Sitework takeoff
Bench-lot cut and fill, retaining walls, utility trenching and haul-off priced by CY and LF for steep east-side lots.
CY · LF · TONWe prepare quantity takeoffs and cost estimates for contractors, developers and owners building in Sandy and across Salt Lake County. Plans go in, and you get a division-organized Excel and PDF estimate with marked-up drawings, typically in 24–48 hours.
Sandy pricing turns on Wasatch Front labor rates, ZIP-code-adjusted material costs, mountain-bench soils that drive footing and backfill quantities, snow-load and seismic detailing per the adopted Utah code, and steep-site logistics on the east bench. Each one moves your unit costs before you ever mark up overhead.
Sandy sits at the south end of the Salt Lake Valley, where the east bench climbs toward the Wasatch Range and the west side flattens toward the Jordan River. That split matters at takeoff time: a footing excavation on a bench lot and one on flat ground in the same ZIP code produce different CY quantities, different haul-off, and different concrete pricing. We price both against ZIP-code-adjusted material and labor data rather than a national average, so your bid reflects what Sandy subs actually charge.
We work from your plan set, specifications and addenda, and return an estimate organized by CSI MasterFormat division with marked-up drawings. Most projects turn around in 24–48 hours, and rush service is available when a bid date moves up. If you are comparing markets across the valley, our Utah construction estimating page covers the state picture, and the same team handles West Jordan and Provo work.
For bidders. You need quantities you can defend line by line. We deliver division-organized takeoffs with waste factors, unit costs and marked-up plans so you can adjust assumptions before the bid date instead of after.
For builders. You are buying out subs and ordering material. We break scope into CSI divisions with units that match supplier and subcontractor quotes, so your purchase orders and change orders start from the same numbers.
For owners. You are checking a budget or a contractor's proposal. We produce an independent estimate from the same drawings, flag scope gaps, and show where allowances and unit prices drive the total.
Select a bar to compare Sandy with the largest Utah markets we cover.
25 new housing units in 2025 (0% vs 2024).
25 single-family · 0 multifamily (0%).
Sandy issued 25 new privately-owned residential units in 2025, all single-family, at a permitted value of $15M — an average of $583,200 per unit. That is unchanged from 25 units in 2024. Among the 25 covered Utah cities on our list, Sandy ranks 25th by units and accounts for 0.2% of the 11,785 state total. For bidders, read this as a small, high-value custom-home market rather than a volume subdivision market: fewer permits, but each one carries enough square footage and finish scope that a missed line item is expensive. Custom homes on the east bench bring retaining walls, deeper footings and longer utility runs that a production-home template will not capture. If you also bid north or south along the front, our Ogden and Orem pages describe those markets.
Residential permits are only part of Sandy's construction activity. The city has a long-established commercial and office corridor along State Street and near the South Towne area, plus institutional and tenant-improvement work that does not appear in the residential permit count. Those projects are driven by different cost factors: longer lead times on switchgear and mechanical equipment, prevailing-wage or certified-payroll requirements on public work, and code review cycles that vary by occupancy. Because Utah's adopted code editions change on a cycle, confirm the current IBC, IRC, IECC and NEC editions with the Sandy building department before you lock a scope of work. We estimate both sides of that market — see commercial estimating and residential estimating for the deliverable formats.
The scopes we take off most often for Sandy and Salt Lake County projects, each priced from your drawings and specs.
Bench-lot cut and fill, retaining walls, utility trenching and haul-off priced by CY and LF for steep east-side lots.
CY · LF · TONFootings, stem walls, slabs and flatwork with formwork area and reinforcement quantities separated for supplier quotes.
CY · SF · LBSpread and continuous footings, waterproofing and drainage board sized to the soils report and frost depth.
CY · SF · LFFloor, wall and roof members counted by size and length, with sheathing, hardware and waste factors by framing system.
BF · LF · EARoof area, underlayment, ice barrier at eaves, flashing and ventilation for snow-load and freeze-thaw detailing.
SQ · LF · EAMechanical, electrical and plumbing counts and fixture schedules for custom homes and tenant improvements.
LF · EA · TONUnit-by-unit takeoffs with typical-floor repetition factors for attached housing and mixed-use podiums.
SF · EA · CYSlab-on-grade, structural steel, process piping and equipment setting for warehouse and light-industrial shells.
TON · LF · CYYou are bidding Sandy bench lots and flat west-side infill from the same plan set. We return division-organized quantities so your bid covers excavation, haul-off and concrete at the same unit basis across both.
Sandy permitted 25 new privately-owned residential units in 2025, all single family, at about $583,200 average value. We take off framing, foundation and finishes so your buyout matches that price point.
