Sitework and grading
Marsh-adjacent lots need clearing, fill, erosion control and dewatering quantities separated from general grading.
CY · LF · TONWe prepare quantity takeoffs and construction estimates for Savannah contractors, developers, architects and owners. Every deliverable is organized by CSI MasterFormat division in Excel and PDF with marked-up plan sets, using ZIP-code-adjusted material and labor pricing.
Savannah pricing is driven by tidal-marsh and high-water-table foundations, historic-district renovation constraints, coastal wind and flood requirements, humid subtropical moisture detailing, and long hauls to outlying sites. These factors change concrete, piling, roofing and MEP quantities compared with inland Georgia markets.
Savannah sits in Chatham County on the Georgia coast, where the construction calendar runs around heat, humidity and storm season rather than a winter shutdown. Foundation design deals with high water tables, tidal marsh and sandy coastal soils, so pile caps, grade beams and dewatering show up on far more estimates than they do inland. Roofing and envelope scopes carry wind-uplift and flood-zone requirements that change fastener schedules, sheathing nailing and opening protection. You can see how we handle those scopes on our Georgia construction estimating page, and we cover bids across the region, including Augusta and Columbus.
Residential work dominates the local permit mix, with smaller commercial and industrial projects filling in around the Port of Savannah, the airport corridor and the medical district. That mix means most estimates we produce are residential or light-commercial, and the line items that move the number are concrete, framing lumber, roofing and MEP rough-in. We price from your drawings and specifications, not from square-foot averages, and return most takeoffs in 24–48 hours. If you are bidding a subdivision or a single custom home, start with residential estimating services or send the set through get an estimate.
For bidders. You need a bid that holds up at buyout. We return CSI-organized quantities with waste factors stated, so you can adjust labor crews and material quotes without rebuilding the takeoff.
For builders. You are buying concrete, lumber and roofing weekly. We break quantities by phase and by floor so your purchase orders match what actually gets installed, including typical waste allowances.
For owners. You want a budget before design is finished. We estimate from schematic sets, flag scope gaps and give you a division-by-division view of where the money sits.
Select a bar to compare Savannah with the largest Georgia markets we cover.
550 new housing units in 2025 (-5% vs 2024).
534 single-family · 16 multifamily (3%).
Savannah issued 550 new privately-owned residential units in 2025, down about 5% from 579 in 2024, according to the U.S. Census Bureau Building Permits Survey. Single-family units accounted for 534 of that total, with 16 multifamily units, or about 3% of the mix. Permitted value reached $140M, an average of $254,000 per unit. For bidders, that means the pipeline is overwhelmingly detached single-family: production plans, custom coastal homes and infill lots. Multifamily bids are scarce, so subcontractors chasing volume should watch the surrounding counties and the larger Georgia market. Our multi-family estimating services team still supports the apartment and townhome work that does come through, and the state-level picture is on the Georgia construction estimating page.
Among the Georgia cities we cover, Savannah ranks 5th by residential units permitted and accounts for 4.2% of the 13,037 units permitted across those cities in 2025. That is a steady, mid-sized market rather than a boom one, so winning work depends on accurate bids more than on capacity. Coastal scopes carry cost that inland competitors miss: pile and grade-beam foundations, wind-rated roof assemblies, flood-zone elevation and flood vents, and dewatering. If you bid Savannah from an Atlanta cost book, you will underprice sitework and foundations. We adjust material and labor by ZIP code and price the coastal details explicitly. Contractors working the wider region can also review our Augusta and Macon coverage.
These are the scopes we take off most often for Savannah-area projects, priced from your plans and specs with quantities organized by CSI MasterFormat division.
Marsh-adjacent lots need clearing, fill, erosion control and dewatering quantities separated from general grading.
CY · LF · TONPile caps, grade beams, stem walls and slab-on-grade priced for high water tables and sandy coastal soils.
CY · SF · LFFootings, slabs, driveways and sidewalks taken off with formwork, reinforcement and typical waste stated.
CY · SF · TONFloor, wall and roof framing by member size and length, with sheathing and hardware counted separately.
LF · PC · SFWind-rated roof assemblies, underlayment, flashing and moisture detailing for humid coastal exposure.
SQ · LF · EAPlumbing, HVAC and electrical rough-in quantities by fixture, run and device for residential and light commercial.
LF · EA · TONRetail, office and hospitality scopes near the port, airport corridor and medical district, by division.
SF · LF · EAWarehouse and light-industrial shells with slab, steel, dock equipment and site utilities broken out.
SF · TON · LFYou are pricing coastal foundations, wind-rated roofing and MEP rough-in against three or four competitors, and you need CSI-organized quantities with waste stated before the bid date, not a square-foot guess.
