Multifamily Takeoff
Podium and garden-style apartment takeoffs, unit-by-unit finishes, common area and amenity space quantified by division.
SF · UNIT · EASandy Springs permitted 1,187 new privately-owned residential units in 2025, 94% of them multifamily. We produce CSI MasterFormat takeoffs and estimates for the contractors, developers and owners building here, delivered in 24–48 hours.
Fulton County red clay and rock excavation, steep driveway grades, a 94% multifamily permit mix that concentrates cost in Type III and V podium framing, and City of Sandy Springs plan review requirements. ZIP-code-adjusted material and labor pricing across 30328, 30342 and 30350 keeps your numbers tied to the actual sub market.
Sandy Springs sits inside Fulton County along the GA-400 corridor, between Roswell to the north and the City of Atlanta to the south. The building stock splits sharply: mid-rise and high-rise multifamily along the Perimeter and Northside Drive, and older single-family subdivisions where renovation and teardown-rebuild work is steady. We estimate both, plus the warehouse and office tenant fit-out work that follows the metro's logistics and data-center demand. Our Georgia construction estimating work runs on Bluebeam Revu, PlanSwift and RSMeans data, with material and labor pricing adjusted by ZIP code.
If you are bidding a podium apartment building, a garden-style complex or a custom home in Sandy Springs, send the plan set and we return an Excel and PDF estimate organized by CSI MasterFormat division, with marked-up plans showing what we measured and where. Most projects come back in 24–48 hours, and rush turnaround is available. Contractors working the wider north metro often send us Roswell and Johns Creek plans in the same batch, and we keep the pricing basis consistent across all three.
For bidders. You need a number you can defend. We quantify concrete, framing, MEP rough-in and finishes by division so you can see exactly which line items carry the risk before you submit.
For builders. You want a budget that survives buyout. We break scope into bid packages with quantities, so your subs price the same scope and your purchase orders match the takeoff.
For owners. You need a cost check before committing capital. We price the design you have and flag the scope gaps that typically turn into change orders during construction.
Select a bar to compare Sandy Springs with the largest Georgia markets we cover.
1,187 new housing units in 2025 (+241.1% vs 2024).
71 single-family · 1,116 multifamily (94%).
Sandy Springs issued permits for 1,187 new privately-owned residential units in 2025, up from 348 in 2024 — a 241% increase. Of those, 1,116 units, or 94%, were multifamily, and only 71 were single-family. Permitted value reached $142M, an average of $119,900 per unit. That mix tells you where the estimating hours go: podium and wrap apartment buildings with Type III or Type V wood framing over concrete, not scattered custom homes. For a bidder, the cost concentration is in the structural package, the MEP rough-in and the exterior skin. The city ranked 2nd of 25 covered Georgia cities by units and accounted for 9.1% of the 13,037 units permitted across those cities, so you are competing in one of the most active residential submarkets in the state. Compare that to Athens or Albany, where single-family carries more of the load.
A jump from 348 to 1,187 units in one year means subcontractor capacity in the north Fulton trade pool is tight. Framing crews, concrete finishers and MEP contractors are pricing more work than they were 12 months ago, and that shows up in unit costs. When we build an estimate for a Sandy Springs project, we price labor at current metro rates and adjust material by ZIP code, then show the quantities by division so you can see how a 5% swing in framing labor moves the total. If your bid is chasing a 2024 budget on a 2025 scope, the gap is usually in labor, not material. We also flag long-lead items — switchgear, elevators, rooftop units — because those dates drive the schedule and the general conditions cost.
We estimate the project types that actually get built in Sandy Springs, from podium multifamily to Fulton County sitework.
Podium and garden-style apartment takeoffs, unit-by-unit finishes, common area and amenity space quantified by division.
SF · UNIT · EAMass grading, rock excavation, retaining walls and utility runs for the steep, red-clay lots along the GA-400 corridor.
CY · LF · TONPodium slabs, post-tension decks, footings and foundations priced with formwork, reinforcing steel and finish labor.
CY · SF · TONType III and Type V wood framing, engineered lumber and truss packages quantified from plan and section.
LF · BF · EAPlumbing, HVAC and electrical rough-in for multifamily and commercial fit-out, priced by fixture, ton and device count.
EA · TON · LFTPO, modified bitumen and shingle systems with insulation, flashing and penetration counts for low-slope and steep-slope roofs.
SQ · LF · EASpread footings, mat slabs and deep foundation systems, including the rock excavation that drives cost in this area.
