Sitework takeoff
Cut and fill, demolition, haul-off and utility relocation on Dallas County infill and greenfield lots.
CY · LF · TONWe produce quantity takeoffs and construction estimates for Dallas contractors, developers, architects and owners. Plans come back in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets and ZIP-code-adjusted pricing for the Dallas market.
Dallas pricing turns on expansive clay soils that drive drilled pier and post-tension foundation scope, IECC-driven envelope and insulation values, steep summer cooling loads on MEP systems, City of Dallas permitting and Dallas County review timelines, and a residential permit mix that in 2025 ran 71% multifamily.
Dallas is the second-largest city in Texas by construction volume and one of the busiest permit jurisdictions in the country. New privately-owned residential permits issued by the city reached 6,993 units in 2025, up 16% from 6,038 in 2024, at a permitted value of $1.5B and an average of $212,300 per unit. Multifamily accounted for 4,967 of those units, or 71% of the total, while single-family accounted for 2,026. That split shapes what a Dallas takeoff actually looks like: more podium and wrap product, more Type III and Type V over podium, and far more unit-mix repetition than a typical single-family market.
We price from ZIP-code-adjusted material and labor data, so a takeoff for a project in Oak Cliff is not carrying the same numbers as one in Frisco or Plano. Plans come back in Excel and PDF organized by CSI MasterFormat division, with marked-up plan sets showing what was measured and where. Most projects turn in 24–48 hours, with rush available. If you are bidding work across the metroplex, see our Texas construction estimating page, or the nearby Fort Worth and Houston pages for how pricing shifts across the region.
For bidders. You need quantities you can defend at bid opening. We return division-level takeoffs with marked-up plans so you can trace every line back to a sheet before you set your number.
For builders. You need a budget that holds through buyout. We break scope by trade and unit so you can compare subcontractor quotes against a measured baseline instead of a square-foot guess.
For owners. You need a cost basis before design is frozen. We estimate from schematic and design-development sets so you can see which scope items carry the most cost risk early.
Select a bar to compare Dallas with the largest Texas markets we cover.
6,993 new housing units in 2025 (+15.8% vs 2024).
2,026 single-family · 4,967 multifamily (71%).
The city issued 6,993 new privately-owned residential units in 2025 against 6,038 in 2024, a 16% increase, at $1.5B in permitted value and $212,300 average value per unit. Multifamily was 4,967 units, or 71% of the total, with single-family at 2,026. Dallas ranked 4th of 25 covered state cities by units and took 9.7% of the 72,008-unit covered state total. For a bidder, that means the competitive field is deepest on multifamily, where unit repetition rewards accurate per-unit assemblies and punishes anyone who carries a lump sum. Single-family work is a smaller share of city permits but still 2,026 units of framing, foundation and MEP scope. Our multi-family estimating services and residential estimating services pages cover the assembly structures we use for each.
Most of the residential volume sits in Dallas County, where expansive clay subgrade is the single largest cost driver. Structural scope typically runs drilled piers or post-tensioned slabs rather than shallow spread footings, and the geotechnical report governs which. Summer design conditions push cooling capacity and duct sizing well above what a milder climate would produce, so mechanical scope per square foot runs heavier. Envelope and insulation values follow the adopted energy code, and you should confirm the adopted code edition with the local building department before you price it. Sitework on infill lots adds demolition, haul-off and utility relocation that greenfield pricing misses. We cover those trades on our sitework estimating services and foundation estimating services pages.
We measure Dallas plan sets across the divisions that carry the most cost on local projects, from dirt through MEP rough-in.
Cut and fill, demolition, haul-off and utility relocation on Dallas County infill and greenfield lots.
CY · LF · TONDrilled pier, post-tension slab and grade beam quantities driven by expansive clay subgrade reports.
CY · LF · EAPodium decks, retaining walls, footings and slab-on-grade measured by mix and placement method.
CY · SF · TONWood and light-gauge studs, joists, trusses, sheathing and hardware counted by member and length.
LF · EA · BFTPO, modified bitumen and shingle systems with tapered insulation and flashing quantities.
SQ · LFMechanical, electrical and plumbing rough-in sized to Dallas summer design conditions and unit counts.
LF · EA · TONFull division-level takeoffs for retail, office and tenant improvement work across the metroplex.
SF · EA · LSWarehouse, distribution and light manufacturing scope for the data center and logistics corridors.
SF · CY · TONBidding podium and wrap multifamily across Dallas County, you need division-level quantities you can defend at bid opening, not a square-foot allowance that collapses during buyout.
