Concrete takeoff
Footings, stem walls, slabs-on-grade and elevated decks for garden apartments and mid-rise buildings, including formwork and reinforcement.
CY · SF · TONWe produce quantity takeoffs and cost estimates for Tallahassee contractors, developers and owners — from FSU-area multifamily to red-clay sitework in Leon County. Excel and PDF deliverables organized by CSI MasterFormat division, with marked-up plan sets.
Five cost drivers dominate here: Leon County red clay and high water table driving deep foundations and undercut, wind-borne debris and Florida Building Code requirements, heavy multifamily and student-housing schedules, FSU and FAMU campus-area logistics, and ZIP-code-adjusted material and labor pricing across the Tallahassee market.
Tallahassee is the ninth-largest city in Florida and its permit activity is dominated by multifamily: 1,430 of the 1,898 new privately-owned residential units permitted by the city in 2025 were multifamily, about 75% of the total. That mix means most of the takeoff work here is repetitive-unit, load-bearing and MEP-heavy rather than scattered single-family. If you are bidding a garden apartment or student-housing building near Florida State University or Florida A&M University, the quantity risk sits in the vertical repetition, not the unit plan.
We estimate from your plan set, not from a square-foot benchmark. Every line item is priced with RSMeans data adjusted to the project ZIP code, so a concrete or framing package in Tallahassee is not priced like one in Hialeah or Fort Lauderdale. Deliverables are Excel and PDF, sorted by CSI MasterFormat division, with the plan sheets marked up so you can trace each quantity back to the drawing it came from. For the statewide picture, see our Florida construction estimating page.
For bidders. You need a defensible number before the bid date. We return division-sorted takeoffs with marked-up plans so you can check every quantity and adjust your markup before submission.
For builders. You need buyout quantities and a schedule of values. We break framing, concrete, MEP and finishes into unit-level quantities you can issue to subcontractors for pricing.
For owners. You need a budget before design is complete. We estimate from schematic drawings, flag scope gaps and give you a cost basis to compare contractor bids against.
Select a bar to compare Tallahassee with the largest Florida markets we cover.
1,898 new housing units in 2025 (+30% vs 2024).
468 single-family · 1,430 multifamily (75%).
The city permitted 1,898 new privately-owned residential units in 2025, up from 1,460 in 2024 — about 30% growth, with a permitted value of $393M and an average of $206,800 per unit. Multifamily accounted for 1,430 units, or about 75% of the total. For a bidder, that means your competition is pricing the same repetitive building types, and the differentiator is quantity accuracy on the repeated floors. A 2% miss on concrete or drywall in a 200-unit building compounds across every floor. We build unit-level takeoffs so the repetition works for you instead of against you. This city ranks 10th of 25 covered Florida cities by units, about 5% of the 38,215-unit covered statewide total — enough volume to support dedicated multifamily crews, not enough to absorb a bad estimate. See our multi-family estimating services for how we structure those takeoffs.
Single-family accounted for 468 of the 1,898 units, so roughly a quarter of the residential market is detached housing on infill lots and subdivision phases. Leon County's red clay and shallow water table change the sitework and foundation numbers more than the vertical construction does: undercut, select fill, drainage swales and pier or stem-wall foundations are where budgets move. If you are also tracking work in Port St. Lucie or Cape Coral, the soil and flood-zone assumptions do not transfer, so price each market separately. On the residential side we handle residential estimating services and sitework estimating services as linked packages when the earthwork drives the bid.
We price the trades that carry the most risk in Tallahassee's multifamily, student-housing and infill residential work.
Footings, stem walls, slabs-on-grade and elevated decks for garden apartments and mid-rise buildings, including formwork and reinforcement.
CY · SF · TONPier, stem-wall and mat foundations priced against Leon County red clay and high-water-table conditions, with undercut and select fill separated.
CY · LF · EAWood and cold-formed steel framing by floor and wall type, with stud, plate, header and sheathing counts for repetitive unit plans.
