Earthwork takeoff
Caliche and expansive clay cut, fill, over-excavation and lime stabilization quantities for Webb County pads and subdivisions.
CY · SFWebb County bidders need takeoffs that hold up under south Texas heat, caliche subgrade and border-market labor rates. We produce CSI MasterFormat estimates in Excel and PDF, priced with ZIP-adjusted material and labor data, with marked-up plan sets returned in 24–48 hours on most projects.
Laredo pricing turns on caliche and expansive clay subgrade, high summer design temperatures that drive HVAC tonnage, stucco and masonry wall assemblies, and wage rates set by the Laredo–Webb County border market rather than San Antonio or Austin. Freight from out-of-market suppliers and cross-border material sourcing also move the numbers.
Laredo is the tenth-largest city in Texas and a self-contained construction market. The U.S. Census Bureau's 2025 Building Permits Survey counted 1,340 new privately-owned residential units permitted by the city, down about 7% from 1,448 in 2024, with 1,029 single-family and 311 multifamily units. That mix matters to your bid: single-family work lives in framing, flatwork, stucco and roofing quantities, while the 23% multifamily share pulls in full MEP rough-in, elevator and common-area scopes.
We estimate from your plan set the way a Webb County general contractor buys the job. Earthwork is priced against caliche and expansive clay, not a generic soil profile. Roofing and HVAC are sized for south Texas design temperatures. If you bid across the state, the same approach applies on our Texas construction estimating work, and we cover nearby markets such as Corpus Christi and Lubbock with the same format. Send drawings through Get an estimate and you receive Excel and PDF quantities organized by CSI MasterFormat division, with the plan set marked up.
For bidders. You get division-by-division quantities, waste factors and unit costs you can drop into a bid form. Marked-up plan sets show exactly where each count came from, so you can defend a number in a pre-bid meeting.
For builders. We break scopes into buy-out packages: concrete, framing, roofing, MEP. That lets you compare subcontractor quotes line by line instead of against a lump sum you cannot audit.
For owners. You see where the budget sits before construction starts. We separate hard costs from allowances and flag the scopes most likely to change once the soil report and MEP design are final.
Select a bar to compare Laredo with the largest Texas markets we cover.
1,340 new housing units in 2025 (-7.5% vs 2024).
1,029 single-family · 311 multifamily (23%).
At 1,340 residential units and $321M in permitted value, Laredo averaged $239,900 per unit in 2025 — a figure that reflects a market weighted toward single-family production rather than high-rise multifamily. The 7% drop from 1,448 units in 2024 means fewer jobs chasing the same subcontractor base, so bids get tighter and quantity errors cost more. Laredo accounted for 1.9% of the 72,008 units permitted across the Texas cities we cover, ranking 15th of 25. For a bidder, that argues for precise framing, flatwork and roofing quantities rather than padded allowances. The same discipline shows up in our Plano and Garland work, where multifamily scopes dominate.
The most common failure we see in Webb County takeoffs is treating subgrade as generic fill. Caliche and expansive clay change over-excavation depth, lime or cement stabilization quantities, and pier depth on foundations, and those line items are measured in cubic yards and linear feet, not lump sums. Second is HVAC: high summer design temperatures push equipment capacity and duct sizing above what a template from a milder market assumes. Third is wall assembly. Stucco, masonry veneer and their associated lath, flashing and weep systems are separate CSI sections that get collapsed into one number. Our foundation estimating and MEP estimating teams keep those scopes separated so nothing hides inside another division.
We price the scopes that actually drive Laredo residential, commercial and light industrial work, with quantities organized by CSI MasterFormat division.
Caliche and expansive clay cut, fill, over-excavation and lime stabilization quantities for Webb County pads and subdivisions.
CY · SFSlab-on-grade, post-tension and pier-and-beam quantities, including vapor barrier, rebar and concrete placement for south Texas subgrade.
CY · LF · TONDriveways, sidewalks, curb and gutter, and site paving measured by thickness and finish, with formwork and jointing called out separately.
SF · CY · LFStuds, plates, headers, trusses, sheathing and hardware counted from elevations and framing plans, with typical waste factors stated.
