Hard Bid & Bid Day Support

Send your plans, specs, and the bid form. We return a leveled estimate organized by CSI MasterFormat division, with marked-up plan sets and a line-by-line comparison of every sub quote you received.

24–48 hours for most projectsTypical turnaround
Excel + marked-up PDFsOrganized by CSI section
ZIP-code pricingLocal material and labor
Price confirmed firstBefore any work starts
Sample estimate sheet
Division 03 — ConcreteSample format
Line itemQtyUnitConcrete
Continuous footing 24" × 12"1,240LF91.9 CY
Slab-on-grade 5" thick18,400SF284.0 CY
Thickened edge 12" × 12"860LF31.9 CY
Column pier 24" × 24" × 36"24EA12.8 CY
Vapor barrier 10 mil18,400SF—
Total concrete420.6 CY
Illustrative quantities. Waste factor applied as a separate line.
Rebar laps included

Hard bid day is a scope-matching problem, not a pricing problem. You have a bid form with line items like 01 22 Unit Prices and 01 23 Alternates, a stack of sub quotes that each cover a different slice of the work, and a deadline. We take your plans and specifications, produce a ZIP-code-adjusted material and labor takeoff in Bluebeam Revu and PlanSwift using RSMeans data, and level every sub quote against that baseline so you can see what is actually covered before you sign the bid form.

Deliverable
Excel estimate + marked-up PDF plans
Organized by
CSI MasterFormat section
Turnaround
24–48 hours for most projects
Pricing
ZIP-code-adjusted material and labor pricing
Software
Bluebeam Revu, PlanSwift, RSMeans data

We work from the same bid documents you bid from: architectural, structural, MEP, civil, and the spec book. The takeoff is organized by CSI MasterFormat division, with quantities in the units your subs quote in — square feet for gypsum board assemblies (Division 9 finishes, 09 21), linear feet for piping and conduit (Division 22 plumbing, 22 11; Division 26 electrical, 26 05), tons for structural steel (Division 5 metals, 05 12), and each for door hardware sets (08 71). Marked-up plan sets show where each quantity came from, so when a sub says "I included that," you can point to the sheet and the line. Division 3 concrete stays on its own line because formwork, rebar, and finish allowances rarely arrive on the same quote.

If you need a second set of eyes on a quote that arrived at 4:30 PM, or a full takeoff to replace a missing bid, we turn most projects in 24–48 hours with rush available. Use this service alongside Bid Estimating Services when you need the full package priced, or Outsource Estimating Services when you want us to act as your estimating department through bid day. For a second opinion on a number you already have, Estimate Review & Second-Opinion Audit checks the takeoff and the pricing basis before the bid closing.

Services

What construction bid support and bid day support covers

We price the base bid, map every line to the bid form, and compare sub quotes line by line. The goal is a bid you can sign with known scope, known exclusions, and known unit prices for the work that always changes in the field.

Base bid takeoff by CSI division with ZIP-code-adjusted material and labor pricing

Base bid takeoff by CSI division with ZIP-code-adjusted material and labor pricing

Bid form line item mapping

unit prices (01 22) and alternates (01 23) priced independently

Sub quote leveling

included vs. excluded scope, unit price vs. RSMeans baseline, tax and freight treatment

Marked-up plan sets showing quantity origins for every major line

Marked-up plan sets showing quantity origins for every major line

Allowance and contingency recommendations for undefined scope

Allowance and contingency recommendations for undefined scope (testing, final cleaning, temporary facilities)

Bond and insurance percentage check against contract value if the bid requires performance/payment bonds

Bond and insurance percentage check against contract value if the bid requires performance/payment bonds

Escalation qualification language for materials bid now but installed months later

Escalation qualification language for materials bid now but installed months later

