Sitework and earthwork
Clearing, mass excavation, fill and dewatering for Broward sites with a shallow water table and high groundwater.
CY · SF · LSWe prepare quantity takeoffs and construction estimates for Miramar, Broward County and the surrounding South Florida market. Deliverables are organized by CSI MasterFormat division in Excel and PDF, with marked-up plan sets, and most projects turn around in 24–48 hours.
Miramar's 2025 permit mix drives the work: 192 new privately-owned residential units, 188 of them multifamily (98%) at $115,600 average value per unit. Add Broward County high-water-table sitework, Miami-Dade and Broward notice-of-commencement rules, wind-borne debris detailing, and ZIP-adjusted material and labor pricing across Pembroke Pines, Hollywood and Fort Lauderdale.
Miramar sits in Broward County between Pembroke Pines, Hollywood and the western Everglades edge, so most of the work we price is multifamily, industrial and commercial rather than scattered single-family. The city issued 192 new privately-owned residential units in 2025, down from 449 in 2024, and 188 of those units were multifamily — 98% of the total. That mix tells you where the estimating effort goes: podiums, parking decks, unit-turn repetition and long MEP runs, not one-off custom homes. The city's geographic spread matters too: projects near the Everglades edge sit on fill and shallow groundwater, while infill sites closer to Pembroke Pines and Hollywood bring tighter staging and older utility ties. Both conditions change your sitework and foundation quantities before you ever price a superstructure. We build takeoffs from the plan set you send, price them with ZIP-code-adjusted material and labor data, and return them organized by CSI MasterFormat division with marked-up drawings so your team can see exactly what was measured. For a broader view of state pricing and permit trends, start with our Florida construction estimating page, or compare adjacent markets in Pembroke Pines and Fort Lauderdale.
For bidders. You need a bid that holds up under GC review. We measure the drawings, flag scope gaps between divisions, and hand you a division-by-division takeoff you can price, adjust and defend line by line.
For builders. You need quantities you can buy from. Concrete by CY, rebar by TON, framing by LF and SF, roof area by square — measured from the set you are actually building, with waste factors you choose.
For owners. You need a budget before you commit. We price the concept or permit set against Broward ZIP-code labor and material rates so your pro forma reflects what the trade contractors will quote.
Select a bar to compare Miramar with the largest Florida markets we cover.
192 new housing units in 2025 (-57.2% vs 2024).
4 single-family · 188 multifamily (98%).
The 2025 numbers are lopsided: 188 of 192 new residential units were multifamily, 98% of the total, at $115,600 average permitted value per unit and $22M in permitted value overall. For a bidder, that means the repeatable work is apartment and townhome construction — unit-mix repetition, shared podiums and garages, and MEP distribution that gets cheaper per unit as the count rises. When you estimate a Miramar multifamily job, the leverage is in the unit turn: get one unit right, then verify the typical-unit count against the plan index before you multiply. We handle that scope through multi-family estimating, and the same discipline applies to the smaller single-family and renovation work we see across Broward.
Residential permits dropped from 449 units in 2024 to 192 in 2025, a 57% decline, and Miramar ranked 15th of 25 covered Florida cities by units, about 0.5% of the 38,215-unit state total. A thinner pipeline changes bidding behavior: fewer jobs chase more crews, and subs who were busy last year may sharpen numbers or pad mobilization. Build your estimate with clear assumptions on general conditions, permit fees and inspection cycles, because those are the lines that move when schedules stretch. For the statewide context, see Florida construction estimating; for nearby competition, check Hollywood and Coral Springs.
These are the scopes we measure most often on Miramar and Broward County plan sets, each returned by CSI MasterFormat division with quantities you can price.
Clearing, mass excavation, fill and dewatering for Broward sites with a shallow water table and high groundwater.
CY · SF · LSPodium slabs, spread and auger-cast piles, pile caps, grade beams and elevated decks measured from the structural set.
CY · SF · TONCMU, structural steel and cold-formed framing for low- and mid-rise Miramar buildings, counted by member and area.
LF · SF · EAPlumbing, HVAC and electrical distribution for multifamily buildings, including riser counts and fixture schedules.
LF · EA · TONTPO and modified bitumen roof areas, tapered insulation, flashing and balcony waterproofing by square and LF.
SQ · LF · SFTypical-unit quantity verification, finishes, doors, cabinets and fixtures priced per unit and extended across the mix.
EA · SF · LFTenant fit-out takeoffs for retail, office and warehouse space along the Miramar Parkway and I-75 corridors.
SF · LF · EASlab-on-grade, tilt-wall panels, racking loads and dock equipment for distribution buildings near the industrial parks.