LF · EA · BFShingle, tile and low-slope membrane systems with underlayment, flashing, drip edge and ridge vent quantities for high-temperature exposure.
SQ · LFHVAC tonnage, ductwork, plumbing fixtures, gas piping and electrical devices sized for Laredo design temperatures and code-driven ventilation.
TON · LF · EAGrading, drainage, utility trenching, paving and erosion control quantities for new subdivisions and commercial pads.
CY · LF · ACUnit-by-unit quantities for the 311 multifamily units permitted in 2025, including common areas, stairs and elevator scopes.
EA · SFYou bid Webb County schools, retail shells and city work against a short list of local subs. We deliver division-by-division quantities so your bid form is auditable line by line.
With 1,029 single-family units permitted in 2025, your margin lives in framing, flatwork and roofing counts. We take off every wall, truss and slab pour from the plan set.
The 311 multifamily units permitted here carry full MEP rough-in, elevator and common-area scopes. We separate unit types so your buy-out packages match how subs price them.
Concrete, framing, drywall and MEP subs need quantities they can defend at a pre-bid walk. We mark up the plan set so every count traces back to a sheet.
You need a cost check before the design is frozen. We return quantities by CSI MasterFormat division, which lets you compare alternates without re-drawing.
You are deciding whether to build in Laredo or hold. We separate hard costs from allowances and flag the scopes most likely to move after the soil report.
We take off plans for projects across Webb County, from central Laredo to the growing north and south corridors. If your job sits outside these areas, send the address and we will confirm coverage.
The 2025 permit mix here is 1,029 single-family and 311 multifamily units, plus commercial and industrial work along the I-35 corridor. We estimate all of it from the same plan set.
Production and custom homes from slab to shingle. We count studs, plates, trusses, roof squares, stucco and flatwork, then apply waste factors typical for each trade.
Watch for: Slab thickness, rebar spacing, roof pitch changes
Garden-style and walk-up buildings with repeated unit types. We take off per-unit and per-building quantities so your buy-out packages match how subs price the job.
Watch for: Unit mix, common areas, elevator and stair scopes
Strip centers, pad sites and tenant improvements along the commercial corridors. We separate shell from fit-out so you can bid the base building without guessing at the tenant work.
Watch for: Grease interceptors, hoods, storefront glazing
Distribution and light manufacturing buildings tied to the border trade. We estimate slab-on-grade, tilt-wall or metal building systems, and the MEP that supports them.
Watch for: Slab flatness, dock equipment, fire protection
Classroom additions, gyms and municipal facilities. These jobs carry prevailing wage and bonding requirements, so we keep labor and material lines separate.
Watch for: Prevailing wage, bond and insurance lines
Out-of-town builds on large tracts with well, septic and long utility runs. We estimate the house and the site work together so you see the true cost to build.
Watch for: Utility trenching, septic, driveway length
Laredo pricing is not San Antonio pricing. The six factors below are the ones that move a number here, and we adjust for each before we send a takeoff.
Laredo and Webb County enforce the IBC and IRC families, with local amendments for wind and flood. The adopted editions and the permit review sequence can differ from other Texas cities, so confirm the current edition and submittal requirements with the city building department before you lock a schedule. We price the plan set as drawn and flag code items that typically trigger plan review comments.
IBC · IRC · City of Laredo Building Department · Webb CountyMuch of Webb County sits on expansive clay and caliche, which drives foundation design more than the house above it. A post-tension slab on grade is common, but the engineer's letter governs beam depth, rebar and pier counts. We take off the foundation as detailed and separate excavation, backfill and moisture conditioning so you can see what the soil report actually costs you.
Expansive clay · Caliche · Post-tension slab · Geotechnical reportSouth Texas design temperatures push HVAC tonnage and roof assembly choices. Cooling loads run high, and roofing systems must handle heat, UV and occasional hail. We size mechanical from the drawings, count roof squares by pitch and material, and note where wind uplift or hail-rated products may change the spec. Confirm local amendments with the building department.
IECC · Wind uplift · Hail-rated roofing · HVAC cooling loadLaredo is a smaller labor pool than San Antonio or Houston, and crews cross from both sides of the border. That affects crew sizes, productivity and the travel component in unit costs. We price labor by ZIP code and trade, and we separate material from labor so you can see where a sub's quote is above or below the market.
