Multifamily takeoffs
Unit-by-unit quantity takeoffs for garden-style and mid-rise apartment buildings, including typical-floor repetition and corridor lengths.
EA · SF · LFGainesville permitted 2,665 new privately-owned residential units in 2025, 92% of them multifamily. We produce CSI MasterFormat takeoffs and estimates for contractors, developers, and owners building in Alachua County.
Multifamily and student-housing density, Alachua County's adopted code cycle, sandy loam and karst-influenced soils, a compressed university-adjacent leasing calendar, and ZIP-code-adjusted material and labor pricing. Gainesville's 2025 permit mix was 2,447 multifamily units against 218 single-family, so unit-count-driven scopes dominate takeoffs here.
Gainesville is a multifamily market with a single-family tail. Of the 2,665 new privately-owned residential units permitted by the city in 2025, 2,447 were multifamily — 92% of the total — and permitted value reached $402M, an average of $150,700 per unit. That mix changes what a takeoff has to prove. A four-story wood-frame apartment building over a podium has a different unit-cost structure than a production single-family house, and the estimate has to separate them.
We build estimates from the drawings, not from a square-foot multiplier. Wall types, floor assemblies, roof geometry, MEP fixture counts, and sitework quantities are measured and priced individually, then organized by CSI MasterFormat division with marked-up plan sets. For a garden-style building, that means counting plumbing fixtures per unit type, measuring corridor and balcony lengths, and separating the podium slab from the elevated decks above it. For sitework, it means calculating cut and fill from the grading plan and pricing storm drainage by linear feet of pipe and number of structures.
If you are bidding in Gainesville, start with our Florida construction estimating services page, or send plans directly through get an estimate.
For bidders. You need bid-ready quantities fast. We return Excel and PDF takeoffs in 24–48 hours, organized by division, with marked-up plan sets so you can defend every line in a scope review.
For builders. You are buying out trades and tracking production. We price by ZIP-code-adjusted material and labor rates and break scopes into installable line items — concrete, framing, MEP rough-in, finishes.
For owners. You need a budget before design is finished. We estimate from schematic sets and flag scope gaps early, so change orders do not land after the foundation is poured.
Select a bar to compare Gainesville with the largest Florida markets we cover.
2,665 new housing units in 2025 (+118.8% vs 2024).
218 single-family · 2,447 multifamily (92%).
Gainesville issued permits for 2,665 new privately-owned residential units in 2025, up from 1,218 in 2024 — a 119% increase. Multifamily accounted for 2,447 of those units, or 92%, while single-family contributed 218. Permitted value was $402M, about $150,700 per unit. For bidders, that means the work is concentrated in garden-style and mid-rise apartment buildings, not scattered lot development. Unit counts drive the estimate: fixture counts per unit, corridor lengths, roof area per building, and the number of typical floors. Gainesville ranked 6th of 25 covered Florida cities by units and represented about 7% of the 38,215 units permitted across those cities. If you are comparing this market to South Florida, our Pembroke Pines construction estimating and Miramar construction estimating pages cover denser infill conditions.
At $150,700 per unit, Gainesville sits in a range where wood-frame over podium and light-gauge steel systems are common, and where sitework and utility extensions carry real weight. Alachua County soils are sandy and often karst-influenced, so foundation scope is not a formality: you may see auger-cast piles, grade beams, or over-excavation and replacement, and the geotechnical report drives the number. The leasing calendar tied to the university compresses the schedule, which raises formwork cycling and crane or pump costs. We price these as separate line items rather than burying them in a general conditions percentage. The state-level demand picture is covered on our Florida construction estimating services page.
We estimate the scopes that dominate Gainesville's permit mix — multifamily, student housing, and the sitework and foundations that support them.
Unit-by-unit quantity takeoffs for garden-style and mid-rise apartment buildings, including typical-floor repetition and corridor lengths.
EA · SF · LFFootings, grade beams, slabs-on-grade, and elevated decks priced with formwork, reinforcement, and pump or crane placement.
CY · SF · TONPile, pier, and mat scopes for Alachua County's sandy and karst-influenced soils, tied to the geotechnical report.
CY · LF · EAWood-frame and light-gauge wall, floor, and roof assemblies measured by wall type, with sheathing and hardware.
LF · SF · EAPlumbing fixture counts, HVAC tonnage, and electrical device and panel schedules for multifamily buildings.
EA · TON · LFClearing, mass grading, storm drainage, and utility extensions, including lime-rock base and pavement sections.
