Sitework takeoff
Cut, fill, stripping, and utility trenching measured for Weber County frost depth and lot grading.
CY · LF · TONRoy issued 174 new residential permits in 2025, 86% of them multifamily. We produce CSI-organized takeoffs in 24–48 hours so Weber County bidders can price those units before the bid date moves.
Roy's 2025 permit mix ran 149 multifamily units against 25 single-family, so pricing skews to repeated unit types and shared sitework. Weber County soil, cold-winter concrete schedules, and ZIP-adjusted material and labor rates drive the numbers. Multifamily share, unit count, and permitted value all shape how you carry overhead.
Roy sits west of Ogden in Weber County, where the 2025 permit year was dominated by multifamily: 149 of 174 new residential units, about 86%, against only 25 single-family. That mix changes what a takeoff has to prove. A 149-unit multifamily job rewards accurate per-unit repetition and a hard look at shared scope — sitework, foundations, framing, and MEP risers — because a small per-unit error multiplies across the building.
We price with ZIP-code-adjusted material and labor rates from RSMeans data, take off in Bluebeam Revu and PlanSwift, and deliver Excel and PDF organized by CSI MasterFormat division with marked-up plan sets. Turnaround is 24–48 hours for most projects, with rush available. If you are comparing this market to the rest of the state, start with our Utah construction estimating coverage, or see how we handle the same Wasatch Front conditions in Herriman and Riverton.
Roy ranked 18 of 25 among the covered state cities by units and took about 1.5% of the 11,785 covered state total. Permitted value was $47M, an average of $268,500 per unit — a sanity check, not a budget. For single-family work in Roy, the same freeze-thaw and frost-depth conditions that drive multifamily foundations also drive footing and slab pricing on detached homes. Whether you are bidding a 149-unit apartment project or a single infill house, the takeoff has to be measured line by line, not carried as a percentage.
For bidders. You need divisional quantities fast enough to hold a bid date. We return marked-up plans and Excel by division so your subcontractor quotes can be slotted in without rebuilding the takeoff.
For builders. You are buying out a multifamily or infill residential job in Weber County. We break repeated unit types into per-unit quantities so purchase orders and change orders stay traceable.
For owners. You want a budget before design is final. We price the scope that is drawn, flag the scope that is not, and show unit rates you can carry forward as the drawings mature.
Select a bar to compare Roy with the largest Utah markets we cover.
174 new housing units in 2025 (+234.6% vs 2024).
25 single-family · 149 multifamily (86%).
Roy issued 174 new privately-owned residential units in 2025, up from 52 in 2024 — a 235% change. Multifamily accounted for 149 units, about 86% of the total, while single-family was 25. Permitted value was $47M, an average of $268,500 per unit. For bidders, that average is a sanity check, not a budget: it blends townhome or apartment shells with single-family, so your own scope still has to be taken off line by line. Roy ranked 18 of 25 among the covered state cities by units and took about 1.5% of the 11,785 covered state total. The practical read is a market where a handful of multifamily starts set the schedule, and single-family work is competed harder per unit. See the statewide picture for context.
Roy's ground and climate do real work on a takeoff. Frost depth drives footing elevations and backfill quantities, so foundation and sitework scope has to be measured, not carried as a percentage. Winter concrete placement affects curing and scheduling assumptions, and roof snow load affects framing and truss pricing. On multifamily plans, the recurring scope gaps are shared site utilities, fire-rated assemblies between units, and MEP riser counts — all easy to under-measure when you price one unit type and multiply. Nearby work in Pleasant Grove and Spanish Fork shows the same pattern along the Wasatch Front. Confirm adopted code editions with the Roy building department before you lock allowances.
We take off the divisions that carry Roy's residential and multifamily work, and hand back quantities you can price.
Cut, fill, stripping, and utility trenching measured for Weber County frost depth and lot grading.
CY · LF · TONFootings, stem walls, slab-on-grade, and rebar counted per unit type across repeated Roy plans.
CY · SF · LBFloor, wall, and roof members with sheathing and hardware, priced against roof snow load.
LF · EA · SFUnderlayment, ice barrier at eaves, and shingle squares for Roy's freeze-thaw cycles.
SQ · LFPlumbing, electrical, and HVAC counts by unit, including shared riser and meter scope.
LF · EAPer-unit quantities for repeated apartment and townhome types, with shared scope separated.
EA · SFSingle-family and infill budgets for Roy's smaller share of detached permits.
SF · EADivisional takeoffs for retail, shop, and light industrial shells along the Weber County corridor.
