Foundation takeoff
Pier-and-beam and post-tension slab quantities for expansive clay soils common across Tarrant County.
CY · SF · EAFort Worth issued 9,437 new residential permits in 2025, down 28% from 2024, yet still ranked second among the 25 Texas cities we cover. We produce CSI MasterFormat estimates from your plans in 24–48 hours.
Fort Worth estimating is driven by expansive clay soils that dictate pier-and-beam or post-tension foundations, Tarrant County windstorm and energy code requirements, a 38% multifamily share of permitted units, ZIP-adjusted material and labor pricing, and the volume of data center and semiconductor work across the Metroplex.
Fort Worth sits in Tarrant County, where expansive clay soils, summer heat above 100°F, and the transition zone between IECC climate zones 2 and 3 shape foundation, envelope, and HVAC scope on nearly every project. Residential permitting dropped from 13,148 units in 2024 to 9,437 in 2025, a 28% decline, but the city still accounts for 13.1% of the 72,008 units permitted across the Texas cities we cover. That mix — fewer starts, more competition per bid — makes takeoff accuracy the difference between winning work and absorbing a miss.
We build estimates for general contractors, subcontractors, and owners working in Fort Worth and across the Metroplex, including Dallas and Arlington. Deliverables come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the sheet. Turnaround is 24–48 hours for most projects, and rush service is available. See how our Texas construction estimating coverage handles the state's largest market.
For bidders. You need quantities you can defend in a bid review. We return division-level takeoffs with waste factors and unit costs adjusted to your Fort Worth ZIP code, so your number holds up when the GC asks how you got there.
For builders. You need buyout and change-order pricing fast. Send revised sheets and we reprice affected divisions, keeping foundation, framing, and MEP quantities current as the drawings move through permitting.
For owners. You need a budget before design is complete. We estimate from schematic sets, flag scope gaps by division, and give you a cost basis you can carry into the construction documents phase.
Select a bar to compare Fort Worth with the largest Texas markets we cover.
9,437 new housing units in 2025 (-28.2% vs 2024).
5,887 single-family · 3,550 multifamily (38%).
Fort Worth permitted 9,437 new privately-owned residential units in 2025, down 28% from 13,148 in 2024, per the U.S. Census Bureau Building Permits Survey. The split was 5,887 single-family and 3,550 multifamily, so 38% of permitted units were in multifamily buildings. For bidders, that means fewer single-family starts chasing the same framing, concrete, and MEP crews, while multifamily work stays steady enough to keep podium and wrap builders active. Average permitted value was $245,800 per unit. When volume tightens, subs who can show a clean, division-by-division takeoff win the bid review. Our residential estimating and multi-family estimating teams price both sides of that split.
Fort Worth ranked second by permitted units among the 25 Texas cities we cover and represented 13.1% of the 72,008 units permitted across those cities in 2025. Statewide demand remains driven by Sun Belt population growth, data centers, semiconductor plants, and single-family home building — the same drivers pushing industrial and commercial work through the Metroplex. That breadth matters for estimating: a Fort Worth estimator may price a pier foundation in a clay subdivision one week and a tilt-wall distribution shell the next. We cover the full range, from sitework and concrete through MEP, and we coordinate with our San Antonio and Austin coverage when a client builds across the state.
Every takeoff is organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor, and returned in Excel and PDF with marked-up plans.
Pier-and-beam and post-tension slab quantities for expansive clay soils common across Tarrant County.
CY · SF · EAFootings, grade beams, slab-on-grade, and tilt-wall panels priced by mix design and placement method.
CY · SFDimensional lumber, engineered joists, trusses, and sheathing counted from floor plans and elevations.
LF · EA · SFArchitectural shingle, standing seam, and TPO systems with slope, ridge, and valley quantities.
SQ · LFHVAC tonnage, ductwork, plumbing fixtures, and electrical devices coordinated across divisions 22, 23, and 26.
TON · LF · EAGrading, drainage, paving, and utility quantities for Fort Worth subdivisions and commercial pads.
CY · LF · TONProduction and custom home budgets from plan sets, including allowances and division-level waste factors.
SF · EARetail, office, and industrial shell and interior takeoffs for the Metroplex's growing commercial pipeline.
SF · EAYou bid Tarrant County schools, retail shells, and multifamily against a thinning pipeline. We return division-level takeoffs with waste factors and ZIP-adjusted unit costs so your number survives bid leveling.
Foundation, framing, and MEP scopes carry the most risk in Fort Worth's clay. Send us the sheets and we price your division only, with quantities you can check against the plans line by line.
You need a budget before civil plans are final. We estimate from schematic sets, flag scope gaps by CSI division, and carry the basis into construction documents for your lender package.
Your Fort Worth projects move through city permitting with revisions. We reprice affected divisions when sheets change, keeping your cost model current without rebuilding the estimate.
