Residential takeoff
Single-family foundations, framing, roof and finishes taken off sheet by sheet for tract and custom homes in Utah County.
SF · EA · LFAmerican Fork permitted 190 new privately-owned residential units in 2025, all single-family, at an average value of $463,400 per unit. We produce CSI-organized takeoffs and estimates for the contractors building here, delivered in 24–48 hours.
Three things drive cost here: residential-only permit volume (190 single-family units in 2025, zero multifamily), Utah County soil and frost conditions that set footing depth, and ZIP-code-adjusted material and labor pricing. Add steep east-bench grades and you get earthwork quantities that swing bids more than framing does.
American Fork sits in Utah County, between Pleasant Grove and Lehi along the I-15 corridor, and its permit mix is unusually clean: 190 new privately-owned residential units in 2025, every one of them single-family, per the U.S. Census Bureau Building Permits Survey. That matters to you as a bidder because there is no multifamily volume to average against — your competition is other single-family builders, and the estimate that wins is the one with the tightest earthwork and concrete numbers.
We build those numbers from your plan set, not from a square-foot rule of thumb. Footings, stem walls, flatwork, framing, roof, and MEP rough-in get taken off line by line in Bluebeam Revu and PlanSwift, then priced with RSMeans data adjusted to American Fork ZIP codes. Deliverables come back in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly where each quantity came from. If you are pricing work across the corridor, our Utah construction estimating team covers the same format for Pleasant Grove and Tooele.
For bidders. You need quantities you can defend in a bid review. We return division-level takeoffs with marked-up plans, so when a GC asks where your concrete yardage came from, you can point to the sheet and the line.
For builders. Production builders here run the same plans repeatedly. We take off the first lot, then help you track variance against actuals so your next bid reflects what the crew really installed, not what the plan promised.
For owners. If you are developing a lot or a small commercial pad in American Fork, you want a budget before you commit. We price sitework, foundations and shell separately so you can see which scope is driving your number.
Select a bar to compare American Fork with the largest Utah markets we cover.
190 new housing units in 2025 (+26.7% vs 2024).
190 single-family · 0 multifamily (0%).
American Fork issued permits for 190 new privately-owned residential units in 2025, up from 150 in 2024 — about a 27% increase — and all 190 were single-family. The city ranks 16th of 25 covered Utah cities by units and accounts for 1.6% of the 11,785 covered statewide units. For you as a bidder, that means the local pipeline is tract homes and custom single-family, not apartment shells. Your estimate should be built around repetitive foundation and framing scopes, with concrete and framing quantities that repeat lot to lot. Multifamily share is zero, so do not carry apartment-style economies of scale into a bid here. The statewide picture shows the same residential tilt along the Wasatch Front.
The 2025 permitted value in American Fork was $88M across those 190 units, an average of $463,400 per unit. That average is high enough that finish scope and sitework both matter — you are not pricing entry-level production boxes alone. When we take off a project here, we separate earthwork, foundation, framing, roofing and MEP so you can see which division is pushing the total. On east-bench lots with grade, earthwork and retaining often outrun the framing line. If your bid is heavy on concrete and flatwork, our concrete estimating and foundation estimating teams work the same plan sets. Contractors pricing the neighboring corridor often compare our Pleasant Grove and Cedar City coverage.
We take off and price the scopes that actually appear on American Fork plan sets, from lot grading through MEP rough-in.
Single-family foundations, framing, roof and finishes taken off sheet by sheet for tract and custom homes in Utah County.
SF · EA · LFMass excavation, structural fill, backfill and grading quantities for sloped bench lots along the east side of the city.
CY · SFFootings, stem walls, slab-on-grade and rebar priced to the frost depth your local building department requires.
CY · LF · TONDriveways, walkways, patios and garage slabs with typical waste factors applied to ready-mix and forming.
CY · SFFloor, wall and roof framing with lumber, sheathing, hardware and truss counts separated by floor level.
BF · LF · EARoof area, underlayment, flashing and ridge vent quantities for steep-slope roofs common on Wasatch Front homes.
SQ · LFPlumbing, electrical and HVAC rough-in counts coordinated with fixture schedules and equipment cut sheets.
EA · LFShell and interior scopes for small commercial and tech-corridor buildouts, organized by CSI MasterFormat division.
SF · EAYour 2025 permit run in American Fork was 190 units, all single-family, so your bid turns on footing, stem wall and flatwork quantities on repetitive plans. We take off lot one, then track variance against installed quantities.
