Scope Precision EstimateContact Us
Revere, MA

Construction estimating services in Revere, MA

Scope Precision Estimate delivers Revere, MA construction estimating with 24–48 hour turnaround, CSI MasterFormat organization, and ZIP-code-adjusted material and labor pricing for multifamily, residential, and commercial work.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Revere ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Revere · 2025
Revere new housing permits2025
New housing units131Change vs. 2024+42%Permitted construction value$25MAverage value per unit$191,600Rank among covered Massachusetts cities#10
Single-family: 3 (2%)Multifamily: 128 (98%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Revere, MA different?

Revere's 2025 permit data shows 131 new private residential units, 98% multifamily, with $25M in permitted value and an average of $191,600 per unit. That density, coastal exposure, older urban infill sites, and Boston-area life-sciences demand drive costs for concrete, framing, roofing, and MEP scopes.

  • Revere permitted 131 new housing units in 2025, #10 among the Massachusetts cities we cover.
  • About 98% were in multifamily buildings; 2% were single-family.
  • Permit volume was up 42% compared with 2024.

Revere sits in Suffolk County, where dense urban infill and Boston's life-sciences lab construction keep material and labor costs among the nation's highest. The city's 2025 Building Permits Survey data shows 131 new privately-owned residential units, up 42% from 92 in 2024. Of those, 128 units were multifamily, or 98% of the total, with $25M in permitted value and an average of $191,600 per unit. That mix means your takeoffs need to handle repeated floor plans, shared structural systems, and tight site logistics rather than single-family details.

We prepare estimates for Revere contractors, developers, and owners using Bluebeam Revu, PlanSwift, and RSMeans data, with pricing adjusted by ZIP code. Deliverables arrive in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets. Most projects turn around in 24–48 hours, and rush service is available. If you are bidding a multifamily project near Revere Beach or a commercial fit-out along Broadway, our Massachusetts construction estimating team can match the format your bid requires. We also cover nearby Weymouth and Peabody for contractors working across the North Shore and South Shore.

Coverage
Revere and nearby Massachusetts communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Revere ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need a complete takeoff before the bid deadline. We return CSI-organized quantities with marked-up plans in 24–48 hours, so you can price concrete, framing, roofing, and MEP scopes without rebuilding a spreadsheet from scratch.

02

For builders. You are buying out trades and tracking changes. Our ZIP-adjusted RSMeans pricing and PlanSwift takeoffs give you quantities by unit and floor, which helps you compare subcontractor quotes and catch scope gaps before contracts are signed.

03

For owners. You are testing feasibility or validating a budget. We provide line-item estimates by CSI division with clear assumptions, so you can see where cost sits in a Revere multifamily or mixed-use project before committing to design.

Revere by the numbers

Revere's residential construction pipeline

Select a bar to compare Revere with the largest Massachusetts markets we cover.

131New housing units, 2025
2.8%Of all units in the Massachusetts cities we cover
$25MPermitted residential value
98%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Revere

131 new housing units in 2025 (+42.4% vs 2024).

3 single-family · 128 multifamily (98%).

Multifamily dominates Revere permits

The 2025 data is unambiguous: 128 of 131 permitted new private residential units in Revere were multifamily, or 98%. Single-family permits totaled just 3. For bidders, that means the local pipeline is mostly apartment and condo buildings, not scattered houses. Your estimate should be built around repeated unit types, one structural system priced across multiple floors, and shared MEP risers. The $191,600 average value per unit is a planning figure, not a bid price, but it tells you the scale of finishes and systems in the current permit stream. If you are pricing that work, our multi-family estimating services and commercial estimating services teams can break quantities by building, floor, and unit type.

Volume is up, and so is competition

Permitted units rose 42% year over year, from 92 to 131, and Revere ranked 10th of 25 covered Massachusetts cities by units, with 2.8% of the covered state total. Statewide, 4,601 units were permitted in the same survey. More permits mean more bidders chasing the same subcontractors, so quantity accuracy matters more than ever. A missed 5% on concrete or framing can decide whether your bid is competitive or a loss. Contractors working from Taunton or Chicopee often see the same pattern. We adjust material and labor pricing by ZIP code so your Revere numbers reflect local conditions, not a statewide average.

