Sitework takeoff
Clearing, mass excavation, lime-stabilized subgrade, storm sewer and paving quantities for Frisco podium and garden-style sites.
CY · LF · TONFrisco permitted 5,652 new privately-owned residential units in 2025, 81% of them multifamily. We produce CSI-organized quantity takeoffs and estimates for builders, bidders and owners working in Collin and Denton County.
Frisco's 2025 permit mix is 81% multifamily, so most vertical work is wrap and podium construction over structured or at-grade parking, not detached homes. That shifts quantity toward division 03 concrete, 05 structural steel and 09 finishes, and adds drilled pier and post-tension slab scope driven by Collin County expansive clay. ZIP-adjusted DFW labor and material pricing applies.
Frisco sits on the Collin and Denton County line, roughly 30 miles north of Dallas along the Dallas North Tollway and SH 121. The permit mix here is unusual for a suburb: 4,562 of the 5,652 residential units permitted in 2025 were multifamily, against 1,090 single-family. That means most of the vertical work you bid is podium and wrap construction over structured or at-grade parking, not detached houses.
We price both. A typical Frisco takeoff runs CSI MasterFormat divisions 03 concrete, 05 metals, 06 wood and plastics, 07 thermal and moisture, and 22/23/26 for MEP, with quantities tied to the plan sheets and a marked-up set returned alongside the spreadsheet. Our Texas construction estimating team works from Bluebeam Revu and PlanSwift markups with RSMeans data, adjusted to the project ZIP code. Turnaround is 24–48 hours for most projects, with rush available. Send plans through the estimate request page and we will confirm scope before pricing.
For bidders. You need quantities you can defend in a bid review. We return line items by CSI division with units, waste factors and marked-up sheets so your GC or owner can trace every number back to the plan.
For builders. Multifamily and single-family builders in Frisco use our takeoffs for buyout, change-order pricing and budget updates. Foundation, framing and MEP scopes are separated so you can compare subcontractor quotes line by line.
For owners. Owners and developers get a cost baseline before design is frozen. We flag scope gaps in specifications, alternates and allowances, and price the sitework, utility and parking components that drive Frisco project budgets.
Select a bar to compare Frisco with the largest Texas markets we cover.
5,652 new housing units in 2025 (+324% vs 2024).
1,090 single-family · 4,562 multifamily (81%).
Frisco issued permits for 5,652 new privately-owned residential units in 2025, up from 1,333 in 2024, a 324% increase, with a permitted value of $1.1B and an average of $192,900 per unit. That is the fifth-highest unit count among the 25 Texas cities we cover, and 7.8% of the 72,008 units permitted statewide in our coverage set. For a bidder, the signal is multifamily: 4,562 units, or 81% of the total, were in buildings with shared walls, corridors and structured or surface parking. Budget your estimating effort accordingly — more division 03, 05 and 09 quantity per unit, more MEP coordination, and a longer foundation and podium scope than a detached-home subdivision of the same unit count. See how this compares across the state on our Texas construction estimating page.
Frisco shares subcontractor pools and material suppliers with McKinney, Garland, Irving, Grand Prairie, Amarillo and Lubbock, and pricing moves with the same DFW labor market. If you bid in more than one of these cities, expect the same trade rates but different foundation and sitework costs, because soil and municipal requirements change at the county line. Our McKinney construction estimating and Irving construction estimating pages cover how we handle those differences. Within Frisco, the split between Collin County and Denton County addresses matters for permit submittal and inspection sequencing, and the local building department should be consulted for the adopted code edition on any given project.
We price the scopes that dominate Frisco's multifamily and single-family pipeline, from dirt to MEP trim-out.
Clearing, mass excavation, lime-stabilized subgrade, storm sewer and paving quantities for Frisco podium and garden-style sites.
CY · LF · TONDrilled piers, grade beams, post-tension slabs and retaining walls sized for Collin County expansive clay profiles.
CY · LB · SFPodium decks, elevated slabs, columns, shear walls and site flatwork, with formwork and reinforcing broken out by area.
CY · SF · LBWood and light-gauge wall, floor and roof framing for townhome and wrap buildings, including sheathing and hardware counts.
LF · SF · EATPO and modified bitumen roof systems on multifamily, plus shingle and standing-seam scopes on single-family and club buildings.
SQ · LF · EAPlumbing, HVAC and electrical rough and trim counts per unit and per building, coordinated with the unit mix and amenity areas.
EA · LF · TONFull-building budgets for wrap, podium and garden apartments, with common area, amenity and parking scopes separated from unit work.
SF · UNIT · LSRetail, office and mixed-use shells along the tollway corridors, priced by CSI division with allowances called out separately.
SF · EA · LSFrisco's 2025 permit mix was 81% multifamily, so most vertical bids here are wrap or podium jobs over structured parking. We separate cast-in-place decks, post-tension slabs and wood frame above so your bid review holds up.
