Sitework takeoffs
Cut and fill, aggregate base, and utility trench quantities for Spanish Fork lots with variable soil and drainage requirements.
CY · LF · TONWe produce line-item takeoffs and estimates for builders in Spanish Fork, from single-family subdivisions to commercial shell work, with 24–48 hour turnaround.
Spanish Fork pricing turns on Utah County labor rates, aggregate base and backfill quantities, frost-depth footings, and roof snow-load detailing. Residential permits dropped sharply year over year, so bidders face tighter competition. ZIP-code-adjusted material and labor pricing keeps your numbers tied to this market.
Spanish Fork sits in Utah County along the I-15 corridor, where subdivision platting, school and church projects, and light commercial buildings move through plan review in volume. We take off those plans the way a general contractor bids them: by CSI MasterFormat division, with quantities you can check against the drawings. Our Utah construction estimating work covers the Wasatch Front and beyond, including Pleasant Grove and Cedar City.
Because the city issues its own residential permits, plan sets here tend to be complete and repetitive, which makes quantity takeoff efficient but leaves little room for missed scope. We mark up the plan set, list every counted item, and price material and labor with ZIP-code adjustments for the 84660 area. Most projects return in 24–48 hours, in Excel and PDF, organized by division. The 2025 permit data shows 177 new privately-owned residential units, down 64% from 492 in 2024, with single-family units at 157 and multifamily at 20. That mix keeps foundation, framing, and roofing takeoffs in steady demand on repeatable plans, while the smaller multifamily share means apartment bidders should watch for podium and Type V over Type I assemblies when those projects appear. Nearby Riverton and Herriman compete for the same crews and materials, so labor pricing in Utah County tends to move together. If you bid in Spanish Fork and one of those cities in the same month, use the same ZIP-adjusted pricing basis for both.
Select a bar to compare Spanish Fork with the largest Utah markets we cover.
177 new housing units in 2025 (-64% vs 2024).
157 single-family · 20 multifamily (11%).
Spanish Fork issued 177 new privately-owned residential units in 2025, down from 492 in 2024, a 64% drop. Single-family units made up 157 of that total, with 20 multifamily units, about 11% of the year's activity. Permitted value came to $65M, averaging $365,600 per unit. The city ranked 17 of 25 among covered Utah cities by units and accounted for 1.5% of the 11,785 statewide units in the same survey. For bidders, fewer starts mean more contractors chasing each set of plans, so takeoff accuracy and clear exclusions matter more than ever. See our statewide Utah page for how the rest of the Wasatch Front compares.
Single-family detached construction dominates Spanish Fork's permit activity, which keeps demand steady for foundation, framing, and roofing takeoffs on repeatable plans. Multifamily is a smaller share, so apartment bidders should watch for podium and Type V over Type I assemblies when those projects appear. Nearby Riverton and Herriman compete for the same crews and materials, so labor pricing in Utah County tends to move together. If you bid in Spanish Fork and one of those cities in the same month, use the same ZIP-adjusted pricing basis for both.
We estimate the scopes that drive cost on Utah County residential and commercial work.
Cut and fill, aggregate base, and utility trench quantities for Spanish Fork lots with variable soil and drainage requirements.
CY · LF · TONFootings, stem walls, slab-on-grade, and flatwork priced with local batch plant haul distances in mind.
CY · SF · LFFrost-depth footings, rebar schedules, and waterproofing counted from the structural sheets, not assumed.
CY · LB · SFWall, floor, and roof framing with snow-load-driven member sizes common along the Wasatch Front.
BF · LF · EASheathing, underlayment, and shingle or metal roofing quantities for steep-slope Utah County roof plans.
SQ · SF · LFMechanical, electrical, and plumbing counts coordinated with equipment schedules and fixture types.
EA · LF · TONFull-house takeoffs for production and custom plans, formatted for builder purchasing and bid comparison.
SF · EA · LSTenant improvements, shell buildings, and small commercial projects priced by CSI MasterFormat division.
SF · EA · LSSpanish Fork issued 157 single-family permits in 2025 on repetitive plans; we build division-by-division takeoffs you can apply across lots and update when elevations or options change.
The 20 multifamily units permitted here are a small share of the 177 total, so apartment bids turn on getting Type V over podium assemblies, unit-mix counts, and shared MEP risers right.
