Multifamily takeoff
Unit-mix matrices, repeated wall and floor types, and per-unit quantity rollups for Worcester podium and wood-frame projects.
SF · EA · per unitWe prepare quantity takeoffs and cost estimates for Worcester contractors, developers and owners, priced with ZIP-code-adjusted material and labor rates and delivered in Excel and PDF by CSI MasterFormat division, typically within 24–48 hours.
Worcester pricing is driven by steep hillside sites and ledge, a deep stock of pre-1950 mill and triple-decker buildings, cold-weather concrete and masonry schedules, Worcester County wage rates, and a multifamily-dominated permit mix — about 88% of 2025 permitted units — that shifts takeoff volume toward repeated unit types.
Worcester is the second-largest city in Massachusetts by permitted residential volume, and the 2025 numbers show where the work sits: 470 new privately-owned residential units permitted, 413 of them multifamily, at an average permitted value of $195,700 per unit. That mix means most of the takeoff volume here is repeated unit plans — wood-frame over podium, elevator-core layouts, and mill-conversion floor plates — rather than one-off custom homes. We build those estimates division by division so your buyout packages line up with how you actually subcontract.
Because Worcester sits in Worcester County with its own wage and material market, we price with ZIP-code-adjusted data rather than statewide averages, and we mark up the plan set so you can trace every quantity back to a sheet. Most projects return in 24–48 hours, rush available. If you bid work across the region, our Massachusetts construction estimating coverage and the Boston page show how we handle the higher-cost eastern market. Send drawings through get an estimate and we will confirm scope before starting.
For bidders. You get a division-by-division takeoff with waste factors, unit rates and marked-up plans, so you can adjust a bid the same day and see exactly which assemblies drive your number.
For builders. We take off from your permit or construction set for mill renovations, triple-decker rehabs and multifamily infill, then hand back quantities you can convert straight into purchase orders and subcontractor scopes.
For owners. You get a cost basis for budgeting before design is complete, with assumptions listed separately from measured quantities so you can see what changes when the drawings change.
Select a bar to compare Worcester with the largest Massachusetts markets we cover.
470 new housing units in 2025 (-50.3% vs 2024).
57 single-family · 413 multifamily (88%).
The 2025 Building Permits Survey figures for Worcester show 470 new privately-owned residential units permitted, down from 945 in 2024 — a 50% drop — with 413 of those units multifamily, or about 88% of the total. Permitted value was $92M, an average of $195,700 per unit. For a bidder, that concentration matters: when multifamily is 88% of the pipeline, your competition is other wood-frame and podium bidders, and your estimate lives or dies on repetition accuracy — wall types, floor-to-floor heights and unit-mix counts. It also means a slow year in one large project can swing the city total, so track your own backlog rather than the headline. Worcester still ranks second of 25 covered state cities by units and accounts for 10.2% of the 4,601 units permitted statewide. Compare that with Springfield or Lowell when you are deciding where to chase work.
At $195,700 average permitted value per unit, Worcester projects are not Boston high-rise numbers, but they are not light either — that figure reflects mid-rise wood-frame, podium and renovation work with full MEP and sprinkler scope. In takeoff terms, expect a full multi-family breakdown: footing and slab quantities, stick-framed or truss floor systems, unit-by-unit plumbing fixture counts, and NFPA 13 residential sprinkler head counts by floor. The 50% year-over-year drop from 945 units in 2024 means fewer projects chasing the same subcontractor pool, which usually softens bid spreads but not material pricing. Confirm the adopted code edition — IBC, IECC and the Massachusetts amendments — with the Worcester building department before you lock scope, since energy and sprinkler requirements move quantities more than most bidders expect.
We take off the trades that dominate Worcester County work — multifamily shells, mill renovations, sitework on ledge and steep grades, and the MEP that goes with them.
Unit-mix matrices, repeated wall and floor types, and per-unit quantity rollups for Worcester podium and wood-frame projects.
SF · EA · per unitMass excavation, ledge removal, retaining walls and utility trenching on Worcester's hillside and redevelopment parcels.
CY · LF · TONFootings, slab-on-grade, podium decks and garage structures, with formwork and reinforcement separated from placed concrete.
CY · SF · LBFloor and roof framing takeoff for wood-frame multifamily and triple-decker rehabs, including blocking and sheathing counts.
LF · SF · EAFlat membrane and steep-slope assemblies for mid-rise and mill buildings, with insulation, flashing and edge metal quantities.
SF · LFPlumbing fixture counts, HVAC distribution and electrical device counts per unit, plus riser and common-area scope.
EA · LF · TONMill and downtown building fit-outs — partitions, ceilings, doors and finishes taken off from architectural and MEP sets.
SF · LF · EAScope comparison against subcontractor quotes, alternates priced separately, and marked-up plan sets for your bid review.