Add/deduct alternate pricing kept separate

Add/deduct alternate pricing kept separate, never netted

What every hard bid & bid day support takeoff includes

  • Base bid takeoff by CSI division with ZIP-code-adjusted material and labor pricing
  • Bid form line item mapping: unit prices (01 22) and alternates (01 23) priced independently
  • Sub quote leveling: included vs. excluded scope, unit price vs. RSMeans baseline, tax and freight treatment
  • Marked-up plan sets showing quantity origins for every major line
  • Allowance and contingency recommendations for undefined scope (testing, final cleaning, temporary facilities)
  • Bond and insurance percentage check against contract value if the bid requires performance/payment bonds
  • Escalation qualification language for materials bid now but installed months later
  • Add/deduct alternate pricing kept separate, never netted
  • Unit price schedule build-out for rock excavation (31 23), unsuitable soil, extra doors (08 11), and similar bid-form items
  • Sales tax and freight reconciliation across sub quotes
  • Deliverable in Excel and PDF, organized by CSI MasterFormat division
How we work

How we work a hard bid estimate for contractors

  1. Document intake and bid form reviewWe load the plans, specs, addenda, and the bid form into Bluebeam Revu. The bid form controls everything: if it asks for unit prices on rock excavation (31 23) and alternates on 01 23, those become separate lines in our estimate. We note the bid due time, the delivery method, and whether the owner requires a specific breakdown by CSI division. We also check for addenda that change scope, such as a revised door schedule or an added alternates list, and flag any that are not reflected in the sub quotes.
  2. Base takeoff by divisionWe measure the base bid in PlanSwift, division by division. Concrete (03 30) is measured by footing, slab, and pier with formwork and rebar separated. Steel (05 12, 05 21, 05 31) is measured by member and converted to TON. Drywall (09 21) is measured by wall and ceiling SF with corner bead in LF. Every quantity is linked to a sheet and a spec section. We also note where dimensions are missing and use a reasonable assumption, clearly labeled, so you can verify before submission.
  3. Sub quote levelingEach sub quote is entered line by line against our baseline. We flag exclusions written in the cover email but not on the quote, such as "excludes fireproofing" or "excludes final connections." We compare unit prices to our ZIP-code-adjusted RSMeans unit and note where the low quote is low because scope is missing, not because the sub is cheap. We also check that the quote includes the correct specification, such as 5/8" Type X gypsum board instead of 1/2" regular, and that the sub has priced the correct quantity from the drawings.
  4. Bid form mapping and alternate pricingWe map every estimate line to the exact bid form sequence. Additive and deductive alternates are priced independently so you can see the true cost of each option. Unit prices are built from the same takeoff quantities, so a rock excavation unit price reflects the actual CY in the base bid. Allowances are labeled as allowances, not hard numbers. If the bid form requires a breakdown by CSI division, we provide that in the same Excel file, with subtotals for each division and a grand total that ties to the bid form.
  5. Bid-day delivery and supportYou receive Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets showing where quantities came from. If a quote arrives late, we level it against the baseline and tell you the delta. If you need a second opinion on a scope gap, we stay available through the bid deadline. We also provide a summary sheet that highlights the top five scope gaps and their dollar impact, so you can decide quickly whether to carry the low number or add an allowance.
  6. Post-bid debrief and handoffAfter you submit, we can provide a debrief document that lists the assumptions, exclusions, and unit prices used in the bid. This becomes the baseline for change order pricing and project cost control. If you win the job, we can transfer the takeoff to a schedule of values or a project cost control format. If you lose, we can review the winning bid against our estimate to see where the market differed, which helps calibrate future bids.

What we need from you

  • Bid formThe exact line item sequence, unit prices, and alternates required by the owner. This drives our output format.
  • Plans and specsArchitectural, structural, MEP, civil, and the specification book. Addenda must be included or noted.
  • Sub quotesEvery quote you received, including the cover email. Exclusions often hide in the email, not the quote.
  • Bid due dateDate and time, plus your internal review deadline. We work backward from the submission time.
  • Project ZIP codeFor ZIP-code-adjusted material and labor pricing. Labor rates vary by market.
  • Bond requirementsWhether performance and payment bonds are required, so we can apply the correct percentage to contract value.
Sample output

Sample takeoff format for a bid estimate

This is how a leveled bid-day estimate looks. Quantities are illustrative and tied to sheet references.

