF25.4 CY
Slab-on-grade 5"4,850SF74.8 CY
Formwork, footing and stem1,396SF—
Rebar, #4 and #53,240LF3,240 LF
Total concrete130.7 CY
Illustrative quantities. Waste factor applied as a separate line.
Rebar laps included

What is small contractor estimating?

Small contractor estimating is a plan-based quantity takeoff and pricing service for contractors without a full-time estimator. We measure line items from your drawings and specifications, organize them by CSI MasterFormat division, and deliver Excel and PDF files with quantities, units, and a marked-up plan set. Pricing is ZIP-code-adjusted for material and labor.

  • Line items carry CSI section numbers, quantities, units, and drawing references.
  • Typical waste factors range from 5 to 10 percent for most materials.
  • The most common costly miss is waste factors buried inside quantities.

You run a small crew and price your own work at night. When a bid lands on your desk, you need a real takeoff, not a guess. We produce that takeoff from your plans and specifications, organized by CSI MasterFormat division, with the quantities and units your suppliers and subs quote from. If you also handle larger jobs, see our General Contractor Estimating page; if you self-perform a trade, our Subcontractor Estimating Services may fit better.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We work from the same documents you bid: architectural, structural, MEP, and the specifications. Every line item carries a section number, a quantity, a unit of measure, and a drawing reference. You get Excel and PDF files, plus a marked-up plan set showing where each quantity came from. Takeoffs run in Bluebeam Revu and PlanSwift, with RSMeans data behind the pricing. Pricing is ZIP-code-adjusted for material and labor, so a 2x4 stud wall in Texas does not carry the same labor unit as the same wall in California.

This service is built for contractors billing $200K–$2M a year, where a full-time estimator does not pencil out. You send the plans; we send back a number you can defend to a GC or an owner. Turnaround is 24–48 hours for most projects, with rush available. If you are comparing providers, our Who We Serve: Estimating Services by Contractor and Client Type page shows how this offer sits next to the others, and you can get an estimate when you are ready to send files.

Services

What the small contractor takeoff covers

We take off the scopes you are pricing, not the whole building, unless you ask for the whole building. Quantities come off the drawings with scale and dimensions checked against the schedules. Each line lands in its CSI section so your supplier quote and your sub quote line up. The Who We Serve page shows how this fits with other client types.

Concrete and Sitework

Footings, stem walls, slab-on-grade, and flatwork measured with formwork area and reinforcement tonnage.

CY · SF · TON

Steel and Framing

Structural beams, columns, joists, wall framing, and sheathing counted with connection and fastener quantities.

TON · LF · SF

Insulation and Sealants

Batt insulation by R-value, rigid board, and joint sealant measured along the actual joint length.

SF · LF

Openings and Hardware

Hollow metal doors, frames, hardware sets, and windows counted by type and size from the door schedule.

EA · SF

Interior Finishes

Gypsum board by type and thickness, tile, ceilings, and paint measured with ceiling height and room boundaries.

SF · LF

Plumbing Systems

Fixtures, water and waste piping by size, and specialty equipment measured from riser diagrams.

EA · LF

HVAC Systems

Equipment, ductwork by weight and size, flex duct runs, and grilles counted from mechanical plans.

EA · LB · LF

Electrical Systems

Devices, panelboards, conduit, and wire measured by gauge and run length from power and lighting plans.

EA · LF

What every small contractor estimating takeoff includes

  • Division 03 concrete: footings, stem walls, slab-on-grade in CY with formwork SF
  • Division 05 steel: beams, columns, joists in TON with connection count
  • Division 06 rough carpentry: wall framing LF, joists LF, sheathing SF
  • Division 07 insulation and sealants: batt SF by R-value, joint sealant LF
  • Division 08 openings: hollow metal doors EA, hardware sets EA, windows SF
  • Division 09 finishes: gypsum board SF by type, tile SF, ceiling SF, paint SF
  • Division 22 plumbing: fixture EA, water and waste pipe LF by size
  • Division 23 HVAC: equipment EA, ductwork LB, flex duct LF
  • Division 26 electrical: devices EA, conduit LF, wire LF by gauge
  • Waste factors applied as separate lines, not buried in the quantity
  • Marked-up plan set showing each takeoff area and dimension
  • Excel and PDF organized by CSI MasterFormat division
How we work