SF · TONYou are bidding 149-unit multifamily work in Roy where a per-unit miss on framing or MEP multiplies fast. We return divisional quantities you can slot subcontractor quotes into without rebuilding the takeoff.
Your Roy project carries repeated unit types plus shared sitework, foundations and risers. We break the takeoff by building and by unit type so buyout and change orders stay traceable.
You are one of the 25 single-family permits issued in Roy against a multifamily-heavy market. We measure footing, slab, framing and roofing quantities line by line instead of carrying percentages.
You need quantities for one division only, not a full estimate. We can isolate concrete, framing, roofing or MEP scope with marked-up plans so your bid holds its date.
You want a cost check while Weber County drawings are still moving. We price what is drawn, list what is not, and return unit rates you can carry forward as sheets revise.
You are budgeting a Roy addition, renovation or rebuild before design is final. We show scope and unit rates in Excel so you can compare options without a full bid set.
We estimate from plans for projects anywhere in Roy and the surrounding Weber County corridor, from the older grid near the city center out to the newer multifamily parcels along the western edge.
Roy's 2025 permit year ran 149 multifamily units against 25 single-family, about 86% multifamily. That mix is what our takeoffs are usually built around.
The dominant Roy permit type. We take off repeated unit types once, then extend by count, and measure shared scope separately: sitework, foundations, corridor framing and MEP risers.
Watch for: Per-unit multiplication errors and shared riser scope
Party walls, shared foundations and repeated roof planes make townhome takeoffs a repetition exercise. We count units and building runs, then price the fire-rated assemblies between them.
Watch for: Party-wall fire assemblies and shared footing quantities
Roy issued 25 single-family permits in 2025. We measure footing, stem wall, slab, framing, roofing and MEP by house plan, with waste factors applied to lumber, sheathing and roofing.
Watch for: Frost-depth footings and lumber waste factors
Older Roy lots along the central grid often carry a teardown or an addition rather than a clean lot. We separate demolition, utility relocation and new construction into distinct line items.
Watch for: Demolition, utility conflicts and haul-off
Small commercial buildings serving Roy's residential base need divisional takeoffs for shell, MEP and sitework. We price shell scope separately from tenant fit-out so each can be bid.
Watch for: Shell versus tenant improvement split
Weber County industrial buildings near the rail and highway corridors are slab-heavy and steel-framed. We take off slab thickness, reinforcement, structural steel and loading docks by area.
Watch for: Slab thickness, reinforcement and dock scope
Roy pricing moves on the same things that move the rest of the Wasatch Front, plus a Weber County set of local conditions that a generic national cost book will miss.
Roy reviews residential and commercial permits under Utah's adopted code editions, and the adopted IBC, IRC, IECC and NEC editions change on a state cycle. Plan review comments on energy envelope, egress and fire separation can add scope after your first number. Confirm the current adopted editions and any local amendments with the Roy building department before you lock a bid, and carry plan-review resubmittals as a line item.
IBC · IRC · IECC · NECWeber County soils range from lakebed silts and clays near the lower benches to gravelly deposits closer to the mountains, and frost depth drives footing elevation across the Wasatch Front. A geotechnical report changes footing width, stem wall height and backfill quantities. If you bid footings from a typical detail instead of the soils report, you can be short on concrete and rebar before the first pour.
Geotechnical report · Frost depth · Footing and stem wallRoy carries real ground snow load and freeze-thaw cycling, which shows up in roof framing, snow guards, exterior concrete air entrainment and drainage detailing. Wind exposure on open multifamily sites affects sheathing nailing and roof attachment schedules. These are not allowances you can carry as a percentage; they are measurable quantities in the framing and concrete divisions.
Ground snow load · Freeze-thaw · Wind exposureThe Wasatch Front labor pool is stretched by single-family and tech-campus construction, so crew availability and overtime assumptions move your labor line more than material pricing does. We price with ZIP-code-adjusted labor rates from RSMeans data, and you should state your own crew mix and shift assumptions so the estimate matches how you actually build.
RSMeans data · ZIP-code adjustment · Crew mixRoy sites near the lower bench and the Weber River corridor need grading, import or export of fill, and storm drainage sized for spring runoff. Utility trenching for water, sewer and power often runs through shared easements on multifamily parcels. We take off cut and fill, pipe runs and structures by station and depth rather than as a lump sum.