LS · per bidWorcester permitted 413 multifamily units in 2025, 88% of its residential total. You need unit-by-unit takeoffs on repeated floor plates, plus separate base-building and fit-out scopes for podium and elevator-core buildings.
The city's older housing stock and converted mill buildings produce irregular framing, undersized joists and unknown existing conditions. We take off from your set and flag assumptions you should carry as contingency before bidding.
Worcester's hills and glacial soils mean cut, fill and retaining quantities swing block to block. We measure from the civil set so your earthwork and drainage bid reflects the actual grades, not a flat-site assumption.
Sloped lots and ledge close to grade drive stepped footings, deeper walls and rock removal. We quantify formwork, rebar and concrete separately so you can price the foundation scope without burying risk in a unit rate.
Multifamily and mill-conversion work brings sprinkler, riser and corridor distribution scope that is easy to miss. We count fixtures, mains, branches and sprinkler heads by floor so your bid matches the drawings.
You may only have a site plan or schematic set. We build a division-by-division budget with assumptions listed separately from measured quantities, so you can see what changes when design advances.
We take off Worcester County work from the city core out through the surrounding suburbs, where lot sizes, soil conditions and utility service change the numbers. If your project is in one of these areas, send the drawings and we will price it the same way.
The 2025 permit mix is 88% multifamily, so most of the takeoff volume here is repeated unit plans in wood-frame and podium buildings, plus renovation work in older housing and mill stock. We price each type from its own assembly list rather than a generic square-foot rate.
Three- and four-story wood-frame over podium with elevator cores and common corridors. We take off each unit type once, then multiply by count and add corridor, stair and mechanical room quantities separately.
Watch for: Unit-to-unit wall and floor assemblies, corridor MEP distribution, sprinkler coverage
Heavy-timber and masonry mill buildings converted to apartments, where existing floors and walls rarely match the drawings. We measure new partitions, shafts and roof work and list existing-condition assumptions as separate line items.
Watch for: Existing joist sizing, floor leveling, shaft and stair openings
Renovation of the city's older three-story wood buildings, often gut to studs with new mechanical and sprinkler systems. We take off demolition, framing repair, new MEP rough-in and finishes by floor.
Watch for: Demolition quantities, framing repair, sprinkler retrofit routing
Infill lots and teardown rebuilds on Worcester's sloped streets. We quantify foundation, framing, roofing and MEP from the permit set, with waste factors applied per assembly.
Watch for: Stepped footings, retaining walls, driveway and utility runs
Ground-floor retail below apartments, small office and institutional buildings on the city's main corridors. We organize the takeoff by CSI division so your subcontractor packages match the bid form.
Watch for: Storefront glazing, separate utility metering, tenant fit-out boundaries
Light industrial, self-storage and warehouse work in Worcester's industrial corridors. We take off slab, tilt or masonry walls, structural steel, roof systems and site utilities from the construction set.
Watch for: Slab thickness and reinforcement, clear-height steel, dock and apron work
Worcester is not priced like Boston or like the rural parts of the county, and the physical site often moves the number more than the building itself. These are the drivers we adjust for on every takeoff.
Worcester reviews projects under the Massachusetts State Building Code and its amendments, with separate plumbing, gas, electrical and fire review. Sprinkler and alarm scope for multifamily buildings is reviewed closely, and older buildings often trigger upgrades when change of use occurs. Confirm the adopted code edition and any local amendments with the Worcester building department before you lock your scope, because the edition in force affects egress, sprinkler and energy requirements.
Massachusetts State Building Code · Worcester building department · NFPA 13 · IECCMuch of Worcester sits on glacial till with bedrock close to grade on the hills, so footing depths, rock removal and dewatering vary from lot to lot. Stepped footings, deeper foundation walls and retaining walls are common on sloped streets. We take off excavation, backfill, formwork and reinforcement from the geotechnical report and foundation plan rather than assuming a flat, uniform site, and we carry rock removal as its own line item when the drawings show it.
Glacial till · bedrock · stepped footings · retaining wallsWorcester runs colder and snowier than coastal Massachusetts, which affects concrete curing, masonry and roofing schedules. Winter conditions add temporary heat, enclosures and cold-weather concrete protection, and snow load governs roof framing design. We price these as separate items when the schedule crosses the cold months, and we check roof framing against the ground snow load shown on the structural drawings for the project location.
Ground snow load · cold-weather concrete · temporary heat · roof framingWorcester County labor rates sit below Boston's but above the western part of the state, and trade availability tightens when Boston-area work pulls crews east. Prevailing-wage projects carry a different rate structure than private work. We price with ZIP-code-adjusted labor rather than a statewide average, so your bid reflects the market your crews actually buy labor in, and we keep trade rates separate so you can swap in your own numbers.