CY · SF · LFOffice, retail and warehouse interior takeoffs with demolition, partitions, ceilings and MEP modifications.
SF · LF · EAPodium and wrap projects along the GA-400 corridor need division-level quantities fast. We break concrete, framing, MEP rough-in and finishes so your bid holds through buyout and the first change-order cycle.
With 1,116 multifamily units permitted in Sandy Springs in 2025, you are comparing several sites at once. We price the same scope across options so your pro forma rests on measured quantities, not a per-unit rule of thumb.
Infill lots inside the Perimeter bring tight access, tree ordinances and older utility ties. We quantify sitework, foundation and framing separately so you can see what the lot itself adds to the house.
Perimeter-area office and medical suites are interior-heavy: partitions, ceilings, HVAC distribution and electrical. We take off by room and system so your bid packages match how the landlord's shell was delivered.
Metro Atlanta's logistics and data-center demand reaches north Fulton County. We estimate slab, tilt or metal building, dock equipment and MEP for warehouse and light-industrial shells.
You price one trade and need clean quantities, not a full GC budget. Send us the civil set or the structural sheets and we return measured yards, square footage and linear feet with waste shown separately.
We estimate projects across Fulton County's north metro, from the Perimeter core out to the surrounding cities. If your project is in one of these areas, the pricing basis is adjusted for the ZIP code.
The 2025 permit mix in Sandy Springs was 94% multifamily, with 1,116 units against 71 single-family units. That shapes what we take off most weeks, but the single-family and commercial work is steady too.
Mid-rise buildings over a concrete podium with structured parking. We take off the podium slab, post-tensioned decks, unit framing, exterior skin and full MEP distribution by floor and by unit type.
Watch for: Podium-to-wood transition details and deck thickness changes
Three and four-story wood-frame buildings with surface parking. Quantities are driven by repeated unit plans, so we count each unit type once and multiply, then add the breezeways, stairs and clubhouse separately.
Watch for: Unit-type count errors and building-separation fire walls
Infill houses on older lots, often with basements and steep driveways. We estimate demolition, retaining walls, foundation, framing and finishes, and we price alternates when the owner is still choosing a finish level.
Watch for: Demolition debris, rock excavation and tree-protection fencing
Tenant improvements in Perimeter-area office and medical buildings. The work is interior: partitions, doors, ceilings, lighting, HVAC distribution and plumbing for exam or procedure rooms, all measured by room.
Watch for: Landlord shell conditions and after-hours work restrictions
Distribution and data-center support buildings along the metro's logistics corridors. We take off slab, tilt-up or metal building, dock equipment, fire protection and MEP, with clear separation between shell and tenant work.
Watch for: Slab flatness tolerances and racking loads
Small commercial buildings and end-cap spaces on the major corridors. Grease interceptors, hood and make-up air, and utility capacity often drive cost more than the finishes, so we price them as separate line items.
Watch for: Grease, hood and utility capacity requirements
Two bids for the same drawings can land far apart in Sandy Springs. These are the drivers we adjust for, and the ones you should confirm with the city before you lock a number.
Sandy Springs runs its own plan review and inspection process, and Fulton County requirements apply alongside it. Georgia adopts the IBC and IRC with state amendments, and the edition in force changes with each adoption cycle. Confirm the adopted edition and any local amendments with the city building department before you price. Review comments on fire separation, egress and energy compliance can add scope after bid.
City of Sandy Springs Community Development · Fulton County · Georgia Department of Community AffairsNorth Fulton sits in the Piedmont, where residual soils and weathered rock are common and depth to rock varies over short distances. That affects drilled pier lengths, rock excavation and retaining wall design. A geotechnical report is the single most useful document you can send with the plans, because it lets us price foundation quantities against actual bearing conditions instead of a default assumption.
Piedmont residual soils · weathered rock · geotechnical reportGeorgia's humid subtropical climate means high summer heat, frequent thunderstorms and occasional freeze events. Those drive roof drainage, insulation and vapor control, and HVAC sizing. Local stormwater management rules also push detention, water quality and stream buffer requirements onto the site plan. If the civil set is not final, we price the sitework to a stated assumption and flag it for revision.
IECC climate zone 3A · local stormwater management · detention pondsMetro Atlanta's construction labor market is large but tight for specialty trades, and north Fulton competes with data-center and industrial work for the same crews. We price labor at ZIP-code-adjusted rates and note where a trade may need a premium or a longer lead time. On occupied-building fit-outs, shift restrictions and after-hours work change the labor cost more than the material cost.