Sample format — illustrative quantities
SectionLine itemQtyUnitRef.
03 30 00Cast-in-place concrete, 5" slab-on-grade, 4000 psi18,400SFS-101
05 12 00Structural steel, columns and beams, A99242.5TONS-201
09 21 16Gypsum board assemblies, 5/8" Type X, one layer each side22,800SFA-301
08 71 00Door hardware sets, office and corridor, per hardware schedule64EAA-601
26 05 19Conductors and cables, THHN copper, branch circuits14,200LFE-401
22 11 16Domestic water piping, Type L copper, 1" and smaller3,850LFP-501
23 31 13Metal ductwork, galvanized steel, rectangular, 2" w.g.6,200LBM-601
31 23 16Rock excavation, trench and footing, unit price item185CYC-101
01 22 00Unit price: extra door, single leaf, 3'-0" × 7'-0"12EAA-601
01 23 00Alternate: add roof screen, structural steel and panels1LSA-801
09 90 00Paint, interior latex, two coats over primer, walls38,000SFA-901
03 30 00Concrete formwork, footings and slab edges2,400SFS-101

Units and how we measure them for bids

Every quantity is tied to a unit a sub will quote in. If the bid form asks for a unit price, we price it in the same unit the form uses.

ItemUnitHow it's measured
Slab-on-grade, deck, roofing, ceiling, flooring, wall areaSFMeasured from outside face to outside face for slabs; net area for finishes with openings deducted over 10 SF
Piping, conduit, wire, base, edge forms, curbsLFCenterline length along the run; fittings counted separately as EA; no deduction for valves under 2 in
Concrete, excavation, backfill, borrowCYVolume from plan dimensions; footings measured by actual size, not by the excavation box
Fixtures, doors, hardware sets, panels, lights, equipmentEACounted from schedules and floor plans; hardware sets counted by door leaf, not by opening
Structural steel, rebar, HVAC tonnageTONSteel from member sizes and lengths; rebar from bar lists; HVAC tonnage from equipment schedule
Reinforcing steel, misc. metals, hangersLBRebar converted from LF using bar size weight per foot; hangers counted from spacing and run length
Paving, carpet, site finishesSYArea divided by 9; waste factor applied per material type
Mobilization, testing, commissioning, permitsLSLump sum when scope is defined by specification or allowance, not by measurement
Paint, coatings, sealantsGALCoverage rate from manufacturer data; number of coats from specification Section 09 90
Piping runs, wire pulls100 LFUsed when the bid form or sub quote is priced per hundred; quantity divided by 100
LumberMBFBoard feet from nominal dimensions and lengths; used for rough carpentry (06 10)
Door hardware sets, storefront assembliesEach (set)Counted by set when hardware is specified as a group in Section 08 71

Worked example: leveling a gypsum board quote on a bid due in 24 hours

A general contractor sends us a set of architectural plans for a 12,000 SF tenant improvement, a bid form with unit prices and alternates, and three drywall quotes. The bid is due tomorrow at 2:00 PM. We need to check if the low quote is real. Dimensions are illustrative.

Step 1 — Measure wall area from the plans. Using PlanSwift, we trace the interior partitions on sheets A-201 through A-204. The takeoff gives 8,400 LF of wall at a 9'-0" ceiling height. Deduct openings: 24 doors at 3'-0" × 7'-0" = 504 SF; 18 windows at 4'-0" × 4'-0" = 288 SF. Total deductions = 792 SF. Gross wall area = 8,400 LF × 9.0 ft = 75,600 SF. Net wall area = 75,600 − 792 = 74,808 SF. We add 10% for waste as a separate line: 7,481 SF. Total board = 82,289 SF.

Step 2 — Check the quote's board thickness. The specification Section 09 21 16 requires 5/8" Type X on corridor walls and 1/2" regular on office walls. The low quote states "1/2" drywall throughout." That is a scope gap. We split the takeoff: 22,800 SF is corridor (5/8" Type X) and 52,008 SF is office (1/2" regular). The quote's unit price of $0.85/SF is based on 1/2" board. We replace it with our ZIP-code-adjusted RSMeans unit for 5/8" Type X, which is $1.12/SF installed. The corrected material and labor for the corridor alone adds $6,156.