I-15 corridor GCs bid Spanish Fork against Riverton and Herriman on the same labor pool; our ZIP-adjusted pricing keeps your number comparable across those bid days.
Foundation, framing, and roofing crews need quantities they can install from — footing and stem wall lengths, plate counts, squares with pitch factors — not a lump sum from a bid invitation.
We mark up the plan set and return a quantity list you can check against your drawings before the set goes out, catching missing schedules and unlabeled assemblies early.
For church, school, and light commercial work in Utah County, we price the scope you actually plan to build so budget numbers hold through plan review and bidding.
We take off plans for projects inside Spanish Fork and for the Utah County and south-valley communities that share its crews, suppliers, and plan-review habits.
The 2025 permit mix — 177 residential units, 157 of them single-family — tells you what most bids here look like, but the commercial and agricultural work along the corridor has its own takeoff rules.
Production and semi-custom plans on subdivision lots. We count footing and stem wall linear feet, anchor bolts, floor and wall framing by size and grade, roof squares by pitch, and every window and door from the schedule.
Watch for: Elevation and option changes that alter framing and roofing quantities between lots.
Small apartment and attached projects like the 20 multifamily units permitted in 2025. Takeoff runs per unit type plus shared areas: corridors, stairs, common MEP risers, and site parking.
Watch for: Unit-mix counts, fire-rated assemblies, and shared-wall framing at party lines.
Retail, office, and service buildings along the I-15 corridor. We take off shell and core separately from tenant fit-out so you can bid either scope without redoing the other.
Watch for: Divisions 2 through 16 split between landlord and tenant scope.
Meetinghouses, chapels, and school additions common in Utah County. Large open assembly areas drive structural steel, long-span joists, and high-volume ductwork quantities.
Watch for: Acoustical assemblies, stage rigging, and kitchen equipment connections.
Barns, shops, and equipment sheds on the remaining farm ground around Lake Shore and Leland. Simple shells, but slab thickness, door sizes, and power service need real counts.
Watch for: Slab reinforcement, overhead door openings, and service amperage.
Small distribution and shop buildings near the highway. Slab-on-grade, tilt or masonry walls, and racking-ready clear heights drive the quantities more than finish work does.
Watch for: Slab flatness, dock equipment, and fire protection coverage.
Two bids on the same plan can land far apart here because of code review, soils, and how crews are priced along the corridor. These are the drivers we adjust for.
Utah adopts statewide code editions, and Spanish Fork reviews residential and commercial permits through its own building department. Confirm the adopted IBC, IRC, IECC, and NEC editions with the city before you price. Energy-code requirements for envelope insulation, duct sealing, and window U-values move Division 7 and Division 23 quantities more than most bidders expect on Utah County plans.
Spanish Fork Building Department · Utah Uniform Building Code · IECC envelope requirementsMuch of the south Utah County ground includes lake-bed and alluvial soils with varying clay content, and geotechnical reports often call for over-excavation, engineered fill, or deeper footings. That changes excavation, backfill, and concrete quantities before a single wall is framed. Price from the soils report, not from the typical detail, and carry the report's bearing assumptions into your foundation takeoff.
Geotechnical report · Engineered fill · Footing and stem wall concreteSpanish Fork sits in a snow-load and wind zone that drives roof framing, shear nailing, and hold-down schedules. Frost depth governs footing elevation and stem wall height on unheated structures. Roof pitch and valley count change shingle and underlayment squares, and ice-dam protection at eaves is a line item you should see in the takeoff, not assume.
Ground snow load · Frost depth · Roof underlayment and ice barrierSpanish Fork competes for the same framers, concrete finishers, and roofers as Riverton, Herriman, and the rest of the Wasatch Front. When several subdivisions are active at once, labor rates and crew availability shift, so a bid priced from last quarter's rates can miss. We price labor by trade with ZIP-code adjustment so your number reflects the corridor, not a national average.
Framing crews · Concrete finishers · ZIP-adjusted labor ratesNew plats on the city's edges need mass grading, utility trenching, curb and gutter, and storm drainage before vertical construction starts. Retention and detention requirements depend on the approved drainage report and lot grading plan. If the site plan is still schematic, we estimate sitework from the civil set and flag quantities that will move once final grades are set.