Worcester County wage rates · prevailing wage · ZIP-code-adjusted laborSloped sites, older combined sewers and stormwater requirements drive significant site scope on Worcester projects. Grading, retaining walls, utility re-routing, catch basins and detention or infiltration systems often carry more cost than expected. We take off earthwork by cut and fill area, count drainage structures and pipe runs by size and material, and separate site utilities from building work so the site package can be bid on its own.
Stormwater management · combined sewers · cut and fill · detention systemsWorcester is close enough to Boston suppliers that material pricing tracks the eastern market, but tight downtown and mill sites restrict staging, crane placement and deliveries. Massachusetts sales tax applies to most materials unless an exemption is documented for the project. We apply typical waste factors by assembly, note delivery and staging constraints in the estimate, and list any tax assumptions separately so your buyout is not surprised later.
Massachusetts sales tax · staging constraints · typical waste factorsWorcester's mix of triple-decker rehabs, multifamily infill and hillside sites off the worn glacial soils of the Nashua River valley changes what you count and how you count it. Here is how those local realities land in each division of a takeoff.
Worcester sits on glacial till and bedrock that varies block to block. On hillside lots in the West Side and around Newton Hill, a takeoff has to carry rock excavation as a separate line from common excavation, plus a sheeting and shoring allowance where the cut is close to a property line. Underpinning and rock anchors show up on additions near older foundations. Confirm the adopted code edition with the Worcester building department before you price frost depth or footing embedment. We break Division 31 and 03 30 00 cast-in-place concrete into measured items — cubic yards of strip footing, square feet of slab on grade — and mark the plan set so you can see where the quantity came from. See our sitework and foundation estimating pages for how we split rock from soil.
Worcester gets roughly 45 to 50 inches of precipitation a year, with heavy snow loads and freeze-thaw cycles that punish flat and low-slope roofs. On the city's older three-story buildings, a roofing takeoff has to include tear-off of multiple existing layers, deck repair, and ice-and-water membrane at eaves and valleys. For the newer multifamily buildings, you are counting TPO or EPDM membrane, tapered insulation crickets and roof drains. We measure squares by plane, add typical waste factors for hips and valleys, and list flashing, drip edge and pipe boots as separate line items so nothing gets buried in a lump sum. Our roofing estimating service handles both steep-slope and low-slope Worcester work.
Worcester's winter drives general conditions. A takeoff has to carry temporary heat, snow removal, winter protection and a longer schedule for concrete and masonry. On the finish side, triple-decker rehabs mean counting doors, trim, flooring and paint by unit, not by building, because each floor is a separate dwelling. We measure square feet of gypsum board by room, linear feet of base and casing, and count fixtures and hardware sets. The result is a takeoff organized by CSI MasterFormat division, with a marked-up plan set showing where every quantity came from, delivered in Excel and PDF. See our residential estimating page for how we structure a Worcester gut rehab.
Much of Worcester's housing stock is wood-frame triple-deckers and two-family homes, many with balloon framing and full-dimension lumber that does not match today's nominal sizes. A takeoff for a gut rehab has to count new studs, headers, sheathing and floor joists by span and grade, not just by square foot of wall. On the newer mid-rise multifamily projects downtown, you are pricing engineered floor systems and panelized wall assemblies, where the takeoff is driven by shop drawings and connector counts. We measure linear feet of plate, count joist hangers and hold-downs, and flag where a structural engineer's stamped details change the member size. Our framing estimating service covers both the old and new Worcester stock.
Worcester's older buildings rarely have drawings that match what is in the wall, so MEP takeoffs start with a site walk and a set of as-builts where they exist. On multifamily rehabs you are counting fixture units, branch line lengths, panel schedules and device counts room by room. On new construction, we work from the engineer's riser diagrams and schedules, measure pipe and duct by diameter and run, and separate rough-in from trim-out. Massachusetts has its own plumbing and electrical amendments on top of the model codes, so confirm the adopted edition with the local building department before you lock in material. Our MEP estimating service produces a division-by-division breakdown you can hand to each subcontractor.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete footings | 48 | CY |
| 06 10 00 | 2x6 wood stud framing, 16 in. o.c. | 6,200 | LF |
| 06 16 00 | 7/16 in. OSB wall sheathing | 4,800 | SF |
| 07 30 00 | Asphalt shingles, tear-off 2 layers | 32 | SQ |
| 09 29 00 | 1/2 in. gypsum board, walls and ceilings | 18,500 | SF |
| 09 30 00 | Ceramic tile, bathrooms and kitchens | 1,150 | SF |
| 22 11 00 | PEX domestic water piping | 2,400 | LF |
| 26 05 19 | Branch circuit wiring, 12 AWG | 5,600 | LF |
This example sizes strip footings for a two-story wood-frame addition on a hillside lot in Worcester. Dimensions are illustrative; your engineer's drawings govern.
