Residential takeoffs
Single-family and small multifamily quantity takeoffs from permit or construction sets, including waste factors and division-level line items.
SF · LF · EAWe produce material and labor takeoffs for Haverhill contractors and developers — residential additions, multifamily, and small commercial — organized by CSI MasterFormat division and priced with ZIP-code-adjusted costs for Essex County.
Haverhill sits in Essex County, where Boston-driven demand, Merrimack Valley labor rates, older housing stock with unknown framing, cold-climate envelope requirements, and ledge and high groundwater on sloped lots all move numbers. Pricing must reflect the city's ZIP codes, not a statewide average.
Haverhill is a Merrimack Valley city with a housing stock that spans 19th-century mill-era buildings, mid-century neighborhoods, and newer subdivisions. That mix means takeoffs rarely follow a single template. A gut renovation near downtown carries demolition, shoring, and unknown-framing allowances that a new build on the city's western edge does not. We price both from the same plan set discipline: measured quantities, clear scope notes, and line items a subcontractor can bid from.
We work from your drawings and specifications, mark up the plan set, and return Excel and PDF takeoffs organized by CSI MasterFormat division. Pricing uses ZIP-code-adjusted material and labor data, so Haverhill numbers are not Boston numbers or Worcester numbers. Most projects return in 24–48 hours, with rush available. If you are comparing bids across the region, our Massachusetts construction estimating page explains how we handle state-level cost differences, and our Lawrence construction estimating page covers the adjacent market.
For bidders. You need quantities you can defend in a bid opening. We provide division-level takeoffs with waste factors and unit costs so your number holds up against three or four competitors.
For builders. You are buying material and scheduling crews. We break out concrete, framing, roofing, and MEP quantities by phase so your purchase orders and labor plans match the drawings.
For owners. You want a budget before design is complete. We estimate from concept or permit sets and flag scope gaps early, before change orders become the budget.
Select a bar to compare Haverhill with the largest Massachusetts markets we cover.
46 new housing units in 2025 (+12.2% vs 2024).
36 single-family · 10 multifamily (22%).
Haverhill issued 46 new privately-owned residential units in 2025, up from 41 in 2024 — about a 12% increase. Single-family units accounted for 36 of those, with 10 multifamily units, or 22% of the total. Permitted value was $15M, averaging $329,500 per unit. That average is a useful sanity check when you bid: it reflects land, soft costs, and construction, not just hard costs. Haverhill ranked 16th of 25 covered Massachusetts cities by units and accounted for about 1% of the 4,601 units permitted across those cities. For bidders, the message is a steady but modest pipeline — enough work to keep crews busy, not enough to assume every bid will be competitive on price alone. Our residential estimating services support both the single-family and small multifamily work this data reflects.
Boston's life-sciences lab construction and dense urban infill keep demand and costs among the nation's highest, and that pressure reaches Haverhill through labor availability and material logistics. Essex County contractors compete with Boston wages for carpenters, electricians, and plumbers, so labor rates here are not discounted. The city's older housing stock adds another layer: renovating a mill-era building often means balloon framing, knob-and-tube wiring, and undersized service — items that show up as allowances, not measured quantities, until walls open. Cold-climate envelope requirements under the state's adopted energy code affect insulation, air sealing, and window specifications. Confirm the adopted code edition with the Haverhill building department before finalizing scope. For neighboring market context, see our Somerville construction estimating and Framingham construction estimating pages.
We estimate the trades that dominate Haverhill's residential and small commercial work, from foundation through finishes.
Single-family and small multifamily quantity takeoffs from permit or construction sets, including waste factors and division-level line items.
SF · LF · EAUnit-mix pricing for 2–20 unit buildings, with shared MEP, egress, and sitework broken out separately from dwelling units.
UNIT · SF · LFFootings, frost walls, slab-on-grade, and retaining walls priced for Haverhill's ledge and high groundwater conditions.
CY · SF · TONFloor, wall, and roof framing quantities with lumber list, sheathing, and hardware, including allowances for older-stock reframing.
BF · LF · EAAsphalt, EPDM, and standing-seam roof areas with tear-off, underlayment, flashing, and ice-dam protection for snow-load design.
SQ · LF · EAPlumbing, HVAC, and electrical rough-in counts by fixture, register, and device, with service upgrades common in mill-era buildings.
EA · LF · TONExcavation, backfill, erosion control, and utility trenching quantities for sloped lots and tight urban infill sites.
CY · LF · SYSmall commercial and mixed-use fit-outs, including tenant improvements, ADA upgrades, and life-safety scope by division.
SF · EA · LSYou are bidding gut rehabs in the mill blocks and new subdivisions on the west side. We give you division-level quantities, waste factors and unit costs that survive a bid opening against three or four competitors.
