Multifamily takeoffs
Unit-type repetition quantified across apartment and townhome buildings, including podium and Type III wood-frame assemblies.
EA · SF · LFScope Precision Estimate produces CSI MasterFormat takeoffs for Layton contractors and developers — 24–48 hour turnaround, Excel and PDF, with marked-up plan sets. We price multifamily, single-family and commercial work against ZIP-code-adjusted material and labor data.
Layton's 2025 permit mix — 84% multifamily — drives podium and Type III wood-frame pricing. Davis County soil, freeze depth, and short Wasatch Front build seasons affect sitework and foundations. Weber Basin water and utility districts control tap fees and inspections. ZIP-adjusted RSMeans pricing, not national averages, sets the baseline.
Layton sits in Davis County on the Wasatch Front, between Ogden and Salt Lake City. The city issued 488 new privately-owned residential permits in 2025, up 12% from 435 in 2024 — 408 of those units were multifamily, 80 single-family, at a permitted value of $87M. That mix tells you where the estimating hours go: podium slabs, Type III wood-frame over concrete, and the MEP rough-in that comes with density. We build takeoffs for the same work. If you bid along the corridor, our Utah construction estimating page covers the state-level picture, and Ogden construction estimating covers the market just north.
A Layton takeoff is not a Salt Lake takeoff with a different ZIP code. Davis County soils run from gravelly loams to clays with expansive tendencies, so foundation quantities and over-excavation assumptions swing between subdivisions. Winter pours drive blanket and accelerator line items. On the multifamily side, unit-count repetition rewards a careful typical-unit takeoff — one missed wall type multiplies across 408 units. We mark up your plan set, quantify to CSI division, and hand back Excel you can sort by trade. Start with get an estimate and send the drawings.
For bidders. You need quantities fast and defensible. We return CSI-organized Excel and PDF in 24–48 hours, with marked-up plans so you can trace every line before the bid date.
For builders. You need buyout numbers that match how you actually build. We quantify by assembly, flag scope gaps between trades, and price with ZIP-adjusted material and labor data.
For owners. You need a budget before design is finished. We provide order-of-magnitude and schematic-level estimates you can reconcile against contractor bids as documents tighten.
Select a bar to compare Layton with the largest Utah markets we cover.
488 new housing units in 2025 (+12.2% vs 2024).
80 single-family · 408 multifamily (84%).
Layton issued 488 new privately-owned residential units in 2025, up 12% from 435 in 2024, ranking 7th of 25 covered Utah cities and 4.1% of the state's 11,785 units. Multifamily was 408 units — 84% of the total — at an average permitted value of $178,600 per unit and $87M overall. For bidders, that means the pipeline is dominated by apartment and townhome packages, not custom homes. Expect podium decks, Type III wood-frame, and repeated unit plans. The 80 single-family permits still matter, but they are not where the volume is. If you bid multifamily in Layton, your takeoff has to handle unit-type repetition and the MEP density that comes with it — see multi-family estimating services.
Layton's position between Ogden and Salt Lake City puts it in a corridor where contractors routinely bid work in several jurisdictions at once. Davis County soils include clays with expansive potential, so footing and slab quantities depend on geotech recommendations, not a default detail. Frost depth, winter concrete protection, and spring dewatering all show up in sitework and foundation line items. Utility tap fees and inspections run through local districts, and adopted code editions change on the city's schedule — confirm the current IBC and IRC editions with the Layton building department before pricing. Contractors working south along the corridor also bid in Sandy and South Jordan, where the same crew and the same takeoff standards apply.
We quantify Layton projects by CSI MasterFormat division, with marked-up plan sets and Excel/PDF deliverables in 24–48 hours.
Unit-type repetition quantified across apartment and townhome buildings, including podium and Type III wood-frame assemblies.
EA · SF · LFSpread footings, stem walls, slab-on-grade and podium decks priced against Davis County soil and frost conditions.
CY · SF · LFWall, floor and roof framing by member size, with waste factors typical for Layton's multifamily and single-family plans.
BF · LF · EAPlumbing, mechanical and electrical counts for dense unit plans, coordinated with fixture and equipment schedules.
EA · LF · TONMass excavation, over-excavation, backfill and utility trenching tied to geotech recommendations and local district requirements.
CY · LF · TONArchitectural shingle, TPO and membrane roof areas with edge metal, flashing and insulation quantified by system.