With 4,562 multifamily units permitted in 2025 and an average permitted value of $192,900 per unit, you need a cost baseline before design freeze. We price alternates, allowances and parking structures as separate line items.
Frisco permitted 1,090 single-family units in 2025. We take off slab-on-grade, post-tension foundations, frame, truss and MEP rough by plan sheet so your trade buyout matches the lots you are actually building.
Collin and Denton County soils move between expansive clay and limestone. We quantify pier depth, beam forming, rebar and vapor barrier by area so your [foundation bid](/foundation-estimating-services/) reflects the geotech report, not a default depth.
Frisco multifamily and commercial shells carry long MEP runs and repetitive unit stacks. We count fixtures, devices, ductwork and studs by floor and unit type so your [MEP takeoff](/mep-estimating-services/) and [framing quantities](/framing-estimating-services/) match the architect's unit plan.
Retail pads, office shells and warehouse space along the Dallas North Tollway and SH 121 need division-by-division quantities. We price sitework, tilt or masonry skin, roof and MEP separately for [commercial bids](/commercial-estimating-services/).
We price projects across Collin and Denton County, from the Tollway corridor through the older Frisco core and out to the surrounding suburbs. If your plans are for a site inside these areas, send the set and we will confirm scope before pricing.
The 2025 permit data shows where the volume is: 4,562 multifamily units against 1,090 single-family, with $1.1B in permitted residential value. Those two categories, plus the commercial and industrial space that follows them, drive most takeoffs we run here.
Four and five-story wood frame over a concrete podium or at-grade parking, with unit stacks repeated floor to floor. We take off the podium deck, stud walls, trusses, sheathing and unit-by-unit MEP rough.
Watch for: Podium deck thickness, fire separation, unit mix count per floor
Three-story walk-ups with surface parking, common in the northern Frisco growth areas. Quantities are driven by building count, roof area and the number of unit types rather than by height.
Watch for: Roof area per building, stair count, site retaining walls
Slab-on-grade homes on tight lots, often with post-tension foundations and engineered wood or truss framing. We price by plan and elevation so option packages and lot premiums stay traceable.
Watch for: PT slab design, truss package, lot-specific retaining
Larger custom homes with complex roofs, stone or brick veneer and extensive millwork. Takeoffs split veneer, roofing, glazing and interior finishes so your allowances are explicit rather than buried.
Watch for: Roof complexity, veneer quantities, allowance carry
Retail pads, medical office and flex buildings along the Tollway and SH 121. Core and shell scopes price separately from tenant fit-out, with sitework, paving and utilities broken out by division.
Watch for: Shell versus TI line, storefront glazing, site utilities
Tilt-wall and metal building distribution space with high clear heights. Slab flatness, dock equipment and fire protection drive cost more than the shell itself on these projects.
Watch for: Slab thickness, dock packages, NFPA 13 sprinkler scope
Two projects on the same street can price differently because of soil, drainage, code edition and labor. These are the variables we check before we release a number.
Frisco issued 5,652 residential units in 2025 against 1,333 the year before, a 324% jump. That volume moves plan review queues and inspection scheduling, which changes your carry and general conditions. Confirm the adopted IBC and IRC editions, plus local amendments, with the Frisco building department before you lock a schedule.
City of Frisco building department · IBC · IRC · Collin CountyCollin and Denton County soils swing between expansive clay and shallow limestone. Post-tension slabs and drilled piers are common, and pier depth is set by the geotech report rather than a default. If you bid a foundation from a typical detail instead of the soils report, your concrete and rebar quantities will miss.
Geotechnical report · post-tension slab · drilled piers · vapor barrierNorth Texas swings from summer heat above 100°F to winter freezes that burst pipe and damage flatwork. Roofing, insulation and exterior sealant specs carry more weight here than in milder markets, and IECC compliance affects envelope and glazing quantities. Confirm the adopted energy code edition locally.
IECC · roof underlayment · thermal envelope · freeze protectionFrisco competes for concrete, framing and MEP crews with the rest of the Dallas–Fort Worth metro, and the 2025 permit surge tightened those trades. Labor rates and productivity assumptions should be checked against current local conditions, not carried forward from a bid you priced two years ago.
Dallas–Fort Worth metro · concrete crews · framing crews · MEP tradesFlat Blackland Prairie ground and local drainage requirements mean grading, retention and utility relocation can carry a large share of site cost on a tight Frisco tract. We quantify cut and fill, storm pipe, inlets and detention volume from the civil sheets. Confirm current site development and drainage criteria with the city.
Civil drawings · detention pond · storm sewer · mass gradingFrisco sits on the Dallas North Tollway and SH 121, so delivery access is good, but long-lead switchgear, elevators and rooftop units still set the schedule. Texas has no state income tax, yet sales tax treatment of materials and the local tax rate affect your bottom line. Verify tax treatment with your accountant.