ZIP-code-adjusted labor · Crew productivity · Travel time · Trade shortageFlat lots and seasonal downpours make drainage and grading a real cost line, not a footnote. We estimate cut and fill, swales, retention and utility trenching from the civil sheets, and we flag where the grading plan and the architectural plan disagree. On large tracts, the length of water, sewer and electrical runs can rival the house cost.
Cut and fill · Retention · Utility trenching · Civil drawingsLaredo is a border market, so some materials arrive through Mexico and some come up I-35 from San Antonio. Freight, lead times and sales tax treatment vary by supplier and project type. We price material at ZIP-code-adjusted rates, keep taxable and non-taxable lines separate for your accountant, and note long-lead items such as switchgear and elevators.
I-35 corridor · Freight · Sales tax · Long-lead equipmentLaredo's mix of single-family subdivisions, multifamily infill, and border-adjacent commercial work means your takeoff has to reflect local soil, climate, and logistics — not a generic Texas template.
Webb County soils range from expansive clays to caliche, and the caliche layer depth changes the cut/fill balance fast. We take off stripping by square yard, then measure cut and fill from the grading plan rather than assuming a net-zero balance. On tight infill lots, haul-off is a separate line because there is no room to waste on site. If your project is in the Sitework Estimating Services scope, we break out lime stabilization by square yard and import by cubic yard. Confirm the geotech report's recommended treatment depth before you price, because a 6-inch versus 12-inch stabilization course swings the earthwork number.
Most Laredo residential framing is wood, but commercial and industrial tilt-wall projects shift the trade entirely. We count studs by length and spacing, then add plates, blocking, and headers as separate items. Drywall gets measured by square foot of finished surface, with a typical 10% waste factor for cutouts and butt joints. Ceiling heights above 12 feet change the labor component, so we flag them. If your project is in the Framing Estimating Services scope, we also break out sheathing and housewrap. Confirm whether the local jurisdiction has adopted the current IRC or a amended edition.
Laredo's climate means HVAC loads are dominated by cooling, and ductwork in unconditioned attics needs extra insulation. We take off refrigerant line sets by linear foot, condensate drains by fixture, and duct by pound or square foot depending on the spec. Plumbing counts fixtures and measures DWV by diameter and run length. Electrical counts devices, fixtures, and panel schedules. For a full trade breakdown, see MEP Estimating Services. Confirm the adopted mechanical and plumbing code editions with the City of Laredo, since they affect vent sizing and duct insulation R-values.
Post-tension slabs are common in Laredo single-family and low-rise multifamily. A takeoff that stops at cubic yards of concrete misses the tendon footage, anchorages, and stressing labor, which are separate line items. We measure slab area, thickened edges, and beam depths from the structural sheets, then apply a typical 5–8% waste factor on concrete. For elevated decks, we separate formwork by square foot of contact area, not slab area. See Foundation Estimating Services for how we handle pier-and-beam versus slab-on-grade. Verify the adopted foundation code edition with the City of Laredo Building Department before finalizing.
Laredo's heat and hail exposure push roofing specs toward Class 4 impact-rated shingles or standing-seam metal. We measure roof area from the plan, then add for hips, valleys, and penetrations. Underlayment, drip edge, and ridge vent are separate line items. On low-slope commercial roofs, we take off TPO or modified bitumen by square (100 square feet) and include tapered insulation by board foot. See Roofing Estimating Services for how we handle tear-off and deck replacement. Confirm the wind uplift requirement with the local building department, since it can drive fastener spacing.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, slab | 180 | CY |
| 03 30 00 | Post-tension tendons | 4,200 | LF |
| 04 20 00 | CMU backup, 8-inch | 2,800 | SF |
| 06 10 00 | Wood framing, studs | 1,950 | LF |
| 07 30 00 | Asphalt shingles, Class 4 | 32 | SQ |
| 08 11 00 | Steel doors and frames | 6 | EA |
| 09 29 00 | Gypsum board, 1/2-inch | 4,600 | SF |
| 23 31 00 | Ductwork, flex and sheet metal | 420 | LB |
We are pricing a slab-on-grade for a 2,000-square-foot single-family home in Laredo. The dimensions are illustrative. The slab is 4 inches thick over a 10-mil vapor barrier, with a 12-inch-by-12-inch thickened edge beam around the perimeter and two interior beams.