Historic-district and marsh-front homes carry pile foundations, high-wind detailing and irregular framing that never price cleanly from a per-foot number, so you need floor-by-floor takeoffs you can turn into purchase orders.
You bid the same scopes repeatedly across Savannah and the islands, and you want quantities broken by phase and elevation so your crews, formwork and shingle orders match what actually gets installed.
Your projects near the medical district and port corridor need division-by-division budgets early, when unit mixes, parking decks and MEP systems are still moving and a wrong assumption is expensive to unwind.
You issue schematic sets and need a third-party quantity check that flags scope gaps and code-driven items, such as flood-zone elevations and opening protection, before documents are finalized.
You are budgeting a roof replacement, interior fit-out or building addition on an occupied property, and you need demolition, phasing and temporary-protection costs visible before you commit funds.
We estimate from plans for projects across Chatham County and the surrounding coastal counties, from the historic grid to the islands and inland towns. Send the set and the project address; ZIP-code-adjusted pricing follows the location.
Savannah's 2025 permit mix is almost entirely residential — 534 single-family units against 16 multifamily units — so most sets we price are houses and small commercial buildings, with industrial work following the port.
New houses on infill lots and in west Chatham subdivisions, priced from foundation through finishes. We break concrete, framing lumber, roofing squares and MEP rough-in by floor so your purchase orders track the schedule.
Watch for: Pile or slab foundation type, wind-rated shingle and nailing schedules.
Elevated houses on the islands and along tidal creeks, with deep foundations and large glazed areas. Takeoffs separate structural from decorative scopes so you can see what the view actually costs.
Watch for: Elevation certificates, flood-zone openings, impact-rated glazing.
Interior and envelope work in the historic districts, where selective demolition, structural repair and matching trim drive the number more than new construction does. We quantify salvage and replacement separately.
Watch for: Demolition, temporary shoring, custom millwork lead times.
Small apartment buildings and attached units near the medical district and southside corridors. We estimate by unit type and repeat floor, with common-area and site work carried in separate divisions.
Watch for: Unit-mix repetition, fire separation, parking and sitework.
Tenant fit-outs, restaurants and small office buildings along the commercial corridors. MEP and kitchen or process equipment often outweigh shell costs, so those divisions get their own detail.
Watch for: Grease, hood and make-up air, ADA upgrades, utility capacity.
Distribution and light-manufacturing buildings tied to the Port of Savannah and the airport corridor. Slab flatness, racking loads and dock equipment set the structural and concrete quantities.
Watch for: Slab thickness and reinforcement, dock packages, fire protection.
Two bids for the same square footage can differ by a wide margin here, and the reasons are usually foundation type, flood elevation, wind detailing and how far materials travel to the site.
Savannah and Chatham County enforce floodplain, wind and historic-district requirements that add real scope: elevation certificates, flood vents, opening protection, fastener schedules and, in the historic districts, design review. Confirm the adopted code edition, flood-zone designation and local amendment with the building department before you lock the bid, because a zone change can move foundation height and envelope costs.
IBC · IRC · IECC · local building departmentSandy coastal soils, tidal marsh and shallow groundwater push many projects to piles, pile caps and grade beams instead of spread footings. Dewatering, spoil removal and import fill are common line items. A geotechnical report changes the foundation number more than any other document, so we price from the soils report and note the assumed bearing stratum.
geotechnical report · pile caps · grade beams · dewateringWind-uplift requirements drive sheathing nailing, roof-to-wall connections and shingle ratings, and flood zones drive elevation, breakaway walls and utility placement. Hurricane-season scheduling affects roofing and envelope labor availability. We carry these as separate line items rather than burying them in a general conditions allowance, so you can see the cost of each requirement.
wind uplift · flood zone · opening protection · NFPA 13Coastal Georgia competes for the same concrete, framing and roofing crews as the larger Georgia markets, and travel time from the islands to inland sites affects crew hours. We price labor by trade and by ZIP code rather than applying one blended rate, because finish carpentry and concrete labor rarely move together in this market.
RSMeans data · trade labor rates · crew travel timeFlat coastal terrain means storm drainage, retention and grading are engineered rather than incidental, and marsh-adjacent sites often need erosion control and buffer protection. Clearing, fill and utility extensions vary widely by parcel. We take off sitework from the civil set and keep it in its own division so shell bids stay comparable.
storm drainage · erosion control · import fill · utility extensionsSavannah's port moves a lot of building material, but local availability still varies by product, and long-lead items such as impact glazing, custom millwork and switchgear need early release. Freight, sales tax treatment and supplier lead times belong in the estimate. We price material by ZIP code and list assumed lead times so your buyout schedule reflects reality.
port logistics · sales tax · lead times · freightSavannah's coastal setting, historic districts, and low-lying terrain shape what you must price into every division, from sitework through finishes.