SF · LF · EASingle-family budgets and bid packages for the 80-unit-per-year custom and production home segment in Layton.
SF · EA · LSTenant improvements, retail shells and light industrial buildings along the I-15 corridor, priced by division.
SF · TON · EALayton permitted 408 multifamily units in 2025, 84% of its residential total. You need typical-unit quantities that repeat cleanly across the building, plus a defensible basis for alternates.
Podium decks, post-tension slabs and Type III wood-frame walls dominate the Layton multifamily pipeline. We quantify board feet, plate counts, anchor bolt schedules and embeds so your bid holds after buyout.
The 80 single-family permits in 2025 ran through Davis County subdivisions with varying soil conditions. Per-plan takeoffs let you compare lot premiums and over-excavation exposure across a plat.
You need a hard-cost check before you close on a Layton parcel. We price sitework, foundations and vertical shell at schematic level so your pro forma reflects what the dirt actually costs.
Early budgets keep a Layton project funded through design. We quantify from preliminary drawings and flag where assemblies are underspecified before they harden into the permit set.
Tenant improvements, roof replacements and equipment pads along the Layton corridor need scope numbers, not square-foot guesses. We break the work into CSI divisions you can bid out.
We take off plans for projects across Davis County and the northern Wasatch Front. Send drawings for any Layton address or a neighboring community and we return the same CSI-organized Excel and marked-up set.
Layton's 2025 permit mix was 84% multifamily and 16% single-family, so most of our takeoff volume here is density work with a steady tail of custom and production homes. The list below covers what we quantify most often.
Type III wood frame over a concrete podium, three to five stories, with tuck-under or structured parking. We quantify by typical unit, then extend across the floor plates and reconcile the podium deck separately.
Watch for: Podium slab thickness, shear wall hold-downs, unit-to-unit acoustical separation.
Two and three-story walk-ups on grade with surface parking. Repetition makes the typical-unit takeoff the whole game, so we build one unit completely and multiply by plan type and building count.
Watch for: Wall type counts, plumbing stack grouping, exterior sheathing waste.
Plat-built homes on Davis County lots, typically with basements or crawl spaces. We take off per plan and per lot so you can see which lots carry extra excavation or retaining.
Watch for: Over-excavation depth, footing steps, window and door schedules.
East Layton and the bench above the valley bring walkout basements, stepped footings and taller retaining walls. These plans have fewer repeats, so every wall and beam gets measured individually.
Watch for: Retaining wall lengths, stepped foundation heights, roof plane count.
Small commercial buildings and pad sites along the Layton corridors. We quantify the shell, sitework and MEP rough-in, and separate tenant improvement scope so the landlord and tenant numbers stay clean.
Watch for: Storefront glazing, demising walls, rooftop unit curbs.
Flex buildings and distribution space near the I-15 and Hill Air Force Base employment areas. Slab flatness, column spacing and dock equipment drive the quantities more than the building footprint does.
Watch for: Slab thickness and reinforcement, dock packages, fire protection.
Two bids on the same Layton drawings can differ by more than the drawings explain. These are the variables we price explicitly instead of burying in a contingency line.
Layton reviews and issues its own residential permits, and Davis County handles other approvals depending on the parcel. Plan review comments on foundations, fire separation and energy compliance can add revision cycles. We price to the code edition the jurisdiction has adopted, and you should confirm that edition and any local amendments with the Layton building department before you lock the estimate. Utah has also moved through recent code adoption cycles, so older permit sets may not match current requirements.
Layton building department · Davis County · IBC · IECCSoils across the Layton bench and valley floor range from gravelly loams to clays with expansive tendencies. That changes over-excavation depth, backfill import, footing width and sometimes the decision to use a structural slab or pier system. Geotechnical reports vary lot to lot, so we quantify foundation work from the report rather than applying one assumption across a subdivision. Where the report is missing, we flag the foundation line as an allowance and say so.
Geotechnical report · over-excavation · footings · structural slabWasatch Front winters bring freeze-thaw cycles, snow load on roofs and cold-weather concrete procedures. Blankets, accelerators, heating and extended curing show up as real line items on fall and winter pours, and roof framing must be priced to the ground snow load for the site. We carry those costs where the schedule puts work in the cold months instead of assuming a summer build.
