Multifamily takeoff
Unit-by-unit counts for stacked floor plates, corridors, stairs and shared risers, with typical waste factors applied.
EA · SF · LFMiami Gardens permitting is running far above last year, with multifamily driving the mix. We produce CSI MasterFormat takeoffs and estimates for contractors, developers and owners working in Miami-Dade County, delivered in 24–48 hours.
Miami Gardens pricing is driven by Miami-Dade County impact fees and permitting, high water table and sandy/limestone soils that push foundation and dewatering scope, wind-borne debris and HVHZ product requirements, and a multifamily-heavy permit mix where unit counts and repetitive floor plates drive cost. ZIP-code-adjusted material and labor pricing matters.
Miami Gardens sits in north Miami-Dade County, where the 2025 permit data shows 79 new privately-owned residential units versus 15 the prior year — a 427% jump. Multifamily accounted for 68 of those units, 86% of the total, at an average permitted value of $142,000 per unit. That mix tells you where the estimating risk sits: repetitive unit plans, shared MEP risers, and sitework that has to be priced before the first slab.
We build estimates the way a Miami-Dade bid actually gets assembled. Quantities come off the plan set in Bluebeam Revu and PlanSwift, then get priced with RSMeans data adjusted to the ZIP code. Every deliverable is organized by CSI MasterFormat division with marked-up plan sets, so your superintendent and your buyout schedule work from the same document. If you are also bidding outside the city, our Florida construction estimating work covers the state, and nearby scopes in Pompano Beach and Davie follow the same format.
For bidders. You need a number you can defend on bid day. We break out labor, material and equipment by division, flag scope gaps, and hand you marked-up plans so you can see exactly what was counted.
For builders. You are buying out trades and tracking production. Division-level quantities let you compare subcontractor quotes line by line and catch the missing dewatering, formwork or roof underlayment before mobilization.
For owners. You are testing a pro forma or a change order. We price the scope you actually have, with assumptions listed, so your budget review is based on quantities instead of a lump sum.
Select a bar to compare Miami Gardens with the largest Florida markets we cover.
79 new housing units in 2025 (+426.7% vs 2024).
11 single-family · 68 multifamily (86%).
Miami Gardens issued 79 new privately-owned residential units in 2025, up from 15 in 2024 — a 427% increase. Single-family units were 11; multifamily was 68, or 86% of the total. Permitted value was $11M, averaging $142,000 per unit. For a bidder, that means the pipeline is mostly attached and stacked construction, not scattered custom homes. Takeoff effort shifts to repeating floor plates, corridor and stair quantities, and shared MEP risers. The 11 single-family permits still matter, but they are one-off scopes. Ranked 18 of 25 among covered state cities by units, Miami Gardens is 0.2% of the covered state total of 38,215 units, so local pricing still tracks the broader Florida market.
Three things move the number here. First, soil and water: sandy/limestone conditions and a high seasonal water table drive foundation type, dewatering and backfill quantities, which is why we separate foundation and sitework scope instead of burying it in general conditions. Second, wind: Miami-Dade product approval and wind-borne debris requirements change glazing, roof attachment and sheathing details, so those line items need unit prices, not allowances. Third, permit and impact fees, which are jurisdiction-specific and should be verified with the city before you carry them. Contractors comparing scopes across the county often ask us to price a Sunrise or Boca Raton job in the same format.
We estimate the scopes that show up on Miami Gardens plans — residential, commercial and the site and structure work underneath them.
Unit-by-unit counts for stacked floor plates, corridors, stairs and shared risers, with typical waste factors applied.
EA · SF · LFSingle-family and small residential scopes priced with ZIP-adjusted material and labor for Miami-Dade County.
SF · EASlab, grade beam, column and elevated deck quantities, including formwork contact area and rebar by bar size.
CY · SFCA · TONExcavation, dewatering, backfill and pile or footing scope tied to the geotech report and grading plan.
CY · LF · TONWood or metal stud counts, sheathing, truss or joist layout, and drywall by board type and thickness.
LF · SF · EAPlumbing, HVAC and electrical counts by fixture, tonnage and device, coordinated with the riser and panel schedules.
EA · LF · TONRoof area, edge metal, underlayment and attachment quantities for Miami-Dade wind requirements.
SF · LFTenant improvement and shell scopes organized by CSI MasterFormat division for bid comparison and buyout.
SF · EAMiami Gardens permitted 68 multifamily units in 2025, 86% of the city total. Repetitive unit plans still hide riser, corridor and balcony scope you must price per building.