With 4,967 multifamily units permitted in Dallas in 2025, unit-mix repetition drives cost. We measure typical units and stack them so your pro forma holds from schematic through construction documents.
Dallas's expansive clay and post-tension podium decks punish sloppy takeoffs. We count linear feet of grade beams, pier quantities and deck square footage by pour strip so your bid covers the real sequence.
Horizontal podium distribution, vertical chases and rooftop equipment screening are common scope gaps on Dallas mid-rise. We measure fixture counts, ductwork and piping by system and floor.
You need an independent cost basis before design is frozen. We estimate from schematic and design-development sets so you can see which scope items carry the most risk early.
Hail season in North Texas drives re-roof and envelope work. We measure roof area, slope, edge metal and penetration counts from plan sets so your proposal reflects actual quantities.
We take off plans for projects across Dallas County and the surrounding metroplex. ZIP-code-adjusted pricing means a takeoff for a project in Oak Cliff does not carry the same numbers as one in Frisco or Plano.
Dallas permitted 6,993 new privately-owned residential units in 2025, and 71% of them were multifamily. That mix means our Dallas takeoffs lean toward podium and wrap product, with single-family and light commercial filling out the rest.
Type III or Type V wood frame over a concrete podium, typically four to five stories with structured or surface parking. We measure unit repetition, corridor lengths and deck square footage by pour strip.
Watch for: Podium deck thickness, post-tension tendon layout, fire separation at the podium line.
Wood-framed units wrapping a precast or cast-in-place parking garage. Common in Dallas infill near transit. We count exterior wall area, balcony quantities and garage ventilation scope.
Watch for: Garage-to-unit fire rating, balcony waterproofing, exterior skin transitions.
Dallas permitted 2,026 single-family units in 2025. We take off plan repeats by elevation and option so your budget reflects the base house plus the upgrades buyers actually select.
Watch for: Option pricing, lot-specific foundation design, masonry versus brick veneer quantities.
Tear-down and infill lots in Preston Hollow, Lakewood and Oak Cliff carry irregular geometry and tight staging. We measure from architectural sets with structural and civil overlays.
Watch for: Retaining walls, tree preservation, utility relocation, alley access.
Dallas's data center and semiconductor growth pulls warehouse and flex space along the I-20 and I-35 corridors. We estimate tilt-wall, slab-on-grade and MEP by system.
Watch for: Slab flatness, tilt panel reinforcing, dock equipment, fire pump and storage.
Pad and inline retail in growing Dallas submarkets, often delivered as shell with tenant improvements. We separate shell scope from TI so you can bid either side cleanly.
Watch for: Grease interceptor, hood and makeup air, ADA restroom counts, storefront glazing.
Dallas pricing moves with code adoption, soil conditions and the sheer volume of work in the metroplex. These are the six items that most often change a number between two similar-looking sets.
Dallas enforces the International Building Code and International Residential Code as adopted locally, and the edition in force affects fire separation, egress and energy compliance. Multifamily podium projects often trigger additional plan review for high-rise or mid-rise provisions. Confirm the adopted edition and any local amendments with the Dallas building department before you lock your bid, because a code cycle change can move wall assemblies, sprinkler scope and insulation values.
IBC · IRC · IECC · Dallas building departmentMuch of Dallas County sits on expansive clay that shrinks and swells with moisture. Geotechnical reports commonly drive pier-and-grade-beam foundations for single-family and drilled piers or post-tensioned slabs for multifamily. The depth and spacing of piers, the amount of select fill and the need for moisture conditioning all change the foundation line item. A takeoff that assumes a standard slab on grade will miss the cost that matters most on a Dallas lot.
Geotechnical report · drilled piers · post-tensioned slab · select fillNorth Texas sits in a hail-prone corridor, and roof coverings, edge metal and rooftop equipment screening take a beating. Wind design also matters for open parking structures and tall wood-frame buildings. We measure roof area by slope and system, count penetrations and curbs, and separate steep-slope from low-slope so your roofing bid reflects the actual assembly rather than a single square-foot rate.
Hail · wind uplift · roof coverings · edge metalDallas is one of the busiest construction markets in the country, and framing, concrete and MEP crews are stretched across data centers, semiconductor plants and residential work. Labor rates in our estimates come from ZIP-code-adjusted data, so a project in a tight submarket carries different burden than one farther out. When you compare subcontractor quotes, check whether they used the same crew assumptions and overtime basis you did.