Step 3 — Compare finish level. The quote excludes corner bead, joint compound, and primer. Our takeoff includes 8,400 LF of corner bead at $0.45/LF = $3,780; 1,200 GAL of joint compound at $18/GAL = $21,600; and 74,808 SF of primer at $0.22/SF = $16,458. The quote's exclusion is written in the cover email, not on the quote itself. We add these lines to the quote total.

Step 4 — Reconcile tax and freight. The quote is material tax-inclusive, but our baseline uses tax-exclusive pricing. We subtract the estimated sales tax (8.25% on material) from the quote's material line to compare apples to apples. Freight is listed as "included" on the quote, so no adjustment.

Step 5 — Adjusted comparison. The original low quote is $63,450. After adding missing 5/8" board, corner bead, joint compound, primer, and removing tax, the adjusted total is $89,120. The second quote, which included all scope, was $91,200. The low quote is no longer low. We flag this in the bid-day summary and recommend carrying the second quote or adding an allowance of $27,670 to cover the gap.

Cost drivers

What moves the bid-day number

Relative impact on a typical estimate for this trade, based on estimator judgment. Select a bar for details.

Scale: 1 = minor, 5 = major relative impact. Estimator judgment, not measured data.
Relative impact 5 / 5

Scope gaps in sub quotes

A quote that excludes fireproofing, final connections, or testing looks low until you price the missing scope. We level every quote against the base takeoff so the gap is visible before you use the number. For example, a mechanical quote that excludes test and balance (23 05 93) or a electrical quote that excludes final terminations can add thousands. We catch these by comparing the quote's inclusion list to our division-by-division takeoff and flagging any missing line.

Scope gaps in sub quotes

A quote that excludes fireproofing, final connections, or testing looks low until you price the missing scope. We level every quote against the base takeoff so the gap is visible before you use the number. For example, a mechanical quote that excludes test and balance (23 05 93) or a electrical quote that excludes final terminations can add thousands. We catch these by comparing the quote's inclusion list to our division-by-division takeoff and flagging any missing line.

Unit price exposure

Bid forms with unit prices for rock excavation (31 23) or unsuitable soil transfer risk to the contractor. We price those units from the actual CY in the base bid, not from a guess, so you know what you are signing. For instance, if the base bid includes 185 CY of rock excavation, we build the unit price from that quantity, not from a lump sum. This prevents under- or over-pricing the unit and protects you if quantities change.

Alternate pricing

Additive and deductive alternates must be priced independently. If you net them, you lose the true cost of each option and cannot adjust after award. We keep them separate and map them to the bid form. For example, an alternate to add a roof screen (structural steel and panels) is priced as a standalone lump sum, including its own mobilization and overhead, so you can decide whether to include it without affecting the base bid.

Material escalation

Steel, joists, and equipment quoted today may be installed months later. We flag escalation exposure and recommend qualification language if the bid form allows it. For instance, if a project bids in March but steel is installed in September, we note the risk and suggest a qualification such as "prices based on current mill pricing, subject to escalation at time of order." This protects you from market swings without inflating the bid.

Tax and freight treatment

Some subs quote material tax-inclusive, others not. Freight on steel and equipment is often a separate line. We reconcile both across quotes so the low number is comparable. For example, a steel quote that excludes freight and tax may appear 8% lower than another that includes them. We add the missing costs to the quote total and show the adjusted comparison, so you are comparing apples to apples.

Labor productivity assumptions

Sub quotes often embed different labor productivity assumptions, especially for trades like drywall or electrical. A quote that assumes 200 SF per day for drywall hanging may be unrealistic for a complex ceiling. We compare the quote's implied productivity to RSMeans data and flag where it is optimistic. If the sub is low because of unrealistic productivity, you may face back charges or delays, so we recommend carrying a higher number.