The 11 single-family units permitted in 2025 are infill lots, not tract runs. Each plan needs its own foundation, tie-in and utility connection priced from scratch.
Flat lots in north Miami-Dade still need fill, compaction and dewatering priced. Bidders here win or lose on cubic yards, not on the concrete line.
Shared risers and meter banks in multifamily work mean fixture counts and pipe runs must be taken off per building, per floor, before you quote a unit price.
You are testing a pro forma against $142,000 average permitted value per unit. We give you division-level quantities so the budget review is not a single lump sum.
When a Miami Gardens set is at 60% and the owner wants a number, we take off what is drawn, list assumptions, and flag what is still missing.
We take off plans for projects inside Miami Gardens and across the north Miami-Dade and south Broward corridor. If your job sits in one of these areas, the pricing basis is the same ZIP-code-adjusted material and labor data.
The 2025 permit mix — 79 new privately-owned residential units, 68 of them multifamily — tells you what gets built here. We price those scopes plus the commercial and industrial work that supports them.
Two- and three-story walk-ups with surface parking. Takeoff runs per building: unit mix, corridor lengths, stair counts, roof area, and the meter bank feeding each building.
Watch for: Balcony railings, attic access, and per-building riser counts
One-off lots on existing platted streets. Quantities come off the lot survey and the foundation plan together, because tie-ins to existing utilities drive the sitework number.
Watch for: Utility tie-in distance and driveway apron replacement
Small-format retail, medical office and service buildings along the corridors. We take off shell and core separately so a tenant fit-out can be added later without redoing the base.
Watch for: Storefront glazing, grease interceptors, and ADA restroom counts
Tilt-wall and pre-engineered metal buildings with truck courts. Slab thickness, dock equipment and fire protection are priced from the civil and structural sheets, not from a square-foot allowance.
Watch for: Slab flatness, dock levelers, and NFPA 13 sprinkler density
Footings, grade beams, slabs-on-grade and elevated decks. We measure formwork by contact area, rebar by bar list, and concrete by net cubic yards with a typical waste factor added.
Watch for: Rebar lap lengths, vapor barrier, and curing method
Low-slope membrane and steep-slope shingle roofs. Takeoff includes insulation, cover board, flashing, edge metal and roof drains, because these lines are where bids usually leak.
Watch for: Flashing linear feet, drain counts, and secondary water barrier
Two bids on the same Miami Gardens plan can differ by double digits. These are the drivers we adjust for before the number leaves our desk.
Miami-Dade County enforces the Florida Building Code with local amendments, including high-velocity hurricane zone provisions that affect roof attachment, opening protection and structural connections. The adopted edition changes on a state cycle, so confirm the current edition and any city amendments with the Miami Gardens building department before you price. Wind-borne debris protection alone can move the envelope number.
Florida Building Code · Miami-Dade County amendments · Miami Gardens building departmentMuch of north Miami-Dade sits on limestone with a shallow water table, and some lots carry fill from earlier grading. A geotechnical report drives whether you price spread footings, deepened footings or a mat. Without the report, we price the foundation as drawn and list the soil assumption as a line item so you can adjust after the test borings come back.
Geotechnical report · Limestone · Water table · FillSouth Florida pricing carries wind-uplift requirements, impact glazing or shutters, and a rainy season that can idle sitework crews. We add line items for dewatering, stabilized construction entrances and temporary protection, and we note weather days separately from production rates so you can see what the schedule is really buying.
Wind uplift · Impact glazing · Dewatering · Rainy seasonMiami-Dade labor is priced by trade and by crew size, and the multifamily volume here competes for the same concrete, framing and MEP crews. RSMeans data adjusted to the project ZIP code gives a defensible base, but we flag trades where the local market is tight so you can carry the right burden and overtime assumptions in your bid.
RSMeans data · ZIP-code adjustment · Crew rates · OvertimeFlat sites need positive drainage, and Miami-Dade stormwater rules can require on-site retention or exfiltration. We take off clearing, fill, compaction, storm pipe, structures and pavement by area and by linear foot. Setback, parking and landscape requirements from the city land development regulations can change the impervious area you have to price.
Stormwater retention · Exfiltration · Impervious area · Land development regulationsMost material reaches a Miami Gardens site by truck from suppliers in Miami-Dade or Broward, so delivery distance and load size matter on concrete, rebar and drywall. We price material by unit with sales tax and freight shown where they apply, and we separate taxable material from labor so your accounting and your buyout both reconcile to the same takeoff.