CY · LF · TONShingle, membrane, and metal roof systems measured by slope and area, with underlayment, flashing, and edge metal.
SQ · LF · EASingle-family and townhome budgets from schematic or permit sets, priced with ZIP-code-adjusted material and labor.
SF · EA · LSGainesville permitted 2,447 multifamily units in 2025, 92% of its residential total. You need per-unit-type quantity splits — plumbing fixtures, wall types, balcony lengths — not a blended square-foot cost.
Projects near the University of Florida campus carry unit-mix-driven MEP counts and amenity packages. We measure fixture counts and corridor lengths per unit type so your pro forma holds through buyout.
The city permitted 218 single-family units in 2025, and Alachua County subdivisions move on tight schedules. We price plan repeats with per-plan takeoffs so your trade scopes stay comparable lot to lot.
UF Health, the university, and the city's commercial corridors generate clinic, lab, and retail fit-outs. We break MEP and interior scopes into installable line items for hard bids.
Flat terrain and high water table mean grading, storm drainage, and lime-stabilized subgrade drive early cost. We calculate cut and fill and price pipe and structures by count and linear foot.
You need a number before design is complete. We estimate from schematic sets, flag scope gaps, and organize the budget by CSI MasterFormat division so you can compare bids apples to apples.
We estimate projects across Alachua County and the surrounding region. If your site is inside Gainesville city limits or in an unincorporated subdivision, send the address with the plans and we will price to the correct jurisdiction.
The 2025 permit mix was 2,447 multifamily units against 218 single-family units. That tells you where the estimating volume is: apartment and student housing, with a steady tail of infill houses.
Three- and four-story wood-frame buildings over slab-on-grade, with surface parking and surface drainage. We count plumbing fixtures per unit type, measure corridor and stair lengths, and price each building separately.
Watch for: Repeat unit types, corridor lengths, roof pitch changes
Wood frame over a concrete podium, often with structured parking. The estimate must split podium concrete, elevated deck framing, and fire-rated assemblies from the residential floors above.
Watch for: Podium slab, fire separation, elevated deck framing
Bed-count-driven buildings near the University of Florida, with amenity decks, study rooms, and high fixture counts. We price by bed and by unit type so your per-bed cost is defensible.
Watch for: Fixture count per bed, amenity scope, elevator count
Slab-on-grade houses in county subdivisions and city infill lots. We build per-plan takeoffs for concrete, framing, roofing, and MEP rough-in, then apply your plan repeat schedule.
Watch for: Slab thickness, truss package, window schedules
Clinics, offices, restaurants, and retail shells along Archer Road and the commercial corridors. Interior demolition, MEP distribution, and storefront glazing are measured as separate scopes.
Watch for: MEP distribution, storefront, grease and venting
University, hospital, and warehouse projects where equipment pads, process piping, and electrical service size drive cost. We organize these by division with equipment schedules called out.
Watch for: Equipment pads, service size, process piping
Gainesville sits on flat, sandy ground with a high water table and a hot, wet climate. Those three conditions, plus the local code cycle, move numbers more than any finish selection.
Gainesville and Alachua County enforce the Florida Building Code, which carries its own wind, flood, and energy provisions on top of the IBC and IRC families. Permit review and inspection sequencing can affect your schedule, and impact fees are set locally. Confirm the adopted code edition and fee schedule with the city or county building department before you lock a budget.
Florida Building Code · Alachua County · city building departmentMuch of the area is underlain by sandy soils and a seasonally high water table. That drives foundation selection: slab-on-grade with thickened edges, lime-stabilized subgrade, or deep foundations where fill is deep. A geotechnical report is the first input we ask for, because it changes concrete volume, reinforcement, and sitework quantities before a single wall is framed.
geotechnical report · lime stabilization · slab-on-gradeWind-borne debris provisions and roof-to-wall uplift connections apply across much of the county, and the hot-humid climate sets insulation, glazing, and HVAC sizing. Roof geometry and attachment details are priced from the structural sheets, not from a default allowance. Confirm the wind speed and exposure category that apply to your specific site.
wind-borne debris · roof-to-wall uplift · hot-humid HVACMultifamily volume competes for the same concrete, framing, and MEP crews across north central Florida. Wage rates and crew availability shift with the university calendar and with how many towers are under construction at once. We price labor from ZIP-code-adjusted rates and note where a scope may need to be bought early to hold a number.
