Murray, UT

Construction estimating services in Murray, UT

We produce material and labor takeoffs for builders working in Murray and along the Wasatch Front. Plans go out as Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets, usually inside 24–48 hours.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Murray ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Murray · 2025
Murray new housing permits2025
New housing units80Change vs. 2024−75%Permitted construction value$27MAverage value per unit$336,000Rank among covered Utah cities#21
Single-family: 39 (49%)Multifamily: 41 (51%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Murray, UT different?

Murray pricing turns on four local drivers: shallow spread footings in Lake Bonneville soils, heavy snow and wind loads on the east bench, a 51% multifamily share of 2025 residential permits, and ZIP-adjusted material and labor rates that separate Murray from Salt Lake City and Provo.

  • Murray permitted 80 new housing units in 2025, #21 among the Utah cities we cover.
  • About 51% were in multifamily buildings; 49% were single-family.
  • Permit volume was down 75% compared with 2024.

Murray sits between Salt Lake City and the south valley, and the mix of work reflects that. You get small infill lots off State Street, tear-down rebuilds on the older grid, and mid-rise multifamily along the TRAX line. Each one prices differently, and the takeoff has to match the permit set the city actually approved.

We build those takeoffs from the drawings, not from a square-foot guess. Line items come out sorted by CSI MasterFormat division, quantities carry units you can check, and material and labor pricing is adjusted to the Murray ZIP code. Most projects return in 24–48 hours, with rush available. If you are bidding against other GCs, a clean division-level takeoff is the difference between a number you trust and a number you guess at. Start with our Utah construction estimating services page for the statewide picture, or send plans through get an estimate.

Coverage
Murray and nearby Utah communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Murray ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need quantities you can defend in a bid review. We return division-level takeoffs with units, waste factors, and marked-up plans so you can see exactly where each number came from.

02

For builders. You are buying material and scheduling crews. We price to the Murray ZIP code, flag long-lead items, and keep the format consistent so your purchasing and field teams read the same sheet.

03

For owners. You want a budget before you commit. We break the estimate into hard cost divisions so you can compare options, phase the work, and see which scope items move the total most.

Murray by the numbers

Murray's residential construction pipeline

Select a bar to compare Murray with the largest Utah markets we cover.

80New housing units, 2025
0.7%Of all units in the Utah cities we cover
$27MPermitted residential value
51%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Murray

80 new housing units in 2025 (-74.7% vs 2024).

39 single-family · 41 multifamily (51%).

Permit volume dropped, but the work did not stop

Murray issued 80 new privately-owned residential units in 2025, down from 316 in 2024, a 75% drop. That is a small slice of Utah's 11,785 units, about 0.7%, and it ranks 21st of 25 covered cities in the state. For a bidder, a thin permit year cuts both ways. Fewer projects mean more contractors chasing each set of drawings, so estimates get tighter and scope gaps get punished. It also means the projects that do move tend to be better capitalized, with complete permit sets and fewer mid-job changes. If you are pricing in Murray right now, assume competitive bids and price your general conditions honestly. Contractors working the wider valley should also look at Millcreek and Taylorsville, where the same subs and suppliers compete.

Multifamily is half the residential pie

Of the 80 permitted units, 39 were single-family and 41 were multifamily, a 51% multifamily share. Permitted value was $27M, or about $336,000 per unit. That average tells you the multifamily here is not high-rise; it is townhome and low-rise product, which prices on repetition. Unit-to-unit repetition rewards a careful takeoff: count the typical unit once, multiply, then add the corridor, stair, and amenity scope separately. Single-family infill on the older grid prices differently, with more demolition, tie-ins, and site constraints. Both types need the same discipline on foundation and framing quantities. See our multi-family estimating services for how we structure repetitive unit counts.

Services

Construction estimating services in Murray, UT

We take off the divisions that drive cost in Murray, from dirt to drywall. Each estimate is priced to the local ZIP code and delivered in Excel and PDF.