Concrete suppliers · Freight · Florida sales tax · BuyoutMiami Gardens sits in Miami-Dade County, where the adopted Florida Building Code, High-Velocity Hurricane Zone provisions drive product approvals, attachment schedules, and inspection sequencing. The city's 2025 permit mix was 86% multifamily, so takeoffs here lean toward repetitive unit types, large podiums, and tight trade stacking.
Miami-Dade's limestone and sandy soils usually mean either a stiffened slab or a pile-supported foundation, and the takeoff has to follow the geotech report. For multifamily, count pile caps, grade beams, and slab thickness by area, not by a single square-foot allowance. Include vapor barrier, welded wire or fiber reinforcement, and dowels at construction joints. On elevated decks, separate the concrete, formwork, and shoring line items because the shoring duration affects the schedule. For a detailed breakdown by element, see our foundation estimating services. Confirm the adopted code edition and product approval requirements with the Miami-Dade County building department before pricing.
Roofing in this climate is a wind-uplift calculation, not just a square count. Tile, membrane, and modified bitumen systems each carry different fastener counts, adhesive rates, and edge-metal details. On multifamily, separate the roof areas by building, and include parapet cap, roof drains, and overflow scuppers. Underlayment and secondary water barrier quantities should match the deck area plus typical laps and waste. Our roofing estimating services break out these components. Confirm the product approval numbers and the adopted code edition with the local building department, because HVHZ approvals change.
Sitework in Miami Gardens often includes clearing, mass grading, and drainage, and the flat terrain means stormwater retention is a real cost. Take off excavation by cut and fill volumes, not by a single clearing acreage. Include exfiltration trenches, catch basins, and pipe runs by diameter and depth. Paving quantities should separate base, binder, and surface course. Our sitework estimating services cover these items. Because the water table is high, dewatering and erosion control may be required. Confirm the local drainage and land development requirements with the city and county before you price the site package.
Mid-rise multifamily in Miami Gardens is typically concrete, but low-rise and townhome work uses CMU or wood frame. CMU takeoffs need block count by wall type, grout volume at reinforced cells, horizontal joint reinforcement, and lintels. Wood frame in the HVHZ requires specific nail patterns, straps, and sheathing schedules, so count connectors by type and not by a lump sum. If steel is in scope, separate joists, deck, and miscellaneous metals. Our framing estimating services cover both CMU and light-gauge takeoffs. Always verify the wind-borne debris region and the required opening protection with the local building department.
Mechanical, electrical, and plumbing takeoffs in Miami Gardens multifamily work are driven by unit count and fixture count. Plumbing needs water, waste, and vent counts per fixture, plus grease and sanitary risers. HVAC is typically split systems or VRF, so count condensing units, air handlers, and line-set lengths per unit. Electrical includes panels, branch circuits, and devices by unit type. Our MEP estimating services organize these by system and floor. Coordinate the riser diagrams with the structural openings before you finalize quantities, because missed sleeves and blockouts are a common change-order source.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, elevated slab | 18,400 | SF |
| 04 20 00 | CMU wall, 8 in., reinforced | 6,250 | SF |
| 06 10 00 | Wood framing, roof trusses | 1,850 | LF |
| 07 30 00 | Roofing, tile, HVHZ approved | 24,600 | SF |
| 08 50 00 | Impact windows, fixed and operable | 142 | EA |
| 22 00 00 | Plumbing fixtures, per unit | 96 | EA |
| 23 00 00 | HVAC, split system, per unit | 48 | EA |
| 31 20 00 | Site grading and excavation | 3,200 | CY |
This example shows how we build a CMU wall takeoff for a typical Miami Gardens multifamily building. The dimensions are illustrative and do not come from a specific project. We start with a wall schedule from the architectural drawings, then measure each wall type by length and height, deduct openings, and add waste. The table below shows the calculation steps for one wall type.
| Step | Description | Calculation | Result | Unit | |------|-------------|-------------|--------| | 1 | Wall length | Given | 120 | LF | | 2 | Wall height | Given | 10 | FT | | 3 | Gross wall area | 120 × 10 | 1,200 | SF | | 4 | Deduct openings | 4 doors × 21 SF + 6 windows × 15 SF | 174 | SF | | 5 | Net wall area | 1,200 − 174 | 1,026 | SF | | 6 | Block count | 1,026 × 1.125 blocks/SF | 1,155 | EA | | 7 | Waste factor | 1,155 × 5% | 58 | EA | | 8 | Total blocks | 1,155 + 58 | 1,213 | EA |
After the block count, we add grout volume for reinforced cells, horizontal joint reinforcement, and lintels. Grout is calculated at 0.17 cubic feet per linear foot of reinforced wall, and we count reinforced cells from the structural drawings. Horizontal joint reinforcement is measured in linear feet of wall, and lintels are counted by opening size. We also include mortar, which is typically 3 bags per 100 blocks, and ties and anchors by count. For a full CMU takeoff, our framing estimating services can help. Always verify the adopted code edition and inspection requirements with the Miami-Dade County building department.