How we take off your plans and specifications

  1. Set the scale and check sheetsWe load the PDF into Bluebeam Revu, calibrate each sheet to the graphic scale, and cross-check dimensions against the dimension strings. If the architectural and structural grids disagree, we flag it before taking off a single footing. You get a question list the same day, not after the bid. We also verify that the latest addenda are incorporated, so you are not pricing a superseded sheet.
  2. Take off by assemblyWe measure in PlanSwift by assembly: footing runs, stem wall runs, slab areas, wall plates, studs, sheathing, and openings. Each assembly carries its own waste factor as a separate line. A 2x6 wall at 16 in. o.c. is taken off differently from a 2x4 wall at 24 in. o.c., and the labor unit changes with it. We also count corners, headers, and blocking runs, because those drive waste and labor on a cut-up layout.
  3. Price with ZIP-adjusted dataMaterial and labor units come from RSMeans data adjusted to the project ZIP code. We apply the correct waste factor per material: 5–10% typical for framing lumber, more on a cut-up layout, and a separate overpour allowance on footings. Sales tax and delivery stay visible as their own lines. If you provide your own burdened labor rates, we use those instead of the published data.
  4. Mark up the plan setEvery quantity gets a markup on the drawing: a cloud around the area, a dimension string, and a line number that matches the Excel row. When a sub asks where 412 LF of footing came from, you open the sheet and point to it. The markups also expose scopes you may have missed, like blocking on the finish drawings. We note any assumptions, such as a 4 ft frost depth or a specific wall height, directly on the sheet.
  5. Deliver Excel and PDFYou get an Excel workbook sorted by CSI MasterFormat division and a PDF of the marked-up set. The workbook has columns for quantity, unit, waste, material cost, labor cost, and total. You can drop your own numbers into the material column if your supplier beats our pricing. The PDF is bookmarked by sheet number so you can jump to any takeoff area quickly.
  6. Review and supportAfter delivery, we schedule a 30-minute call to walk through the takeoff, answer your questions, and explain any assumptions. If you need adjustments, we make them within 24 hours. This ensures you understand the numbers before you submit your bid. We also provide a written summary of any scope gaps or clarifications you should include with your proposal.

What to send us

  • Plan setArchitectural, structural, and MEP sheets as PDF. If you only have a portion, send what you have and tell us the scope.
  • SpecificationsThe project manual, even a partial one. Specs set the material grade, the assembly type, and the sealant class.
  • Bid dateThe date and time the bid is due. We schedule the takeoff backward from it and tell you if rush is needed.
  • Scope listThe divisions you are pricing. If you are a framing sub, we take off Division 06 and stop there.
  • Project ZIP codeThe site ZIP, not your office ZIP. Material and labor pricing is adjusted to where the work happens.
  • AddendaAny addenda issued before the bid. An addendum can change the door schedule or the roof assembly and move quantities.
  • Your labor ratesIf your crew rates differ from published data, send them. We can price labor at your burdened rate instead of the default.
Sample output

Sample small contractor estimate format

This is how a small commercial fit-out takeoff looks in the Excel file. Quantities are illustrative.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
02 41 00Demolition, interior partition185LFA-101
03 30 00Footing, continuous 24" × 12"412LFS-101
06 10 00Wall framing, 2x4 at 16 in. o.c.1,240LFA-201
09 21 00Gypsum board, 5/8 in. Type X4,860SFA-301
09 51 00Acoustical ceiling, 2x2 tile1,150SFA-401
09 65 00Luxury vinyl plank flooring980SFA-501
26 00 00Receptacle, duplex 20A48EAE-201
22 00 00Plumbing fixture, water closet12EAP-201
23 31 00Ductwork, galvanized steel1,250LBM-301
09 90 00Paint, interior latex, 2 coats8,400SFA-601

Units of measure we take off and how they are measured

Each quantity carries the unit your supplier or sub prices in. Here is how we measure the common ones.