SF · CY · TONYou are pricing 188-unit garden and podium jobs against three or four competing GCs, and you need rebar tonnage, deck square footage and unit-turn repetition broken out before the bid date.
Miramar podium decks, auger-cast piles and slab-on-grade over fill require CY, TON and SF quantities you can buy from, not allowances, because your ready-mix and rebar orders are placed the week you mobilize.
Broward wood-frame and cold-formed steel crews need LF of wall, SF of sheathing and board footage by floor, measured from the same set the superintendent is building from.
Multifamily and industrial work here means long domestic water, sanitary and conduit runs; you need fixture counts, LF of pipe by diameter and device counts before you can price labor.
You are testing a Miramar pro forma before the permit set exists, so a concept-level takeoff priced at Broward ZIP-code rates keeps your land and construction numbers honest.
You need a third-party quantity check on your own set before it goes out to bid, and a marked-up drawing set that shows exactly what was measured and where.
We price work across Miramar and the surrounding Broward and south Miami-Dade corridor. If your project sits near one of these areas, say so when you send the set — it affects haul routes, staging and which utility authority you tie into.
The 2025 permit mix was 98% multifamily, with 188 of 192 new privately-owned residential units in buildings of two or more units. That is where the estimating hours go, but the commercial and industrial side of Miramar carries its own quantity problems.
Three- to five-story buildings over surface or podium parking, with repeated unit plans. We measure per-unit and per-floor, then extend by building so your buyout matches the schedule.
Watch for: Podium waterproofing, unit-turn repetition, deck formwork reuse.
Podium or wrap construction with long corridors and stacked MEP risers. Quantity risk sits in the deck, the riser count and the fire-rated assemblies between units and corridors.
Watch for: Riser counts, corridor ratings, elevator and stair cores.
Tilt-wall and pre-engineered buildings near the Miramar Parkway industrial parks, with large slab areas and minimal finishes. Slab thickness, joint layout and dock equipment drive the numbers.
Watch for: Slab thickness, tilt panel counts, dock and grade conditions.
Strip centers, outparcels and low-rise office along Miramar Parkway and Pembroke Road. Tenant fit-out scope is usually separate, so we split core-and-shell from interior build-out.
Watch for: Core-shell split, storefront systems, MEP tap-in points.
Only four single-family units were permitted in Miramar in 2025, so this is a small share of local volume. We still take these sets, priced at Broward rates with marked-up drawings.
Watch for: Fill depth, impact glazing, roofing underlayment specs.
Clearing, mass grading, fill, paving and utilities on sites near the Everglades edge. We take off by area and by LF of pipe, and price haul and dewatering separately from the building.
Watch for: Fill import, dewatering, utility tie-in locations.
Two Miramar projects with identical drawings can price very differently depending on where the site sits and what the ground does. These are the drivers we check before we extend a single quantity.
Miramar projects go through city building permitting and Broward County review, and the Florida Building Code edition adopted locally governs wind, flood and energy requirements. Review comments on structural and MEP sheets routinely add scope between the first and second permit submittals. Before you lock a bid, confirm the adopted code edition, flood zone and inspection sequence with the city building department, because those items change both the schedule and the quantities you carry.
Florida Building Code · Broward County · city building departmentSites toward the Everglades edge are often built on imported fill over shallow groundwater, which pushes foundation design toward auger-cast piles, grade beams and thicker slabs. Infill sites closer to Pembroke Pines and Hollywood may hit old fill, muck pockets or undocumented utilities. We take off pile counts, concrete CY, rebar TON and slab SF from the geotechnical report and structural sheets, and we carry dewatering and spoil removal as separate line items rather than burying them in the earthwork.
geotechnical report · auger-cast piles · slab-on-gradeMiramar sits in a high-wind region, so roofing attachment, impact glazing, shutters and continuous load path hardware are not optional line items. The rainy season also affects scheduling and temporary protection, which shows up in general conditions. We measure roof area by square with the specified underlayment and attachment pattern, count impact openings by size and type, and note where the drawings call for secondary water barriers or enhanced fastening that a generic takeoff would miss.
high-wind region · impact glazing · roof attachmentBroward labor rates vary by trade and by how far a crew travels, and multifamily work absorbs a large share of the available concrete, framing and MEP crews. When several podium jobs run at once, premiums appear in the trades with the least slack. We price labor from ZIP-code-adjusted data for Miramar rather than a county average, and we list labor hours by division so you can see where a subcontractor quote is thin before you sign it.