Ground snow load · cold-weather concrete · freeze-thaw · curingLayton competes for crews with Ogden to the north and the Salt Lake Valley to the south, and multifamily density pulls the same framers, drywall hangers and concrete finishers. Wage pressure and crew availability move labor rates more than material indexes do in a tight year. We price labor from ZIP-adjusted data and note where a trade is likely to need a premium to hold the schedule.
Wasatch Front labor · crew availability · ZIP-adjusted rates · RSMeansGrading, utility runs and storm drainage drive early cost on Layton sites, especially where a parcel slopes toward the bench or sits near existing irrigation. We quantify cut and fill, import or export, pipe lengths, structures and detention requirements from the civil set. If the civil drawings are not issued, we estimate sitework from the site plan and mark the quantities as preliminary.
Cut and fill · storm drainage · detention · utilitiesLayton sits on I-15 between Ogden and Salt Lake City, so most material suppliers are within a short haul and freight is rarely the swing factor. What does swing is product selection: engineered lumber versus solid sawn, fiber cement versus vinyl, and the mechanical and electrical fixture packages that vary widely between multifamily developers. We price the specified products and list alternates separately so you can see the spread.
I-15 corridor · engineered lumber · fixture packages · alternatesLayton's permit mix is dominated by multifamily units, and that mix changes what a takeoff has to carry — more repeated unit types, more MEP density per acre, and tighter sitework sequencing than a single-family subdivision of the same value.
Davis County soils include expansive clays, so foundation takeoffs here usually carry over-excavation, granular borrow, and a moisture barrier as separate lines rather than a lump-sum allowance. On a podium or tuck-under multifamily building, expect stepped footings, interior column pads, and post-tensioned slabs priced by area with tendon and anchor counts broken out. Garage slabs and exterior flatwork are measured net with control joint layout by linear foot. If you are comparing bids, see our foundation estimating services for how we structure these lines against a geotech report.
Roof takeoffs in Layton are driven by pitch, valley count, and penetration density. Asphalt shingle is measured in squares with starter, ridge, hip, and valley metal by linear foot; ice-and-water membrane is measured at eaves and valleys only, not across the whole field. On multifamily buildings with multiple roof planes and mechanical curbs, count every curb and pipe boot — those small items add up faster than the shingle. Steep pitches change both labor and staging. See roofing estimating services for how we break out underlayment, flashing, and ventilation separately.
Layton sites sit on bench ground that often needs cut and fill balanced before anything else happens. A sitework takeoff carries mass excavation by cubic yard, structural fill by cubic yard placed and compacted, and import or export as a separate line because haul distance drives the price. Storm drain is measured by linear foot with structures counted individually, and utility trenching is measured by depth band, not a single average. Winter grading windows compress the schedule, so temporary erosion control and snow removal allowances belong in the bid. See sitework estimating services.
Layton framing runs on engineered lumber: LVL headers, TJI floor systems, and manufactured trusses. A takeoff has to count headers by size and span, not by linear foot, because a 14-inch LVL and a doubled 2x10 are different money. Floor sheathing is measured by sheet with a typical waste factor applied at the panel, and roof sheathing by area with valley and hip cuts counted. Snow load governs member sizing across the Wasatch Front, so confirm the design ground snow load on the structural sheets before you price. Our framing estimating services cover this scope.
Multifamily MEP is where a Layton takeoff earns its keep: repeated unit plans let you price one typical unit and multiply, but only after you separate the common areas, corridors, and mechanical rooms. Plumbing is counted by fixture with supply and drain runs by linear foot and pipe size. HVAC on a Utah project typically includes a furnace and coil per unit plus condensers, with line sets and condensate routing measured. Electrical is counted by device, with panel schedules taken from the drawings. Our MEP estimating services handle this scope division.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, stem walls | 184 | CY |
| 03 30 00 | Post-tensioned slab on grade | 24,600 | SF |
| 05 12 00 | Structural steel, podium beams | 9.4 | TON |
| 06 10 00 | LVL headers, various sizes | 62 | EA |
| 06 17 00 | TJIs, floor system | 7,850 | LF |
| 06 16 00 | Floor sheathing, 3/4 in. T&G | 26,400 | SF |
| 07 21 00 | Batt insulation, exterior walls | 18,200 | SF |
| 07 30 00 | Asphalt shingles, architectural | 142 | SQ |
This walk-through uses illustrative dimensions for one 40 ft by 120 ft, three-story building with 9 ft floor-to-floor and 10 ft plate height. Your actual plan dimensions and stud spacing will differ, so substitute your own numbers before pricing.
