Residential takeoffs
Single-family and townhome plans priced by division, with framing, flatwork and finishes measured from the set.
SF · LF · EAPlano is the ninth-largest city in Texas and a Collin County hub where multifamily and infill residential work dominate the permit pipeline. We produce CSI-organized quantity takeoffs and estimates for contractors bidding here, priced with ZIP-code-adjusted material and labor data.
Plano pricing turns on Collin County soil conditions and expansive clay, steep local labor rates, City of Plano permit and inspection sequencing, DFW-area material freight, and a permit mix that in 2025 ran 56% multifamily. Each of those moves your unit costs, so we price them explicitly rather than applying a statewide average.
Plano sits in Collin County, north of Dallas, and its construction market is split between infill residential and commercial work along the US 75 and Dallas North Tollway corridors. The city issued 313 new privately-owned residential units in 2025, down from 799 in 2024, with 175 of those units multifamily. That mix matters when you bid: a multifamily podium or wrap building carries different unit costs than a single-family lot, and the takeoff has to separate them.
We work from your plan set, not a square-foot rule of thumb. Takeoffs are organized by CSI MasterFormat division, use Bluebeam Revu and PlanSwift for measurement, and are priced with ZIP-code-adjusted material and labor from RSMeans data. Most projects come back in 24–48 hours in Excel and PDF with marked-up plan sets, so you can check our quantities against your own. If you are bidding across the Metroplex, our Texas construction estimating team covers the same format in Garland and Arlington.
For bidders. You need quantities you can defend at bid opening. We return division-level takeoffs with waste factors shown, so you can see where the concrete, framing and MEP numbers came from before you mark up.
For builders. Change orders and scope gaps cost more than the estimate. We flag missing divisions, alternate deducibles and unit-price items in the marked-up set so your superintendent is not guessing in the field.
For owners. You want a budget before design is frozen. We price what is drawn, list assumptions, and separate hard costs by division so you can compare bids on the same basis.
Select a bar to compare Plano with the largest Texas markets we cover.
313 new housing units in 2025 (-60.8% vs 2024).
138 single-family · 175 multifamily (56%).
Plano issued 313 new privately-owned residential units in 2025, down 61% from 799 in 2024, and multifamily made up 56% of that total at 175 units. Permitted value was $78M, an average of $248,600 per unit. For a bidder, that means fewer single-family starts and more mid-rise or wrap product, where the takeoff has to carry separate concrete, framing, and MEP scopes. The city ranked 22nd of 25 covered Texas cities by units and accounted for 0.4% of the state's 72,008 permitted units, so Plano is a smaller share of a very large state market. Our multi-family estimating services break those buildings down by podium, deck and unit type.
Plano's expansive clay soils and summer shrink-swell cycles push foundation design toward drilled piers, post-tensioned slabs or stiffened rafts, and the earthwork that supports them is rarely simple. On an infill lot, you may be importing select fill, removing old pavement, or shoring near an existing structure, and those line items belong in the sitework and foundation divisions, not buried in a general conditions allowance. We measure cut and fill by CY, pier counts by LF of drilled depth, and flatwork by SF, then price them with ZIP-adjusted labor for the Plano area. See our foundation estimating services and sitework estimating services for how those scopes are structured.
We estimate the scopes that show up on Plano plan sets, from single-family infill to multifamily and light commercial. Every takeoff is organized by CSI MasterFormat division and priced with local data.
Single-family and townhome plans priced by division, with framing, flatwork and finishes measured from the set.
SF · LF · EAPodium, wrap and garden buildings broken down by unit type, deck and common area for Plano's multifamily pipeline.
SF · UNIT · CYDrilled piers, post-tension slabs and stiffened rafts measured for Collin County clay and shrink-swell movement.
CY · LF · SFCut and fill, select fill import, paving and utilities for infill lots and redevelopment sites.
CY · LF · TONWood and light-gauge studs, joists, trusses and sheathing counted from plans, with typical waste factors applied.
LF · EA · SFLow-slope membrane and steep-slope assemblies measured by square and flashing length for Plano hail exposure.
SQ · LF · EAMechanical, electrical and plumbing scopes priced by fixture, run and equipment count, coordinated across divisions.
EA · LF · TONTenant improvements, retail and light industrial shells priced division by division for bid comparison.
SF · EA · LSPlano's 2025 permit mix ran 56% multifamily, so GCs bidding wrap and podium jobs need unit-level quantities split from common area, not a blended square-foot number.