RSMeans data · ZIP-code-adjusted labor · trade availabilityInfill lots inside the Perimeter bring narrow driveways, mature tree canopies and limited staging. Tree protection and stream buffer rules can remove buildable area and force retaining walls or pier foundations. On larger sites, grading, erosion control and utility extensions are often the largest single cost driver, so we take them off from the civil drawings rather than carrying a percentage.
tree protection ordinance · stream buffers · erosion controlMost material reaches Sandy Springs through metro Atlanta distributors, so freight is short but supplier lead times still move. We use current RSMeans data adjusted for the local ZIP code, and we show sales tax where it applies to materials. For long-lead items such as switchgear, elevators and rooftop units, we flag the item and let you carry an escalation allowance rather than burying it in a lump sum.
RSMeans data · Georgia sales tax · long-lead equipmentSandy Springs sits on the northern edge of Fulton County, where steep grades, Piedmont red clay, and a mix of infill multifamily and light industrial work change what you price. Here is how that shows up in each division of a takeoff.
Most Sandy Springs sites off Roswell Road, Abernathy Road and the Perimeter area are cut-and-fill jobs on grades that fall toward the Chattahoochee. We take off clearing by acre, then strip topsoil at 6 to 8 inches, and separate unsuitable red clay from usable fill. Rock excavation is carried as a separate line because weathered gneiss and schist show up in this part of Fulton County and blasting or hoe-ram work is priced by the cubic yard, not by the hour. Erosion control is measured by linear foot of silt fence and by inlet protection count, and we add a temporary sediment basin where the disturbed area crosses the local threshold. Confirm the adopted state and local erosion rules with the city before you lock the number.
Sandy Springs residential work is mostly wood frame over podiums or slab-on-grade. We take off wall framing by linear foot of plate, floor and roof framing by square foot of area, and sheathing by sheet count with a typical 5 to 10 percent waste factor. Engineered lumber, LVL headers and floor trusses are listed by piece and by span. For light industrial and warehouse shells, we switch to metal stud and joist takeoff by ton and by linear foot. Our framing estimating services separate material, labor and equipment so you can see where the trade breaks. Wind uplift and bracing requirements change with exposure; confirm the adopted code edition with the local building department before you price hold-downs.
Multifamily and commercial interiors drive most of the MEP takeoff in Sandy Springs. We count plumbing fixtures by type, measure domestic water and waste lines by linear foot by diameter, and take off ductwork by pound and by linear foot of run. Electrical is counted by device, by fixture and by panel, with feeders measured by linear foot. On the finish side, drywall is measured by square foot of wall and ceiling area with a typical 10 percent waste, paint by square foot of substrate, and flooring by square foot by product. Our MEP estimating services and residential estimating services split these packages so nothing is double-counted between trades.
On multifamily podiums and parking decks, we take off footings by cubic yard, grade beams by linear foot, and slab-on-grade by square foot with a typical 5 to 8 percent waste factor. Elevated slabs are measured by square foot of deck area, then converted to cubic yards using the structural thickness. For wood-framed residential, we price stem walls, pier footings and slab thickening at the garage. Anchor bolt count, embeds and post-tension layout are separate lines. Our concrete estimating services break the package into formwork, reinforcing, concrete and finishing so your subcontractor bids line up. Verify local frost depth and any special inspection requirements with the Fulton County or Sandy Springs building department.
Roof takeoffs here run from steep-slope shingle on single-family to TPO and modified bitumen on mid-rise and warehouse roofs. We measure by square (100 square feet) for shingle and by square foot for membrane, then add a typical 10 percent waste for cuts, hips and valleys. Underlayment, ice and water shield at eaves and valleys, drip edge, ridge vent and pipe boots are counted by linear foot or by piece. For podium decks we take off hot-applied or sheet waterproofing by square foot, including protection board and drainage mat. Our roofing estimating services carry these as separate lines so the waterproofing scope does not disappear into the roofing bid.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, elevated slab | 18,400 | SF |
| 03 30 00 | Cast-in-place concrete, footings | 310 | CY |
| 05 12 00 | Structural steel, podium framing | 42 | TON |
| 06 10 00 | Wood framing, walls and partitions | 26,800 | SF |
| 07 21 00 | Thermal insulation, exterior walls | 21,500 | SF |
| 07 54 00 | TPO membrane roofing | 9,600 | SF |
| 09 29 00 | Gypsum board, walls and ceilings | 48,200 | SF |
| 22 11 00 | Domestic water piping, by diameter | 3,450 | LF |
This example shows how we move from plan dimensions to a priced framing quantity. The dimensions are illustrative and do not represent a specific project.