Savannah's flat coastal plain and high water table mean your sitework takeoff must include undercut, select fill, and dewatering that inland bidders often miss. For a typical slab-on-grade, we price 6–12 inches of undercut below footing elevation, then import fill compacted in 8-inch lifts. Storm drainage runs shallow because of the water table, so pipe bedding and trench boxes get heavier. We also check the city's stormwater manual for required detention volume; the local building department can confirm the adopted edition. If your project sits near the marsh, add silt fence, turbidity curtains, and a construction entrance with wash rack. Our sitework estimating services break these out by bid item so you can see where the money goes.
Savannah's wind exposure category affects framing connections. We take off studs by linear foot per wall, then add plates, headers, and blocking. For a typical 2,000-square-foot house, that's roughly 450–500 studs at 16 inches on center, plus 15% waste for cuts and culls. Roof trusses or rafters get counted by piece, with hurricane straps and ridge connections as separate lines. Treated lumber is required near the coast for sill plates and any wood within 6 inches of grade; we verify the treated species and retention level on the plans. Our framing estimating services produce a piece count you can hand to a lumber yard for a quote. Do not let a framer include sheathing and housewrap without listing them separately; they are different trades.
Humidity control drives HVAC sizing. We take off supply and return registers by count, then linear feet of duct by size. For a 2,500-square-foot house, expect 12–16 registers and 180–220 linear feet of trunk and branch duct. Condensate lines must drain to daylight or a pump; we show that as a separate line. Electrical takeoff includes device boxes by count, wire by linear foot per gauge, and panel schedules by circuit. Plumbing counts fixtures, then pipe by diameter and material. Our MEP estimating services coordinate these three trades so you don't double-count sleeves or hangers. If the project is in a flood zone, elevate mechanical equipment above the base flood elevation; that adds platform framing and longer line sets.
Coastal air and occasional sulfate soils drive mix designs. We take off concrete by pour strip, then add 5–10% waste for pump loss and cleanout. For elevated coastal homes, pile caps and grade beams are common; we count each cap, dowel, and anchor bolt. Slab thickness usually runs 4 inches for residential, 6 inches for light commercial, but confirm with the structural drawings. Vapor barrier, welded wire mesh, and control joints are separate line items. Our foundation estimating services itemize formwork by square foot of contact area, not just cubic yards, because formwork often controls the cost. Beware of bids that lump concrete and reinforcement together; separation lets you audit unit costs later.
Wind-driven rain and salt air shorten roof life. We measure roof area in squares (100 square feet), then add 10% for hips, valleys, and starter course. Underlayment is typically a synthetic high-temp product, and ice-and-water shield is required at eaves and valleys per the adopted code; confirm the edition with the local building department. For low-slope sections, we take off membrane by square foot, plus tapered insulation by board foot. Flashing at chimneys, skylights, and wall intersections is counted by linear foot of edge. Our roofing estimating services separate tear-off, disposal, and deck repair so you can compare bids fairly. On historic homes, slate or standing-seam metal may be required; we price both options.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Concrete slab, 4 in, 3,000 psi | 1,850 | SF |
| 05 12 00 | Structural steel beams and columns | 1,200 | LB |
| 06 10 00 | Framing lumber, 2x4 and 2x6 | 4,800 | BF |
| 06 10 00 | Roof trusses, 24 in o.c. | 32 | EA |
| 07 30 00 | Roof underlayment, synthetic | 2,400 | SF |
| 08 53 00 | Vinyl windows, impact-rated | 18 | EA |
| 09 29 00 | Gypsum board, 1/2 in, walls | 4,200 | SF |
| 22 11 00 | PEX water piping, 1/2 in | 380 | LF |
We are pricing a 1,850-square-foot slab on grade. The dimensions are illustrative. The slab is 50 feet by 37 feet, with a 12-inch thickened edge. We start with the area: 50 × 37 = 1,850 square feet. For the thickened edge, the perimeter is 2 × (50 + 37) = 174 linear feet. The edge is 12 inches wide and 12 inches deep, so the volume is 174 × 1 × 1 = 174 cubic feet, or 174 ÷ 27 = 6.44 cubic yards. The main slab is 4 inches thick: 1,850 × 4 ÷ 12 = 616.67 cubic feet, or 616.67 ÷ 27 = 22.84 cubic yards. Total concrete = 6.44 + 22.84 = 29.28 cubic yards. We add 7% waste for pump loss and spillage: 29.28 × 1.07 = 31.33 cubic yards. We round up to 31.5 cubic yards for ordering. Reinforcement: welded wire mesh at 6×6-W2.9×W2.9 covers 1,850 square feet; add 10% for laps = 2,035 square feet. Vapor barrier: 1,850 square feet plus 10% laps = 2,035 square feet. Formwork: the perimeter edge needs forms on both sides? No, only the outside face for a slab on grade. The outside face is 174 linear feet, 12 inches high, so 174 square feet of form contact area. We add 5% for bracing and bulkheads = 183 square feet. Curing compound: 1,850 square feet. Control joints: saw-cut at 10-foot intervals each way. Number of cuts = (50 ÷ 10 - 1) + (37 ÷ 10 - 1) = 4 + 3 = 7 cuts, total length = (4 × 37) + (3 × 50) = 148 + 150 = 298 linear feet. This takeoff goes into our concrete estimating services template, with separate lines for each material so you can plug in current Savannah prices.