Bid scopes for concrete, framing and MEP on Plano infill lots are tight; division-level quantities let you price your scope and see what the GC carried for you.
With 313 residential units permitted in 2025 against 799 in 2024, Collin County developers are re-underwriting land; a division-sorted budget shows where hard costs move.
Your Plano plan sets go to bid against several contractors. We measure from the same sheets and return marked-up sets so quantities trace back to drawing and detail.
Tenant improvements, roof replacements and MEP retrofits along the US 75 corridor need a defensible scope before you commit capital to a contractor.
Hail and wind claims in Collin County hinge on measured roof and envelope quantities; we quantify from elevations and roof plans so the scope holds up.
We estimate from plan sets for projects across Collin and Denton counties, from Legacy business park buildouts to infill lots near downtown Plano. Nearby cities in our coverage area are listed below.
Plano's 2025 residential permits were 138 single-family and 175 multifamily units, so we estimate both lot-by-lot houses and larger attached buildings. Commercial and industrial work along the tollway and US 75 rounds out the mix.
Infill and lot-built homes in central Plano and near the Allen and Richardson lines. Takeoffs cover slab or pier-and-beam foundations, frame, roof, and full MEP rough and trim by division.
Watch for: Pier spacing, beam sizes, and flatwork quantities
Podium and wrap buildings carry 175 of the city's 2025 units. We separate unit quantities from corridors, stairs, amenity and parking levels so cost per unit is real.
Watch for: Unit mix, balcony types, and common-area MEP
Office, retail and medical buildouts along the Dallas North Tollway and Legacy corridor. We measure partitions, ceilings, storefront and HVAC distribution against the base-building drawings.
Watch for: Demising walls, sprinkler relocation, and ceiling heights
Warehouse and flex space near US 75 and the President George Bush Turnpike. Slab thickness, tilt-wall or metal panel, and dock equipment drive the estimate more than floor area.
Watch for: Slab thickness, dock packages, and fire access
Hotels and assisted-living projects in the Legacy and Plano Parkway areas. Guest or resident unit types repeat, so we build assemblies once and extend them across the floor plates.
Watch for: Unit-type repetition and corridor MEP risers
Schools, churches and municipal work in Collin County. These jobs carry prevailing-wage and bonding requirements, so we keep labor and material separate in the estimate.
Watch for: Prevailing wage, bonding, and alternates
Plano sits on the Blackland Prairie and is largely built out, so the cost drivers are code edition, soil and drainage, and how much site work a redevelopment lot needs.
Plano enforces the adopted International Building Code, International Residential Code, International Energy Conservation Code, NEC, and the International Plumbing Code with local amendments. Permit review runs through the city's building department, and plan review comments on energy compliance and fire access can add scope after bid. Confirm the adopted code edition and any local amendments with the Plano building department before you lock your estimate, because the edition in force changes insulation, glazing, and sprinkler requirements.
IBC · IRC · IECC · NEC · Plano building departmentMuch of Collin County is underlain by expansive clay that shrinks and swells with moisture. Geotechnical reports commonly drive pier-and-beam or drilled pier foundations for houses and stiffened slabs for larger buildings, and the pier depth and spacing are the biggest single swing in the foundation estimate. We take the geotech recommendation and the structural sheets together, then quantify concrete, rebar, and pier count by size rather than applying a square-foot allowance.
Geotechnical report · Drilled piers · Stiffened slabNorth Texas gets hail and high wind, and summer heat drives HVAC sizing and roof underlayment choices. Roofing estimates need to carry impact-rated shingles or standing-seam metal where the owner wants a hail warranty, and attic ventilation and radiant barrier affect both insulation and HVAC tonnage. Wind bracing and roof-to-wall connections show up in the framing takeoff on taller buildings, so we read the structural general notes before pricing the roof and envelope divisions.
Impact-rated roofing · Wind bracing · HVAC sizingPlano bids against the whole Dallas–Fort Worth market, so labor availability moves with whatever is under construction in Frisco, McKinney, and Richardson. Concrete, framing, and MEP trades are the first to tighten, and a bid that carries bare RSMeans labor without a market adjustment can miss. We price with ZIP-code-adjusted material and labor from RSMeans data, and we show labor and material separately so you can apply your own crew rates or subcontractor quotes.