Services

Construction estimating services in Revere, MA

We provide takeoffs and estimates for the scopes that drive Revere multifamily, residential, and commercial projects.

Concrete estimating

Footings, slab-on-grade, and elevated decks for Revere multifamily buildings, including formwork and rebar quantities.

CY · SF · TON

Foundation estimating

Excavation, backfill, waterproofing, and pile or footing takeoffs for coastal and urban infill sites in Suffolk County.

CY · LF · SF

Framing estimating

Wood and light-gauge studs, joists, sheathing, and trusses priced by floor and unit type for repeated plans.

LF · SF · EA

Roofing estimating

Membrane, shingle, flashing, and insulation quantities for flat and pitched roofs exposed to coastal weather.

SF · LF · SQ

MEP estimating

Plumbing, HVAC, and electrical takeoffs by fixture, run, and device for multifamily risers and commercial fit-outs.

LF · EA · TON

Sitework estimating

Earthwork, paving, utilities, and erosion control for tight Revere lots and redevelopment sites near Broadway.

CY · LF · TON

Residential estimating

Full-scope estimates for single-family and small residential projects, including finishes and allowances.

SF · EA · LS

Industrial estimating

Process, structural, and utility scopes for light industrial and warehouse work in the Boston metro area.

LF · TON · EA
Who we provide estimates for

Who we prepare Revere estimates for

General contractors

You are bidding Revere multifamily and mixed-use jobs where the bid form follows CSI divisions. We return quantities by division with marked-up plans so you can assemble the bid without re-takeoff.

Multifamily developers

Your Revere projects repeat unit plans across floors. We take off by unit type and floor so you can compare the 128-unit multifamily pipeline against your budget and see where the cost sits.

Subcontractors

You price concrete, framing, roofing, or MEP scopes in a tight Revere market. ZIP-adjusted RSMeans pricing and PlanSwift quantities help you check whether the GC's numbers cover your actual scope.

Architects

You need a cost check before design development closes. We estimate from your plan set in Bluebeam Revu and flag scope gaps while changes are still cheap to make.

Owners and property managers

You are testing feasibility on a Revere parcel or budgeting a capital repair. We give line-item estimates by CSI division with assumptions stated, so you can compare options before committing.

Industrial and commercial builders

Suffolk County infill leaves little laydown room. We estimate sitework, foundations, and MEP for commercial and industrial scopes where logistics drive cost as much as material quantities.

Where we provide estimates

Revere areas and nearby communities we cover

Revere runs from the beach and Shirley Avenue corridor west to the Lynn and Saugus lines, with Route 1 and the Blue Line shaping how crews and materials move. We estimate projects across the city and for contractors working the surrounding North Shore and Boston-area suburbs.

Beachfront and east Revere

  • Revere Beach
  • Point of Pines
  • Oak Island
  • Shirley Avenue corridor

Central and west Revere

  • Broadway
  • Beachmont
  • Revere Street
  • North Revere

Nearby cities we cover

Property types

Types of Revere properties we estimate

The 2025 permit data is almost entirely multifamily: 128 of 131 new privately-owned residential units, with only 3 single-family units. That mix tells you where the estimating work is in Revere, and it is not detached houses.

Multifamily buildings

Low- and mid-rise apartment and condo buildings near the beach and along Broadway. We take off by unit type and floor, which keeps repeated plans from being priced six different ways.

Watch for: Stacked wet walls, shared MEP risers, unit-mix quantities

Mixed-use infill

Ground-floor commercial with residential above, common on Revere's main corridors. These estimates need two occupancy scopes priced separately and a clear separation of rated assemblies.

Watch for: Separation walls, rated floor-ceiling, separate MEP systems

Single-family and two-family

Revere's older housing stock generates renovation, addition, and replacement work. We price selective demolition, framing, and envelope repairs from the existing conditions on your drawings.

Watch for: Existing framing sizes, demolition, lead and asbestos handling

Commercial fit-outs

Retail, restaurant, and office fit-outs along Broadway and Revere Beach Boulevard. We estimate partitions, ceilings, storefront, and MEP tie-ins from the shell conditions you provide.