You are comparing American Fork against Pleasant Grove and Lehi on the same I-15 corridor. Division-level takeoffs with marked-up plans let you normalize subcontractor quotes across all three without re-measuring the sheets.
Footing and stem wall pricing in Utah County lives or dies on rebar tonnage, form area and waste. We break those out separately so your bid carries the same line structure as the GC's schedule of values.
American Fork's single-family volume means wall, floor and roof framing packages get bid fast. We count studs, plates, headers, sheathing and truss quantities by floor so your lumber order matches the takeoff.
If you are building one house or a small pad on a lot you already own, you need a budget before you sign a construction loan. We price sitework, foundation and shell separately so you see which scope drives the number.
Your cost history from another market does not transfer to American Fork ZIP codes. We price with RSMeans data adjusted locally so your first Utah bid is not carried by out-of-state assumptions.
We estimate from plan sets for projects anywhere in north Utah County and the surrounding corridor. If your site is inside one of these areas, the takeoff format is the same.
The 2025 permit record here is 190 new privately-owned residential units, all single-family, so the bulk of our American Fork work is detached housing and the sitework that supports it. Commercial and industrial pads along the I-15 corridor make up the rest.
The core of American Fork's permit volume. We take off footing and stem wall concrete, rebar, anchor bolts, sill plate, floor and roof framing, sheathing, roofing, and MEP rough-in by floor, then price with ZIP-adjusted RSMeans data.
Watch for: Footing depth, rebar lap, and waste factors on sheathing
Larger lots in the bench areas bring deeper cuts, retaining walls and more complex roof geometry. We measure wall heights, stepped footings and glazing quantities individually rather than applying a per-square-foot allowance.
Watch for: Stepped footings, retaining walls, and window schedules
Even where the city's 2025 permit count shows no multifamily, attached product appears on infill lots. We break out party walls, fire separations and shared utility runs so each building in the row is priced correctly.
Watch for: Party wall assemblies and fire-rated separations
Retail and office pads serving the growing population need sitework, foundation and shell pricing before lease commitments. We separate earthwork, utilities, slab and structural shell so you can see which scope carries the risk.
Watch for: Utility tap fees, curb cuts, and slab thickness
Storage and light manufacturing buildings near the corridor price on slab area, tilt or masonry wall area and roof structure. We take off slab thickness, reinforcement, dock equipment and MEP rough-in as separate divisions.
Watch for: Slab reinforcement, dock pits, and roof framing
Smaller projects still need defensible quantities. We measure demolition, new framing, insulation and finish by room, and flag where existing construction makes quantities uncertain until you open the wall.
Watch for: Demo quantities and existing wall conditions
Two bids on the same American Fork plan can differ by more than the plan itself. These are the variables we adjust for when we price your takeoff.
Utah adopts statewide code editions, but American Fork runs its own plan review and inspection sequence, and the edition in force can lag or lead what you used on your last project. We do not price permit fees from memory; we list them as a separate line and tell you to confirm the adopted edition and current fee schedule with the city building department before you submit.
Utah Uniform Building Code · American Fork building department · IBC · IRCBench and foothill lots in north Utah County often carry gravelly or clayey soils with variable bearing, and frost depth drives footing elevation. A geotechnical report changes your footing width, stem wall height and backfill volume. We price from the soils report when you have one and flag footing depth as a bid assumption when you do not.
Geotechnical report · frost depth · footing and stem wall · backfillAmerican Fork sits in a cold, snowy winter pattern with freeze-thaw cycles that affect flatwork curing, masonry and exterior finishes. Concrete placed in winter needs blankets, accelerators or heated enclosures, and those costs belong in the bid. We carry a separate line for cold-weather protection so it is visible rather than buried in the concrete unit price.
Freeze-thaw cycles · cold-weather concrete · curing · masonryUtah County's construction labor market is tight when single-family volume runs high, and framing, concrete and MEP crews book out weeks ahead. Labor rates in RSMeans data are adjusted to the local market, but your schedule risk is separate. We note which trades are most likely to drive escalation so you can carry the right contingency.
RSMeans labor adjustment · framing crews · concrete crews · MEP tradesSloped lots need cut and fill balance, retaining walls, and storm drainage that flat-lot builders never price. American Fork's lot grading and drainage requirements vary by subdivision and by the city's current land use approvals. We take off excavation, backfill, import or export, and drainage structures separately so you can see the dirt number on its own.