You are comparing tenant improvement bids or planning a roof replacement. We give you an independent quantity check so you can tell which proposal is missing scope.
You are underwriting single-family rentals and small multifamily in ZIPs like 76107 and 76116. We price rehab scopes from photos and plans so your acquisition math reflects real Fort Worth costs.
We estimate projects across Tarrant County and the surrounding Metroplex, from infill lots near downtown to new subdivisions on the city's edges. If your project is in one of these areas, send the address with your plans.
Residential permits fell to 9,437 units in 2025, with 5,887 single-family and 3,550 multifamily, so the work mix skews toward infill housing, garden-style apartments, and the commercial shell space that follows rooftops.
Production and custom homes on clay lots. We take off foundation, framing, roofing, and MEP from architectural and structural sets, with waste factors applied to lumber and masonry.
Watch for: Post-tension slab details and beam depths.
Garden-style and wrap projects in the Alliance and River District corridors. We quantify per-unit and per-building, separating typical units from amenity and clubhouse scope.
Watch for: Balcony waterproofing and unit-to-unit MEP repeats.
Retail, office, and light industrial shells along the I-35W and I-20 corridors. We estimate structure, envelope, and site utilities, leaving tenant fit-out as a separate division.
Watch for: Divisions 2 and 3 scope gaps at the property line.
Distribution and manufacturing space near Alliance and the intermodal yards. We price tilt-wall, slab flatness, and racking-ready electrical from civil and structural drawings.
Watch for: Slab thickness and FF/FL tolerances.
School additions, fire stations, and city facilities across Tarrant County. We estimate from bridging documents, flag missing divisions, and separate owner-furnished equipment.
Watch for: Prevailing wage and owner allowances.
Office, medical, and restaurant fit-outs in existing Fort Worth buildings. We verify existing conditions, then price partitions, ceilings, and MEP tie-ins to base-building systems.
Watch for: Existing sprinkler and HVAC capacity.
Fort Worth estimates move on six things: code adoption, expansive clay, heat and hail, labor availability, drainage and lot grading, and material logistics across the Metroplex.
Fort Worth enforces the adopted editions of the IBC, IRC, IECC, NEC, and IPC, and the city's development services department reviews plans for both building and site work. Amendment cycles can shift energy-code requirements between design and permit, so confirm the adopted edition with the building department before you lock envelope and HVAC pricing. Plan review comments also drive rework, so budget for one revision cycle.
IBC · IRC · IECC · NEC · IPCMost of Tarrant County sits on expansive clay that swells and shrinks with moisture. Geotechnical reports drive pier depth, beam spacing, and whether you use a post-tension slab or a conventional reinforced slab. Those choices swing concrete and rebar quantities by division 3, and they change the excavation and backfill line in division 31. Get the soils report before you price the foundation.
Geotechnical report · Division 3 · Division 31 · Post-tension slabSummers above 100°F push HVAC sizing and insulation values, and Fort Worth sits in a hail-prone corridor that drives roofing selection and warranty terms. Wind uplift requirements affect roof attachment and wall sheathing fastening. Estimate roof assemblies by division 7 with the manufacturer's uplift rating in hand, and price HVAC from a manual J load, not a rule of thumb.
Division 7 · Manual J · Wind uplift · Hail warrantyThe Metroplex competes for the same concrete, framing, and MEP crews across Dallas, Arlington, and Fort Worth. When starts cluster, framing and drywall bids tighten and premiums appear for small or fast-track jobs. Build labor from current crew rates rather than last year's numbers, and note that open-shop versus prevailing-wage projects price differently on the same drawings.
Crew rates · Prevailing wage · Open shop · Metroplex labor poolFlat lots with poor drainage require engineered fill, swales, and sometimes retention. Sitework quantities in division 31 depend on cut and fill balance, which changes if the geotech calls for over-excavation. On infill lots, existing utilities and demolition add division 2 scope that is easy to miss. Price from the civil plan and the survey, not the architectural sheet.
Division 31 · Cut and fill · Over-excavation · Civil planFort Worth sits on I-35W and I-20, so most materials move without long hauls, but concrete and masonry supply tightens when Dallas and Austin projects peak at the same time. Texas has no state personal income tax, and material sales tax treatment varies by contract type. Price delivery and small-quantity surcharges explicitly, and confirm tax treatment with your accountant.
I-35W · I-20 · Sales tax · Delivery surchargesFort Worth sits on expansive clay, gets pounded by hail and wind, and permits a large share of its housing as multifamily, so a takeoff here has to be built around foundation detail, envelope durability, and repeated unit types.