Bond and insurance costs

Performance and payment bonds are a percentage of contract value, often 1–3% depending on the surety and project. If the bid requires bonds, we apply the correct percentage to the total contract value, including alternates. We also check that the sub quotes include their own insurance costs, such as general liability and workers' compensation, which can vary by trade and state. Missing bond or insurance costs can turn a low bid into a loss.

Scope gaps

Common bid-day misses we catch

These are the items that turn a winning bid into a losing job. We check each one against the documents and the quotes.

  • Bid form line items that do not match the estimate CSI breakdown. We re-map every line to the exact bid form sequence, including unit prices and alternates, so nothing is submitted under the wrong section.
  • Sub quote exclusions written in the cover email but not on the quote, such as "excludes fireproofing" or "excludes final connections." We read the email and flag the gap.
  • Sales tax treatment on material. Some subs quote tax-inclusive, others not. We reconcile the treatment across quotes so the comparison is apples to apples.
  • Freight and delivery for steel, joists, and equipment. Often a separate line that disappears in the leveling sheet. We add it back to the quote total.
  • Permit fees, plan check, and impact fees as an allowance versus a hard number. We label allowances as allowances so you can decide how to carry them.
  • Temporary power, temporary heat, and dumpster pulls during the bid duration. Usually in Division 01 but often missing from the quote. We price them as a separate line.
  • Bond and insurance cost if the bid requires performance and payment bonds. A percentage of contract value, not a fixed fee. We apply the correct percentage.
  • Escalation on material for projects bidding now but starting months later. We flag the exposure and recommend hold or qualify language.
  • Testing and special inspection scope for concrete, weld, and compaction. Owner versus contractor responsibility is often unclear in Division 01. We map it to the correct party.
  • Final cleaning and punch list labor. A small line nobody prices. We add it as an allowance so it does not come out of your margin.
  • Utility connection fees and tap fees. Often owner-furnished but occasionally contractor. We check the specs and the bid form.
  • Alternates that are netted instead of priced independently. We keep additive and deductive alternates separate so you can adjust after award.

Subcontractor bid support: comparing sub quotes line by line

We compare every sub quote against our ZIP-code-adjusted baseline. The goal is to see what is included, what is excluded, and what the true cost is.

Scope itemSub quote inclusionOur baselineAdjustment
5/8" Type X gypsum board, corridor wallsExcluded (quote states 1/2" regular)22,800 SF at $1.12/SFAdd $25,536
Corner bead and joint compoundExcluded8,400 LF at $0.45/LF; 1,200 GAL at $18/GALAdd $25,380
Primer and paintExcluded74,808 SF at $0.22/SFAdd $16,458
Sales tax on materialIncluded in quoteTax-exclusive baselineSubtract $22,461
Freight and deliveryIncludedIncludedNo change
Fireproofing, structural steelExcluded (cover email)42.5 TON at $1,850/TONAdd $78,625
Final cleaningExcluded12,000 SF at $0.15/SFAdd $1,800
Testing and special inspectionExcludedAllowance $8,500Add $8,500
Codes and standards

Codes and standards that change bid-day quantities

Model codes

Quantities on bid day are driven by the adopted model code and its local amendments. The IBC governs egress, fire ratings, and structural loads. For example, IBC Table 601 sets the required fire-resistance rating for structural members, which changes fireproofing quantities on steel. The IECC sets insulation R-values and window U-factors, changing Division 07 and Division 08 quantities. The NEC governs conduit and wire sizing, affecting Division 26 counts. The IPC or UPC sets plumbing fixture counts and pipe sizing, affecting Division 22. NFPA 13 governs sprinkler head spacing, changing Division 21 quantities. Confirm the adopted code edition with the local building department before pricing.

Industry standards

Estimators must read the referenced standards in the specification. ACI 318 governs concrete strength and rebar details, changing Division 03 quantities. ASTM A992 and A36 define steel shapes, affecting Division 05 tonnage. SMACNA standards govern duct construction, changing Division 23 sheet metal weight. GA-216 covers gypsum board application, affecting waste factors and fastener counts. NRCA guidelines govern roofing installation, changing Division 07 quantities. These standards are cited in the specs and directly affect the takeoff.