ItemUnitHow it's measured
Wall framingLFMeasured along the plate line, 16 in. o.c. studs counted, plates and blocking separate
Slab-on-grade concreteCYArea times thickness divided by 27, plus waste and overpour
Gypsum boardSFWall and ceiling area by room, openings over 10 SF deducted
Structural steelTONMember length times weight per foot from the AISC manual
Doors and framesEACounted from the door schedule, hardware sets counted separately
DuctworkLBSheet metal weight from gauge and perimeter, fittings by count
PaintGALSubstrate area divided by spread rate, coats counted separately

Worked example: small contractor project estimating on a bathroom remodel

This example shows how we take off a typical small bathroom remodel. The dimensions are illustrative. We assume a 5 ft × 8 ft bathroom with 8 ft ceilings, one door, one window, and a tub/shower. All quantities are taken from the drawings and converted to the units your suppliers and subs quote in.

Step 1 — Demolition (Division 02 41 00)

  • Remove existing tile floor: 5 ft × 8 ft = 40 SF.
  • Remove existing drywall on three walls: wall area = (5 + 8 + 5) ft × 8 ft = 144 SF, minus door (21 SF) and window (15 SF) = 108 SF.
  • Remove tub: 1 EA.

Step 2 — Framing (Division 06 10 00)

  • New partition for plumbing wall: 5 ft long × 8 ft high = 40 SF. Studs at 16 in. o.c.: 5 ft × 12 in./ft ÷ 16 in. + 1 = 4.75, round to 5 studs. Add top and bottom plates: 5 ft × 2 = 10 LF. Add blocking for grab bars: 6 LF.
  • Total framing: 5 studs (8 ft) = 40 LF of studs, 10 LF of plates, 6 LF of blocking.

Step 3 — Drywall (Division 09 21 00)

  • Walls: 108 SF (same as demolition area).
  • Ceiling: 5 ft × 8 ft = 40 SF.
  • Total drywall: 148 SF. Add 10% waste for small rooms = 14.8 SF, round to 15 SF. Total to order: 163 SF. Use 1/2 in. moisture-resistant board for wet areas.

Step 4 — Tile (Division 09 30 00)

  • Floor tile: 40 SF. Add 10% waste = 4 SF. Total 44 SF.
  • Wall tile around tub: tub surround 5 ft wide × 6 ft high = 30 SF. Add 10% waste = 3 SF. Total 33 SF.

Step 5 — Plumbing (Division 22 00 00)

  • Replace water closet: 1 EA.
  • Lavatory: 1 EA.
  • Tub/shower valve and trim: 1 EA.
  • Water pipe: 20 LF of 1/2 in. PEX.
  • Waste pipe: 15 LF of 2 in. PVC.

Step 6 — Electrical (Division 26 00 00)

  • GFCI receptacle: 2 EA.
  • Exhaust fan: 1 EA.
  • Light fixture: 2 EA.
  • Wire: 30 LF of 12 AWG.

Step 7 — Paint (Division 09 90 00)

  • Walls: 108 SF. Ceiling: 40 SF. Total 148 SF. Two coats. Spread rate 350 SF/gal per coat. 148 × 2 ÷ 350 = 0.85 gal, round to 1 gal.

Step 8 — Waste factors

  • Framing: 5% on studs and plates.
  • Drywall: 10% on small rooms.
  • Tile: 10% on floor and wall.
  • Paint: no waste factor; buy whole gallons.

All quantities are then priced with ZIP-code-adjusted material and labor rates. The marked-up plan set shows each area and dimension so you can verify the numbers. This takeoff would be delivered in Excel and PDF within 24–48 hours.

Cost drivers

What moves the small contractor cost estimating number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Material grade

A 2x6 stud wall costs more than 2x4 in material and slightly more in labor. ZIP sheathing versus OSB, 5/8 in. Type X versus 1/2 in. regular drywall, and architectural shingle versus standing seam metal each shift the unit cost. The spec section tells us which one to price.

Waste factor

Framing lumber runs a typical 5–10% waste, but a cut-up layout with many corners pushes it higher. Drywall waste climbs in small rooms and closets. We show waste as its own line so you can see what it costs and trim it if your crew is efficient.