RSMeans data · ZIP-code adjustment · crew assumptions · overtimeDallas sits on mostly flat terrain with clay soils that drain slowly, so storm drainage, detention and grading often carry more cost than bidders expect. Site plans may require on-site detention, retaining walls or channel improvements. We take off sitework separately from building scope so you can see how much of your budget is underground. Lot coverage, setback and parking ratios also change the building footprint and therefore the structure.
Storm drainage · detention · retaining walls · lot coverageDallas is a distribution hub, so most commodity materials are available locally, but long-lead items like switchgear, elevators and rooftop units still drive schedules. Texas has no state income tax, and sales tax treatment of construction materials depends on the contract structure. We price materials and labor separately so you can apply the correct tax treatment and see which line items are exposed to freight or escalation.
Switchgear · elevators · sales tax · freightDallas sits on expansive clay, hauls in materials from outside the metro, and builds a lot of multifamily and industrial work. Those realities change what a real takeoff has to include.
Dallas County clay moves with moisture, so a sitework takeoff has to separate cut, fill, and unsuitable material. We measure stripping depth, over-excavation under building pads, and lime or cement stabilization by the square yard. On tight urban infill lots, you also have to account for haul-off and import because there is no room to waste on site. Storm drainage is its own quantity: trench length, pipe by diameter, inlets, and riprap at outfalls. For a fuller breakdown of those line items, see our sitework estimating services.
Wood framing dominates Dallas single-family and mid-rise multifamily, but wind and hail drive the sheathing and roof schedule. We take off studs by length and spacing, plates, headers, and blocking, then convert to board feet. Roofing is measured by slope area, not footprint, with starter, ridge, valley, and hip quantities separate from field shingles. Underlayment and ice-and-water are counted at eaves and penetrations. Steep-slope areas and complex hips are where most takeoffs miss material. Our framing estimating services and roofing estimating services both break those quantities out.
Drywall, paint, flooring, and ceilings are where allowances get abused on Dallas bids. We measure wall area by height and room perimeter, deduct openings over a set size, and count corner bead and joint compound by square foot. Flooring is taken off by material and transition type, with waste factors that vary by tile size and layout. Casework, countertops, and specialties are counted by type and room. On multifamily, unit mixes matter because each plan type repeats with different finishes. Our multi-family estimating services page shows how we structure those unit-by-unit quantities.
Post-tension slabs are standard on Dallas residential and low-rise multifamily. A takeoff has to count tendons, anchors, and edge forms separately from the slab volume. We measure slab area by thickness, add typical waste for pump loss, and list vapor barrier, granular base, and rebar by bar size and spacing. Grade beams, pier caps, and drilled piers are taken off by linear foot and count. On commercial pads, tilt-wall panels get their own line items for casting beds and lifting inserts. Our foundation estimating services cover that scope in more detail.
Dallas multifamily and commercial work usually means large rooftop units, long duct runs, and sprinkler coverage under NFPA 13. A takeoff has to capture duct by gauge and size, fittings by count, refrigerant line by foot, and equipment curbs and pads. Electrical includes service entrance, panel schedules, branch wiring by device count, and exterior site lighting. Plumbing counts fixtures, water and waste pipe by diameter, and grease or lift stations where required. We price these against ZIP-code-adjusted material and labor so the numbers reflect the actual Dallas submarket. See MEP estimating services.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Post-tension slab, 6 in. | 18,400 | SF |
| 03 30 00 | Drilled piers, 18 in. dia. | 64 | EA |
| 05 12 00 | Structural steel, misc. | 12,800 | LB |
| 06 10 00 | Wood framing, walls | 42,600 | BF |
| 07 30 00 | Asphalt shingles | 9,200 | SF |
| 09 29 00 | Gypsum board, 5/8 in. | 38,500 | SF |
| 23 31 00 | Ductwork, galvanized | 4,200 | LB |
| 26 05 19 | Branch wiring, #12 THHN | 16,800 | LF |
This example uses illustrative dimensions for a post-tension slab on grade. The building pad is 120 ft by 80 ft, with a 6-inch slab and a 12-inch by 12-inch perimeter grade beam.
Step 1 — Slab area. 120 ft × 80 ft = 9,600 SF.
Step 2 — Slab volume. 9,600 SF × (6 in. ÷ 12) = 4,800 CF. Divide by 27 to get cubic yards: 4,800 ÷ 27 = 177.8 CY.
Step 3 — Grade beam volume. Perimeter = 2 × (120 + 80) = 400 LF. Cross-section = 1 ft × 1 ft = 1 CF per LF. Volume = 400 CF. In cubic yards: 400 ÷ 27 = 14.8 CY.