Switchgear · elevators · RTUs · Texas sales taxFrisco sits in Collin County, where Blackland Prairie clay and limestone meet a multifamily-heavy permit mix. Each trade carries its own quantity traps.
Collin County clay expands and contracts with moisture, so a takeoff that assumes neat cut-and-fill quantities will miss undercut and select fill. We measure stripping depth, over-excavation below building pads, and lime or cement stabilization by square yard of treated area, not by cubic yard alone. Limestone rock is common north and west of the Dallas North Tollway, so ripping versus blasting assumptions change the cost line. Storm drainage, retention ponds and SWPPP items belong in Division 31. If your site package is separate from the building, send it to our sitework estimating team so the two scopes reconcile.
Wood-frame apartments and townhomes dominate Frisco multifamily, so framing takeoffs hinge on wall height, plate count, and how many units repeat. We count studs by linear foot of wall with typical waste of 5 to 10 percent, then break out headers, trusses, sheathing, and hardware. Wind bracing and roof framing over long apartment blocks often need engineering calcs that change connector counts. If the project is a mid-rise with a podium, transfer beams and metal stud infill need their own lines. Send our framing estimating team the architectural and structural sets together, because a framing takeoff without the structural notes will undercount connectors.
Frisco multifamily units repeat, so MEP takeoffs are best built per unit type and then multiplied, with common areas and risers priced separately. We count plumbing fixtures by type, electrical devices by opening, and HVAC tonnage by unit, then add distribution, ductwork, and controls. Podium and garage levels introduce exhaust, fire pump, and sprinkler lines that a residential template will miss. Because Texas adopts local amendments to the model codes, confirm the adopted plumbing and mechanical editions with the Frisco building department before finalizing fixture counts. Our MEP estimating team prices these divisions with current RSMeans data.
Post-tension slabs are the default for Frisco single-family and low-rise multifamily, and the takeoff must count tendons, anchors, and stressing labor separately from the concrete. We measure slab area by square foot, then convert to cubic yards using thickness plus a typical 5 to 10 percent waste, and list vapor barrier, granular base, and dowels as their own lines. Grade beams, pier drilling, and rebar are quantified by linear foot and ton. Because soil reports drive the design, note the pier depth and spacing assumed. Our foundation estimating group prices these packages against ZIP-code-adjusted material and labor.
North Texas hail drives roofing specifications, so the takeoff must match the specified impact-resistant shingle or membrane class, underlayment, and ice-and-water detail at valleys and penetrations. We measure roofing by square (100 square feet) and separate steep-slope from low-slope areas, since labor rates differ. For multifamily, TPO or modified bitumen over tapered insulation adds crickets, cover board, and fasteners as separate lines. Wall envelope items such as house wrap, flashing, and sealants belong in Division 07 and are frequently omitted from roofing bids. Our roofing estimating page covers the line structure we use for both shingle and membrane systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Post-tension slab, 5 in., 4,000 psi | 1,850 | CY |
| 03 10 00 | Lime-stabilized subgrade, 12 in. | 42,000 | SF |
| 05 12 00 | Structural steel, podium transfer beams | 38 | TON |
| 06 10 00 | Wood framing, 2x4 and 2x6 walls | 96,400 | LF |
| 07 30 00 | TPO roof membrane, 60 mil | 310 | SQ |
| 09 21 00 | Gypsum board, 5/8 in. Type X | 128,000 | SF |
| 22 10 00 | Plumbing rough-in, per unit type | 184 | EA |
| 23 00 00 | HVAC, split system per dwelling | 184 | EA |
The dimensions below are illustrative, not a project we priced. Assume a rectangular podium footprint 220 ft long by 85 ft wide, a 5 in. slab thickness, and a typical 7 percent waste factor for ready-mix on a post-tension pour.
Step 1 — Area. 220 ft × 85 ft = 18,700 SF.
Step 2 — Volume. 18,700 SF × (5 in. ÷ 12 in./ft) = 7,791.67 CF. Divide by 27 CF/CY to get 288.58 CY.
Step 3 — Waste. 288.58 CY × 1.07 = 308.78 CY, round to 309 CY ordered.
Step 4 — Tendons and anchors. At a typical 4 ft on center each way: 220 ft ÷ 4 = 55 runs across the short direction, and 85 ft ÷ 4 = 21.25, round to 22 runs across the long direction. Tendon length: (55 × 85 ft) + (22 × 220 ft) = 4,675 ft + 4,840 ft = 9,515 LF, plus 18 in. per anchor end. With 154 anchors, add 154 × 1.5 ft = 231 LF, giving 9,746 LF. Order 10,000 LF to cover cutting and chairs.