LF · SF · EAPlumbing, HVAC and electrical rough and finish counts for multifamily buildings, including riser diagrams and unit-to-unit repetition.
LF · EA · TONShingle, membrane and metal roofing with slope, valley and penetration counts, plus Florida Building Code wind-uplift attachment schedules.
SQ · LF · EAClearing, grading, undercut, storm drainage and paving for Tallahassee infill and subdivision sites, including red-clay haul-off quantities.
CY · LF · TONTenant improvements, retail and office shells near downtown and the campuses, priced by CSI division with allowance schedules.
SF · LF · EAWarehouse and light-industrial shells on the city's perimeter, including slab flatness, dock equipment and utility service runs.
SF · CY · TONYou are bidding multifamily and student-housing work around FSU and FAMU, where unit counts drive every trade. We return division-sorted quantities you can check against your own takeoff before the bid date.
Your pro forma depends on cost per unit, not cost per square foot. We break the building into unit-level quantities so you can compare a 1,430-unit pipeline against your budget at each phase.
Tallahassee's wood-frame apartment work is repetitive, and one missed wall type compounds across every floor. Our marked-up plans show exactly which sheets the counts came from so you can adjust before you commit.
Leon County's sandy soils and high water table change your footing and slab quantities. We take off formwork, rebar and concrete separately so your bid reflects the actual foundation system, not a generic allowance.
Multifamily MEP is where unit repetition hides risk: fixture counts, riser diagrams and corridor runs. We quantify by CSI division so your plumbing, mechanical and electrical bids stay separate and defensible.
You need a budget before design is complete. We estimate from schematic drawings, flag scope gaps in the envelope and MEP, and give you a cost basis to compare contractor bids against.
We estimate projects across Leon County and the surrounding Big Bend region, from downtown infill to new apartment sites near the universities. If your project is outside these areas, send the address and we will confirm coverage.
The city's 2025 permit mix was 75% multifamily, so our Tallahassee work leans toward repetitive-unit buildings and the sitework that supports them. We also estimate the single-family, commercial and institutional projects that fill out the market.
Three- and four-story wood-frame buildings with surface parking are the dominant multifamily type here. We take off by building and by floor so you can see how repetition affects your framing and drywall quantities.
Watch for: Wall type repetition, floor-to-floor heights, balcony framing
Bedroom-count buildings near FSU and FAMU carry heavy MEP and finish loads per square foot. We quantify fixture counts, corridor lengths and unit turnovers separately from the shell.
Watch for: Fixture counts, corridor MEP runs, unit mix changes
Infill and subdivision homes on the north and east sides are typically slab-on-grade with wood framing. We estimate from the plan set, including sitework, foundation, framing and finishes.
Watch for: Slab thickness, roof pitch, window schedules
Strip centers, restaurants and office buildings along Mahan Drive and Capital Circle need separate structural, MEP and finish takeoffs. We sort by CSI division so your subcontractor bids line up.
Watch for: Storefront glazing, grease interceptors, HVAC tonnage
Tallahassee's role as the state capital brings university, state and county projects with strict specification requirements. We estimate to the specified division format and flag additive alternates.
Watch for: Spec division format, alternates, prevailing wage triggers
Distribution and flex buildings near the airport and industrial parks are mostly pre-engineered metal. We take off slab, PEMB erection, MEP and site paving as separate packages.
Watch for: Slab flatness, PEMB anchor bolts, dock equipment
Tallahassee pricing is not Miami pricing. The drivers below are the ones that move a number here, and they are the reason we adjust material and labor to the project ZIP code rather than using a statewide average.
Tallahassee and Leon County review building permits through their respective building departments, and the adopted editions of the Florida Building Code, NEC and plumbing and mechanical codes change on a cycle. Wind-borne debris and flood provisions apply in parts of the county. Before you bid, confirm the adopted code edition and any local amendments with the building department, because plan review comments can add scope after your number is submitted.