Bench-lot stem walls, stepped footings and slab-on-grade on the flats price differently. We give you form area, rebar tonnage and CY by pour so your quote survives the first change order.
Wasatch Front roof snow loads and steeper bench-lot pitches change rafter spans and shingle quantities. We count linear feet of ridge, hip and valley and board feet by member size.
Sandy mechanical, electrical and plumbing scopes get buried in general conditions. We separate fixture counts, device counts and pipe runs by system so your sub bid stands on its own.
You are checking a contractor's proposal or a pro forma before land closes. We produce an independent estimate from the same drawings and show which allowances and unit prices drive the total.
Sandy runs from the Wasatch bench on the east to the Jordan River bottoms on the west, and the estimating inputs change block by block. We cover the city and the surrounding Salt Lake Valley communities from the same ZIP-code-adjusted pricing database.
Sandy's 2025 permit count was 25 new privately-owned residential units, all single family, with no multifamily units permitted by the city. That mix drives what we take off most: custom and production single-family homes, plus the commercial and institutional work that follows the Wasatch Front tech corridor.
Bench-lot homes with walkout basements, steep driveways and retaining walls. We take off excavation by cut depth, foundation drainage, and framing by member size for the plan's actual spans.
Watch for: Retaining wall length, basement daylight height, rock excavation.
Tract homes on the flatter west side where plans repeat. We build a per-plan unit takeoff you can multiply across lots, then adjust foundation and sitework for each lot's soil and slope.
Watch for: Per-lot sitework, plan revisions, repeat-plan waste factors.
Kitchen and basement finishes, second-story additions and ADU conversions. We separate demolition, framing tie-ins and MEP rough-in so your change order pricing starts from counted quantities.
Watch for: Existing framing verification, panel capacity, duct routing.
Retail, office and light industrial space along the State Street and I-15 corridors. We take off shell, core and TI separately so a tenant fit-out can be priced without redoing the base building.
Watch for: Divisions 03, 05, 08, 09 and 23 scope splits.
Schools, churches and municipal buildings where prevailing wage or public bid requirements may apply. We organize quantities by division and flag additive alternates separately from base bid.
Watch for: Wage determinations, alternates, phasing and occupied-site work.
Distribution and flex buildings with slab-on-grade, tilt or masonry walls and heavy MEP. We take off slab thickness, reinforcement, dock equipment and racking loads from the structural sheets.
Watch for: Slab flatness, dock pits, fire protection and sprinkler demand.
Two Sandy projects with the same square footage can land 15 to 25 percent apart once you price the ground, the code cycle and the trade labor. These are the drivers we check before we release a number.
Sandy enforces the adopted Utah building code editions, and the edition in force changes insulation, bracing and ventilation requirements. Confirm the current edition with the Sandy building department before you lock quantities. We price to the code year shown on your permit documents, and we flag where a newer edition would add cost, such as additional wall insulation or a tighter envelope.
Sandy building department · Utah adopted code editions · IECC envelope requirementsEast bench lots sit on sloping ground with shallow bedrock and engineered fill in places, while west-side lots are flatter alluvial ground near the Jordan River. That changes excavation CY, backfill, retaining wall length and foundation drainage. We take off cut and fill by lot, not by subdivision average, because a bench lot can carry several times the earthwork of a flat one.
Wasatch bench slopes · Jordan River alluvium · engineered fillSandy soils range from gravelly bench deposits to clay and silt near the river bottoms, and expansive clays drive deeper footings and reinforcement. We price footings from the geotechnical report where one is provided, and we carry a stated allowance where it is not. Confirm footing depth, drainage and waterproofing requirements with the local building department and the project geotech.
Geotechnical report · expansive clay · footing depth and rebarWasatch Front roof snow loads are high enough to control rafter and truss sizing, and the area carries seismic design requirements. That adds framing, shear and hold-down quantities that a milder-climate estimate would miss. We count hold-downs, anchor bolts and shear panel area from the structural sheets, and we price roof assemblies to the ground snow load listed on the drawings.
Ground snow load · seismic design category · shear walls and hold-downsSandy bids compete with Provo, West Jordan and the rest of the Wasatch Front for the same crews, and labor rates move with the volume of single-family and tech-campus work. We price labor from ZIP-code-adjusted data rather than a state average, so a Sandy bid reflects what local subs charge. If your bid date is tight, ask about rush turnaround.
ZIP-code-adjusted labor · Wasatch Front crew availability · RSMeans dataBench lots need retaining walls, swales and sometimes rock excavation; flat lots near the river need import, dewatering and storm drainage. We take off sitework separately from the building so you can see which line carries the risk. Access also matters: narrow bench roads and limited staging change concrete pump and crane costs.