Specification sections

Bid-day pricing depends on reading the right CSI sections. Division 01 sections 01 22 (Unit Prices), 01 23 (Alternates), and 01 26 (Modification Procedures) control the bid form and change how you price. Section 03 30 00 (Cast-in-Place Concrete) specifies mix designs and curing, affecting material cost. Section 05 12 00 (Structural Steel) specifies connections and fireproofing, changing tonnage and coating quantities. Section 09 21 16 (Gypsum Board Assemblies) specifies board type and finish level, changing SF and LF quantities. Section 26 05 19 (Conductors and Cables) specifies insulation and conduit, changing LF counts. Missing a spec section means missing scope.

Local amendments

Adopted code editions and amendments vary by state and city. A jurisdiction may still enforce an older IBC edition or add local amendments for seismic, wind, or energy requirements. For example, California amendments to the CBC change seismic detailing and steel quantities. Florida amendments address wind-borne debris and impact glazing. New York City has its own construction codes. Always confirm the adopted edition and local amendments with the local building department before finalizing your bid, because these changes directly affect material quantities and unit prices.

Who we provide estimates for

Who uses outsourced bid preparation services

General contractors

You have a bid due and need a leveled estimate to compare against sub quotes. We give you the base takeoff and the quote comparison so you can decide which number to carry.

Subcontractors

You are bidding a package and need a second set of eyes on your own takeoff before you submit. We price the scope by CSI division so you can see what you missed.

Owners and developers

You received a bid and want to know if the number is real. We level the bid against a ZIP-code-adjusted takeoff and show you where the scope gaps are.

Architects

You need a cost check on a design before bid day. We produce a division-by-division takeoff that shows where the budget is concentrated.

Estimators

You are overloaded and need a takeoff to work from. We deliver Excel and PDF by CSI division with marked-up plan sets so you can review the quantities.

Where we provide estimates

Hard Bid & Bid Day Support in 20 states

Pricing is adjusted to the project ZIP code. Select a highlighted state to see the cities we cover there.

States we coverSelected
TX

Hard Bid & Bid Day Support in Texas

Nation's largest construction market; Sun Belt population growth, data centers, semiconductor plants, and single-family home building.

Texas estimating services
Property types

Project types and what changes on bid day

The bid-day takeoff changes with the delivery method, the trade mix, and the owner's bid form. These are the common project types we see.

Commercial tenant improvement

Interior partitions, ceilings, and MEP rough-in dominate; base building shell is excluded.

Watch for: Confirm what is landlord-furnished vs. tenant scope, especially HVAC and electrical gear.

K-12 school addition

Division 01 allowances for testing and special inspections are large; summer schedule drives overtime.

Watch for: Check bid form for unit prices on rock excavation and alternates for portable classrooms.

Multifamily wood-frame

Sheathing, trusses, and fire-rated assemblies drive quantity; sprinkler and alarm scope is separate.

Watch for: Watch for fire-treated lumber requirements and third-party inspection fees.

Light industrial warehouse

Slab-on-grade, structural steel, and site paving are the big numbers; office build-out is small.

Watch for: Verify column reactions from the structural drawings and confirm owner-furnished equipment.

Healthcare clinic

Medical gas, nurse call, and specialty HVAC add divisions not in standard commercial bids.

Watch for: Check that sub quotes include certification and commissioning required by spec.

Restaurant fit-out

Grease duct, hood suppression, and health department requirements change the mechanical scope.

Watch for: Confirm who pays for grease interceptor and hood cleaning access panels.

Municipal water treatment

Process piping, concrete tanks, and electrical gear are bid as separate packages.

Watch for: Unit prices for rock excavation and dewatering are common; check geotech report.

Retail shell building

White box scope only; tenant improvements are future work and must be excluded.

Watch for: Confirm bid form separates shell from tenant fit-out and that alternates reflect that.