Watch for: Landlord shell condition, sprinkler tie-in, hood and grease

Industrial and warehouse

Small industrial and storage buildings in the city's commercial pockets. Slab, structural steel, and utility scopes carry these budgets more than finishes do, so we take them off first.

Watch for: Slab thickness, column reactions, utility capacity

Site and infrastructure work

Parking areas, retaining walls, and utility runs on tight Revere parcels. We quantify excavation, backfill, and drainage by area and depth so the site package stands on its own.

Watch for: Export volume, dewatering, utility conflicts

Local factors

What changes a construction estimate in Revere

Revere estimates move for the same reasons Boston-area estimates do, plus a few that are specific to a dense coastal city with little open land. These are the items we check before we send a number.

Permitting and code review

Revere projects go through the city's building department, and coastal and floodplain parcels can add review steps. Confirm the adopted code edition and any local amendments with the building department before you price. On the drawing side, check that egress, fire separation, and accessibility scopes are shown completely, because missing code items are the most common gap we find in multifamily bid sets.

IBC · IRC · local building department

Soils and foundations

Much of Revere is fill and former marsh, and the beachfront sits on sand. That pushes foundation scope toward deeper footings, compacted structural fill, or piles, and it changes concrete and excavation quantities fast. We need your geotechnical report and foundation plan to price this properly. Without a soil report, we estimate from the drawings and state the assumption on the estimate.

Geotechnical report · spread footings · piles

Coastal climate and exposure

Revere Beach properties take wind-driven rain, salt air, and nor'easters. That drives envelope and roofing specifications: higher wind ratings, corrosion-resistant fasteners and flashing, and more durable waterproofing at balconies and decks. Confirm the adopted energy code edition with the local building department, since envelope requirements shift with each cycle and affect insulation and glazing quantities.

IECC · wind uplift ratings · corrosion-resistant fasteners

Labor market and wage rates

Suffolk County labor sits among the highest in the country, and Boston's life-sciences and infill work keeps crews booked. We price with ZIP-adjusted RSMeans labor rates rather than a statewide average, and we list the wage basis on the estimate. If your project carries a prevailing-wage or Davis-Bacon requirement, tell us up front, because it changes the labor column.

RSMeans data · prevailing wage · Suffolk County

Tight sites and storm drainage

Revere lots are small and often fully built out, so laydown space, crane access, and staging drive cost. Excavation export can require trucking through residential streets with limited hours. Storm drainage ties into combined or separated systems depending on the street, so we price drainage from the site utility plan and flag any connection that needs city review.

Site utility plan · excavation export · staging limits

Material logistics and delivery

Most material reaches Revere over Route 1, Route 16, or the Tobin, and beachfront streets restrict deliveries. We build delivery and hoisting assumptions into the estimate rather than treating them as a markup. Massachusetts sales tax applies to most materials, and we show it as a separate line so your buyout comparison stays clean.

Route 1 · Massachusetts sales tax · hoisting
Revere estimating guide

How Revere conditions show up in a takeoff, trade by trade

Revere's 2025 permit mix — 131 new private residential units, 128 of them multifamily — drives a takeoff that is heavy on concrete, framing, MEP and roofing, with coastal exposure and tight urban lots shaping quantities at every division.

Concrete and foundations

Multifamily work in Revere means mat slabs, pile caps and grade beams, not just spread footings. You are taking off 03 30 00 cast-in-place concrete by cubic yard, with formwork in square feet of contact area and reinforcement in tons. Along the shore, specify sulfate-resisting cement or a lower w/c ratio and confirm the exposure class with the building department. On tight lots, concrete pumps and short chutes change the labor constant, so we price placement separately from material. Our foundation estimating services break out footings, walls, slab-on-grade and slab-on-deck so you can compare bids line by line.

MEP systems

A 128-unit multifamily building in Revere is a plumbing-fixture-count and HVAC-tonnage exercise. We count water closets, lavatories, tubs and kitchen sinks by unit type, then convert to 22 11 00 piping linear feet and 22 40 00 fixture units. On the mechanical side, 23 31 00 ductwork is taken off in pounds and square feet of insulation, with split-system or VRF tonnage by floor. Electrical 26 05 00 runs are measured as conduit and conductor feet per device. Sprinkler head counts and 21 13 00 pipe sizes come from the NFPA 13 layout, not the architectural plan. See MEP estimating services for the full trade package.