Cut and fill · retaining walls · storm drainage · lot gradingMost material in this market moves along the I-15 corridor, so freight is short but supplier lead times and Utah sales tax treatment still move your number. We price material at ZIP-code-adjusted rates, list sales tax as its own line, and flag long-lead items such as trusses, windows and electrical gear so you can order early.
I-15 corridor · Utah sales tax · truss lead time · window lead timeAmerican Fork's 2025 permit data shows 190 new single-family units and no multifamily, so the takeoffs we run here are dominated by detached houses on tight Wasatch Front lots. Each trade below carries a local wrinkle that changes quantities, not just unit prices.
Utah County lots in the American Fork bench area often carry fill placed during subdivision grading, so a takeoff that stops at stripping topsoil misses the real cost. We separate unclassified excavation, structural fill under footings, and export when the cut/fill balance is negative. Rock excavation is a common adder along the east bench, and it must be a unit-rate line, not a lump sum. For residential subdivisions, we also carry trenching for sewer, water and storm laterals in the Sitework division rather than burying it in the concrete package. See our sitework takeoff scope.
Framing takeoffs here are driven by the plan's wall heights and roof geometry, not by a per-square-foot allowance. We count studs by wall run with openings deducted, then add plates, headers, blocking and a typical waste factor. Roof trusses are priced as a supplier package with a separate line for crane or boom truck, because truss delivery on a narrow American Fork street can require a different truck than the framer assumed. Engineered lumber beams and hangers are listed individually so your lumber yard quote can be compared line by line. Our framing estimating service breaks this out by floor.
Mechanical, electrical and plumbing rough-in is where residential bids in Utah County most often go sideways, because the plan set shows fixtures and devices but not the runs. We count plumbing fixtures by type, water and drain runs by fixture group, gas piping by appliance, and HVAC by tonnage with a separate line for flex duct, hard pipe and registers. Electrical is taken off by device, fixture, circuit and panel, including the service entrance and meter. Confirm the adopted NEC edition and any local amendments with the building department before you price. Our MEP estimating service handles this division.
Frost depth in this part of Utah County drives footing depth, and the IBC edition your jurisdiction has adopted governs the minimum. We take off continuous footings, stem walls, slab-on-grade, garage slabs, driveway and flatwork separately, each with its own formwork and finish line. Anchor bolts, sill seal, vapor barrier and rebar are listed as material with a typical waste factor rather than absorbed into the concrete price. If your plan set shows a post-tensioned slab, say so up front — the strand and stressing line items are not interchangeable with #4 rebar. Our foundation estimating service covers this scope.
Asphalt shingle systems dominate, but the takeoff has to carry underlayment, ice-and-water membrane at eaves and valleys, drip edge, ridge vent, pipe boots and step flashing as separate items — those are the lines that disappear when a bid is built from a per-square price. Roof pitch and the number of hips and valleys change labor more than they change material. Stucco, fiber cement and vinyl siding each carry their own trim, house wrap and fastener counts. On a two-story plan, scaffolding or ladder staging is a real cost line. Roofing takeoff details are here.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in continuous | 18.4 | CY |
| 03 20 00 | Rebar, #4 footing and stem wall | 3,120 | LF |
| 03 30 00 | Slab-on-grade concrete, 4 in, house | 2,180 | SF |
| 06 10 00 | 2x6 stud wall framing, 9 ft plate | 1,940 | LF |
| 06 17 53 | Roof trusses, supplier package | 1 | LOT |
| 07 30 00 | Asphalt shingle roofing, 6:12 pitch | 31.5 | SQ |
| 09 21 16 | Gypsum board, 1/2 in, walls and ceilings | 8,640 | SF |
| 22 00 00 | Plumbing fixtures and rough-in, 2.5 bath | 1 | LOT |
Dimensions below are illustrative only. We use them to show the sequence from plan dimensions to a priced line, not to quote your house.
Assume a rectangular footprint 48 ft x 32 ft with a continuous footing 24 in wide by 12 in deep. The perimeter is (48 + 32) x 2 = 160 LF. Add one interior bearing line 32 ft long, so total footing length is 192 LF.
| Step | Calculation | Result |
|---|---|---|
| Footing cross-section | 24 in x 12 in = 2.0 ft x 1.0 ft | 2.00 SF |
| Volume per linear foot | 2.00 SF x 1.0 ft | 0.0741 CY/LF |
| Net volume | 192 LF x 0.0741 CY/LF | 14.23 CY |
| Waste factor (typical 5%) | 14.23 x 1.05 | 14.94 CY |
| Order quantity | round up to whole yard | 15 CY |
Now the same footing has to carry rebar. Two continuous #4 bars top and bottom gives 4 bars x 192 LF = 768 LF. Add 10% for laps and cutting, and you order 845 LF, or about 71 pieces of 12 ft stock.