You bid one trade in Haverhill and need the scope lines that belong to you. We isolate concrete, framing, roofing or MEP quantities so your number is not carrying another trade's work.
You are underwriting a Merrimack Valley site before design is frozen. We estimate from concept or permit sets and flag scope gaps while they are still cheap to fix.
You need a cost check on a design without running a full takeoff yourself. We measure from your drawings, mark up the set and return quantities you can compare across schemes.
You are planning a roof replacement, a mechanical upgrade or a mill-building fit-out. We price from your existing conditions documents and separate base scope from alternates.
You maintain scattered residential and small commercial stock across the city. We produce repeatable unit-cost formats so repair and turnover budgets stay consistent from building to building.
We estimate from plan sets for projects anywhere in Essex County, from the Merrimack riverfront up through the city's hill neighborhoods and out to the surrounding towns. If your site is in one of the communities below, the takeoff method is the same; only the ZIP-code pricing and local code office change.
Haverhill's 2025 residential permit mix ran 36 single-family units against 10 multifamily units, about 22% of the total, with a permitted value near $15M and an average of $329,500 per unit. That split tells you what the takeoff workload looks like: a steady stream of one-off houses plus a smaller number of larger multifamily and mixed-use jobs.
Most permitted units are single-family, often on infill lots or subdivision remnants where the site package carries as much cost as the house. We take off foundation, framing, roofing, siding and MEP from the permit set.
Watch for: Sitework quantities, ledge removal, utility trench lengths
Roughly a fifth of permitted units are multifamily, typically three-story wood-frame over a podium or a converted mill floor plate. Repetitive units hide variation, so we count each unit type separately rather than multiplying an average.
Watch for: Unit-type counts, corridor lengths, fire-rated assemblies
Nineteenth-century mill and triple-decker stock brings demolition, shoring and unknown framing. We carry allowances for hidden conditions and price the new work independently of what comes out.
Watch for: Demolition tonnage, structural repair allowances, abatement
Second-floor additions and dormers are common where lot coverage is already maxed out. The estimate hinges on tying new framing into existing structure and matching the existing envelope.
Watch for: Roof tie-in details, header sizing, envelope transitions
Downtown storefronts and small professional offices turn over regularly, and fit-outs vary widely in mechanical and electrical scope. We separate landlord base-building work from tenant scope so each party prices its own share.
Watch for: Base-building versus tenant split, hood and venting, ADA work
The city's mill and industrial buildings still host light manufacturing, storage and contractor yards. These estimates lean on slab, structural steel, overhead doors and heavy power rather than finish trades.
Watch for: Slab thickness, column loads, service amperage
Two Haverhill estimates for the same square footage can land far apart once you account for what is under the building, what the code office requires, and what the calendar does to a Merrimack Valley schedule. These are the drivers we adjust for on every takeoff.
Massachusetts adopts the building, residential, energy and plumbing codes on its own schedule, and the edition in force when you pull the permit governs your drawings. Amendments to the stretch energy code affect envelope values, glazing and mechanical sizing, which show up as real cost in the takeoff. Confirm the adopted edition and any local amendments with the Haverhill building department before you bid, and note that historic-district review can add weeks to the front end of a downtown project.
Massachusetts State Building Code · IECC · Haverhill building departmentMuch of Haverhill sits on glacial till and bedrock, with ledge close to grade on the hill neighborhoods and deeper fill near the river. That changes foundation cost more than any finish selection: rock excavation, underpinning, dewatering and backfill import all get priced as separate lines. For a mill-building rehab, we also carry an allowance for unknown existing footings because the original drawings rarely survive.
Glacial till · ledge excavation · dewatering · underpinningEssex County winters drive frost depth, snow load and a shorter exterior season. We price frost-protected footings, roof snow load, ice-and-water membrane at eaves and temporary heat for cold-weather concrete and masonry. Winter conditions also compress the schedule, so we note when a trade needs to be sequenced around freeze protection rather than assuming summer productivity.
Frost depth · ground snow load · ice dam protection · temporary heatHaverhill bidders compete with Boston-area projects for the same crews, and the state's prevailing wage and union agreements set a floor on many public and larger private jobs. Our pricing uses ZIP-code-adjusted labor rather than a national average, so a framing or mechanical crew rate reflects what it actually costs to staff a Merrimack Valley site. Open-shop and union bids are priced separately when you ask for both.
Prevailing wage · union agreements · ZIP-adjusted labor ratesSloped lots, riverfront proximity and tight infill parcels shape the site package. We take off earthwork by cut and fill volumes, then price storm drainage, retaining walls, utility connections and erosion control as distinct items. Local zoning, wetlands jurisdiction near the Merrimack and stormwater requirements can force design changes that ripple through the estimate, so we flag them as assumptions rather than burying them in a lump sum.