Material grade

A 2x6 stud wall costs more than 2x4 in material and slightly more in labor. ZIP sheathing versus OSB, 5/8 in. Type X versus 1/2 in. regular drywall, and architectural shingle versus standing seam metal each shift the unit cost. The spec section tells us which one to price.

Labor unit

The labor unit moves with the assembly, not just the quantity. Hanging 5/8 in. Type X on a 10 ft ceiling is slower than 1/2 in. on an 8 ft wall. We apply the unit that matches the assembly and the height, then adjust to your ZIP code.

Access and height

A second-floor takeoff needs a lift or scaffolding, and that cost belongs in Division 01. A roof with a 6:12 pitch is slower to shingle than a 4:12. We note the access condition on the marked-up sheet so you can price it deliberately.

Small-order surcharges

A small job still needs a full delivery of studs, drywall, and concrete. Small-order surcharges and minimum delivery fees hit a $50K job harder than a $500K job. We keep them visible so your markup covers them.

Code compliance

Adopted code editions vary by jurisdiction. For example, the IECC energy code may require higher R-values for insulation, adding material cost. The NEC may require AFCI breakers in more rooms. We price to the code edition you tell us, but confirm the adopted edition with the local building department.

Site conditions

A sloped site needs more excavation and retaining walls. A site with poor soil may require engineered fill or deeper footings. These conditions are not always on the drawings, so we flag them and adjust quantities if you provide a geotechnical report.

Scope gaps

Scope gaps we catch during small contractor bid preparation

Most small-contractor misses are not in the big quantities. They hide in Division 01 and in the details between trades.

  • Division 01 general requirements: permit fees, plan review, dumpster count, temporary toilet, and final cleaning. These live in the front of the spec book, not on the drawings, and we take them off as a checklist.
  • Mobilization and demobilization on a short-duration job. The cost is real even when the contract does not list it, and we add it as a Division 01 line.
  • Concrete waste and overpour on footings, plus rebar lap and chairs. The drawings show the footing, not the 5% overpour or the 40-bar-diameter lap, so we add both as separate lines.
  • Framing waste above the typical 5–10% when the layout is cut up. We count corners, headers, and blocking runs, then set the waste factor to match the plan rather than a default.
  • Drywall waste on small rooms and closets, plus fire-rated assemblies and their penetration details. The fire-rated wall schedule is on the architectural sheets, and the penetration details are in the specs.
  • Blocking and backing for grab bars, TV mounts, and casework shown on finish drawings. These appear on the interior elevations and the casework sections, not on the framing plan.
  • Sealant at dissimilar materials, control joints, and exterior penetrations. Division 07 92 00 calls out the joints, but the length is only measurable from the elevations and the wall sections.
  • Roofing underlayment, drip edge, valley metal, and pipe boots. The roof plan shows shingles; the accessories are in the specs and the details, and they add 10–15% to the roof cost.
  • HVAC condensate drain, line-set length, and equipment pad or curb. These are on the mechanical sheets and the details, and they are easy to skip when you price from the equipment schedule alone.
  • Electrical home-run wire length and panel breaker spaces added by the new circuits. The panel schedule shows the breakers; the wire length comes from the routing on the plan.
  • Sales tax on materials, delivery charges, and small-order surcharges. These are not on the drawings at all, and they vary by state and supplier.
  • Bond and insurance cost when the owner requires them on a small contract. The requirement is in Division 01, and the premium is a percentage of the contract value.

Common assemblies and how they move the small contractor quantity takeoff

Small contractors price the same assemblies repeatedly. This table shows how material choice and waste factor change the labor unit for each.

