Scope Precision EstimateContact Us
Pleasant Grove, UT

Construction estimating services in Pleasant Grove, UT

Pleasant Grove issued 267 new residential permits in 2025, 72% multifamily. We produce CSI MasterFormat estimates in Excel and PDF with marked-up plan sets, priced from ZIP-code-adjusted material and labor data, typically in 24–48 hours.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Pleasant Grove ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Pleasant Grove · 2025
Pleasant Grove new housing permits2025
New housing units267Change vs. 2024+222%Permitted construction value$54MAverage value per unit$202,100Rank among covered Utah cities#15
Single-family: 74 (28%)Multifamily: 193 (72%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Pleasant Grove different?

Pleasant Grove pricing swings on four local drivers: Utah County soil and frost depth on foundations, steep Wasatch bench grades that drive retaining walls and structural fill, multifamily unit-mix repetition across 193 permitted units, and ZIP-adjusted labor rates that differ from Salt Lake County crews bidding the same plans.

  • Pleasant Grove permitted 267 new housing units in 2025, #15 among the Utah cities we cover.
  • About 72% were in multifamily buildings; 28% were single-family.
  • Permit volume was up 222% compared with 2024.

Pleasant Grove sits in Utah County, where the 2025 Building Permits Survey shows 267 new privately-owned residential units permitted by the city, up from 83 the year before. Multifamily accounted for 193 of those units, 72% of the total, at a permitted value of $54M and an average of $202,100 per unit. That mix matters when you bid: a 193-unit multifamily takeoff lives or dies on typical-floor repetition and unit-mix counts, not on a single custom plan.

We estimate from the plans you send, organized by CSI MasterFormat division, with quantities in the units your crews buy and install. Foundation and sitework scopes get priced against Utah County soil conditions and the frost depth your engineer specifies, and everything is priced with ZIP-code-adjusted material and labor rates rather than a national average. If you are comparing this market against the rest of the state, start with our Utah construction estimating work, or look at how we handle the nearby American Fork and Spanish Fork markets.

Coverage
Pleasant Grove and nearby Utah communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Pleasant Grove ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need quantities you can defend in a bid review. We return division-level takeoffs with marked-up plan sets so your superintendent can trace every count, and rush turnaround is available when the bid date is close.

02

For builders. You are buying concrete, framing lumber and MEP rough-in weekly. We price to the unit you purchase, so your purchase orders and change-order pricing start from the same takeoff.

03

For owners. You are underwriting a multifamily or single-family budget before design is final. We give you a division-level cost model with clear assumptions you can carry into a lender or partner conversation.

Pleasant Grove by the numbers

Pleasant Grove's residential construction pipeline

Select a bar to compare Pleasant Grove with the largest Utah markets we cover.

267New housing units, 2025
2.3%Of all units in the Utah cities we cover
$54MPermitted residential value
72%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Pleasant Grove

267 new housing units in 2025 (+221.7% vs 2024).

74 single-family · 193 multifamily (72%).

267 permits, 72% multifamily — what that means for your bid

Pleasant Grove permitted 267 new privately-owned residential units in 2025, up 222% from 83 in 2024. Multifamily units were 193 of the total, and permitted value was $54M at an average of $202,100 per unit. For bidders, that is a market where a handful of apartment and townhome projects set the pace, and where unit-mix repetition is the single biggest lever on your number. If you price a 120-unit building from a single typical unit and miss the corner and end units, you can be off by more than the margin you are bidding. We count every unit type, stack them, and price the repetition honestly. The city ranks 15 of 25 among the state cities we cover, holding 2.3% of the 11,785 units permitted across those cities, so Pleasant Grove is a real but selective market — worth staffing for, not worth pricing off a statewide average.

Utah County site conditions that move the number

Utah County work sits on soils and grades that change the estimate before the first footing is poured. Bench lots along the Wasatch front slope enough that retaining walls, structural fill and extra excavation show up as real line items, not allowances. Frost depth governs footing depth, and expansive clay soils in parts of the county push engineered fill and moisture conditioning into the foundation scope. Storm drainage and utility trenching are priced by the linear foot with bedding and backfill separated, because that is how the excavator bills it. If your project is closer to the Point of the Mountain, the same logic applies in Herriman and Tooele, where we run the same takeoff sequence. Confirm the adopted code edition and any local amendments with the Pleasant Grove building department before you lock the scope.