Cut and fill · storm drainage · wetlands jurisdiction · erosion controlMassachusetts sales tax applies to most materials, and delivery into dense downtown blocks or narrow hill streets costs more than a suburban drop. We price material at ZIP-code-adjusted rates, note which items carry sales tax, and add handling for sites without staging room. For renovation work, we separate salvage credit from disposal cost so you can see which path is cheaper.
Massachusetts sales tax · delivery access · staging limits · disposal costHaverhill sits in Essex County along the Merrimack River, where riverfront infill, mill-building conversions and hillside subdivisions each put different pressure on a takeoff. The five trades below are where those local conditions change quantities, not just unit prices.
Merrimack River valley ground alternates between alluvial sand and gravel near the river and shallow glacial till on the uplands, so a takeoff has to separate unsuitable excavation from common. We carry separate lines for rock removal, dewatering and disposal, because a bid that buries rock in a general excavation line loses money on the first ledge hit. Drainage scope should follow the local stormwater requirements the building department and conservation commission apply, and you should confirm the adopted edition with them. For a full site package, our sitework estimating services break out clearing, mass excavation, utility trenching and backfill by station.
Steep roofs and heavy snow loads push up rafter and truss sizing, and that shows up as deeper members, tighter spacing and more hardware, not just a higher lumber unit price. On older Haverhill housing stock, we price new framing alongside reframing of existing structure, including sistering, temporary shoring and sheathing replacement at a stated percentage. Panel counts come from wall and roof areas with openings deducted, then a typical waste factor. Our framing estimating services produce a line-item breakdown by floor and by wall type, which is what you need when a lender or owner asks why the framing number moved between revisions.
Freeze-thaw cycling and coastal-adjacent weather make membrane selection and flashing details a real line item here, not an allowance. We count roof area by slope and material, then add separate lines for underlayment, ice barrier at eaves, drip edge, step flashing, counterflashing and roof-to-wall transitions. On multi-family and mill buildings, the envelope takeoff includes air barrier, insulation by R-value and thickness, and window and door counts by type and size. Our roofing estimating services and multi-family estimating services both structure these lines by elevation and by building face so a change in one wall does not require reworking the whole estimate.
Frost depth in this part of Massachusetts drives footings well below grade, and hillside lots often need stepped footings or a engineered fill pad rather than a uniform trench. On mill conversions, the takeoff has to price slab infill, new footings inside an existing basement and core drilling for underslab utilities. We list formwork by contact area, reinforcing by weight with lap and waste, and concrete by net volume plus a typical 5 to 10 percent waste factor. Our foundation estimating services and concrete estimating services both output those lines separately so you can compare a spread-footing scheme against a deep foundation alternate.
Laboratory and life-science demand from the Boston market pulls mechanical and electrical labor toward the metro core, so MEP pricing in Essex County is sensitive to crew availability. On residential and small commercial work, the takeoff still has to count fixtures, devices, receptacles, light fixtures, branch circuits, panel schedules, ductwork by weight and linear feet of pipe by size and material. We price sprinkler and standpipe scope from NFPA 13 where the design calls for it, and we flag supply-air, exhaust and domestic water risers as separate lines. Our MEP estimating services deliver a division 21 through 28 breakdown you can hand to each subcontractor.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Bulk excavation, footing trenches | 185 | CY |
| 03 30 00 | Footing concrete, 4,000 psi | 22 | CY |
| 03 20 00 | Rebar, #4 and #5, incl. lap | 3,150 | LB |
| 06 10 00 | Wall framing, 2x6 @ 16 in. o.c. | 4,280 | SF |
| 06 17 53 | Roof trusses, 24 in. o.c. | 1,640 | SF |
| 07 25 00 | Weather barrier, housewrap | 5,120 | SF |
| 09 29 00 | Gypsum board, 1/2 in., walls | 7,900 | SF |
| 22 11 16 | Domestic water piping, PEX | 640 | LF |
This example prices the continuous footing for a two-story wood-frame addition on a Haverhill hillside lot. Dimensions are illustrative; your structural drawings govern. The footing is 16 in. wide by 12 in. deep, running 96 LF along the perimeter, with two interior cross footings of 18 LF each.
| Step | Calculation | Result |
|---|---|---|
| Total footing length | 96 LF + 18 LF + 18 LF | 132 LF |
| Cross-section area | 16 in. x 12 in. = 192 sq in. ÷ 144 | 1.33 SF |
| Net concrete volume | 132 LF x 1.33 SF | 176 CF |
| Convert to cubic yards | 176 CF ÷ 27 | 6.52 CY |
| Waste factor | 6.52 CY x 1.07 | 6.98 CY |
| Order quantity | Round up to full truck increments | 7.0 CY |
Concrete is priced by the cubic yard with a ZIP-code-adjusted material cost plus placing labor, and the waste factor covers spillage, over-excavation and small thickness variance. We keep the waste line visible rather than folding it into the unit price, so you can see what happens if the footing depth changes.