Start with the wall area. Perimeter is 2 × (40 + 120) = 320 LF. Multiply by plate height of 10 ft for 3,200 SF per floor, then by three floors for 9,600 SF of wall face. Deduct openings: assume 18 windows at 20 SF and 6 doors at 21 SF per floor, which is 486 SF per floor or 1,458 SF total. Net wall area is 9,600 − 1,458 = 8,142 SF.
Now convert to studs. At 16 in. on center, that is 0.75 studs per SF of wall, so 8,142 × 0.75 = 6,107 studs before waste. Add plates: 320 LF × 3 plates × 3 floors = 2,880 LF of plate stock, which at 16 ft per piece is 180 pieces.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Gross wall area | 320 LF × 10 ft × 3 floors | 9,600 | SF |
| Opening deduction | (18 × 20) + (6 × 21) per floor × 3 | 1,458 | SF |
| Net wall area | 9,600 − 1,458 | 8,142 | SF |
| Studs at 16 in. OC | 8,142 × 0.75 | 6,107 | EA |
| Studs with 5% waste | 6,107 × 1.05 | 6,412 | EA |
| Plate stock | 320 LF × 3 × 3 | 2,880 | LF |
| Plate pieces at 16 ft | 2,880 ÷ 16 | 180 | EA |
Apply waste at the material level: 5 percent is typical for dimensional lumber, but run 7 to 10 percent on short walls with heavy openings. Sheathing is priced separately by sheet — 8,142 SF ÷ 32 SF per sheet = 255 sheets, plus 5 percent for cuts. If you want this broken out against your own plan set, send it through our residential estimating services or the broader Utah construction estimating group.
Most projects turn around in 24 to 48 hours, and rush service is available when a bid date is close. Turnaround depends on how complete the plan set is — architectural, structural, and MEP sheets together price faster than a partial set with a request to assume the rest. If you send a full set with a scope letter, we can usually confirm the schedule the same day.
We deliver Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly which sheets and dimensions each line came from. The marked-up set is what most Layton contractors use during scope review, because it shows the quantity source rather than just the total.
Yes. We use ZIP-code-adjusted material and labor pricing, so a Layton address prices against the local market rather than a statewide average. That matters on labor-heavy scopes like framing, drywall, and MEP rough-in, where the wage component moves the number more than material does.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, covering permits issued by the city itself for new privately-owned residential units only. That means the 488 total units, 80 single-family and 408 multifamily, exclude commercial, industrial, and renovation permits. Use it as a demand signal, not a count of all construction activity in Layton.
Yes, and repeated units are the fastest scope to price. We take one typical unit, price it fully, then multiply by unit count and add the common areas, corridors, stairs, and mechanical rooms as separate lines. The risk is in the common areas, so we never let them ride inside the typical-unit cost.
We read the geotech report before pricing footings. Over-excavation depth, granular borrow volume, and moisture barrier area are carried as separate lines, because those quantities change fast with a revised soils report. If the report is not available at bid time, we flag the foundation scope as an assumption rather than burying it in a lump sum.
Yes. We measure shingle by the square, then break out starter, ridge, hip, valley metal, underlayment, and ice-and-water membrane by linear foot or area as the specification requires. Penetrations — vents, curbs, boots — are counted individually. Steep pitches affect labor and staging, so pitch is recorded per roof plane, not averaged across the building.
Send the plan set, specifications, any addenda, the geotech report if you have it, and a scope letter describing what you are bidding. If you want alternates priced, list them. The more complete the package, the fewer assumptions we have to carry, and assumptions are where bid-day surprises come from.
Yes. We cover the Wasatch Front and the rest of Utah, including Sandy, Ogden, St. George, South Jordan, Lehi, and Millcreek. Pricing is ZIP-code adjusted, so a project in another city is priced against that location's material and labor costs rather than Layton's.
Yes. We handle commercial estimating services alongside residential, including tenant improvements, retail, and light industrial. Commercial takeoffs lean harder on division 23, 26, and 22, plus division 9 finishes and division 8 openings, so the division structure of the deliverable matters more than it does on a single-family house.
Upload your plan set and scope letter, and we will confirm turnaround and pricing basis before we start.