Assume a continuous strip footing 24 in. wide by 12 in. deep running 120 linear feet, plus six isolated pad footings 30 in. by 30 in. by 12 in. deep.
Step 1 — Strip footing volume. Convert inches to feet: 24 in. = 2.0 ft, 12 in. = 1.0 ft. Volume per linear foot = 2.0 × 1.0 = 2.0 CF. Total = 120 LF × 2.0 CF/LF = 240 CF. Divide by 27 CF/CY = 8.89 CY.
Step 2 — Pad footing volume. 30 in. = 2.5 ft. Volume each = 2.5 × 2.5 × 1.0 = 6.25 CF. Six pads = 37.5 CF. Divide by 27 = 1.39 CY.
Step 3 — Subtotal. 8.89 + 1.39 = 10.28 CY.
Step 4 — Waste and over-excavation. Typical waste for formed footings is 5% to 10%. Use 7%: 10.28 × 1.07 = 11.00 CY. Round up to 11.0 CY.
| Step | Calculation | Result |
|---|---|---|
| Strip footing volume | 120 LF × 2.0 CF/LF ÷ 27 | 8.89 CY |
| Pad footing volume | 6 × 6.25 CF ÷ 27 | 1.39 CY |
| Subtotal | 8.89 + 1.39 | 10.28 CY |
| Waste at 7% | 10.28 × 1.07 | 11.00 CY |
This is the kind of arithmetic that sits behind a Division 03 line in a Worcester takeoff. We also carry formwork by square foot of contact area, reinforcing steel by pound and bar size, and vapor barrier by square foot under slab. On hillside lots, add rock excavation and shoring as separate lines. If you want to see how this looks in a full estimate, send the plans and we will return a marked-up set with quantities you can check.
Pricing depends on project type, size and how complete the drawings are. A single-family addition is a different scope than a 40-unit multifamily building. We quote per project after reviewing the plan set, and we use ZIP-code-adjusted material and labor pricing for Worcester so the numbers reflect local conditions. Send your plans through our get an estimate page and we will return a fixed quote with turnaround.
Most projects are returned in 24 to 48 hours. Larger multifamily or commercial jobs may take longer depending on sheet count and detail. Rush service is available if you have a bid deadline. We deliver Excel and PDF files organized by CSI MasterFormat division with a marked-up plan set so you can trace every quantity back to the drawing.
Yes. Worcester's freeze-thaw cycles and snow load affect concrete, masonry, roofing and general conditions. We carry temporary heat, winter protection, snow removal and longer cure times as separate line items. We also check frost depth and roof snow load against the adopted code edition, which you should confirm with the local building department. These items are often missed on bids and become change orders.
Much of Worcester is underlain by glacial till with areas of bedrock and ledge, especially on the hills. That means a takeoff should separate common excavation from rock excavation, and carry sheeting or shoring where you are close to a property line. We flag these as separate Division 31 lines so you can price the risk rather than bury it in a lump sum. Your geotechnical report governs the actual quantities.
Yes. Triple-deckers are common in Worcester, and they bring specific takeoff challenges: balloon framing, full-dimension lumber, multiple roofing layers and separate dwelling units. We measure framing by linear foot and count, not just square foot, and we break finishes out by unit. Our residential estimating service is built for this type of work. Send the plans and we will return a division-by-division takeoff.
We cover Worcester County and the surrounding area, including nearby cities such as Boston, Springfield, Cambridge and Lowell. If your project is within commuting distance of Worcester, we can price it with ZIP-code-adjusted rates for that location. See our Massachusetts construction estimating page for the full list of areas we serve.
We use Bluebeam Revu for plan markup and quantity review, PlanSwift for digital takeoff, and RSMeans data for material and labor pricing. We adjust RSMeans costs to Worcester ZIP codes so the numbers reflect local wages and material costs. The output is an Excel workbook organized by CSI MasterFormat division, plus a PDF with the marked-up plan set.
Older buildings often lack accurate as-builts, so we start with a site walk or a set of field measurements. We count fixture units, device boxes, panel schedules and branch line lengths room by room. Massachusetts has its own plumbing and electrical amendments, so confirm the adopted code edition with the local building department. Our MEP estimating service delivers a breakdown you can send to each trade.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city of Worcester. The survey shows 470 total units, down from 945 the previous year, with 413 multifamily units and 57 single-family units. The data is residential only and does not include commercial or industrial permits. Use it as a demand indicator, not a complete picture of construction activity.
Send the architectural, structural and MEP drawings, plus any specifications, addenda and geotechnical reports. If you have a bid date, tell us so we can schedule turnaround. We will review the set, ask any clarifying questions, and return a fixed quote. Once you approve, we deliver the takeoff in 24 to 48 hours for most projects, with rush available.
Upload your drawings and we will return a fixed quote and a division-by-division takeoff with a marked-up plan set.