AssemblyMaterial unitTypical waste factorLabor unit driver
Wall framing, 2x4 @ 16 in. o.c.LF of stud, plate, and blocking5–10%Stud count, plate length, and number of corners and openings.
Wall framing, 2x6 @ 16 in. o.c.LF of stud, plate, and blocking5–10%Same as 2x4 but heavier material and slightly slower handling.
Exterior sheathing, OSBSF5–10%Panel size, number of cuts around openings, and fastening pattern.
Exterior sheathing, ZIP SystemSF5–10%Tape and flashing details add labor; panels are heavier than OSB.
Insulation, battSF by R-value and thickness5–10%Number of bays, obstructions, and whether faced or unfaced.
Insulation, rigid foamSF by R-value and thickness5–10%Cutting around openings and taping seams.
Insulation, spray foamSF or board feet2–5%Thickness, substrate, and whether closed-cell or open-cell.
Drywall, 1/2 in. regularSF10–15% for small roomsNumber of rooms, ceiling height, and number of corners.
Drywall, 5/8 in. Type XSF10–15%Heavier board, fire-rated assembly, and penetration details.
Drywall, moisture-resistantSF10–15%Wet-area location, backing, and sealing.
Flooring, LVPSF5–10%Room shape, transitions, and whether glue-down or floating.
Flooring, carpetSY5–10%Seaming layout, stairs, and tack strip.
Flooring, VCTSF5–10%Subfloor prep, adhesive, and border cuts.
Roofing, architectural shingleSF or square10–15%Roof pitch, valleys, and number of penetrations.
Roofing, standing seam metalSF10–15%Panel length, seams, and trim.
Roofing, TPOSF5–10%Membrane thickness, attachment method, and flashings.
Codes and standards

Codes and standards that affect your takeoff

Code requirements change what you buy and how much labor you carry. The editions adopted vary by state, county, and city, so always confirm the adopted code with the local building department before you finalize your bid.

The International Building Code (IBC) and International Residential Code (IRC) set the structural, egress, and fire-separation rules. For a small commercial fit-out, IBC may require a fire-rated wall between occupancies, which adds Type X drywall, fire-rated sealant, and penetration details to your takeoff. IRC governs one- and two-family dwellings and sets footing depth, stair geometry, and guard height.

The International Energy Conservation Code (IECC) sets insulation R-values and window U-factors. A higher R-value means thicker batt or rigid insulation, which changes both material and labor. Some states amend the IECC, so the required R-value for your wall assembly may be higher or lower than the base code.

The National Electrical Code (NEC) sets receptacle spacing, GFCI and AFCI requirements, and panel loading. AFCI breakers are required in more rooms in recent editions, which adds breakers and labor to your electrical takeoff. Confirm the edition adopted in your area.

The International Plumbing Code (IPC) and Uniform Plumbing Code (UPC) set fixture clearances, venting, and pipe sizing. A bathroom remodel may need a larger vent or a different drain configuration, which adds pipe and fittings.

NFPA 13 covers sprinkler systems in commercial buildings. If the building has a sprinkler system, your fit-out may require head relocation or additional heads, which is a separate scope you need to price.

Division 01 general requirements in the spec book often include permit fees, plan review, and special inspections. These are not on the drawings, but they are real costs. We include a Division 01 checklist with every takeoff so you do not miss them.

Who we provide estimates for

Who this small contractor estimating company works for

Small general contractor

You bid 10–30 jobs a year and price them yourself after hours. The takeoff gives you a defensible number and a marked-up set you can hand to a sub or an owner without redoing the work.

Framing or drywall sub

You price Division 06 or 09 only. We take off your scope with the waste factor and the height adjustment, and you add your labor rate and markup before you send the bid.

Remodeler

Your plans are often a few sheets and a scope of work. We take off what is drawn and flag what is not, so your change-order log starts with a list instead of a surprise.

Owner-builder

You are buying your own materials and hiring subs. The takeoff becomes your shopping list and your sub bid sheet, and the marked-up set shows you where each quantity sits.

Where we provide estimates

Small Contractor Estimating in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Small Contractor Estimating in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes in the takeoff

The takeoff method stays the same, but the scope and details shift with the project type. Here is what changes for common small-contractor jobs.

Kitchen remodel

More casework and countertop, plumbing and electrical relocations, and appliance connections.

Watch for: Blocking for upper cabinets, dedicated circuits for appliances, and venting for the range hood.

Bathroom remodel

Tile, waterproofing, and plumbing fixture replacements dominate the scope.

Watch for: Wet-area drywall, shower pan slope, and grab bar blocking if required by code.

Room addition

Full division coverage from concrete to finishes; connects to existing structure.

Watch for: Roof tie-in, foundation depth, and matching existing finishes and insulation R-values.

Basement finish

Framing, drywall, ceilings, flooring, and added electrical and HVAC runs.