Step 1: Slab area. The plan shows a 40-foot by 50-foot rectangle, so area = 40 × 50 = 2,000 SF.
Step 2: Slab volume. At 4 inches thick, volume = 2,000 × (4/12) = 666.7 CF. Convert to cubic yards: 666.7 / 27 = 24.7 CY.
Step 3: Thickened edges. Perimeter = 2 × (40 + 50) = 180 LF. Beam cross-section is 1 FT × 1 FT, so volume = 180 × 1 × 1 = 180 CF = 6.7 CY.
Step 4: Interior beams. Two beams, each 40 LF long, 1 FT × 1 FT: 2 × 40 × 1 × 1 = 80 CF = 3.0 CY.
Step 5: Total concrete. 24.7 + 6.7 + 3.0 = 34.4 CY. Apply a typical 5% waste factor: 34.4 × 1.05 = 36.1 CY. Order 36.5 CY.
Step 6: Vapor barrier. Area = 2,000 SF, plus 10% lap and waste = 2,200 SF.
Step 7: Post-tension tendons (if specified). At 4 feet on center each way, tendon length ≈ (2,000 / 4) × 2 = 1,000 LF, plus anchorage tails. Add 10% for tails and waste: 1,100 LF.
| Step | Item | Calculation | Quantity | Unit |
|---|---|---|---|---|
| 1 | Slab area | 40 × 50 | 2,000 | SF |
| 2 | Slab volume | 2,000 × (4/12) / 27 | 24.7 | CY |
| 3 | Edge beam | 180 × 1 × 1 / 27 | 6.7 | CY |
| 4 | Interior beams | 2 × 40 × 1 × 1 / 27 | 3.0 | CY |
| 5 | Total concrete | (24.7 + 6.7 + 3.0) × 1.05 | 36.1 | CY |
| 6 | Vapor barrier | 2,000 × 1.10 | 2,200 | SF |
| 7 | PT tendons | (2,000 / 4) × 2 × 1.10 | 1,100 | LF |
This is the level of detail we provide for Concrete Estimating Services in Laredo. Always confirm the geotech report's recommended beam depths and any local amendments to the foundation code before you order material.
Laredo's residential permits are mostly single-family, with a smaller multifamily share. Commercial work includes retail, warehouses, and border-related industrial buildings. We estimate all of these, from custom homes to tilt-wall distribution centers.
Yes. Webb County soils often include expansive clays and caliche. We review the geotech report and adjust earthwork, foundation, and concrete quantities accordingly. If no geotech is available, we note the assumption and recommend a allowance for over-excavation.
We follow the code editions adopted by the City of Laredo and Webb County. Since local amendments can change, we always tell you to confirm the current edition with the building department before finalizing your bid. Our takeoffs reference the applicable CSI divisions and note any code-driven line items.
Most projects are returned within 24–48 hours. Rush service is available for tight bid deadlines. The exact time depends on the size and complexity of the plans you send.
We deliver Excel and PDF takeoffs organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. You can use the Excel file to adjust quantities or pricing.
Yes. We handle single-family, multifamily, and commercial work. For residential, see our Residential Estimating Services; for commercial, see Commercial Estimating Services. We also cover industrial projects.
We use ZIP-code-adjusted material and labor pricing based on RSMeans data. That means the quantities reflect Laredo's market rather than a national average. We can also incorporate your own supplier quotes if you provide them.
Send the architectural, structural, and MEP drawings, plus any specifications and geotech report. If you have a bid date, tell us. The more complete the set, the fewer assumptions we have to make.
The permit figures are from the U.S. Census Bureau's Building Permits Survey for 2025, covering new privately-owned residential units permitted by the City of Laredo. They do not include commercial or industrial permits.
Yes. We also estimate projects in Arlington, Plano, Lubbock, Garland, Irving, and Corpus Christi. For statewide coverage, see our Texas construction estimating page.
Email your drawings and we will return a CSI-formatted takeoff within 24–48 hours.