Sitework and utilities

Revere lots are small and often have existing structures, so 31 00 00 earthwork is measured as cut and fill in cubic yards with a shrink/swell factor, not just plan dimensions. You need 33 10 00 water and 33 30 00 sanitary sewer runs in linear feet, plus 33 40 00 storm drainage with catch basins and infiltration units sized to the local stormwater standard. Confirm the adopted plumbing and stormwater requirements with the Revere building department and the engineering department before you price. Sitework estimating services can carry the mass haul, utility trench and pavement sections in one package.

Framing and structural steel

Wood-frame multifamily over a podium is the common Revere type, so 06 10 00 rough carpentry is measured in board feet and linear feet of plate, with joist and rafter counts by span. You also need 05 12 00 structural steel for podium transfer beams and misc. metals for lintels and roof dunnage. Coastal wind uplift drives closer nailing and more hardware, which shows up as extra Simpson hangers and hold-downs per unit. We take off from the architectural and structural sheets together so header schedules and beam sizes match. Framing estimating services cover both the lumber and the hardware side of the takeoff.

Roofing and envelope

Revere roofs take wind-driven rain and freeze-thaw, so 07 51 00 modified bitumen and 07 54 00 TPO are measured in squares, with tapered insulation in board feet and cover board by sheet count. You also need 07 62 00 sheet metal flashing in linear feet, including counterflashing at every wall and penetration. On coastal elevations, corrosion-resistant fasteners and heavier gauge drip edge are real cost items, not allowances. We mark up the roof plan so every cricket, scupper and expansion joint is counted. Roofing estimating services handle both the membrane and the flashing takeoff.

Scope gaps we see on Revere bids

  • Podium waterproofing and drainage mat omitted from the concrete package, then added as a change order after the slab is poured.
  • Coastal wind uplift hardware — extra hold-downs, straps and ring-shank nails — left out of the framing bid.
  • Temporary heat, hoisting and crane time for a tight urban site not carried in the general conditions.
  • Storm drainage and infiltration requirements priced from a civil sheet that predates the latest local review.
  • Firestopping and smoke-seal at rated assemblies shown on the architectural plan but not in the MEP scope.
  • Final cleaning, dumpster pulls and construction-waste diversion not assigned to any trade.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Revere project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Revere conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to RevereMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: 4-story wood-frame multifamily over podium, Revere, MA

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Podium slab, 8 in. thick1,850SF
03 30 00Pile caps and grade beams46CY
05 12 00Podium transfer beams18.5TON
06 10 00Wood floor framing, 2x10 joists12,400BF
06 10 00Roof trusses, 24 in. o.c.3,200LF
07 51 00Modified bitumen roof membrane42SQ
09 21 16Gypsum board, 5/8 in. Type X38,500SF
22 11 00Domestic water piping, PEX4,600LF

Worked example: exterior wall sheathing for a Revere multifamily building

This example sizes 7/16 in. OSB wall sheathing for a four-story, wood-frame multifamily building in Revere. Dimensions are illustrative and come from a simplified wall schedule; your plans will differ.

Step 1 — Wall area by elevation. Take the perimeter wall length and multiply by the average wall height. For this example, the four elevations total 320 LF of wall, and the average height from podium top to roof is 40 ft.

StepCalculationResultUnit
Gross wall area320 LF × 40 ft12,800SF
Deduct openings12,800 SF − 2,150 SF10,650SF
Add waste factor10,650 SF × 1.1011,715SF
Convert to sheets11,715 SF ÷ 32 SF/sheet367sheets
Add 5% for cutting/repair367 × 1.05385sheets

Step 2 — Confirm the waste factor. A 10% waste factor is typical for rectangular walls with standard window openings. If the elevation has many offsets, bays or a complex gable, move to 12–15%. Coastal exposure in Revere does not change the sheet count, but it does change the fastening schedule and the need for a drainage plane behind the sheathing.