Watch for: Egress window if a bedroom, ceiling height for ducts, and moisture barrier on slab.

Small commercial fit-out

Demolition, partitions, ceilings, lighting, and HVAC distribution.

Watch for: ADA compliance, fire-rated walls, and sprinkler modifications if required.

Detached garage

Slab, framing, roofing, siding, and a few electrical devices.

Watch for: Frost depth for footings, overhead door size, and ventilation.

Deck or porch

Footings, framing, decking, stairs, and railings.

Watch for: Ledger attachment, joist span, and guard height per code.

Deliverables

What you receive

  • An Excel workbook organized by CSI MasterFormat division with quantity, unit, waste, material cost, labor cost, and total.
  • A PDF of the plan set marked up with takeoff areas, dimensions, and line numbers that match the workbook.
  • A question list covering drawing conflicts, missing details, and scope items we could not quantify.
  • A Division 01 checklist for permits, dumpsters, temporary facilities, and final cleaning.
  • A waste-factor summary showing each factor applied and the line it affects.
  • Pricing adjusted to the project ZIP code using RSMeans data for material and labor.
  • A bid summary sheet with the total by division, ready to transfer to your proposal form.
Checklist

Pre-bid checklist for small contractor cost estimation

  • Confirm the bid date and time, and whether the owner requires a specific form.
  • Check that you have the latest addenda and that superseded sheets are removed.
  • Verify the project ZIP code for material and labor pricing.
  • List the CSI divisions you are pricing; if you are a sub, define your scope.
  • Review Division 01 for permit fees, dumpsters, temporary facilities, and final cleaning.
  • Check the door and window schedules against the plans for count and size.
  • Note any fire-rated assemblies and their penetration details.
  • Confirm insulation R-values and window U-factors from the spec or energy code.
  • Check for blocking and backing on finish drawings for grab bars, TV mounts, and casework.
  • Review roof details for underlayment, drip edge, valley metal, and pipe boots.
  • Verify HVAC condensate drain, line-set length, and equipment pad or curb.
  • Count electrical home-run wire length and panel breaker spaces from the plan.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

FAQ

Small Contractor Estimating questions

How do I send you my plans?

Email the PDF plan set, specs, and any addenda to the address on our Get an Estimate page. If the files are large, send a download link. Include the project ZIP code, bid date, and the divisions you are pricing. We confirm receipt the same day and send a question list if anything is missing. If you have a bid form, include it so we can match the format. We accept files up to 50 MB via email; for larger sets, use a file-sharing service like Dropbox or Google Drive and share the link. We will confirm receipt and start the takeoff immediately.

What if I only have a few sheets and no specs?

Send what you have. We take off what is drawn and flag what is missing. If there are no specs, we price to a standard assembly and note the assumption on the marked-up set. You can then confirm the assembly with the owner or architect before you submit your bid. For example, if the wall type is not specified, we assume 2x4 studs at 16 in. o.c. with 1/2 in. drywall. We also note any missing dimensions and ask you to confirm them. This approach lets you bid with confidence, knowing the assumptions.

Can you take off just my trade?

Yes. Tell us the divisions you are pricing. If you are a framing sub, we take off Division 06 only and stop there. You get the same marked-up plan set and Excel file, but limited to your scope. This keeps the cost down and the takeoff focused. We can also take off multiple trades if you are a GC and want to compare bids. Just specify the divisions in your request. We will confirm the scope before starting to avoid any misunderstandings.

How do you handle waste factors?

We apply waste as a separate line for each material. Framing lumber typically runs 5–10%, but we adjust higher for cut-up layouts. Drywall waste climbs in small rooms. You see the waste quantity and cost on its own line, so you can trim it if your crew is efficient. For example, if you are using precut studs, waste may be lower. We base the factor on the complexity of the layout and the material. You can override any waste factor in the Excel file.

Do you include sales tax and delivery?

Sales tax and delivery are not on the drawings, so we keep them as visible lines in the Excel file. You can adjust the rate to your state and supplier terms. Small-order surcharges are also shown separately, because they hit a small job harder than a large one. For example, a $500 delivery fee on a $5,000 material order is 10% of the cost. We also note if the supplier requires a minimum order. This way, you can see the full picture and adjust your bid accordingly.