Dallas–Fort Worth market · RSMeans data · MEP tradesPlano regulates stormwater and drainage through its development code, and infill lots often need grading, retaining, and drainage corrections that a house plan alone does not show. On redevelopment sites, demolition, utility relocation, and tree preservation can add divisions that never appear on the architectural sheets. We ask for the civil and site plans, then quantify grading, erosion control, and utility work separately so those costs are visible in the bid instead of buried in general conditions.
Civil plans · Erosion control · Utility relocationPlano is inside the DFW materials corridor, so ready-mix, steel, and wallboard ship from nearby plants and freight is usually a small line. Texas has no state income tax, but sales tax treatment of materials depends on the contract type and whether you are improving real property, so confirm how your purchase is taxed. We keep material quantities by unit of measure and note the basis, which makes it straightforward to reprice when a supplier quote or tax assumption changes.
Ready-mix suppliers · Texas sales tax · Unit of measurePlano sits on the Blackland Prairie, where expansive clay and a mature suburban building stock change what you measure and how you price it. Below is how that plays out division by division.
Plano's clay subgrade moves with moisture, so a takeoff that prices only cut and fill will miss the money. We measure stripping depth, lime or cement stabilization by square yard at the building pad, and undercut where the geotech report calls for it. On tighter infill lots, haul-off is a real line item because there is nowhere to stockpile. Storm drainage is driven by the city's drainage criteria and the flat grades west of Central Expressway. Get the sitework quantities right before the foundation is priced — see our sitework estimating services for how we break this out.
Plano framing takeoffs run heavy on engineered lumber because of open floor plans and long spans. We count studs by wall type and height, headers by size and span, joists and rim board by lineal foot, and sheathing by sheet with a waste factor. Roof framing on steep hip roofs — common in the older Plano subdivisions — uses more material than a simple gable at the same footprint. Truss packages are quoted separately and we reconcile the two. Wind bracing and hold-downs are counted from the structural sheets, not assumed.
Plano work sits under the adopted International Residential Code or International Building Code depending on occupancy, plus local amendments you confirm with the building department. We take off fixture counts from the plumbing plans, branch line by diameter and material, and ductwork by pound and lineal foot with fittings counted. For commercial and multifamily, sprinkler head counts, pipe sizes and riser details come off the NFPA 13 drawings. Electrical is counted by device, run and panel schedule. Our MEP estimating services page shows the format you get back.
Post-tension slabs on grade are the norm on Plano residential and low-rise commercial work, and they are measured differently than a conventional slab. We take off cubic yards of concrete by pour strip, pounds of post-tension strand and anchors, vapor barrier by square foot with lap, and rebar by bar size and spacing. Pier counts come off the foundation plan, not the architectural sheet. Mix design, slump and cure method are noted because they affect both cost and the schedule. Our concrete estimating services and foundation estimating services cover this in detail.
Hail is the single biggest cost driver on Plano roofs, and it shows up as impact-rated shingles, Class 4 underlayment, and heavier flashing. We measure roof area by slope, then convert to squares with ridge, hip and valley lineal feet priced separately. On the wall side, brick and stone veneer are counted by square foot with mortar and ties, and we track weep holes and flashing at every transition. Window and door schedules are taken off by type, size and head/sill detail. Roofing estimating services covers the full assembly.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Post-tension slab, 4,000 psi | 1,120 | SF |
| 03 10 00 | Concrete, slab on grade | 168 | CY |
| 03 20 00 | Rebar, #4 and #5 | 9,850 | LB |
| 06 10 00 | Framing lumber, 2x4 and 2x6 | 14,200 | BF |
| 06 16 00 | Roof sheathing, 7/16 OSB | 142 | SHT |
| 07 30 00 | Impact-rated shingles, Class 4 | 48 | SQ |
| 09 30 00 | Brick veneer, modular | 3,850 | SF |
| 22 11 00 | PEX water piping, 1/2 in. and 3/4 in. | 2,640 | LF |
This example uses illustrative dimensions. You are pricing the slab for a 4,000 square foot single-story house on a Plano lot, with a 3-car garage. The slab is post-tension, 4 inches thick in the living area and 5 inches in the garage, with a 12-inch by 24-inch perimeter beam.
Start with the slab area. Living area is 4,000 SF, garage is 720 SF, and the covered patio is 300 SF, for 5,020 SF total. At 4 inches, the living area and patio take 4,320 SF x 0.333 ft = 1,440 CF. At 5 inches, the garage takes 720 SF x 0.417 ft = 300 CF.