Step 4 — Total concrete. 177.8 + 14.8 = 192.6 CY. Add a typical 5% waste for pump loss and spillage: 192.6 × 1.05 = 202.2 CY.
Step 5 — Vapor barrier. Slab area plus 10% lap and turn-up: 9,600 × 1.10 = 10,560 SF.
Step 6 — Granular base. 4 inches of compacted base under slab: 9,600 SF × (4 ÷ 12) = 3,200 CF. At 1.4 tons per cubic yard, that is 3,200 ÷ 27 × 1.4 = 165.9 tons.
Step 7 — Post-tension tendons. Assume 0.5-inch tendons at 4 ft on center each way. Number of tendons in one direction: 80 ft ÷ 4 ft = 20. In the other direction: 120 ft ÷ 4 ft = 30. Total = 50 tendons. Average length ≈ 100 ft, so 50 × 100 = 5,000 LF. Add 5% for anchorage tails: 5,250 LF.
The table below summarizes the quantities. All dimensions are illustrative and should be replaced with the actual plan dimensions before ordering.
| Item | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 120 × 80 | 9,600 | SF |
| Slab volume | 9,600 × 0.5 ÷ 27 | 177.8 | CY |
| Grade beam volume | 400 × 1 ÷ 27 | 14.8 | CY |
| Concrete with 5% waste | (177.8 + 14.8) × 1.05 | 202.2 | CY |
| Vapor barrier | 9,600 × 1.10 | 10,560 | SF |
| Granular base | 9,600 × 0.333 ÷ 27 × 1.4 | 165.9 | TON |
| PT tendons | 50 × 100 × 1.05 | 5,250 | LF |
Once you have these quantities, we apply ZIP-code-adjusted material and labor pricing for the Dallas area and deliver the takeoff in Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets.
Expansive clay drives over-excavation, lime or cement stabilization, and drilled piers, which are easy to leave out if you only measure the slab. Hail and wind design adds sheathing, roof underlayment, and fastening schedules. Post-tension slabs require tendon, anchor, and edge form quantities separate from concrete volume. We also price against ZIP-code-adjusted material and labor for the Dallas submarket, not a national average.
Most projects turn around in 24 to 48 hours. Rush service is available when your bid date is close. The clock starts when we have a complete set of plans, specifications, and any addenda. If you send a partial set, we will tell you what is missing before we start so the takeoff is not built on assumptions.
Yes. We cover those metros and the surrounding counties. You can see the state overview on our Texas construction estimating page, and city-specific pages for Houston, San Antonio, Austin, and Fort Worth. Each market has different labor rates and material logistics, so we adjust pricing by ZIP code rather than using one number for the whole state.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets. You get quantity columns you can sort, filter, and drop into your own pricing sheet. Marked-up plans show where each quantity came from so you can check our work against the drawings. If you need a different structure for your estimating software, tell us before we start.
Yes. Dallas multifamily work often repeats a handful of unit plans across many floors. We take off quantities by unit type, then multiply by the count and add corridor, amenity, and back-of-house areas separately. That structure makes it easy to compare unit mixes and to see which plan type is driving cost. See our multi-family estimating services for the full scope.
Yes. Industrial scopes bring their own units: process piping by diameter and linear foot, structural steel by ton, equipment pads by cubic yard, and electrical gear by count. We take those off from the drawings and specs, then price them with ZIP-code-adjusted rates. See our industrial estimating services for the divisions we cover.
The permit figures on this page come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city itself, not the whole metro. In 2025 Dallas issued 6,993 residential units, up 16% from 6,038 in 2024. Of those, 2,026 were single-family and 4,967 were multifamily, with a permitted value of $1.5B.
Send the architectural, structural, civil, and MEP drawings, the specification book, and any addenda. If you have a bid form or a scope sheet, include it so we match your line items. Tell us the bid date and whether you want alternates priced separately. For sitework, a geotechnical report helps because it tells us how much over-excavation and stabilization the soils require.
We apply waste by material rather than one blanket percentage. Typical ranges are 5% for concrete, 10% for framing lumber, 10% for drywall, and 10% to 15% for tile and flooring depending on layout. Roofing waste depends on hip and valley count. Those factors are stated in the takeoff so you can adjust them if your supplier or crew works differently.
Yes. Our pricing basis is ZIP-code-adjusted material and labor. That means the labor hours and rates reflect the Dallas market rather than a national average. If you only want quantities, we can deliver the takeoff without pricing. Tell us which you need when you send the plans.
Email your drawings and specs and we will return a MasterFormat takeoff in 24 to 48 hours.