crew availability · ZIP-code-adjusted rates · buyout timingFlat grades mean storm drainage is often by pipe and structure rather than by gravity to a swale, and retention areas consume buildable acreage. We calculate cut and fill from the grading plan and price storm pipe by linear foot and inlets by count. Land use and setback requirements then determine how much of the site can actually be built on.
grading plan · storm drainage · retention areasConcrete, masonry, and structural lumber are sourced regionally, and haul distances from plants and yards affect delivered cost. Florida sales tax treatment of materials and the use of separate material suppliers versus subcontractor-supplied stock change the taxable base. We state the pricing basis on every line so you can compare a supplier quote to our estimate.
regional suppliers · Florida sales tax · delivered costGainesville's mix of student housing, medical offices, and single-family infill means your takeoff has to account for everything from auger-cast piles in karst limestone to wind-rated roofing and heavy MEP coordination. Here is how we break down the trades.
In Gainesville, the limestone and clay soils around Alachua County often require deep foundation systems rather than simple spread footings. We take off auger-cast piles, grade beams, and pile caps separately, then add concrete for elevated slabs and equipment pads. For multi-family projects, you will see post-tensioned slabs on grade with a vapor barrier and reinforcing steel priced by the ton. We measure formwork by contact area and include shoring for any suspended slabs. Typical waste factors for concrete run 5–8% for foundations and 3–5% for slab-on-grade. If your project is in a flood zone, we note the required freeboard and adjust finished floor elevations accordingly. Our concrete estimating services cover these items in detail.
Gainesville's hot, humid climate and frequent thunderstorms drive the need for wind-rated roofing assemblies and durable waterproofing. We take off shingles or standing-seam metal by square, underlayment by roll, and peel-and-stick membrane at valleys and eaves. For flat roofs on commercial buildings, we measure TPO or modified bitumen by square and include tapered insulation, cover board, and flashing. Roof waste factors usually run 10–15% for shingles and 5–10% for membrane. We also account for secondary water barriers and drip edge. Because the Florida Building Code sets minimum wind uplift requirements, your roofing takeoff must match the approved plans. Our roofing estimating services can provide a complete material breakdown.
Gainesville's flat terrain and high water table make grading and drainage a critical part of the takeoff. We measure clearing, grubbing, and topsoil stripping by acre, then calculate cut and fill volumes from the grading plan. Storm drainage includes pipes, inlets, and detention ponds, often with exfiltration systems. For utilities, we take off water, sewer, and force mains by linear feet, including manholes and valves. Erosion control items like silt fence and inlet protection are measured by length or count. Sitework waste factors are minimal, but you should add 5–10% for compaction and unsuitable soils. Our sitework estimating services cover these items in detail.
Wood-framed apartments and mid-rise student housing dominate Gainesville's multifamily pipeline, so we take off dimensional lumber, engineered floor joists, roof trusses, and sheathing by piece count and square footage. For commercial and institutional work near the University of Florida, structural steel columns, beams, and metal deck are measured by weight and area. We include hurricane straps, anchor bolts, and hold-downs as separate line items. Framing waste factors typically range from 5–10% for lumber and 3–5% for trusses. You should confirm the adopted wind speed and exposure category with the local building department because those values change the nailing schedule and hardware. Our framing estimating services handle both light-frame and steel systems.
Gainesville's humid summers mean HVAC latent loads are a major cost driver. We take off packaged rooftop units, split systems, and ductwork by tonnage and linear feet, including insulation and condensate lines. For plumbing, we count fixtures, water heaters, and pipe runs by diameter and material. Electrical takeoffs cover panels, feeders, branch wiring, and devices by count. In student housing, we often see individual fan coils and a central chiller, which requires separate piping and controls. MEP waste factors are typically lower, around 2–5% for pipe and wire. Our MEP estimating services can coordinate these trades to avoid duplicate counts.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, pile caps | 48 | cy |
| 05 12 00 | Structural steel columns and beams | 22 | tons |
| 06 10 00 | Wood framing, floor joists | 18,500 | lf |
| 07 21 00 | Batt insulation, exterior walls | 32,000 | sf |
| 08 11 00 | Hollow metal doors and frames | 96 | ea |
| 09 29 00 | Gypsum board, 1/2" on walls | 44,000 | sf |
| 23 81 00 | Split-system AC units, 3-ton | 24 | ea |
| 26 05 19 | Electrical branch wiring, #12 THHN | 12,000 | lf |
This worked example shows how we calculate concrete volume for pile caps on a multi-family project in Gainesville. The dimensions are illustrative and do not represent a specific job.