Now the perimeter beam. Assume 260 LF of perimeter at 12 in. x 24 in. = 2.0 SF cross-section, so 260 LF x 2.0 SF = 520 CF. Add 60 LF of interior beam at the same section = 120 CF.
Total volume is 1,440 + 300 + 520 + 120 = 2,380 CF. Divide by 27 to get cubic yards: 2,380 / 27 = 88.1 CY. Add a 5 percent waste and pump allowance, typical for a slab pour: 88.1 x 1.05 = 92.5 CY.
| Step | Calculation | Result |
|---|---|---|
| Living + patio, 4 in. | 4,320 SF x 0.333 ft | 1,440 CF |
| Garage, 5 in. | 720 SF x 0.417 ft | 300 CF |
| Perimeter beam | 260 LF x 2.0 SF | 520 CF |
| Interior beam | 60 LF x 2.0 SF | 120 CF |
| Total volume | 1,440 + 300 + 520 + 120 | 2,380 CF |
| Convert to CY | 2,380 / 27 | 88.1 CY |
| With 5% waste | 88.1 x 1.05 | 92.5 CY |
That 92.5 CY is the quantity you carry to the bid, before you apply ZIP-code-adjusted material and labor pricing. The same logic applies to any Plano slab, but the beam depth, pier count and mix design come off the structural sheets every time. If you want this run against your own plans, send them over.
Most Plano projects are returned in 24 to 48 hours. Rush turnaround is available if your bid date is tight. The clock starts when we have a complete set of drawings and the scope notes, not when you first call. If a geotech report or structural sheets are missing, we will tell you before we start so you are not bidding a number with a hole in it.
The permit figures on this page come from the U.S. Census Bureau Building Permits Survey, 2025, for the city of Plano. The survey counts new privately-owned residential units only, so commercial and industrial permits are not included. In 2025 Plano issued 313 residential units, down from 799 in 2024, with 138 single-family and 175 multifamily units.
Yes. We use ZIP-code-adjusted material and labor pricing, so a Plano takeoff reflects the rates a subcontractor in Collin County actually pays, not a national average. That matters on trades where the local labor market is tight, like concrete finishing and mechanical. We also note where a line item is a regional allowance rather than a firm quote, so you know what to confirm with your subs.
Send the architectural, structural, civil and MEP drawings, plus any specifications, schedules and the geotech report. If you have a scope narrative or a bid form, include it. We work from PDF or native files in Bluebeam Revu and PlanSwift. The more complete the set, the fewer assumptions we have to document, and the faster the estimate comes back to you.
Yes. Plano work ranges from single-family infill and multifamily to retail, office and light industrial. We take off residential under the IRC and commercial under the IBC, with the adopted editions confirmed with the local building department. The format is the same either way: Excel and PDF organized by CSI MasterFormat division, with a marked-up plan set.
We read the geotech report first. If it calls for lime or cement stabilization, undercut, or a pier-and-beam system, those become separate line items with their own units and waste factors. We do not fold them into a generic earthwork number. If the report is not available, we flag the omission and price a stated allowance so you can see the exposure before you bid.
Yes. We cover Plano and the surrounding North Texas market, and we also produce estimates for other Texas cities including Garland, Arlington and El Paso. The pricing basis and format are the same, but the code edition, soil conditions and labor rates are adjusted for each location. If your project is outside Plano, tell us the address and we will confirm coverage.
You get an Excel workbook and a PDF, both organized by CSI MasterFormat division, with quantities, units and notes on assumptions. The marked-up plan set shows where each quantity came from. That lets your estimator or project manager audit the numbers line by line instead of trusting a lump sum. We can also deliver a bid-form-ready summary if you provide the form.
Yes. Many Plano clients send only the divisions they need, especially when a subcontractor is carrying the rest. We take off the scope you ask for and note the interfaces with adjacent trades so you can see where the gaps are. If you want the full package, we can expand the same takeoff to all divisions without starting over.
We price the roof assembly, not just the shingles. That means impact-rated shingles, Class 4 underlayment, ice and water shield at valleys and penetrations, and the flashing details shown on the drawings. Wind uplift requirements affect fastener schedule and edge metal, so those are counted separately. The adopted code edition and any local amendments should be confirmed with the Plano building department before you bid.
Send your drawings and scope notes and we will return a division-by-division takeoff in Excel and PDF, usually within 24 to 48 hours.