Florida Building Code · Leon County Building Department · City of Tallahassee Growth ManagementMuch of Leon County sits on sandy soils with a seasonally high water table, and some sites include clay or organic pockets. That combination often pushes foundations toward engineered fill, thickened slabs or deeper footings than a generic takeoff assumes. We take off excavation, backfill, vapor barrier, reinforcing and concrete separately so your foundation bid reflects the geotechnical report rather than a square-foot allowance.
Geotechnical report · Slab-on-grade · Engineered fill · Vapor barrierTallahassee sees hot, humid summers and occasional freezing winter nights, plus a real hurricane and severe-storm exposure. Those conditions drive insulation values, roof underlayment and flashing details, exterior envelope sealing and HVAC sizing. They also affect the construction schedule, which affects general conditions and temporary power. We carry weather-sensitive items as separate lines so you can see their cost.
IECC climate zone · Hurricane exposure · HVAC sizing · Roof underlaymentTallahassee is a mid-sized market with a labor pool split between university-area residential work and state-funded institutional projects. Crews for specialized trades such as elevators, fire sprinklers and structural steel may travel from Jacksonville, Orlando or south Georgia, which adds per diem and mobilization. We price labor at the ZIP-code level and flag trades where travel is likely to affect your bid.
RSMeans labor rates · Per diem · Mobilization · Prevailing wageThe terrain in and around Tallahassee rolls more than most of Florida, and stormwater management is a major permitting item. Sites often need retention ponds, swales, culverts and engineered fill to balance cut and fill. We take off clearing, grading, erosion control, storm pipe and paving as separate packages so you can see how much of your budget is underground before you price the building.
Stormwater permit · Retention pond · Erosion control · Mass gradingTallahassee is roughly four hours from major Florida ports and two hours from the nearest interstate junction, so some materials carry freight premiums compared with coastal markets. Concrete, drywall, roofing and MEP equipment are generally available locally, but specialty items may ship from Atlanta or Jacksonville. We adjust material pricing to the project ZIP code and show freight as its own line where it applies.
RSMeans material pricing · Freight · Local suppliers · ZIP-code adjustmentTallahassee's mix of multifamily and single-family work, its clay-heavy soils, and its stormwater rules all change what you measure and how you price it. Here is how each major trade plays out in a takeoff for a Leon County project.
Leon County soils often include expansive clay and sandy pockets, so foundation takeoffs here usually carry over-excavation and select fill that a coastal Florida takeoff would not. You measure footing length by type, then convert to cubic yards using the actual footing width and depth from the structural sheets, not a default. Slab-on-grade is measured by square feet of finished area plus turn-down edges, haunching at interior bearing walls, and thickened slabs under post-tension anchors. Add waste at typical 5–8% for formed concrete and 3–5% for ready-mix ordered by the yard. Our concrete estimating services break these out by pour strip and pour sequence so your crew schedule matches the quantity. Confirm the adopted Florida Building Code edition with the City of Tallahassee Building Department before you finalize embed plates and dowel schedules.
The city and Leon County require stormwater management for new development, and on Tallahassee's rolling terrain that usually means ponds, swales, or underground detention. A sitework takeoff starts with clearing limits by acre, then cut and fill volumes from the grading plan. You measure sanitary sewer and water main by linear foot with fittings counted separately, and you separate trench depth bands because bedding and backfill change with depth. Erosion control is measured by linear foot of silt fence and by each inlet protection device. Our sitework estimating services organize this by CSI division so your civil subcontractor bid package is complete. Verify the current stormwater manual and inspection requirements with the city or county before you rely on a quantity for permitting.
Tallahassee roofs take wind uplift and heavy summer rain, so roofing takeoffs need the roof plan measured by square (100 square feet) with slope factored in, plus underlayment, drip edge, valley metal, and fasteners. For shingle roofs, count starter courses and ridge caps separately. For low-slope multifamily, measure membrane by square foot with lap and waste, then add insulation thickness, cover board, and flashing at penetrations and parapets. Windows and doors are counted by type and size from the schedule, with flashing tape measured by linear foot of perimeter. Our roofing estimating services list each assembly by CSI section so your supplier quote can be checked against the takeoff.