Services

Construction estimating services in Pleasant Grove

We take off the scopes that drive Pleasant Grove residential and light commercial budgets, in the units your trades actually buy.

Sitework takeoff

Mass excavation, structural fill, retaining walls and utility trenching priced for sloped Wasatch bench lots.

CY · LF · TON

Foundation estimating

Footings, stem walls, slab-on-grade and waterproofing sized to Utah County frost depth and soil reports.

CY · SF · LF

Concrete estimating

Formwork, rebar, anchor bolts and flatwork for podiums, garages and building slabs, waste factored by element.

CY · SF · LB

Framing takeoff

Floor, wall and roof members counted by unit type, with sheathing, hardware and blocking separated.

LF · EA · SF

Roofing estimating

Underlayment, ice barrier, shingles and flashing for steep-slope and low-slope multifamily roofs.

SQ · LF

MEP estimating

Plumbing fixture counts, HVAC tonnage and electrical device counts by unit plan, with riser and corridor runs.

EA · LF · TON

Multi-family estimating

Typical-unit repetition, end units, corridors and amenity spaces priced from the unit mix, not one plan.

EA · SF

Residential estimating

Single-family budgets from lot grading through finishes, matched to the 74 single-family units permitted here.

SF · EA
Who we provide estimates for

Who sends us Pleasant Grove plans

General contractors bidding multifamily

Pleasant Grove permitted 193 multifamily units in 2025 against 74 single-family, so your bid is won on typical-floor repetition, unit-mix counts and podium or Type III framing quantities rather than one-off custom details.

Single-family production builders

The 74 single-family units permitted here are small infill and subdivision lots where excavation, footing and flatwork quantities drive the number more than finish upgrades do.

Concrete and foundation subcontractors

Footings, stem walls, slab-on-grade and post-tension decks along the Wasatch Front hinge on the geotech report. We take off rebar by bar size and mark the plan set for your pour sequence.

Framing and truss subcontractors

Lumber packages are priced per piece and per sheet, not per square foot. We count plates, studs, headers, sheathing and hardware so your material order matches what the crew installs.

MEP subcontractors

Rough-in counts for plumbing fixtures, gas lines, duct runs, panels and devices have to match the unit mix. We take off by division so your proposal lines up with the GC's bid form.

Owners and developers underwriting a pro forma

You need a division-level budget before design is final. We price against ZIP-code-adjusted labor and material rates for Utah County, not a national average, so your lender sees a defensible number.

Where we provide estimates

Pleasant Grove areas and nearby communities we cover

We estimate from plans and specs wherever the project sits, and most of our Pleasant Grove work comes from Utah County and the south Salt Lake Valley. If your site is outside the list below, send the address and we will confirm coverage.

Pleasant Grove and immediate neighbors

South Utah County

North Utah County and the point of the mountain

  • Lehi
  • Highland
  • Alpine
  • Cedar Hills
  • Draper
  • Saratoga Springs

Wasatch Front markets we also cover

Property types

Types of Pleasant Grove properties we estimate

The 2025 permit mix here is 72% multifamily, with the rest single-family, so our Pleasant Grove takeoffs lean toward attached housing and the site and utility work that comes with it.

Multifamily and attached

Three- and four-story wood-frame apartments, townhomes and stacked flats with tuck-under or podium parking. We take off one typical floor and one unit type completely, then multiply by counts and reconcile the differences at corners and stairs.

Watch for: Typical-floor repetition, unit-mix counts, balcony and stair quantities

Single-family production

Subdivision and infill homes on narrow lots. We count footing and stem-wall linear feet, slab square footage, and the full lumber package per plan so your material order matches the model you are actually building.

Watch for: Plan-option pricing, footing steps, garage slab thickness

Sitework and utilities

Mass grading, curb and gutter, sidewalk, storm drain, sanitary sewer and water main for a plat. We take off by station and by linear foot, with pipe size, bedding class and trench depth called out per run.

Watch for: Rock excavation, import and export balance, utility tie-in depths

Concrete structures and flatwork

Retaining walls, podium decks, footings, driveways and sidewalk. Rebar is taken off by bar size and length, not by weight per cubic yard, so your supplier quote and your placing crew agree on the same tonnage.

Watch for: Rebar lap and splice, mix design, finish and cure requirements

Tenant improvement and shell

Retail, office and light industrial shells and fit-outs along the State Street and I-15 corridors. We separate base-building scope from tenant scope so each party prices only what they own.