Reinforcing follows the same logic. Two continuous #4 bars top and bottom gives 4 bars x 132 LF = 528 LF of bar, which at 0.668 LB per LF is about 353 LB. Adding #4 dowels at 4 ft on center over 132 LF gives 33 dowels at 2.5 LF each, or 82.5 LF and about 55 LB. With a typical 10 percent lap and waste factor, the reinforcing line is roughly 449 LB. Formwork is measured by contact area: two sides at 12 in. deep over 132 LF is 264 SF of contact area, priced separately from the concrete.
The point of breaking these out is that a Haverhill footing bid changes quickly when the building department requires a deeper frost footing or the geotechnical report calls for over-excavation and crushed stone. If you send us the plan set and the soils report, we return the footing, rebar, formwork and backfill lines separately in Excel and PDF, organized by CSI MasterFormat division, usually within 24 to 48 hours.
You get an Excel workbook and a PDF organized by CSI MasterFormat division, plus a marked-up plan set showing what we measured and where. Quantities are separated from unit prices so you can swap your own material and labor rates. We use Bluebeam Revu, PlanSwift and RSMeans data, and pricing is adjusted to the ZIP code rather than a national average. Most projects are returned in 24 to 48 hours, and rush turnaround is available if your bid date is close.
Renovation and conversion work needs a different structure than new construction. We price selective demolition, temporary shoring, structural repair and reframing as separate lines instead of allowances, and we state the assumed percentage of sheathing or subfloor replacement. For mill buildings, that means slab infill, new footings inside existing basements and core drilling for underslab utilities. You should confirm the adopted code edition and any historic-district review requirements with the Haverhill building department before the estimate is finalized.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, covering permits issued by the city itself for new privately-owned residential units only. They do not include commercial, industrial or renovation permits, and they do not capture unpermitted work. For Haverhill, 46 units were permitted in 2025 against 41 in 2024, a 12 percent increase, with 36 single-family and 10 multifamily units. That mix tells you the local pipeline is mostly small residential, which affects how we weight our takeoff detail.
Yes. We cover Haverhill along with Lawrence, Somerville, Framingham, Waltham, Malden, Brookline and the rest of Massachusetts. Each city gets its own pricing adjustment and its own permitting assumptions, so a Lawrence estimate is not a copy of a Haverhill one. If you have projects in more than one municipality, send them together and we will keep the formats consistent so you can compare them side by side.
We separate rock removal from common excavation and price it by volume, with a stated assumption about the percentage of the excavated area that is rock. If the geotechnical report gives a range, we show both a low and high case. Dewatering, disposal fees and backfill with imported crushed stone are separate lines. A single blended excavation number hides the biggest cost risk on a hillside lot, so we do not use one.
Typical waste factors run about 5 to 10 percent for concrete and masonry, 10 percent for framing lumber and panel products, and 5 to 10 percent for gypsum board, depending on layout complexity and the number of cuts. We show the waste line separately rather than burying it in the unit price, so you can see the effect of a design change. If your supplier or your own historical data supports a different factor, we will apply yours instead.
We estimate all divisions. For MEP we count fixtures, devices, receptacles, light fixtures, branch circuits, panel schedules, ductwork by weight and pipe by size and material. Sprinkler and standpipe scope is priced from NFPA 13 where the design calls for it. On larger projects we deliver divisions 21 through 28 as a separate package so each mechanical, electrical and plumbing subcontractor can review their own section without sorting through the rest of the estimate.
Send the architectural, structural, civil and MEP drawings, the specifications, the geotechnical report if one exists, and any addenda. A bid date and the scope you intend to self-perform help us prioritize. If drawings are incomplete, we can estimate from what exists and list the assumptions and exclusions on the cover sheet. The more complete the set, the fewer allowances we have to carry, and allowances are where bids usually go wrong.
Boston's life-sciences lab construction and dense urban infill keep demand and costs among the nation's highest, and that pulls labor and material availability outward into Essex County. A Haverhill project competes for the same mechanical and electrical crews as a Cambridge lab fit-out. We adjust labor rates by trade and by ZIP code rather than applying one blended rate, because the spread between trades is wider here than in slower markets.
The method is the same but the structure differs. Multi-family takeoffs need unit-type breakdowns, repeated-floor counts, and separate lines for common areas, elevators, trash rooms and site work. We also separate building envelope by face so a change on one elevation does not force a full rework. Single-family additions are usually priced as a single scope with clear divisions. Tell us the unit mix and we will set up the estimate to match how you buy the work.
Send your drawings, specifications and bid date, and we will return a division-organized estimate in Excel and PDF, usually within 24 to 48 hours.