ZIP-code-adjusted labor · crew availability · division labor hoursFlat terrain and seasonal water table mean storm drainage, exfiltration and grading quantities are real cost drivers, not rounding. Sites near the western edge may need more fill, larger swales or on-site retention, while infill parcels contend with existing drainage connections and easements. We take off pipe by LF and diameter, structures by count, and grading by CY of cut and fill, and we separate permitting-related drainage work from the building scope so it does not disappear into a sitework allowance.
storm drainage · exfiltration · cut and fillReady-mix, rebar, tilt panels and trusses all move by truck, and Miramar's distance from some suppliers and its traffic patterns affect delivery cost and pour scheduling. Large podium pours may need plant capacity confirmed weeks ahead, and oversize loads need routing approval. We carry haul, delivery and any crane or pump time as distinct items, and we note where a supplier's standard delivery radius no longer covers the site so you can price it before the bid goes in.
ready-mix delivery · oversize loads · pump and crane timeMiramar sits on a mix of sandy ridge and former Everglades muck, and that geology drives more of the estimate than most GCs expect. Here is how the local ground, wind code and Broward County review process change the line items we carry.
Broward County's flat, high-water-table ground means most sites need a muck probe and a cut-and-fill balance before you price anything. We take off stripping by square yard, then separate unsuitable material removal, structural fill import, and compaction in lifts, because a 2-foot organic layer under a parking field can add hauling that never shows on the grading plan. Retention is usually exfiltration or wet pond rather than deep infiltration, so we carry pipe, structures, baffles and dewatering separately. If you are pricing a shell pad or a drainage retrofit, our sitework estimating services break the earthwork from the utilities so you can see which scope is driving the number.
Miramar is in a high-velocity hurricane zone, so the framing takeoff is not just studs and trusses. We count continuous load path hardware, hold-downs, straps, and anchor bolt spacing against the design uplift pressures, then convert to pieces per floor. Roof sheathing is taken off by sheet with clips and ring-shank nails called out, since the nailing schedule is inspected. For multifamily podium work, we separate light-gauge from cold-formed structural steel and track deflection details at the slab edges. Framing estimating services shows how we present stud counts, plate lengths and hardware by floor.
Multifamily and mixed-use work dominates the permit mix, so MEP takeoffs here are usually repetitive by unit type. We build one unit's plumbing fixture count, branch lines, and electrical devices, then multiply by unit mix and add the common-area risers, house panels, and corridor systems separately. HVAC is taken off by tonnage and by distribution, with condensate routing and fresh-air requirements carried as line items. For commercial tenant fit-outs, we separate base-building connections from in-suite work so the landlord and tenant scopes do not overlap. MEP estimating services lays out the fixture and device counts we need to start.
On the ridge, standard spread footings on compacted fill work; on the western muck, you are often into auger-cast piles or a raised structural slab. That decision changes the takeoff completely, so we price both and flag the delta. Formwork is taken off by contact area, not by slab area, and we track edge forms, bulkheads, column forms and chamfer separately. Rebar is converted from pounds to tons with lap and waste, and we carry vapor barrier, capillary break and termite treatment as their own lines. Concrete estimating services and foundation estimating services cover the structural and flatwork scopes as separate packages.
Wind-driven rain is the governing case here, not just wind speed. We take off roof area by slope and system, then add underlayment, secondary water barrier, drip edge, and the specific fastening pattern the product approval requires. Tile, standing-seam metal and modified bitumen each carry different waste factors and different attachment schedules, so we do not lump them. On the walls, we separate stucco, CMU, impact glazing and the flashing at openings, because that is where water intrusion claims start. Roofing estimating services handles the roof assembly as its own takeoff if you want it priced apart from the envelope.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Podium slab concrete, 8 in. | 1,240 | CY |
| 03 20 00 | Rebar, slab and columns | 96 | ton |
| 03 30 00 | Formwork, columns and walls | 8,600 | SF |
| 31 23 00 | Structural fill import and compact | 2,150 | CY |
| 05 12 00 | Structural steel, podium framing | 74 | ton |
| 06 10 00 | Wood framing, upper floors | 118,000 | BF |
| 07 21 00 | Roof insulation and cover board | 42,000 | SF |
| 22 11 00 | Plumbing, fixture count by unit | 168 | EA |
This example sizes the roof sheathing package for a four-story Miramar multifamily building with a low-slope roof over the upper floor and a small pitched mechanical screen. Dimensions are illustrative; your plan dimensions and roof plan govern. We take the roof area from the plan, then add waste and the secondary water barrier as separate lines because the fastening schedule and product approval drive both.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Roof plan area | 210 ft x 90 ft | 18,900 | SF |
| Add 5% for slope and irregular edges | 18,900 x 1.05 | 19,845 | SF |
| Sheathing sheets, 4 ft x 8 ft | 19,845 / 32 | 620 | sheets |
| Add 7% cutting waste | 620 x 1.07 | 664 | sheets |
| Underlayment, 10 sq rolls | 19,845 / 100 | 199 | rolls |
| Add 10% laps and waste | 199 x 1.10 | 219 | rolls |
| Secondary water barrier | 19,845 x 1.10 | 21,830 | SF |
| Fasteners per sheet, field | 664 x 32 | 21,248 | EA |
Sheathing is ordered in sheets, so we round up to the next full unit and carry the waste as a separate line rather than burying it in the sheet count. Underlayment comes in 10-square rolls; the 10% factor covers side and end laps, which the wind-driven rain detail requires. The secondary water barrier is measured in square feet and priced with its own fastening pattern, not as part of the felt. Fasteners are counted from the nailing schedule, not from a rule of thumb, because the inspector checks spacing at the edges and in the field. If you want this same breakdown applied to your roof plan, send the drawings and we will return a takeoff in Excel and PDF within 24 to 48 hours.