Step 1 — Wall area. The building has four exterior wall runs. Each run is 120 feet long and 10 feet high. Gross wall area = 4 × 120 ft × 10 ft = 4,800 SF.
Step 2 — Deduct openings. Windows and doors total 620 SF. Net wall area = 4,800 − 620 = 4,180 SF.
Step 3 — Studs. At 16 inches on center, studs per square foot of wall = 0.75. Stud count = 4,180 × 0.75 = 3,135 studs. Add plates: top and bottom plates at 3 per linear foot of wall. Wall length = 4 × 120 = 480 LF. Plate count = 480 × 3 = 1,440 LF.
Step 4 — Sheathing. Sheathing covers net wall area. Sheets are 4 ft × 8 ft = 32 SF. Sheets = 4,180 ÷ 32 = 130.6, round to 131 sheets.
Step 5 — Waste. Apply a typical 7 percent waste factor to studs and sheathing. Studs = 3,135 × 1.07 = 3,354. Sheathing = 131 × 1.07 = 140.2, round to 141 sheets.
Step 6 — Cost. Multiply quantities by ZIP-code-adjusted material and labor rates. We use RSMeans data adjusted for the Sandy Springs ZIP code.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Gross wall area | 4 × 120 × 10 | 4,800 | SF |
| Net wall area | 4,800 − 620 | 4,180 | SF |
| Studs at 16 in OC | 4,180 × 0.75 | 3,135 | EA |
| Plates | 480 × 3 | 1,440 | LF |
| Sheathing sheets | 4,180 ÷ 32 | 131 | SH |
| Studs with 7% waste | 3,135 × 1.07 | 3,354 | EA |
| Sheathing with 7% waste | 131 × 1.07 | 141 | SH |
Send the plan set and we will return this level of detail in Excel and PDF, organized by CSI MasterFormat division, with marked-up plans.
Pricing depends on project type, square footage and how many trades you want separated. We quote per project after reviewing the plans. There is no published starting price because a 2,000 SF residential addition and a 200,000 SF multifamily building are different scopes. Send the drawings and we will give you a fixed quote before we start.
Most projects are returned in 24 to 48 hours. Rush service is available if you have a bid deadline. Turnaround depends on the completeness of the plan set and whether you need every CSI division or only specific packages. We confirm the schedule when we quote the job.
Yes. We use RSMeans data adjusted by ZIP code for material and labor, so the numbers reflect the Sandy Springs and metro Atlanta market rather than a national average. We also track local trade availability and note where labor rates are running above or below the published average.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets. The Excel file is set up so you can adjust quantities, waste factors and unit costs. The PDF is a clean copy for your bid folder or for sending to a subcontractor.
Yes. Multifamily is a large share of the permitted residential work in Sandy Springs. We take off podium and slab-on-grade structures, wood frame over concrete, parking decks, and all interior finishes. Our multi-family estimating services cover the full scope from sitework through MEP and finishes.
We do. Sandy Springs sites often involve cut and fill on sloped ground, rock excavation, storm drainage and erosion control. We take off clearing, grading, utilities, pavement and erosion control by the appropriate unit. Confirm the adopted local erosion and stormwater rules with the city before finalizing quantities.
Send the architectural, structural, civil, and MEP drawings, plus any specifications and addenda. If you have a bid form or a scope sheet, include it so we match your format. For sitework we also need the grading plan and the utility plan. The more complete the set, the fewer assumptions we have to carry.
The permit numbers come from the U.S. Census Bureau Building Permits Survey for 2025. The survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits, additions or renovations. The 2025 count for Sandy Springs was 1,187 units, up from 348 in 2024.
Yes. We cover the metro Atlanta area, including Roswell, Johns Creek, Marietta, Alpharetta and the city of Atlanta. We also handle projects in Macon, Savannah, Athens and Albany. If your project is in Georgia, we can price it with ZIP-code-adjusted rates for that location.
We apply waste factors by material and by trade. Typical ranges are 5 to 10 percent for framing lumber, 7 to 10 percent for drywall, 10 percent for roofing shingles, and 5 to 8 percent for concrete. The factor depends on the complexity of the layout and the number of cuts. We list the waste factor as a separate line so you can adjust it.
Send your drawings and we will return a fixed quote for a takeoff organized by CSI MasterFormat division, with marked-up plans and ZIP-code-adjusted pricing.