Watch for: Demising walls, MEP stub locations, fire-rated assemblies

Roofing and envelope

Asphalt shingle, standing-seam metal and low-slope membrane over multifamily and commercial. We measure by roof plane, count penetrations, flashing and drip edge, and price insulation to the specified R-value.

Watch for: Ice barrier at eaves, valley and penetration flashing, R-value

Local factors

What changes a construction estimate in Pleasant Grove

Two bids on the same Pleasant Grove plan can differ by double digits before a single subcontractor markup is applied. These are the drivers we price explicitly instead of burying in a square-foot number.

Code edition and permitting

Utah adopts statewide code editions, and the city enforces them through its own plan review and inspection process. Which edition is in force, and what local amendments apply, changes wall assemblies, egress widths, sprinkler thresholds and energy compliance. We price to the edition your permit is issued under and flag anything that looks like a plan-review comment waiting to happen. Confirm the adopted edition and any local amendments with the Pleasant Grove building department before you lock your bid.

IBC · IRC · IECC · NFPA 13

Soils and foundation design

Utah County soils range from gravelly bench ground near the mountains to clay and silt in the lower areas, and the geotech report governs. Expansive clay means over-excavation, import structural fill, deeper footings or a post-tensioned slab. We take off the foundation exactly as the structural sheets show it, then carry a separate line for the geotech-driven work so you can see what the soil is costing you.

Geotechnical report · Post-tension slab · Structural fill · Footing depth

Frost depth and winter concrete

Footing depth follows the frost depth your engineer specifies for the site, and northern Utah winters add cold-weather concrete measures: heated enclosures, accelerators, blankets and cure time. Those costs land in the concrete and general conditions divisions, not in a contingency. We carry them as separate lines when the schedule puts foundations or flatwork in the winter months.

Frost depth · Cold-weather concrete · Cure time · General conditions

Labor market and crew availability

The Wasatch Front has been one of the fastest-growing construction labor markets in the country, and framers, concrete finishers and MEP rough-in crews are the tight trades. We price labor from ZIP-code-adjusted rates for the area rather than a state or national average, and we keep the hours visible by division so you can see where a crew shortage will hurt your bid most.

RSMeans data · ZIP-code adjustment · Crew hours · Trade availability

Site, drainage and land use

Pleasant Grove lots slope toward the bench and the valley floor, so grading, retaining walls, swales and storm drain runs vary block to block. Setbacks, lot coverage and parking ratios come from the city's land development code and can force a different building footprint than the one you priced. We take off drainage and earthwork by station and by cubic yard, and note where a code requirement may change the design.

Mass grading · Storm drain · Retaining walls · Land development code

Materials, logistics and taxes

Most material here arrives from Salt Lake Valley suppliers, so freight, lead times and delivery windows are real line items on a Pleasant Grove job. Utah has no state property tax on inventory, but sales tax treatment varies by contract type and by who buys the material. We price material at the point of purchase the contract specifies and note the tax basis in the estimate assumptions.

Freight · Supplier lead time · Utah sales tax · Contract type
Pleasant Grove estimating guide

How Pleasant Grove conditions show up in a takeoff, trade by trade

Pleasant Grove is a mix of single-family infill and larger multifamily projects, with soil, frost, and code requirements that directly affect quantities. Here's how each trade's takeoff changes when you're pricing work in this city.

Sitework and earthwork

Pleasant Grove sits on the eastern edge of Utah Valley, where lots often slope toward the mountains and require cut and fill. A takeoff here must account for topsoil stripping, structural fill import, and compaction testing — not just the building pad. For multifamily sites, you'll see deeper utility trenches for water, sewer, and storm lines, plus retaining walls where grade breaks exceed 3 feet. If you're pricing a subdivision, include erosion control measures like silt fence and inlet protection, which the city requires during construction. For a detailed sitework takeoff, see our sitework estimating services.

Framing and structural steel

Single-family homes here are typically wood-frame with engineered floor systems. A framing takeoff must include joists, rim board, headers, and sheathing, with waste factors of 5–10% for dimensional lumber. Multifamily projects often have steel moment frames or podiums, so you'll need to separate structural steel quantities by connection type and include fireproofing where required. In Pleasant Grove, high wind zones can drive additional blocking and hold-downs. If you're pricing a tech campus or larger commercial building, expect heavier steel and metal deck. Our framing estimating services cover both wood and steel systems.