Tarrant County lots often need cut and fill balanced on tight acreage, and the clay subgrade does not drain. A sitework takeoff here carries unclassified excavation by cubic yard, import or export of select fill, lime or cement stabilization by square yard, and undercutting where the geotech report calls for it. Storm drainage is its own line group: RCP pipe by linear foot and diameter, inlets and junction boxes by each, and riprap or flared end sections. Detention is frequently required, so include pond excavation, side slopes, and outlet structures. For a full site package, our sitework estimating services break these out by CSI division rather than lumping them into a single allowance.
Wood framing dominates single-family and low-rise multifamily in Fort Worth, with light-gauge steel appearing on some commercial work. A framing takeoff runs studs by length and gauge, plates by linear foot, headers by size and count, joists and rafters by piece, and sheathing by sheet with a waste factor typically in the 5 to 10 percent range. Roof geometry matters because of hail: the takeoff should show squares of shingle or standing seam, underlayment by square, ridge and hip by linear foot, and drip edge. Wind-rated attachment details and ice and water shield at valleys are separate lines. Our framing estimating services and roofing estimating services both work from marked-up plan sets.
Multifamily was 38 percent of Fort Worth's permitted residential units in 2025, so unit-type repetition drives the estimate. Take off one full unit of each plan — framing, drywall, doors, fixtures, finishes — then multiply by the count per building and apply a floor-to-floor adjustment for the ground level and any amenity spaces. Corridors, stairs, elevator shafts, and common mechanical rooms should be taken off separately because they do not scale with the units. Balcony and breezeway structure, trash rooms, and leasing offices are frequent omissions. Multi-family estimating services handle this unit-type build-up with a clear count sheet.
Expansive clay is the dominant foundation driver in Fort Worth. Post-tensioned slabs are common on residential and light commercial work, and the takeoff has to separate the slab from the pier system. Count drilled piers by each with depth, grade beams by linear foot, and post-tension cable by linear foot with anchorage and stressing hardware. Include vapor barrier by square foot, perimeter insulation, and the void space or carton forms under grade beams. Ready-mix concrete is measured in cubic yards with a typical waste factor of 5 to 10 percent, and rebar in tons or linear feet by bar size. Foundation estimating services cover this scope in detail.
Fort Worth's long cooling season pushes HVAC sizing and ductwork counts higher than a northern market, and the takeoff needs to reflect that. On the mechanical side, count condensing units and air handlers by each and tonnage, flex and hard duct by linear foot and diameter, and registers and diffusers by each. Plumbing runs PEX and PVC by linear foot, fixtures by each, and gas piping by linear foot and size. Electrical carries service entrance by ampere rating, panels by each, branch circuits by linear foot of conduit and count of conductors, and devices by each. Our MEP estimating services organize these by division 22, 23, and 26.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Ready-mix concrete, slab on grade | 410 | CY |
| 03 20 00 | Reinforcing steel, slab and piers | 38 | TON |
| 31 23 16 | Unclassified excavation and backfill | 1,250 | CY |
| 06 10 00 | Wood framing, unit and corridor walls | 18,400 | LF |
| 06 16 00 | Roof sheathing, 7/16 in. OSB | 310 | SHT |
| 07 30 00 | Asphalt shingles, impact rated | 96 | SQ |
| 09 29 00 | Gypsum board, unit and corridor | 42,600 | SF |
| 23 31 00 | Ductwork, flex and hard | 3,150 | LF |
This example sizes a post-tensioned slab and drilled pier system for a three-story, 24-unit building on expansive clay. The dimensions are illustrative and are not a substitute for the geotechnical report or the structural sheets.
Assumptions: building footprint 120 ft by 60 ft, slab thickness 5 in. with a 12 in. thickened edge, piers 12 in. diameter drilled to 12 ft average depth at 8 ft on center along the perimeter and interior bearing lines, total pier count 46. Ready-mix waste factor 7 percent.
Step 1 — Slab area and volume.
| Step | Calculation | Result |
|---|---|---|
| Footprint area | 120 ft × 60 ft | 7,200 SF |
| Slab volume at 5 in. | 7,200 SF × (5 ÷ 12) ft | 3,000 CF |
| Convert to cubic yards | 3,000 CF ÷ 27 | 111.1 CY |
| Add 7% waste | 111.1 CY × 1.07 | 118.9 CY |
Step 2 — Thickened edge.
| Step | Calculation | Result |
|---|---|---|
| Perimeter | 2 × (120 ft + 60 ft) | 360 LF |
| Extra depth beyond slab | 12 in. − 5 in. = 7 in. | 0.583 ft |
| Extra width | 12 in. | 1.0 ft |
| Volume | 360 LF × 0.583 ft × 1.0 ft | 209.9 CF |
| Convert and add waste | (209.9 ÷ 27) × 1.07 | 8.3 CY |
Step 3 — Piers.
| Step | Calculation | Result |
|---|---|---|
| Volume per pier | π × (0.5 ft)² × 12 ft | 9.42 CF |
| All piers | 9.42 CF × 46 | 433.3 CF |
| Convert and add waste | (433.3 ÷ 27) × 1.07 | 17.2 CY |
Step 4 — Total concrete.
| Step | Calculation | Result |
|---|---|---|
| Slab + edge + piers | 118.9 + 8.3 + 17.2 | 144.4 CY |
Step 5 — Post-tension cable. Using two tendons each way at 4 ft on center across a 120 ft by 60 ft footprint, roughly 1,440 LF in the long direction and 720 LF in the short direction, plus anchorage and stressing hardware by each.