Mass grading · Storm drainage · Curb and gutterConcrete, aggregate, and masonry come from local producers, but specialty items and some steel packages ship from the Salt Lake Valley or farther. Freight and lead times belong in the estimate as real costs, not allowances. Sales tax treatment on materials depends on the contract structure, so confirm how your purchase orders are written before you finalize the number.
Ready-mix concrete · Rebar and steel packages · Utah sales tax on materialsSpanish Fork sits in Utah County, where the building department enforces the adopted IBC and IRC editions, and where winter freeze depth and expansive soils change quantities on nearly every trade. Here is how each major division gets priced.
Spanish Fork sits on a bench above the Spanish Fork River, and lots on the east side routinely hit caliche and cobble before you reach undisturbed material. A sitework takeoff here has to carry rock excavation as a separate line, not buried in the general excavating item, because the unit price difference is large. Storm drainage is driven by the city's drainage requirements and by the grade fall to the river corridor. We measure cut and fill from the civil sheets, break out structural fill under footings, and list import or export separately. For a full site package, see our sitework estimating services.
Wasatch Front plans are almost always engineered for higher snow loads than the national default, so you will see closer rafter and truss spacing and heavier headers on the elevation-facing walls. A framing takeoff here has to count plates, studs, headers, joists, sheathing, and hardware individually, because lumber yards quote them separately and the waste factor on a cut-up roof plan is not the same as a simple gable. Trusses are usually a delegated-design item, so we take them off from the truss layout sheets and note the hold-downs and shear nailing shown on the structural drawings. See framing estimating services for the full division 06 breakdown.
Utah adopts the IECC and the IPC/UPC families, and the adopted editions change insulation values, duct sealing, and venting details, so confirm the edition with the Spanish Fork building department before you lock the MEP numbers. On residential work we count fixtures, water and drain runs by diameter, gas piping by size, and HVAC equipment by tonnage plus the duct takeoff by trunk and branch. Commercial plans get device counts from the electrical sheets and fixture units from the plumbing risers. MEP estimating services covers divisions 21 through 28 as one coordinated package.
Footings in this area are typically designed with a frost depth that the plans will state, and Utah County soils reports often call for over-excavation and replacement beneath footings. That means the concrete takeoff includes footing concrete, stem walls, slab-on-grade, garage slabs, and any pier or caisson work, each with its own formwork and reinforcement. Flatwork is measured separately because driveways and approaches are usually a different thickness than interior slabs. We count rebar by bar size and lap, not by blanket square footage. Our foundation estimating services and concrete estimating services cover both residential and commercial scopes.
Snow retention, ice barrier at eaves, and underlayment requirements are the items that separate a Utah roof takeoff from a generic one. We measure roof area by slope, add the typical waste factor for hips and valleys, and list ice-and-water membrane by linear foot at eaves and in valleys rather than as a lump sum. Ventilation, drip edge, and flashing are counted at each penetration and wall intersection. If the project is in a wildfire interface area, the plan set may specify Class A assemblies, so we read the general notes before pricing. Roofing estimating services covers shingle, tile, and membrane systems.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 18.5 | CY |
| 03 20 00 | Rebar, #4 footing and stem wall | 4,200 | LB |
| 03 30 00 | Slab-on-grade, 4 in, garage and basement | 2,850 | SF |
| 06 10 00 | Wall framing, 2x6 studs at 16 in OC | 3,640 | LF |
| 06 10 00 | Roof trusses, engineered, 24 in OC | 62 | EA |
| 07 30 00 | Ice-and-water membrane at eaves | 210 | LF |
| 09 29 00 | Gypsum board, 1/2 in, walls and ceilings | 9,400 | SF |
| 31 23 16 | Rock excavation, footing trenches | 95 | CY |
This example uses a simple rectangular footing run to show how a quantity moves from plan dimensions to an order quantity. All dimensions are illustrative and are not taken from a specific Spanish Fork project. Confirm the actual footing width, depth, and frost depth on your structural sheets and in the geotechnical report before you buy concrete.