The U.S. Census Bureau Building Permits Survey counts new privately-owned residential units permitted by the city. For 2025, Miramar issued 192 units, down from 449 in 2024, a change of about -57%. Of those, 4 were single-family and 188 were multifamily, so multifamily was about 98% of the total. The permitted value was about $22M, or about $115,600 per unit on average. That mix tells you most current takeoff work here is multifamily and podium, not scattered single-family.
Broward County and the City of Miramar both review portions of a project, and the split depends on the scope and whether the site is in a special district. We build the takeoff around the permit set, but we flag items that commonly trigger comments, such as product approvals for impact glazing, the roof nailing schedule, and the drainage calculation. Confirm the adopted code edition and submittal requirements with the local building department before you lock your schedule, because review cycles move with volume.
Yes, and on western Miramar sites we often do. The eastern ridge tends to support spread footings on compacted fill, while the muck areas push you toward auger-cast piles or a raised structural slab. We take off both schemes from the same geotech report and show the cost delta by line item, so you can compare the foundation package against the sitework and slab scope together rather than in isolation.
We count continuous load path hardware, hold-downs, straps, and anchor bolt spacing against the design uplift pressures, then convert to pieces per floor. Roof sheathing is taken off by sheet with the clip and nail schedule called out, because the nailing pattern is inspected. We also separate the wall framing from the roof framing so the hardware is not buried in the lumber line. The specific requirements depend on the design pressures and the adopted code edition, so confirm those with the local building department.
That is most of the Miramar work we see. We build one unit's plumbing, electrical and framing quantities, then multiply by the unit mix and add common-area risers, house panels and corridor systems as separate lines. That keeps the per-unit cost visible and makes it easy to test a change in unit mix. Multi-family estimating services covers this format, and we can break the takeoff by building or by phase if you are pricing a podium project in stages.
We take off stripping by square yard, then separate unsuitable material removal, structural fill import, and compaction in lifts. The muck probe and geotech report set the depth, so we do not assume a thickness. Hauling is carried as its own line because disposal distance and trucking rates move the number more than the excavation itself. If you want the earthwork priced apart from the utilities, sitework estimating services shows the format we use.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the drawing. Most projects turn around in 24 to 48 hours, and rush is available. Pricing is ZIP-code-adjusted for material and labor, using RSMeans data with Bluebeam Revu and PlanSwift for the takeoff. That means the labor rates reflect the Miramar and Broward County market rather than a national average.
Yes. Commercial tenant fit-outs, warehouse and distribution space, and light industrial work all come through this market, and we take them off the same way: by division, with base-building connections separated from in-suite work. Commercial estimating services and industrial estimating services cover those formats. If your project is a shell building with a tenant improvement allowance, we can price the shell and the allowance as two packages so the landlord and tenant scopes stay distinct.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, counting permits issued by the city itself for new privately-owned residential units only. That means commercial, industrial and government permits are not in the count, and neither are renovations. The survey reported 192 total units for Miramar, 4 single-family and 188 multifamily, with a permitted value of about $22M. Use it as a read on residential volume, not as a full picture of construction activity.
Send the plan set, the geotech report if you have one, and the unit mix or schedule. We will confirm the scope, set the turnaround, and return the takeoff in Excel and PDF with marked-up drawings. If you are comparing foundation schemes or unit mixes, tell us which alternates you want priced. You can start with the Florida construction estimating page for the statewide scope, or send the files directly through the estimate request form.
Send your plan set and geotech report, and we will return a division-by-division takeoff in Excel and PDF within 24 to 48 hours.