The numbers we cite are from the U.S. Census Bureau's Building Permits Survey for 2025. They cover new privately-owned residential units permitted by the city itself, not the entire metro area. In 2025, Savannah issued permits for 550 units, down 5% from 579 in 2024. Of those, 534 were single-family and 16 were multifamily. The total permitted value was $140 million, averaging $254,000 per unit. This survey excludes commercial and industrial permits, so it is a residential indicator only.
If your project is in a Special Flood Hazard Area, you must elevate the lowest floor above the base flood elevation. That adds fill, foundation height, and longer utility runs. We include a line for elevation certificates and flood vents. The local building department can confirm the adopted flood damage prevention ordinance and the required freeboard. We also price breakaway walls for enclosures below the base flood elevation. Always check the current FIRM panel for your parcel.
Savannah is in a high-wind region. The design wind speed for most of Chatham County is 130–140 mph, depending on exposure category. We take off hurricane straps, anchor bolts, and continuous load path connectors per the structural drawings. The adopted code edition matters; confirm it with the local building department. For window and door openings, impact-rated assemblies may be required if the project is in a wind-borne debris region. We list them as a separate line so you can compare alternates.
We do not include permit or review fees in our takeoff unless you ask. Historic district projects in Savannah may require review by the Historic Preservation Commission, and that can add time and cost. We can add a line item for expediting or consultant fees if you provide the fee schedule. Our estimates focus on construction scope, not soft costs. Let us know if you want a separate soft-cost summary.
We follow the treated wood requirements in the adopted code. For Savannah, any wood within 6 inches of grade or in contact with masonry must be treated. We specify the retention level and species on the takeoff, and we count sill plates, bottom plates, and blocking separately. If the project is near the marsh, we may increase the treatment level. The local building department can confirm the exact requirements for your site. We do not guess; we read the plans and specifications.
Most estimates are delivered within 24–48 hours after we receive complete plans. Rush service is available for an additional fee. We deliver Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets showing what we measured. For large commercial or multifamily projects, we may need 3–5 days. We use Bluebeam Revu, PlanSwift, and RSMeans data with ZIP-code-adjusted pricing for Savannah.
Yes. We cover Savannah and the nearby cities of Augusta, Columbus, Macon, Athens, Sandy Springs, and Roswell. We also estimate projects in Chatham, Bryan, Effingham, and Liberty counties. Our pricing uses ZIP-code-adjusted material and labor rates, so it reflects local conditions. If your project is outside these areas, contact us and we will confirm coverage.
We provide a detailed takeoff that you can use to level subcontractor bids. Each line item includes quantity, unit, and CSI code, so you can compare apples to apples. We do not contact subs or negotiate on your behalf. If you send us the bids, we can highlight scope gaps and missing items for an additional fee. Our goal is to give you the numbers you need to make informed decisions.
We use RSMeans data adjusted by ZIP code for Savannah. That captures local labor rates, productivity, and material costs. We do not publish a single wage rate because it varies by trade and project type. For prevailing wage projects, we can adjust to Davis-Bacon rates if you provide the wage determination. Our estimates show labor and material separately so you can see the breakdown. Always verify current rates with your subcontractors.
We need a complete set of architectural, structural, and MEP drawings, plus specifications. If you have a scope narrative or bid form, send that too. For sitework, include a boundary survey and geotechnical report if available. We also ask for the project address and ZIP code. The more detail you provide, the more accurate the estimate. You can upload files through our get an estimate page.
Upload your drawings and specifications, and we will return a detailed, CSI-organized estimate within 24–48 hours.