Deliverables

What you receive

  • Excel and PDF estimate organized by CSI MasterFormat division, with quantities in the units your subs quote in.
  • Marked-up plan sets showing where each major quantity came from, keyed to the estimate line.
  • Sub quote leveling sheet comparing included scope, excluded scope, unit prices, tax treatment, and freight against our baseline.
  • Bid form mapping document that aligns every estimate line to the exact bid form sequence, including unit prices and alternates.
  • Unit price schedule for bid-form items such as rock excavation (31 23), unsuitable soil, and extra doors (08 11).
  • Alternate pricing sheet with additive and deductive alternates priced independently, never netted.
  • Allowance and contingency summary for undefined scope such as testing, final cleaning, and temporary facilities.
Checklist

Pre-bid checklist for general contractor estimating

  • Confirm bid due date, time, and delivery method.
  • Verify all addenda are included and acknowledged.
  • Check that sub quotes include the correct specification section.
  • Compare sub quote unit prices to ZIP-code-adjusted RSMeans data.
  • Identify exclusions written in cover emails, not just quotes.
  • Reconcile sales tax treatment across all quotes.
  • Add freight and delivery costs if excluded.
  • Price additive and deductive alternates independently.
  • Apply bond and insurance percentage if required.
  • Flag material escalation for projects starting months later.
  • Confirm testing and special inspection responsibility.
  • Include final cleaning and punch list allowance.
Client reviews

What clients say about Scope Precision Estimate

10 client reviews
SH
Steven HarrisCommercial Builder

The quality of the estimate exceeded our expectations. Their detailed breakdown of labor, materials, and project costs gave us confidence in our bid.

MA
Michael AndersonGeneral Contractor

The cost estimate was detailed, accurate, and easy to understand. It helped us prepare our bid confidently and stay competitive without overlooking important costs.

AW
Andrew WilsonGeneral Contractor

Highly recommended for construction cost estimating. The quantities were accurate, the pricing was well organized, and the final report was easy to review.

MD
Matthew DavisConstruction Manager

Their construction estimate was thorough and professionally prepared. It made our budgeting process much easier and helped us identify potential cost issues early.

CM
Christopher MillerResidential Builder

We needed a quick and accurate construction cost estimate, and they delivered exactly what we needed. Great attention to detail and a very responsive team.

BT
Brian TaylorProject Estimator

Fast, accurate, and dependable estimating service. They understood the project requirements quickly and provided a detailed estimate without unnecessary delays.

FAQ

Hard Bid & Bid Day Support questions

How fast can you turn around a bid-day takeoff?

Most projects are delivered in 24–48 hours. If you send plans, specs, and the bid form by morning, we can often return a leveled estimate by the next morning. Rush service is available for same-day deadlines, but we need the documents as early as possible. The bid form and sub quotes drive the schedule, so send everything at once to avoid delays.

What do you need from me to level sub quotes?

Send every quote you received, including the cover email. Exclusions often hide in the email, not the quote. We also need the bid form, the plans and specs, and the project ZIP code for labor rates. If you have a bid due time, tell us so we can work backward. The more complete the package, the faster we can flag scope gaps.

Can you price unit prices and alternates on the bid form?

Yes. We build unit prices from the actual quantities in the base bid, not from a guess. For example, if the base bid includes 185 CY of rock excavation, we price the unit from that quantity. Additive and deductive alternates are priced independently, never netted, so you can adjust after award. We map every line to the exact bid form sequence.

How do you handle sales tax and freight differences between quotes?

We reconcile both. Some subs quote material tax-inclusive, others not. Freight on steel, joists, and equipment is often a separate line. We add missing costs to the quote total and show the adjusted comparison. If a quote is tax-inclusive, we subtract the tax to compare against our tax-exclusive baseline. This prevents a low quote from looking lower than it really is.

What if a sub quote arrives late on bid day?

Send it to us as soon as you receive it. We level it against the baseline and give you the delta. If the quote is missing scope, we flag it and recommend an allowance. We stay available through the bid deadline to help you decide whether to carry the low number or add a contingency. Late quotes are common; the key is to compare them quickly.