Step 6 — Vapor barrier and reinforcement. Vapor barrier equals slab area plus 10 percent lap, about 7,920 SF. Rebar in the thickened edge and pier cages is taken by bar size and converted to tons.
Every one of these lines should be traceable to a plan sheet or a geotech recommendation. If a bid shows a single lump sum for foundations, that is where the risk sits.
It moves cost out of the slab and into the ground. Piers get deeper and more numerous, grade beams get heavier, and the geotechnical report may call for lime or cement stabilization, over-excavation, or both. A takeoff that prices only the slab and a pier allowance will miss the largest variable. We take pier count and depth from the structural sheets and cross-check them against the geotech recommendations, then carry stabilization and undercut as separate line items so you can see the exposure before you bid.
Fort Worth sits in a high-wind and hail-prone region, so the takeoff should separate impact-rated shingles, upgraded underlayment, and enhanced fastening patterns from base roofing. Ridge, hip, valley, and drip edge lengths matter because they carry the attachment details. Steep-slope and low-slope areas are taken off separately, and any roof screen or mechanical curb flashing is its own line. Confirm the adopted code edition and any local amendments with the city building department before you finalize the specification.
We take off one complete unit of each plan type — framing, drywall, doors, casework, fixtures, finishes, and mechanical drops — then multiply by the unit count per floor and building. Common areas such as corridors, stairs, elevator shafts, trash rooms, and mechanical rooms are taken off separately because they do not scale with unit count. Balcony and breezeway structure is a frequent omission. The result is a count sheet you can audit unit by unit instead of a single blended square-foot number.
We cover the full CSI MasterFormat range, but the heavy volume in this market is sitework, concrete and foundations, structural and light-gauge framing, roofing, drywall and finishes, and the mechanical, electrical, and plumbing packages. For commercial work, our commercial estimating services group the takeoff by division so your subcontractor solicitations line up with the bid form. We can also isolate a single trade if you only need one package priced.
Most projects come back in 24 to 48 hours, with rush turnaround available. Deliverables are Excel and PDF organized by CSI MasterFormat division, plus marked-up plan sets showing where each quantity came from. Pricing uses ZIP-code-adjusted material and labor rates, so Fort Worth labor and material costs are reflected rather than a national average. If you send a partial set, we will tell you what is missing before we start rather than guessing at scope.
Yes, and we recommend it. On Fort Worth jobs the civil package often carries its own risk: mass excavation, select fill import, lime stabilization, storm drainage, and detention. Mixing those into a building square-foot number hides the biggest swing item. Our sitework estimating services take off excavation, fill, pipe, structures, and paving by unit of measure so the civil bid stands on its own and can be compared across contractors.
We price with ZIP-code-adjusted material and labor rates using RSMeans data, which reflects the local market rather than a national average. That matters in a metro that has been adding population and construction volume quickly, because wage pressure and material availability move independently of the national trend. We do not publish a single citywide labor rate, since trade rates vary by scope and contract type. If you have recent local quotes, send them and we will benchmark our pricing against them.
Yes, with a clear list of assumptions. We will take off everything shown and flag the missing sheets — typically structural, MEP, or civil — as exclusions rather than filling them with a guess. You get a written list of what was priced and what was not, so you can decide whether to wait for the full set or bid with a stated allowance. This is common on fast-track multifamily work where the shell is released before the interiors are complete.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, covering permits issued by the city itself for new privately-owned residential units only. That means the 9,437 total units, the 5,887 single-family units, and the 38 percent multifamily share exclude commercial, industrial, and renovation permits. It is a useful read on residential volume and unit mix, but it is not a measure of total construction spending in Fort Worth or Tarrant County.
Yes. We work across Tarrant County and the surrounding metro, including nearby cities such as Dallas, San Antonio, Austin, El Paso, Arlington, and Corpus Christi. Soil conditions, code editions, and labor rates shift as you move across the region, so the pricing basis changes with the ZIP code even when the drawings do not. If your project is outside the metro, start with our Texas construction estimating page and we will confirm coverage before you send plans.
Send your drawings and specifications and we will return a division-by-division takeoff in Excel and PDF, usually within 24 to 48 hours.