Step 5 — Vapor barrier and base. Vapor barrier at 18,700 SF plus 10 percent laps = 20,570 SF. Granular base at 4 in. compacted: 18,700 SF × (4 ÷ 12) = 6,233.33 CF ÷ 27 = 230.86 CY, plus 15 percent compaction loss = 265.5 CY.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 220 ft × 85 ft | 18,700 | SF |
| Concrete, neat | 18,700 × 5/12 ÷ 27 | 288.58 | CY |
| Concrete, with 7% waste | 288.58 × 1.07 | 309 | CY |
| Tendons | (55 × 85) + (22 × 220) + anchors | 9,746 | LF |
| Vapor barrier | 18,700 × 1.10 | 20,570 | SF |
| Granular base | 18,700 × 4/12 ÷ 27 × 1.15 | 265.5 | CY |
Every line above needs a unit price tied to Frisco ZIP codes, and the tendon count must be checked against the structural sheets before you order. If the geotech report calls for deeper piers or a thicker slab, rerun steps 2 through 4 with the revised thickness. Send the plan set and we return this takeoff in Excel and PDF, organized by CSI division, within 24 to 48 hours for most projects.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, covering permits issued by the city itself for new privately-owned residential units only. That means additions, remodels, and commercial permits are not included. The survey reported 5,652 residential units in 2025 against 1,333 in 2024, a 324 percent change, with 4,562 multifamily units and 1,090 single-family units. Use these as a demand signal, not as a count of every project in Frisco.
Most projects are returned in 24 to 48 hours, and rush service is available when your bid deadline is tight. Turnaround depends on the completeness of the set: architectural, structural, civil, and MEP sheets together move faster than a partial package with RFIs outstanding. Multifamily projects with repeated unit types are quicker per square foot because we build one unit type and multiply. If you send a set with addenda, tell us which sheets changed so we do not price a superseded detail.
Send the plan set in PDF, the specifications, the geotechnical report if you have it, and any addenda. For sitework, include the civil drawings and a boundary survey. For multifamily, tell us the unit mix and which building types repeat. If you have a bid form or a scope sheet from the general contractor, send that too, because it tells us what to exclude. Marked-up plan sets come back with the estimate so you can see exactly where each quantity was measured.
Yes. We use ZIP-code-adjusted material and labor pricing and RSMeans data as the base, then adjust for the Frisco market. Collin County labor rates and material logistics differ from other parts of Texas, and concrete, framing, and MEP pricing moves with local demand. We do not publish a single citywide rate because the same square footage can price differently depending on slab thickness, roof system, and unit repetition. Give us the scope and we price the actual quantities.
Expansive clay is the default condition in this part of Collin County, so we read the geotechnical report before pricing. If the report calls for over-excavation, lime or cement stabilization, or deeper piers, those become separate line items with their own units. We do not bury stabilization in a general excavation line. If no geotech report is available, we price the design shown and flag the assumption so you can carry a contingency until the report is issued.
Yes, and it is usually the fastest way to price a Frisco apartment or townhome building. We build a complete takeoff for each unit type, then multiply by the count and add common areas, corridors, stairs, elevators, and the podium or garage separately. This keeps the estimate readable and makes it easy to update when the unit mix changes. It also exposes scope gaps early, such as risers, garage exhaust, and fire pump lines that a residential template would miss.
Yes. We cover the wider North Texas market, including McKinney, Garland, Irving, Grand Prairie, and Amarillo, plus Lubbock and other Texas cities. If your project is in a suburb we have not listed, send the address and we will confirm coverage. Pricing is ZIP-code-adjusted, so a McKinney or Irving estimate carries that location's labor and material assumptions rather than a generic state average.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing where quantities were measured. The Excel file is structured so you can adjust unit costs, add your markup, and roll up to a bid total without rebuilding the sheet. The PDF is the review copy. If your estimating software needs a specific import format, tell us at kickoff and we will match the column structure.
Yes. Frisco's permit mix leans residential and multifamily, but the city also has retail, office, and industrial construction along the tollway corridors and the north side. We price commercial and industrial scopes with the same division-by-division structure, including sitework, concrete, structural steel, MEP, and specialty systems. For industrial work, send the process drawings and equipment schedules so we can quantify supports, utilities, and tie-ins rather than pricing an empty shell.
We follow the code family referenced in the drawings, such as IBC, IRC, IECC, NEC, and IPC or UPC, and we quantify the items those codes drive, including insulation values, fire-rated assemblies, sprinkler coverage, and energy code envelope details. Texas adopts local amendments, so the adopted editions in Frisco may differ from the model code. Confirm the current edition and any local amendments with the Frisco building department before you finalize your bid.
Send the plan set, specs, and geotech report, and we will return a division-organized takeoff in Excel and PDF, usually within 24 to 48 hours.