What if my labor rates are different from RSMeans?

Send your burdened labor rates and we will use them instead of the published data. Many small contractors have crews that are faster or slower than the average, and your rates should reflect that. We apply your rates to the same quantities and units. For example, if your carpenter rate is $65/hr instead of the RSMeans rate of $75/hr, we will use $65. This ensures your bid is competitive and accurate. We can also adjust productivity factors if you provide historical data.

How do I use the marked-up plan set?

The markups show each takeoff area with a cloud, a dimension string, and a line number that matches the Excel row. When a sub or owner asks where a quantity came from, you open the sheet and point to it. The markups also help you spot scopes you may have missed. For example, if you see a cloud around a wall but no corresponding line in your bid, you know to add it. This visual verification is a powerful tool for bid review.

Can you help me with a change order?

Yes. If you have an approved change and need a takeoff for the added scope, send the change documents and we will take off the new work. We can also compare the change to the original takeoff to show what was already included and what is new. For example, if the owner adds a window, we will take off the window unit, framing, flashing, and trim. We deliver the change order takeoff in the same format as the original, so you can easily integrate it.

What if I need the takeoff faster than 24–48 hours?

Rush service is available. Tell us your deadline when you send the plans. We will confirm whether we can meet it and any rush fee. Rush jobs are scheduled ahead of standard work, and we may need to limit the scope to your priority divisions. For example, if you need a bid tomorrow, we can focus on the divisions you specify and deliver a partial takeoff within 12 hours. We will communicate clearly about what is feasible. Rush fees are quoted based on the scope and deadline.

Do you take off plumbing, HVAC, and electrical?

Yes. We take off Division 22 plumbing, Division 23 HVAC, and Division 26 electrical from the MEP sheets. We count fixtures, equipment, devices, and pipe or conduit and wire lengths. If the MEP drawings are not available, we can price from the equipment schedules and note the assumptions. For example, if the plumbing plan is missing, we can use the fixture schedule to count water closets and lavatories. We also note any missing information that could affect the bid. This ensures you have a complete takeoff even with incomplete documents.

How do you handle code requirements?

We price to the code edition you tell us. If you do not know the adopted edition, we use the model code and note it. Code requirements like fire-rated assemblies, insulation R-values, and AFCI breakers affect quantities, so confirm the adopted edition with the local building department before you bid. For example, if your area has adopted the 2021 IECC, we will use the higher R-values for insulation. We also include a code checklist with the takeoff. This helps you avoid surprises during plan review.

What if I find an error in the takeoff?

Contact us within 30 days. If we made an error, we correct it at no charge and send an updated file. We also review the marked-up set with you to understand what happened. Our goal is a takeoff you can trust for your bid. For example, if we missed a door, we will add it and adjust the quantities. We stand behind our work and want you to be confident in the numbers. Your feedback helps us improve.

How does outsourced small contractor estimating handle my bid package?

You send the bid package as issued: plans and specifications, addenda, and any request for information responses. We take off each trade to its CSI division, tag every line to a sheet, and return a cost breakdown you can drop into your own spreadsheet. If a subcontractor quote arrives later, we can fold it in and run bid leveling against our quantities. Turnaround is 24–48 hours for most packages, with rush available.

What does construction estimating for small contractors include beyond quantities?

Beyond the takeoff, we organize line items by division, from Division 1 general conditions through Division 3 concrete, Division 5 metals, and Division 9 finishes. Each line shows quantity, unit of measure, and drawing reference, with a separate labor and material split. You get an estimate summary in Excel and PDF plus a marked-up plan set. That structure lets you check our numbers against your own crew rates before you submit.

Can you run a small contractor construction takeoff from a partial set?

Yes. Many small contractors bid from a few sheets and no full spec book. We take off what is drawn and dimensioned, note assumptions on the estimate summary, and flag anything that needs a request for information. On-screen takeoff in Bluebeam Revu and PlanSwift lets us scale and measure linear feet, square feet, and cubic yards directly from the PDF. You still confirm the adopted code edition with the local building department.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Ready to send your plans?

Email your plan set, specs, bid date, and project ZIP code, and we will return a CSI-organized takeoff in 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us