Retaining walls · storm drainage · import and haul-off · staging accessSandy sits at the mouth of Little Cottonwood Canyon, where steep lots, sandy gravel soils and a short building season change quantities in predictable ways. Here is how those conditions land in each division of a takeoff.
East-bench lots in Sandy frequently run 15 to 30 percent slope, so cut-and-fill volumes, retaining walls and temporary erosion control are real line items, not allowances. We take off mass excavation by cross-section, then break out structural fill, backfill, export and import separately, because haul-off in the east bench area often costs more than the digging. Winter grading windows compress the schedule, so we price rock excavation and dewatering as separate bid items rather than burying them in a unit rate. For hillside subdivisions, our sitework estimating services team also carries sediment basins, riprap at outfalls and street sweeping as recurring costs.
Utah's adopted IRC requires ground snow loads that vary across the valley floor and rise sharply at the bench, so roof framing in Sandy is often engineered with deeper members or closer spacing than a comparable plan in a lower-elevation city. We take off studs by wall length and plate height, joists by span and spacing, and sheathing by sheet with a typical 8 to 10 percent waste on angled walls. Roof trusses are quoted from the supplier's layout, but we verify bearing, hangers and blocking, because those are the items most often dropped between the truss package and the framer's bid. See our framing estimating services page for the takeoff format.
Sandy residential plans typically run PEX supply, ABS or PVC drain waste and vent, a 200-amp service and a high-efficiency furnace with central air. We count fixtures, valves, cleanouts and vent penetrations, then price pipe by diameter and run length rather than by fixture. On commercial and tech-adjacent tenant improvements, the MEP scope grows fast: VAV boxes, rooftop units with curb and crane, dedicated outside air, and electrical gear sizing all need to be taken off from the mechanical and electrical drawings, not carried as a square-foot allowance. Our MEP estimating services page shows the division breakdown we deliver.
Sandy's sandy gravel over clay layers drives foundation design toward reinforced footings, stem walls and, on sloped lots, stepped footings with deeper embedment on the downhill side. Takeoffs need footing width and depth by wall run, not a single average, plus vapor barrier, gravel capillary break and anchor bolt counts. Flatwork is a separate quantity: driveway aprons on steep driveways need thicker sections and more control joints than a typical flat lot. Our foundation estimating services group prices rebar by bar size and lap, and concrete by cubic yard with a typical 5 to 10 percent waste factor on formed walls.
Snow retention, ice-and-water membrane at eaves and valleys, and Class A assemblies are standard expectations on Sandy roofs, and they are frequently missing from subcontractor bids. We take off underlayment by square, ice barrier by linear foot of eave and valley, and snow guards by count against the roof plan. On the commercial side, tapered insulation and crickets around drains add board feet that a flat takeoff will miss. Wind exposure at the bench also pushes fastener schedules and edge metal gauge. Our roofing estimating services team measures from the same marked-up plan set we return to you.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Mass excavation, cut to subgrade | 410 | CY |
| 31 23 23 | Structural fill, import and compact | 180 | CY |
| 03 30 00 | Footings, stepped, 24 in. wide | 96 | LF |
| 03 30 00 | Stem walls, 8 in. formed | 142 | LF |
| 03 30 00 | Slab on grade, 4 in. with vapor barrier | 1,850 | SF |
| 06 10 00 | Wall framing, 2x6 at 16 in. O.C. | 3,240 | LF |
| 07 30 00 | Roof underlayment and ice barrier | 38 | SQ |
| 22 11 16 | PEX domestic water, 1/2 in. and 3/4 in. | 620 | LF |
Footings on Sandy's sloped lots step down the hill, so a single average depth will understate concrete and rebar. The dimensions below are illustrative; substitute your plan's footing schedule and wall runs.
Assume a 24-inch-wide by 12-inch-deep continuous footing running 96 linear feet, stepped in four 24-foot runs that drop 16 inches each. Volume per foot is 2.0 ft x 1.0 ft = 2.0 CF, or 0.0741 CY per linear foot. At 96 LF that is 7.11 CY. The step drops add vertical concrete: each 24-foot run drops 16 inches, and the footing is 2.0 ft wide, so each step adds 24 ft x 2.0 ft x 1.333 ft = 64 CF, or 2.37 CY. Three steps add 7.11 CY, bringing neat volume to 14.22 CY. Apply a typical 7 percent waste factor for formed footings: 14.22 x 1.07 = 15.22 CY, ordered as 15.5 CY.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Footing run | 96 LF x 2.0 ft x 1.0 ft / 27 | 7.11 | CY |
| Step drops | 3 x (24 ft x 2.0 ft x 1.333 ft) / 27 | 7.11 | CY |
| Neat volume | 7.11 + 7.11 | 14.22 | CY |
| Waste, 7% | 14.22 x 1.07 | 15.22 | CY |
| Ordered | round up to half-yard | 15.5 | CY |
Rebar follows the same logic. A #4 continuous bar at 96 LF plus lap of 40 bar diameters (20 inches, call it 1.67 ft) per splice, four splices, adds 6.7 LF, so 102.7 LF of continuous bar. Transverse bars at 12 inches O.C. over 96 LF is 96 bars at 2.0 ft each = 192 LF. Total #4 is 294.7 LF, or about 295 LF, which at 0.668 lb per LF is 197 lb, plus a typical 5 percent waste for cutting.