MEP systems

Mechanical, electrical, and plumbing takeoffs in Pleasant Grove must account for Utah's dry climate and code requirements. For residential, you'll see forced-air furnaces with AC, and plumbing with PEX and PVC. Multifamily projects often use split systems or VRF, and electrical includes panel schedules, branch wiring, and low-voltage rough-in. Commercial kitchens or tech spaces need grease ducts and dedicated circuits. Always verify the adopted energy code — IECC editions change insulation and lighting requirements. Our MEP estimating services break down these systems by fixture, device, and linear feet of pipe and wire.

Concrete and foundations

Utah's frost depth in this area is typically 30 inches, so footings must be below that line. A foundation takeoff for Pleasant Grove includes continuous footings, stem walls, slab-on-grade with vapor barrier, and anchor bolts. Multifamily projects often use post-tensioned slabs, which require a different quantity breakdown for tendons and concrete. You'll also need to account for winter concrete practices if you pour between November and March — heated enclosures and accelerators add cost. Confirm the adopted code edition with the Pleasant Grove building department for any special inspection requirements. Our foundation estimating services can help you itemize these components.

Roofing and waterproofing

Roofing in Pleasant Grove faces freeze-thaw cycles and occasional heavy snow loads. For steep-slope residential, a takeoff includes underlayment, ice-and-water shield at eaves, drip edge, and shingles, with waste of 10–15% for complex hips and valleys. Low-slope multifamily or commercial roofs often use TPO or EPDM, and you'll need to quantify insulation, cover board, and flashing. Don't forget roof drains and scuppers on flat roofs, which are common on larger projects. Our roofing estimating services can help you capture all layers and accessories.

Scope gaps we see on Pleasant Grove bids

  • Missing rock excavation allowances for sites with shallow bedrock or caliche, which can require blasting or hoe ram.
  • No allowance for dewatering or temporary drainage during spring runoff, common on Utah Valley projects.
  • Overlooking snow load design for roof framing and the additional blocking or hardware it may require.
  • Excluding utility trench backfill and compaction testing, which the city inspector will require before paving.
  • Forgetting fire-rated assemblies in multifamily buildings, including shaft wall and floor-ceiling details.
  • Not pricing temporary heat and enclosures for winter concrete pours, which can add 10–15% to concrete costs.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Pleasant Grove project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Pleasant Grove conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to Pleasant GroveMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: typical Pleasant Grove single-family home

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Footing concrete, 30" deep12.5CY
03 30 00Slab-on-grade concrete, 4" thick28CY
05 10 00Structural steel beam, W8x10320LF
06 10 002x6 studs, 16" o.c.2,450LF
06 10 002x10 floor joists, 16" o.c.1,800LF
07 30 00Asphalt shingles, 30-year42SQ
22 00 00PEX water lines, 1/2"680LF
26 00 00Romex 12/2 electrical wire1,200LF

Worked example: concrete foundation for a Pleasant Grove single-family home

We'll calculate concrete for a simple rectangular foundation with continuous footings and a slab-on-grade. Dimensions are illustrative: 40 ft by 30 ft building footprint, 12-inch wide by 30-inch deep footings, and a 4-inch slab. All concrete quantities are in cubic yards (CY).

Step 1: Footing volume. Perimeter = 2 × (40 + 30) = 140 LF. Footing cross-section = 1 ft × 2.5 ft = 2.5 SF. Volume = 140 × 2.5 = 350 CF. Convert to CY: 350 ÷ 27 = 12.96 CY.

Step 2: Slab volume. Area = 40 × 30 = 1,200 SF. Thickness = 4 in = 0.333 ft. Volume = 1,200 × 0.333 = 400 CF. Convert to CY: 400 ÷ 27 = 14.81 CY.

Step 3: Waste factor. Typical waste for concrete is 5–10%. Use 7%: footing 12.96 × 1.07 = 13.87 CY; slab 14.81 × 1.07 = 15.85 CY. Total concrete = 29.72 CY.

Step 4: Rebar. Assume #4 rebar at 12" o.c. each way in slab and 2 continuous bars in footing. Slab: 1,200 SF × 2 directions × (1 bar per foot) = 2,400 LF. Footing: 140 LF × 2 bars = 280 LF. Total = 2,680 LF. Add 10% lap and waste = 2,948 LF.