Two things change this number on a real American Fork job. First, frost depth and the adopted IBC edition set the minimum footing depth; if the plan calls for 18 in instead of 12 in, the volume rises by half. Second, stepped footings on a sloped bench lot add short vertical segments that a simple perimeter calculation misses entirely. We take those steps off individually.
Formwork is priced by contact area, not by volume: 192 LF x 2 sides x 1.0 ft height = 384 SF of footing forms, plus stem wall forms if the wall is poured separately. Anchor bolts, keyway and sill seal are listed as material lines so nothing is absorbed into the concrete price.
When you send plans, include the foundation plan, the structural notes and any geotechnical report. The soils report is what tells us whether the footing has to bear on engineered fill, which adds an excavation and compaction line the architectural sheets never show.
We price by project scope, not by a flat city rate, so the number depends on the plan set, the number of trades and how fast you need it back. Most projects return in 24 to 48 hours, and rush turnaround is available. Send the drawings and we will confirm scope and price before any work starts. There is no local office to visit — everything is handled electronically, which is how we keep turnaround short for Utah County builders.
A complete plan set is the minimum: architectural, structural, foundation, and the MEP sheets if you want mechanical, electrical and plumbing priced. A geotechnical report helps on bench lots where fill or rock is likely. Specifications, finish schedules and any addenda matter more than most people expect, because they carry the material grades that change unit prices. If you only have a partial set, tell us which divisions you want and we will scope to that.
We use ZIP-code-adjusted material and labor pricing, so an American Fork address prices differently than a rural Utah address. RSMeans data provides the base, and we adjust for the local market. That matters in Utah County because the labor pool is stretched by concurrent single-family and tech-campus work along the Wasatch Front. If you have recent subcontractor quotes from your own jobs, send them and we will reconcile our numbers against them.
Yes. We cover American Fork and the surrounding cities, including Pleasant Grove, Cedar City and Tooele. The soil, frost depth and jurisdiction change between them, so the takeoff changes too — a footing detail that works in one city may not satisfy another's adopted code edition. Tell us the project address and we will price to that jurisdiction and note anything you should confirm with the local building department.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see what was measured and where. The Excel file is built so you can adjust quantities, swap unit prices and add your own markup without rebuilding the sheet. Marked-up drawings show the takeoff boundaries for each trade, which is the fastest way to check a quantity you disagree with. If your team works in a different structure, tell us before we start.
Yes. Residential single-family is the bulk of permitted volume here, but we also take off commercial buildings, tenant improvements and light industrial space. Commercial scopes bring divisions that residential plans do not, such as fire protection, elevators, and building automation, and those need their own line items rather than an allowance. If your project is a tech-campus or retail shell, send the full set including the civil drawings.
Accuracy depends on the completeness of the documents you send. We measure from the drawings and state our assumptions, so you can see exactly where a quantity came from. Where a plan is silent, we flag it as an assumption rather than guessing silently. The marked-up plan set is the check: if a wall run or a footing segment looks wrong, you can point to the sheet and we will correct it. We do not publish an accuracy percentage because it would not mean anything without the same plan set to compare against.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means the 190 units and the $88M permitted value exclude commercial, industrial and renovation permits. The survey is a useful demand signal, but it is not a construction cost index. Do not use it to set unit prices — use it to understand how much residential work is moving through the city.
Yes, even though the 2025 permit data shows zero multifamily units permitted in the city that year. Multifamily takeoffs are structured differently from single-family: you get a typical unit takeoff multiplied across the unit mix, plus separate lines for common areas, corridors, stairs, elevators and the podium or parking structure. That structure lets you see cost per unit type instead of one blended number. Send the unit plans and the unit mix table together.
Yes, and we recommend it. We can deliver the estimate organized by CSI division and also grouped into bid packages — concrete, framing, roofing, MEP, drywall and finishes — so you can hand each package to a subcontractor without reformatting. That structure also exposes scope gaps, such as flatwork that no trade claimed. If you have a standard package list you bid with, send it and we will map the takeoff to it.
Send your plan set and we will confirm scope, turnaround and price before any takeoff work begins.