Tallahassee's wind-borne debris region designation drives the fastening schedule, and that shows up in the takeoff as extra clips, straps, and anchor bolts beyond what a basic wall count would show. You measure wall area by height and length, deduct openings over 10 square feet, and then add plates, studs at 16 or 24 inches on center, headers, and blocking. For multifamily, repeat the unit type and multiply, but check corridor and stair framing separately because it rarely matches the unit module. Floor trusses and I-joists are counted by piece with rim board and web stiffeners. Our framing estimating services produce a piece-count list by floor so your lumber package quote can be compared line by line.
Florida's humid climate means MEP takeoffs must account for condensate management, insulation values, and ventilation rates that differ from drier states. You measure ductwork by linear foot by size and material, count diffusers and returns by type, and count plumbing fixtures by schedule. For multifamily, riser diagrams drive the vertical pipe counts, and you should measure each stack separately. Electrical takeoffs run from the panel schedule: count breakers, circuits, devices, and fixtures by type, then add feeder and branch wiring by linear foot with a typical 10% waste for pulls. Our MEP estimating services coordinate the three trades on one MasterFormat sheet so nothing lands in two scopes or none.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" continuous | 48 | CY |
| 03 30 00 | Slab-on-grade concrete, 5" thick | 12400 | SF |
| 05 12 00 | Structural steel columns and beams | 6.5 | TON |
| 06 10 00 | Wood framing, walls and floors | 18500 | BF |
| 07 21 00 | Batt insulation, exterior walls | 9800 | SF |
| 08 53 00 | Vinyl windows, fixed and operable | 96 | EA |
| 09 30 00 | Ceramic tile, unit bathrooms | 1450 | SF |
| 23 31 00 | Ductwork, rectangular and flex | 2100 | LF |
This example shows how we build a slab-on-grade quantity for a three-story multifamily building in Tallahassee. The dimensions are illustrative; use the actual dimensions from your structural and architectural sheets.
The building footprint is 120 feet by 60 feet, with a 5-inch-thick slab. We measure the finished slab area first, then add turn-down edges, thickened slabs under bearing walls, and a waste factor. Concrete is ordered by the cubic yard, so we convert square feet and thickness to cubic yards using 27 cubic feet per cubic yard.
| Step | Calculation | Result |
|---|---|---|
| Slab area | 120 ft × 60 ft | 7,200 SF |
| Slab volume | 7,200 SF × (5 in ÷ 12 in/ft) | 3,000 CF |
| Turn-down edge | 360 LF × 1.5 ft × 1.0 ft | 540 CF |
| Thickened slabs | 8 each × 4 ft × 4 ft × 1.0 ft | 128 CF |
| Total volume | 3,000 + 540 + 128 | 3,668 CF |
| Cubic yards | 3,668 CF ÷ 27 | 135.9 CY |
| Waste at 5% | 135.9 CY × 1.05 | 142.7 CY |
We round to 143 cubic yards for the order. For a Tallahassee project, we would also check whether the geotech report requires a capillary break or vapor retarder under the slab, and whether the structural sheets call for a thicker slab at dumpster pads or mechanical rooms. Those items change the quantity, so we list them as separate lines rather than burying them in the slab average. If you are comparing bids, our concrete estimating services can return this level of detail in Excel and PDF, organized by CSI division and marked up on your plan set.
We estimate multifamily, single-family, commercial, and light industrial projects in Tallahassee and Leon County. That includes garden-style apartments, student housing, retail shells, and tenant improvements. Because the city's permit data shows a strong multifamily share, we often work from full plan sets with unit plans that repeat across floors. We also handle smaller residential additions and renovations when the plans are complete enough to measure. If your project is in a nearby city like Hialeah or Port St. Lucie, we cover those markets as well.