StepCalculationQuantityUnit
Footing concrete140 LF × 2.5 SF ÷ 2712.96CY
Slab concrete1,200 SF × 0.333 ft ÷ 2714.81CY
Concrete with 7% waste(12.96 + 14.81) × 1.0729.72CY
Rebar(2,400 + 280) × 1.102,948LF

These quantities feed directly into our foundation estimating services.

FAQ

Pleasant Grove construction estimating questions

What code edition does Pleasant Grove use for residential construction?

Pleasant Grove adopts the Utah Uniform Building Standards Act, which references the International Residential Code (IRC) and International Building Code (IBC). However, the specific edition year can change with state amendments. For any project, confirm the adopted edition with the Pleasant Grove building department before finalizing your takeoff, as insulation, seismic, and egress requirements vary by edition. We track these changes and adjust our takeoffs accordingly, so you can be confident your estimate reflects the current code.

How does frost depth affect foundation takeoffs in Pleasant Grove?

Utah's frost depth in this region is typically 30 inches, so footings must extend below that line. This increases concrete and excavation quantities compared to warmer climates. Your takeoff should show footing depth, width, and rebar placement accordingly. If you're using a design-build approach, verify the geotechnical report for any local variations. We incorporate the specified frost depth into our foundation takeoffs to ensure you capture the full scope of work.

What are typical waste factors for framing lumber in Pleasant Grove?

For dimensional lumber, typical waste factors range from 5% to 10% for straight runs, and up to 15% for complex cut-up roofs or angled walls. In Pleasant Grove, where many homes have varied rooflines, we often see 10–12% on framing packages. Always add waste separately in your takeoff so you can adjust for design complexity. Our framing estimating services account for these factors to give you accurate material quantities.

Do I need to include snow load design in my structural takeoff?

Yes. Pleasant Grove is in a region with ground snow loads that can affect roof framing and connections. Your takeoff should reflect any additional blocking, hardware, or engineered lumber required by the structural drawings. If the drawings don't specify, ask the engineer for the design snow load and confirm with the building department. We review structural drawings for these details and include them in our takeoffs to prevent underestimating the framing package.

How does the permit data from the U.S. Census Bureau Building Permits Survey help my estimate?

The survey tracks new privately-owned residential units permitted by the city. In 2025, Pleasant Grove issued 267 units, up 222% from 2024. This data helps you gauge market activity and labor demand, but it does not include commercial or industrial permits. Use it as a general indicator, not a direct input for your takeoff. We monitor these trends to advise on potential cost escalations due to labor shortages.

What's the typical turnaround for an estimate from Scope Precision Estimate?

We deliver most estimates within 24–48 hours. Rush service is available for time-sensitive bids. Our takeoffs come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured. This quick turnaround helps you meet bid deadlines without sacrificing detail. For projects in Pleasant Grove, we use ZIP-code-adjusted pricing to reflect local material and labor costs.

Can you handle both residential and commercial projects in Pleasant Grove?

Yes. We estimate single-family homes, multifamily buildings, and commercial projects. Our team uses Bluebeam Revu, PlanSwift, and RSMeans data with ZIP-code-adjusted pricing for Utah. Whether you're building a tech campus or a custom home, we can provide a detailed takeoff. We also cover nearby cities like American Fork, Herriman, and Spanish Fork, so we understand the regional market conditions.

What soil conditions should I watch for in Pleasant Grove?

Parts of Pleasant Grove have expansive clays and shallow groundwater in spring. Your geotechnical report will specify required over-excavation, drainage, or moisture conditioning. In your takeoff, include allowances for import fill, drainage stone, and possibly deeper footings. Always verify with the geotech and local building department. We review geotechnical reports and incorporate their recommendations into our sitework and foundation takeoffs.

How do I get started with a Pleasant Grove estimating project?

Send us your plans and specifications through our get an estimate page. We'll review the scope and provide a quote and turnaround time. If you have a bid date, let us know so we can prioritize. We cover Pleasant Grove and nearby cities like American Fork, Herriman, and Spanish Fork. Our team will confirm receipt and may ask clarifying questions to ensure we capture all scope items.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Pleasant Grove project plans for a quote

Upload your drawings and we'll return a detailed, CSI-formatted takeoff within 24–48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us