How fast can you turn around a Massachusetts estimate?
Most projects return in 24–48 hours from receipt of a complete plan set and specifications. Rush turnaround is available when a bid date moves up. Larger multifamily, lab and phased projects take longer, and we will tell you the schedule before we start. Send the drawings, specs, any addenda and the bid form, and we will confirm scope and delivery in writing.
What format do you deliver?
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace each quantity back to the sheet it came from. We work in Bluebeam Revu, PlanSwift and RSMeans data. If your office uses a specific template or bid form, send it and we will match the structure so the numbers drop straight into your estimate.
Do you price labor for Massachusetts specifically?
Yes. We price with ZIP-code-adjusted material and labor data, so a Boston, Worcester or Springfield estimate reflects the local market rather than a national average. On public work, prevailing wage requirements change the labor burden line, and apprenticeship ratios and overtime rules feed in as well. Tell us whether the bid is union, open shop or prevailing wage, and which wage decision applies.
How do you handle the stretch energy code?
Massachusetts adopts the IECC with state amendments, and some municipalities have opted into a stricter stretch energy code. That changes envelope assemblies, continuous insulation, air sealing, ventilation and testing requirements. We carry those items as separate lines so a base-code estimate does not hide them. Confirm the adopted edition and any local opt-in with the building department before pricing, because requirements vary by municipality.
Can you estimate a project from partial drawings?
Yes. For conceptual and schematic phases we estimate by division from the drawings you have, state the assumptions and carry allowances for undefined scope. We flag what is missing rather than filling the gap silently. As drawings develop, we update the same takeoff so the numbers stay consistent from concept through construction documents and into buyout.
Do you take off sitework and foundations separately?
Yes, and we recommend it in Massachusetts. Glacial till, coastal marine clay and filled ground produce very different foundation scopes, so we separate stripping, over-excavation, unsuitable soils, structural fill, dewatering, shoring and rock removal. Concrete, rebar and formwork are taken off by element. That structure lets you price a foundation change order from the original takeoff instead of rebuilding it.
Can you price change orders and buyout packages from the same takeoff?
Yes. Because the takeoff is built by division and by element, we can price a change order, a buyout package or a subcontractor quote review against the same quantities used in the original bid. That keeps the basis consistent from bid through closeout and makes it easier to see where a quote diverges from the scope you priced.
What do you need from me to start?
The plan set, specifications, any addenda, the bid date and the bid form. Tell us the project address or ZIP code, the delivery format you want, and whether the work is public or private. If you have a geotechnical report, a survey or a permit set with conditions, send those too. We confirm scope and turnaround in writing before starting.
Do you work on public and prevailing wage projects?
Yes. Public work in Massachusetts triggers prevailing wage requirements that change the labor burden line, so we price labor by trade against the applicable wage decision rather than a blended rate. Send the wage decision and any apprenticeship or overtime requirements with the drawings. We also flag certified payroll and reporting obligations that can affect supervision and administrative cost.
Where does the permit data on this page come from?
The figures come from the U.S. Census Bureau Building Permits Survey, annual place-level data for 2025, covering new privately-owned residential units only. That means the counts do not include commercial, industrial or institutional construction, and they do not represent total construction activity. They are a residential pipeline signal across the 25 Massachusetts cities we cover.