Step 3 — Fasteners and accessories. Count nails or screws per sheet from the nailing schedule, then convert to boxes. Add seam tape or housewrap in square feet using the same gross wall area, not the net sheathing area, because laps and end laps add 10–15%.

Step 4 — Check the scope boundary. Sheathing, housewrap, flashing and fasteners are four separate line items. If you lump them into one "dry-in" price, you lose the ability to compare bids when one contractor substitutes a different WRB or skips the flashing at the base of the wall. Break them out.

For a building this size, the sheathing takeoff should reconcile to the architectural elevation sheets and the structural wall schedule. If the two disagree on stud spacing or sheathing thickness, price the more demanding condition and note the assumption in your proposal.

FAQ

Revere construction estimating questions

What does a Revere multifamily takeoff usually include?

For the typical 4-story wood-frame over podium we see in Revere, the takeoff covers concrete and foundations, structural steel at the podium, wood framing and sheathing, roofing and flashing, MEP rough-in, drywall, and site utilities. We organize everything by CSI MasterFormat division so your subcontractors can bid directly from the spreadsheet. You get Excel and PDF files plus marked-up plan sets showing what we measured.

How do you handle coastal exposure in a Revere estimate?

Coastal exposure affects material selection and fastening, not just quantities. We note where the plans call for corrosion-resistant fasteners, heavier flashing gauges, or specific concrete exposure classes, and we price those items as separate lines. If the drawings do not address exposure, we flag it as an assumption so you can confirm the requirement with the Revere building department before you lock in a bid.

Where does the Revere permit data on this page come from?

The permit numbers come from the U.S. Census Bureau Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. That means the 131 total units, 128 multifamily units, and $25M permitted value are residential only. They do not include commercial, industrial or institutional permits, so treat them as a signal of residential demand, not total construction volume.

Can you estimate a project in Revere if my plans are only at schematic design?

Yes. At schematic design we work from floor plans, elevations and a preliminary wall section, and we carry allowances for systems that are not yet specified. The takeoff will show quantities by division with clear assumptions, so you can compare schemes. As the design develops, we update the estimate and tighten the allowances. Most schematic-level takeoffs are delivered in 24–48 hours.

What software do you use for Revere takeoffs?

We use Bluebeam Revu for plan markup and quantity checks, PlanSwift for digital takeoff, and RSMeans data adjusted by ZIP code for material and labor pricing. That means the labor constants reflect the Boston metro market, not a national average. The output is an Excel workbook organized by CSI division, with a PDF summary and the marked-up plan set.

Do you cover Revere's neighboring cities?

Yes. We cover the greater Boston area, including Taunton, Chicopee, Weymouth and Peabody. If your project is in one of those cities, the takeoff format and pricing basis are the same, with ZIP-code adjustments for local material and labor. You can see the state-level overview on our Massachusetts construction estimating page.

How do you price labor for a Revere project?

We use RSMeans labor constants adjusted to the Revere ZIP code, then apply a productivity factor based on the project type and site conditions. A tight urban lot with limited laydown area will carry a higher factor than a suburban site. We show the labor hours and the rate separately in the spreadsheet so you can see exactly what drives the number.

What is the turnaround for a Revere estimate?

Most Revere projects are delivered in 24–48 hours. Larger multifamily projects with multiple buildings may take longer, and we will tell you the schedule before we start. Rush service is available if you have a bid deadline. You get Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets.

Can you take off just the concrete and foundations for a Revere project?

Yes. We can price individual scopes, such as concrete and foundations, framing, MEP or roofing. That is useful when you are bidding a single trade or checking a subcontractor's number. Send the structural and architectural sheets for the area you want covered, and we will return a takeoff with quantities, waste factors and unit costs for that scope only.

Do you provide a quantity takeoff without pricing?

Yes. If you only need quantities for your own pricing, we can deliver the takeoff with dimensions, counts and waste factors but no dollar amounts. That format is common for general contractors who want to plug in their own labor rates. We still organize it by CSI division and mark up the plans so you can audit every line.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Revere project plans for a quote

Email your plans and we will return a division-by-division takeoff in 24–48 hours, with clear assumptions and marked-up drawings.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us