Assume a continuous footing 24 inches wide by 12 inches deep running under the exterior walls and interior bearing lines. The plan measures 185 linear feet of footing, including the garage return and the rear bearing wall.
| Step | Calculation | Result |
|---|---|---|
| Footing cross-section | 24 in x 12 in = 2.0 ft x 1.0 ft | 2.00 SF |
| Volume per linear foot | 2.00 SF x 1.0 ft | 0.0741 CY/LF |
| Total volume | 0.0741 CY/LF x 185 LF | 13.71 CY |
| Waste factor | 13.71 CY x 1.05 (typical 5%) | 14.39 CY |
| Order quantity | Round up to whole yards | 15 CY |
From there, reinforcement is counted separately. A #4 bar at 12 inches on center in a 24-inch-wide footing needs two longitudinal bars plus transverse bars at 12 inches on center, which is roughly 185 LF x 2 longitudinal bars plus about 185 transverse bars at 2 feet each. Convert to pounds using the #4 unit weight of 0.668 lb per foot and add a typical lap allowance. The stem wall, anchor bolts, and any pier pads get their own lines.
Two Spanish Fork-specific adjustments matter here. First, if the soils report calls for over-excavation beneath the footings, the structural fill is a separate line item measured in cubic yards and is not part of the footing concrete. Second, if the trench hits rock, the excavation line changes from soil to rock, and that unit price is materially different. We carry both as separate bid items so the estimate survives the first site visit. If you want the full division 03 breakdown for a project like this, our foundation estimating services page shows the format we deliver.
Snow-load-driven framing, ice barrier at eaves and valleys, frost-depth footings, and over-excavation from the soils report. Utah County plans also tend to show shear nailing and hold-downs that a generic framing number will not carry. We read the structural and geotechnical sheets before we price division 03 and 06, so those items land in the bid instead of in a change order.
It comes from the U.S. Census Bureau Building Permits Survey, and it counts new privately-owned residential units only. For 2025, Spanish Fork issued 177 residential units, down from 492 in 2024, with 157 single-family and 20 multifamily units, an average permitted value of $365,600 per unit. Commercial and industrial permits are not part of that figure, so do not read the drop as a full picture of local construction volume.
Most projects are returned in 24 to 48 hours, and rush turnaround is available when you have a bid date closing. Large multifamily or commercial packages with many sheets take longer because the sheet count drives the takeoff time. Send the full plan set, including the civil, structural, and MEP sheets, so we can price the whole scope in one pass.
Yes. We use ZIP-code-adjusted material and labor pricing and RSMeans data, so Spanish Fork and the surrounding Utah County market are reflected in the wage and material lines. That matters on concrete, framing labor, and mechanical work, where local rates move independently of national averages. The pricing basis is stated on the estimate so you can see what was applied.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets showing what was measured. The Excel workbook lets you adjust quantities or unit prices, and the marked-up drawings let you check our counts against the sheets. We build it in Bluebeam Revu and PlanSwift, so the quantities trace back to the drawings.
Yes. Multifamily work in this market often mixes podium or slab-on-grade construction with wood framing above, and each type carries different division 03, 05, and 06 quantities. Commercial and industrial scopes are taken off by system, including site utilities, structure, envelope, and MEP. Our multi-family estimating services and commercial estimating services pages describe how those packages are organized.
We separate rock from soil as two bid items. The geotechnical report and the civil sheets usually indicate whether rock is expected, and the footing trench depth tells you how much volume is at risk. Carrying rock as its own line keeps the soil excavation price honest and gives you a defensible position when the trench is opened and the actual material is visible.
It helps. The soils report drives over-excavation depth, structural fill, and sometimes footing width. Without it we take off what the structural sheets show and flag the soil-dependent items as allowances, so you know which numbers to confirm before you submit. If you have the report, send it with the plans and we will price those items directly.
We cover the Wasatch Front and the rest of Utah, including Bountiful, Riverton, Herriman, Roy, Pleasant Grove, and Cedar City. The same MasterFormat format and ZIP-adjusted pricing apply across all of them. If your project is outside these areas, send the address and we will confirm coverage.
Yes, and it is often the best time to do it. Early takeoffs on a partial set let you test the budget before the drawings are frozen, and we flag which quantities are likely to move. When the final set is issued, we update the takeoff and show what changed. That sequence keeps the estimate tied to the drawings rather than to assumptions.
Email the plan set and we will return a MasterFormat takeoff in Excel and PDF, usually within 24 to 48 hours.