Leon County soils can include expansive clays and sandy pockets, and the geotech report usually tells you whether over-excavation or select fill is required. In a takeoff, that means measuring the volume of unsuitable material to be removed and the volume of select fill to be placed, then pricing them separately from the footing concrete. If the report calls for a capillary break or moisture barrier, that is another line. We cannot tell you what your geotech will find, but we can build the takeoff so those items are visible instead of hidden in a lump sum.
Yes. Tallahassee is in a wind-borne debris region, and the Florida Building Code requires specific fastening and protection details that show up as extra clips, straps, anchor bolts, and glazing protection. In a takeoff, we count those items from the structural and architectural sheets rather than applying a blanket percentage. We also note where the plans call for a product approval number or a Florida Product Approval, because that affects what you can buy. Always confirm the adopted code edition and local amendments with the City of Tallahassee Building Department before you finalize your bid.
The permit numbers on this page come from the U.S. Census Bureau's Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city itself, not the whole metro area. In 2025, the city issued 1,898 residential units, up from 1,460 in 2024, with 468 single-family and 1,430 multifamily units. The survey reports permitted value of $393 million, or about $206,800 per unit on average. These figures are for residential only and do not include commercial or industrial permits.
Most estimates are returned in 24 to 48 hours after we receive a complete set of plans. Rush service is available if your bid deadline is sooner. The turnaround depends on the size and complexity of the project; a three-story multifamily building with full MEP takes longer than a single-family house. We send Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured. If anything is missing from the plans, we tell you before we start rather than guessing.
We can start with architectural drawings, but structural, civil, and MEP sheets change quantities significantly. For example, without the structural sheets you cannot count footing sizes, anchor bolts, or framing members accurately. We will prepare what we can from the architectural set and list the assumptions we made, then update the estimate when the other disciplines arrive. If you are bidding a design-build job, tell us which sheets are preliminary so we can flag the items most likely to change. Our goal is to give you a number you can defend, not a guess.
We use Bluebeam Revu for plan markup and quantity measurement, PlanSwift for digital takeoff, and RSMeans data for material and labor pricing. Pricing is adjusted by ZIP code so that Tallahassee labor and material costs reflect the local market rather than a national average. That matters for trades like concrete, framing, and roofing where local availability and haul distance affect the number. We deliver the takeoff in Excel with formulas visible, so you can trace any quantity back to the plan sheet and adjust it if your scope changes.
Yes. We estimate single-family homes, multifamily buildings, and commercial projects such as retail, office, and light industrial. The takeoff method is the same, but the scope gaps differ. Commercial jobs often need tenant improvement allowances, fire-rated assemblies, and MEP coordination that residential work does not. Residential jobs in Tallahassee often need wind mitigation details and flood zone considerations. We organize the estimate by CSI division so your subcontractors can bid from the same document, whether the project is a house or a shopping center.
Send the complete plan set, including architectural, structural, civil, and MEP sheets, plus any specifications, geotech report, and addenda. If you have a bid date, tell us so we can schedule the turnaround. We also ask for the project address or ZIP code so we can apply the correct local pricing adjustment. If you have a preferred format, such as a specific Excel template or a CSI division breakdown, include that. The more complete the information, the fewer assumptions we have to make, and the more accurate your estimate will be.
We apply waste factors by material and installation method, not one blanket percentage. Typical ranges are 5–8% for formed concrete, 3–5% for ready-mix ordered by the yard, 10% for framing lumber, and 10% for electrical wire pulls. Roofing shingles are ordered by the square with a typical 10% waste for cuts and valleys. We show the waste as a separate line in the Excel file so you can see the base quantity and the allowance. If your supplier or installer uses a different factor, you can change it without rebuilding the takeoff.
Email your plan set and bid date, and we will return a CSI-organized takeoff in Excel and PDF within 24–48 hours.