Miami Gardens is a multifamily market. In 2025, the city issued permits for 79 new privately-owned residential units, and 68 of those were multifamily. That is 86% of the total. Single-family accounted for 11 units. The average permitted value per unit was $142,000. So takeoffs here usually involve repeated unit plans, shared MEP risers, and large roof areas. We also see some commercial and institutional work, but residential multifamily drives the volume.
The permit numbers come from the U.S. Census Bureau's Building Permits Survey for 2025. The survey counts new privately-owned residential units permitted by the city itself. It does not include commercial permits or renovations. The 2025 total was 79 units, up from 15 units in 2024. That is a 427% increase. The permitted value was $11 million. We use this data to understand the local market mix, but your takeoff should always be based on your project's plans and specifications.
The High-Velocity Hurricane Zone provisions of the Florida Building Code apply in Miami-Dade County. They require product approvals for roofing, windows, doors, and other components. In a takeoff, this means you cannot price a generic assembly. You must use the approved product's installation instructions for fastener counts, adhesive rates, and edge details. If the drawings do not specify approved products, we flag it as a scope gap. Confirm the adopted code edition and product approval numbers with the local building department before you finalize your bid.
For cast-in-place concrete, typical waste factors range from 5% to 10% depending on the element and formwork reuse. For elevated slabs, 5% is common. For foundations with irregular shapes, 10% may be more realistic. We apply waste by line item, not as a blanket percentage. On a recent multifamily takeoff, we used 7% for pile caps and 5% for slabs. Your geotech report and structural drawings will drive the final quantities.
Yes. We provide construction estimating services throughout South Florida, including Davie, Sunrise, Pompano Beach, and Boca Raton. If your project is in Miami Gardens or any of these nearby cities, we can prepare a takeoff organized by CSI MasterFormat division. We also cover Clearwater and Lakeland. Our pricing is adjusted by ZIP code for material and labor. You can send plans for any of these locations through our get an estimate page.
We use Bluebeam Revu for plan markup, PlanSwift for quantity takeoff, and RSMeans data for pricing. This combination lets us produce Excel and PDF deliverables organized by CSI MasterFormat division, with marked-up plan sets. For Miami Gardens projects, we adjust material and labor pricing by ZIP code. The software helps us maintain consistency, but the real value is in knowing which line items to include and which scope gaps to flag. We do not rely on software alone.
Most projects are completed in 24 to 48 hours. Rush service is available if you have a bid deadline. The turnaround depends on the size and complexity of your project. For a typical multifamily building in Miami Gardens, we can deliver a full takeoff within two business days. For larger projects, we will give you a specific schedule when you send the plans. We recommend sending all available drawings, including architectural, structural, and MEP.
We need the complete set of drawings and specifications. For a Miami Gardens project, that usually means architectural, structural, civil, mechanical, electrical, and plumbing plans. We also need the geotech report if foundations are in scope. If you have a bid form or a scope sheet, send that too. The more information you provide, the fewer assumptions we have to make. You can upload files through our get an estimate page. We will confirm receipt and give you a delivery date.
Yes. We can identify cost drivers and suggest alternatives, but we do not design. For example, if the structural drawings call for a certain pile type, we can price alternatives based on the geotech report. We can also compare roofing systems or window types. Any value engineering suggestion must be reviewed by the design team and confirmed with the local building department. Our role is to give you accurate quantities and pricing so you can make informed decisions.
We cover all divisions relevant to your project. For Miami Gardens multifamily work, that typically includes Division 03 (Concrete), Division 04 (Masonry), Division 06 (Wood, Plastics, and Composites), Division 07 (Thermal and Moisture Protection), Division 08 (Openings), Division 22 (Plumbing), Division 23 (HVAC), Division 26 (Electrical), and Division 31 (Earthwork). We organize our takeoffs by these divisions so you can compare them directly to your bid form. If your project has specialty systems, we can include those divisions as well.
Send your plans and specifications through our get an estimate page, and we will return a detailed takeoff organized by CSI MasterFormat division within 24 to 48 hours.