Cut and fill · Storm drainage · Utility trenchingMost Roy material arrives by truck along the I-15 and US-89 corridors, so haul distance and delivery windows affect concrete, steel and truss pricing. Utah applies its own sales and use tax treatment to construction materials, and job-site versus off-site fabrication can change what is taxable. Confirm current rates and exemptions with the Utah State Tax Commission before you finalize.
I-15 corridor · Utah State Tax Commission · Sales and use taxRoy sits in Weber County on the eastern shore of the Great Salt Lake, where shallow groundwater, silty lakebed soils, and a cold, windy winter drive the quantities that matter most. The city's 2025 permit mix — 149 of 174 new residential units in multifamily buildings — tells you where the volume is.
Roy's lake-adjacent ground means stripping depths and over-excavation quantities are rarely the same as a bench cut farther east. We take off stripping by area, import and export by loose cubic yard with a swell factor, and structural fill in compacted lifts. Underdrain and footing drain runs get measured in linear feet with gravel and filter fabric by the ton and square yard. On multifamily pads, detention and drainage scope is a common line item, so we carry it separately. If your project needs a dedicated site package, our sitework estimating services break it out by CSI division.
Wasatch Front framing takeoffs live or die on wall height and plate count. We measure exterior walls in linear feet, multiply by height for square footage of sheathing, and count studs at 16 or 24 inches on center with corners, openings, and blocking added. Roof framing is taken off by slope and overhang, with trusses by count and sheathing by square. Lumber waste on multifamily runs typically lands in the 5 to 10 percent range depending on plan repetition. Our framing estimating services produce a member-by-member list you can send to suppliers.
On a Roy multifamily building, MEP is where the per-unit cost spread is widest. We count fixtures by type, measure domestic water and drain-waste-vent piping in linear feet by diameter, and take off branch wiring by device count and home run length. Ductwork is measured by pound or by linear foot depending on the spec. Snow-melt and freeze protection on exterior piping is a line item worth carrying. Our MEP estimating services organize everything by CSI Division 22, 23, and 26 so your subs can price against the same quantities.
Frost depth for footings in this part of Utah is typically set by the adopted code and confirmed with the local building department, and it drives footing thickness and stem wall height. We take off continuous footings in linear feet, pad footings by count, and slab on grade by square foot with a typical 5 to 10 percent waste factor on ready-mix. Flatwork for multifamily parking and sidewalks is measured by square foot with joint and cure line items. Foundation estimating services cover the footing-to-backfill sequence in one package.
Snow load, wind uplift, and freeze-thaw cycles make underlayment and ice barrier quantities more than an afterthought on Roy roofs. We take off roof area by plane, add a typical 10 percent waste on shingles and underlayment, and measure ice-and-water membrane in linear feet along eaves, valleys, and penetrations. For multifamily buildings, we separate low-slope membrane from steep-slope shingle so the two bids can be compared. Roofing estimating services include flashing, drip edge, and ventilation line items.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, footings | 84 | CY |
| 03 30 00 | Slab on grade, 5 in. reinforced | 9,200 | SF |
| 05 10 00 | Structural steel, misc. lintels | 1,850 | LB |
| 06 10 00 | Wood framing, walls and floors | 31,400 | SF |
| 07 20 00 | Ice-and-water membrane, eaves | 410 | LF |
| 07 30 00 | Asphalt shingles, steep slope | 8,600 | SF |
| 22 10 00 | Domestic water piping, PEX | 3,150 | LF |
| 26 20 00 | Branch wiring, devices and home runs | 1,240 | EA |
This example shows how we turn a footing plan into a ready-mix quantity. Dimensions are illustrative and do not represent a specific Roy project.
Assume a rectangular building with a continuous perimeter footing and two interior bearing lines. The perimeter measures 240 linear feet. Each interior line runs 60 feet, so total continuous footing length is 240 + 60 + 60 = 360 LF. The footing is 24 inches wide and 12 inches deep. Cross-section area is 2.0 ft × 1.0 ft = 2.0 SF. Volume is 360 LF × 2.0 SF = 720 CF. Divide by 27 to convert to cubic yards: 720 ÷ 27 = 26.7 CY.
Now add pad footings. Suppose there are 12 interior column pads, each 3 ft × 3 ft × 1 ft. One pad is 9 CF. Twelve pads are 108 CF, or 4.0 CY. Combine continuous and pad footings: 26.7 + 4.0 = 30.7 CY.