We take these quantities off the same marked-up plan set we return to you, organized by CSI division in Excel and PDF. If your plan shows a deeper embedment or a wider footing, the step-drop multiplier changes with it, which is why we ask for the foundation plan and the architectural sheets together.
The residential permit figures come from the U.S. Census Bureau Building Permits Survey, which counts new privately-owned residential units permitted by the city itself. For 2025, Sandy issued 25 units, all single-family, unchanged from 25 in 2024, with a permitted value of $15M and an average of $583,200 per unit. That places Sandy 25th of 25 covered state cities and at 0.2 percent of the 11,785 covered state units. The survey does not count commercial, industrial or remodel permits.
Yes. We price from RSMeans data adjusted by ZIP code for the Sandy area, so concrete, lumber, roofing and mechanical rates reflect the local market rather than a national average. Labor rates in the Salt Lake Valley move with the Wasatch Front construction volume, so we note the pricing date on every estimate. If you are bidding a project that will be built 12 months out, tell us and we will flag the divisions where escalation is most likely to bite.
Send the plan set you are bidding, the specifications, any addenda and the bid date. If a geotechnical report or a truss layout exists, include it. We also ask for the project address so we can apply the correct ZIP-code pricing and note the elevation band, which matters for snow load and roof framing in Sandy. Most projects are returned in 24 to 48 hours, and rush turnaround is available when your bid date is tight.
We take off earthwork by cross-section rather than a single average depth, then separate cut, fill, export and import. Retaining walls, stepped footings, drainage swales and erosion control become their own line items. On the steepest lots we also carry temporary shoring or benching where the geotechnical report calls for it. This keeps the sitework bid honest instead of pushing rock and haul-off into change orders after the cut is opened.
Yes. Along the 10600 South and State Street corridors, and around the tech and office campuses, we take off tenant improvements, retail shells, light industrial and multi-family. Commercial takeoffs run from the architectural, structural, mechanical, electrical and plumbing sheets, with a separate division for fire protection when NFPA 13 sprinklers are shown. Confirm the adopted code edition and any local amendments with the Sandy building department, since those affect egress, sprinkler and energy requirements.
You receive Excel and PDF files organized by CSI MasterFormat division, along with the marked-up plan set showing what we measured. Quantities carry units — cubic yards, square feet, linear feet, each — so you can check our math against your own. If you want the takeoff loaded into your own estimating template, tell us the column structure and we will match it.
Yes. We work across the Wasatch Front and the rest of Utah, including Provo, West Jordan, Orem, Ogden, St. George and Layton. Pricing adjusts by ZIP code, so a project in St. George prices differently from one on the Sandy bench. If your bid package spans several cities, we can return one estimate with the locations broken out.
Ground snow load rises with elevation, and Sandy spans the valley floor up to the bench, so roof framing members and spacing change from one lot to the next. We take off framing from the stamped plans and note where the design assumes a higher snow load. Seismic bracing shows up as anchor bolts, hold-downs, shear panel nailing and strap counts, and we carry those as separate line items rather than folding them into the framing square-foot price.
Yes. Remodels in Sandy's older neighborhoods often involve removing finishes, cutting openings, upgrading the electrical service and adding shear where walls are opened. We take off demolition by area and by fixture count, then price the new work from the plans. Asbestos and lead surveys are the owner's responsibility, but we flag abatement as an exclusion so it does not sit silently in your bid.
We exclude permit and impact fees, builder's risk insurance, performance bonds, design fees, utility company charges and any owner-furnished equipment unless you tell us otherwise. We also exclude escalation beyond the pricing date and unknown subsurface conditions beyond what the geotechnical report shows. Each estimate lists these exclusions on the summary sheet so you can decide what to carry in your own bid.
Email your plan set and bid date, and we will return a division-organized takeoff with marked-up drawings in 24 to 48 hours.