Do you provide marked-up plan sets?

Yes. Every major quantity is linked to a sheet and a spec section. We mark up the plan sets in Bluebeam Revu so you can see where each number came from. When a sub says "I included that," you can point to the sheet and the line. Marked-up sets also help you verify assumptions before you sign the bid form.

Can you help with bond and insurance costs?

We apply the correct percentage to contract value if the bid requires performance and payment bonds. Bond costs are typically a percentage of contract value, often 1–3%, not a fixed fee. We also check that sub quotes include their own insurance costs. Missing bond or insurance costs can turn a low bid into a loss, so we flag them early.

How do you handle material escalation on projects starting later?

We flag escalation exposure and recommend qualification language if the bid form allows it. For example, if steel is bid in March but installed in September, we suggest a qualification such as "prices based on current mill pricing, subject to escalation at time of order." This protects you from market swings without inflating the bid. We note the risk in the bid-day summary.

What is your pricing basis for labor and material?

We use ZIP-code-adjusted material and labor pricing from RSMeans data. This means your estimate reflects local market conditions, not national averages. We also compare sub quote unit prices to our baseline to see if they are realistic. If a quote is low because of unrealistic productivity assumptions, we flag it and recommend carrying a higher number.

Can you work with my estimating team instead of replacing them?

Yes. We can act as an extension of your team, providing takeoffs and leveling sheets that your estimators review and submit. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets. Your team keeps control of the bid; we provide the backup. This is common when you have multiple bids due the same week.

What deliverables do I receive?

You receive an Excel and PDF estimate organized by CSI MasterFormat division, marked-up plan sets, a sub quote leveling sheet, a bid form mapping document, a unit price schedule, and an alternate pricing sheet. We also provide an allowance and contingency summary. Everything is tied to the bid form sequence so you can submit directly or review with your team.

Do you offer post-bid support?

Yes. After you submit, we can provide a debrief document listing assumptions, exclusions, and unit prices used. This becomes the baseline for change order pricing and project cost control. If you win, we can transfer the takeoff to a schedule of values. If you lose, we can review the winning bid against our estimate to calibrate future bids. See our Change Order Estimating and Schedule of Values Preparation services.

Can you provide construction bid estimating for a project still in addendum?

Yes. Send the current plans and specifications plus every issued addendum, and note the bid opening date so we sequence the work. We log each addendum against the sheets it touches, flag any request for information still open, and re-measure affected quantities before the bid closing. If an addendum lands inside the last 24 hours, we price the delta and show it as a separate line so your bid tabulation stays clean.

How does quantity takeoff for bids differ from a budget takeoff?

A budget takeoff works from typical assemblies and allowances; a bid takeoff is measured to the bid form. We measure square feet, linear feet, and cubic yards from the actual sheets, map each quantity to the line item the owner will open, and separate material, labor, overhead and profit, and unit price bid lines. That mapping is what lets you compare your number to the bid tabulation after the bid opening.

Do you offer bid leveling services when quotes arrive from several subs?

Yes. We build a line-by-line matrix in Excel, align each quote to CSI MasterFormat divisions, and mark inclusions, exclusions, and qualifications. Missing scope is priced at our ZIP-code-adjusted rates so every sub is compared on the same basis. You get a proposal summary, a scope letter you can send back to the sub, and a short list of questions to close before you sign.

What does a bid day support company do differently from a standard takeoff?

A bid day support company works to your deadline and your bid form, not just a quantity list. We start from the invitation to bid and Division 1 general conditions, build an on-screen takeoff in Bluebeam Revu and PlanSwift, then level every subcontractor quote against that baseline. You get a line-by-line comparison that shows what each quote covers, what it excludes, and where the gaps sit before you sign the bid form.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning. is a Senior Estimator with more than 15 years of professional experience in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Guides on this topic

Send your plans and bid form

Get a leveled bid-day estimate in 24–48 hours with rush available. Send your plans, specs, bid form, and sub quotes to start.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.