Assume a building with 48 pile caps, each 3'-0" x 3'-0" x 2'-0" thick. First, calculate the volume of one cap:
3.0 ft × 3.0 ft × 2.0 ft = 18.0 cubic feet per cap.
Next, convert to cubic yards: 18.0 ÷ 27 = 0.667 cy per cap.
Then multiply by the number of caps: 0.667 cy × 48 = 32.0 cy.
Add a waste factor of 5% for spillage and over-excavation: 32.0 × 1.05 = 33.6 cy.
So the total concrete volume for pile caps is approximately 33.6 cubic yards. This does not include the concrete for piles, grade beams, or slabs. For a complete foundation takeoff, you would also measure formwork by contact area, reinforcing steel by weight, and any required vapor barrier.
| Step | Calculation | Result |
|---|---|---|
| Volume per cap | 3.0 × 3.0 × 2.0 | 18.0 cf |
| Convert to cy | 18.0 ÷ 27 | 0.667 cy |
| Total caps | 0.667 × 48 | 32.0 cy |
| Waste 5% | 32.0 × 1.05 | 33.6 cy |
We use RSMeans data adjusted for Gainesville ZIP codes to price the concrete, formwork, and labor. If your project has different cap sizes or quantities, the same method applies. For a full foundation estimate, our foundation estimating services can provide a detailed breakdown. Always verify the geotechnical report for allowable bearing capacity and any special requirements for karst limestone.
Gainesville sees a mix of multi-family apartments, student housing, medical offices, and single-family infill. The University of Florida and the medical district drive institutional and commercial work. In 2025, the city issued permits for 2,665 new privately-owned residential units, with 92% of those being multifamily. That concentration means your takeoff should handle repetitive unit layouts but also account for site-specific conditions like karst soils and stormwater management.
Much of Alachua County sits on karst limestone, which can lead to sinkholes and variable bearing capacity. A geotechnical report is essential. We often see deep foundation systems such as auger-cast piles or drilled shafts instead of shallow spread footings. Your takeoff should include pile caps, grade beams, and potential dewatering. We measure concrete by volume, rebar by weight, and formwork by contact area. Always confirm the geotech recommendations with the local building department.
The Florida Building Code sets minimum wind speed requirements that vary by location and exposure category. Gainesville is generally in a 120–130 mph zone, but you must confirm the adopted edition and any local amendments with the Alachua County building department. Your roofing takeoff should include wind-rated shingles or membrane, enhanced fastening schedules, and secondary water barriers. We price these items separately so you can see the cost impact.
Yes. We estimate single-family homes, multi-family apartments, student housing, retail, offices, and light industrial. For residential, we focus on framing, roofing, and MEP rough-in. For commercial, we include structural steel, curtain wall, and complex MEP systems. Our deliverables are organized by CSI MasterFormat division and include marked-up plan sets. You can send plans in PDF or CAD format.
We take off mechanical, electrical, and plumbing systems separately, then cross-check for overlaps. In student housing, for example, we count individual fan coils, condensate lines, and electrical panels per unit. We also include fire sprinklers and alarm devices. Our MEP estimating services use RSMeans data adjusted for Gainesville labor rates. We flag any items that require coordination with the structural or architectural plans.
Most estimates are delivered within 24–48 hours after we receive complete plans and specifications. Rush service is available for an additional fee. The actual time depends on project size and complexity. For a multi-family building with 100 units, we may need 3–5 days. We provide a preliminary schedule when you send the documents.
The permit numbers we cite come from the U.S. Census Bureau's Building Permits Survey for 2025. That survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits or renovations. The data helps you understand market volume, but for your specific project, always check with the Alachua County building department for current permit requirements and fees.
Impact fees are typically not included in our takeoff unless you provide the fee schedule. They vary by jurisdiction and project type. We recommend adding a separate line item for school, transportation, and utility impact fees. Your civil engineer or local permit expeditor can provide the current rates. We focus on material and labor quantities, not government charges.
Yes. We cover Gainesville and surrounding areas, including Ocala, Palm Coast, and The Villages. We also serve other Florida cities such as Pembroke Pines, Hollywood, Miramar, Coral Springs, Palm Bay, and West Palm Beach. Our pricing is adjusted by ZIP code, so labor and material costs reflect the local market. Send your plans and we will confirm coverage.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. These tools allow us to measure areas, lengths, and counts accurately. We deliver Excel and PDF files organized by CSI MasterFormat division, along with marked-up plan sets. That format makes it easy for you to review and adjust quantities.
Email your plans and specifications to get a detailed estimate within 24–48 hours.