Apply waste and overpour. Ready-mix on footings typically carries a 5 to 10 percent allowance for spillage, uneven subgrade, and slight over-excavation. At 7.5 percent, add 30.7 × 0.075 = 2.3 CY, for a total order of 33.0 CY. On lakebed soils in Roy, over-excavation can push this higher, so we carry a separate line for structural fill and confirm the geotech recommendation before finalizing.
| Step | Calculation | Result |
|---|---|---|
| Perimeter footing length | 240 + 60 + 60 | 360 LF |
| Footing cross-section | 2.0 ft × 1.0 ft | 2.0 SF |
| Continuous footing volume | 360 × 2.0 ÷ 27 | 26.7 CY |
| Pad footings | 12 × 9 CF ÷ 27 | 4.0 CY |
| Subtotal | 26.7 + 4.0 | 30.7 CY |
| Waste at 7.5% | 30.7 × 0.075 | 2.3 CY |
| Order quantity | 30.7 + 2.3 | 33.0 CY |
We run this same sequence for stem walls, slab on grade, and flatwork so the concrete package is complete before you send it out for bid. If you want the full division breakdown, our concrete estimating services cover footing through flatwork.
Roy issued 174 new residential units in 2025, up from 52 in 2024, with 149 of those units in multifamily buildings. That kind of swing means local subcontractors and suppliers are busier, and bid windows can be tighter. We work from your plans and specs, not from a queue, so most takeoffs are returned in 24 to 48 hours. If you are bidding a multifamily project against several other GCs, tell us the bid date and we can prioritize the divisions you need first.
Roy sits near the Great Salt Lake, and much of the area has silty, fine-grained soils with a shallow water table in places. That often means over-excavation and structural fill below footings, plus underdrain or footing drain runs. We take off the footing and slab quantities from the drawings, then carry over-excavation and fill as separate line items so you can see the cost before the geotech report is final. Confirm the actual bearing conditions with a local geotechnical engineer and the city building department.
Yes. Material and labor pricing is adjusted by ZIP code using RSMeans data, so a Roy takeoff reflects Weber County costs rather than a national average. That matters for concrete, framing lumber, and mechanical trades where local supply and crew availability move the number. We show labor and material separately in the Excel file, so you can swap in a subcontractor quote or a supplier price without rebuilding the takeoff.
Every estimate comes as an Excel workbook and a PDF, organized by CSI MasterFormat division. We also return a marked-up plan set with the takeoff so you can trace each quantity back to the sheet it came from. That matters on multifamily work where a reviewer may question a wall area or a footing length. If your team uses a different breakdown, tell us and we will match your division structure.
Yes. Multifamily is a large share of Roy's recent residential permits, and those projects need unit-by-unit repetition with common-area and site work broken out separately. We take off a typical unit, then apply counts for the unit mix, and carry corridors, stairs, elevators, and amenity spaces as separate line items. Our multi-family estimating services cover the full building, from footings through MEP rough-in.
We read the structural drawings for the ground snow load and wind speed the engineer used, then check that the roof framing and sheathing quantities match those loads. If the drawings do not state them, we flag it before pricing. We also measure ice-and-water membrane at eaves, valleys, and penetrations in linear feet, and carry snow guards or roof anchors if the spec calls for them. Confirm the adopted code edition and local amendments with the Roy building department.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city of Roy, not commercial or industrial permits. In 2025 that was 174 total units — 25 single-family and 149 multifamily — with a permitted value of $47 million and an average value of $268,500 per unit. The survey is a useful demand signal, but it is not a substitute for your own project scope.
Send the architectural, structural, civil, and MEP sheets in PDF, plus any specifications and the geotech report if you have it. Tell us the bid date, the divisions you want priced, and whether you need alternates. If you only have a partial set, we can start with the divisions you have and note the assumptions. Most Roy projects are returned in 24 to 48 hours, and rush turnaround is available.
We cover Roy and the surrounding Wasatch Front, including nearby cities like Pleasant Grove and Tooele, and we also work statewide. If your project is in a neighboring city, the same ZIP-code-adjusted pricing and CSI division breakdown apply. For a broader view of how we handle Utah projects, see our Utah construction estimating services page.
Waste is applied by material, not as one blanket percentage. Ready-mix concrete typically carries 5 to 10 percent for overpour and uneven subgrade. Framing lumber runs 5 to 10 percent depending on plan repetition and cut complexity. Shingles and underlayment usually take about 10 percent. We show the waste line separately in the Excel file so you can see the base quantity and adjust it if your supplier or crew runs tighter. On multifamily work, repetition usually lets you use the lower end of those ranges.
Send your plans and specs and we will return a CSI-organized takeoff with marked-up drawings in 24 to 48 hours.