Sitework takeoff

Cut and fill, utility trenching, and asphalt for tight infill lots and redevelopment sites along State Street.

CY · LF · TON

Concrete estimating

Spread footings, stem walls, and slab-on-grade quantities for both single-family and low-rise multifamily.

CY · SF · LF

Foundation estimating

Footing schedules and rebar counts sized for Lake Bonneville soils and the frost depth the local code requires.

CY · LB · LF

Framing takeoff

Studs, plates, joists, sheathing, and trusses for repetitive townhome plans and one-off infill houses.

LF · EA · BF

Roofing estimating

Slope, underlayment, ice barrier, and venting quantities for snow-load and wind-uplift conditions on the east bench.

SQ · LF · EA

MEP estimating

Mechanical, electrical, and plumbing counts for multifamily units, including fixture and device schedules.

EA · LF · TON

Residential estimating

Full-house takeoffs for custom and production homes, from excavation through finish, sorted by division.

SF · EA · LF

Commercial estimating

Tenant improvements and ground-up commercial scope for the State Street and 5300 South corridors.

SF · EA · TON
Who we provide estimates for

Who sends us Murray plans

General contractors

You are bidding tear-down rebuilds and small commercial fit-outs along State Street and need division-level quantities you can defend in a bid review with the owner's estimator.

Multifamily developers

Your mid-rise projects near the TRAX line carry 41 of Murray's 80 permitted units this year, so unit-mix takeoffs and per-unit cost tracking drive the pro forma.

Custom home builders

Infill lots on the older Murray grid mean tight staging, short driveways and utility reconnects that a generic square-foot number will miss entirely.

Subcontractors

You need your scope isolated before you sign a GC's bid form. We return your division alone, with units and waste factors, so you can price your own labor.

Architects

You want a cost check while the permit set is still moving. We mark up the drawings we price so your team can see which assemblies are driving the total.

Owners and property managers

Replacement and capital work on older Murray buildings needs a hard-cost breakdown by division before you commit a budget or a board vote.

Where we provide estimates

Murray areas and nearby communities we cover

We price projects across Murray and the south Salt Lake Valley, from the older grid near the city center out to the surrounding suburbs. If your site is inside Salt Lake County, we can take it off.

Central Murray

  • Murray City Center
  • State Street corridor
  • Murray Park
  • Vine Street
  • Fashion Place area

Residential Murray

  • Arcadia Heights
  • Little Cottonwood corridor
  • Murray-Holladay line
  • Winchester
  • Grant Street
Property types

Types of Murray properties we estimate

Murray permitted 80 new privately-owned residential units in 2025, split 39 single-family and 41 multifamily, with about $27M in permitted value. That mix shapes what we take off most weeks.

Tear-down rebuilds

Older homes on the central grid get replaced with larger houses on the same lot. We take off demolition, utility reconnects, and the new structure separately so you can phase the work.

Watch for: Demo disposal, temporary power, and water line upsizing

Infill single-family

Narrow lots off State Street and Vine Street limit equipment access and staging. We quantify excavation by hand where a machine cannot reach and note the shoring the plan shows.

Watch for: Hand excavation, spoil removal, and tight-form work

Mid-rise multifamily

Projects along the TRAX line run three to five stories over podium or tuck-under parking. We take off by unit type and floor, then roll up to a per-unit cost for the pro forma.

Watch for: Podium waterproofing, unit-turn quantities, and elevator scope

Small commercial fit-outs

Retail and office suites turn over along State Street and near Fashion Place. We price demising walls, storefront, ceiling and MEP rough-in from the tenant plan, not the shell.

Watch for: Landlord vs. tenant split and existing sprinkler coverage

Additions and remodels

Second-story additions and kitchen gut work dominate the older housing stock. We measure existing conditions from your drawings and flag where the new work ties into framing you cannot see.

Watch for: Structural tie-in, egress windows, and panel capacity

Light industrial and yard

Murray keeps a band of warehouse and service buildings near the rail corridor. We take off slab, tilt or masonry walls, and site concrete by square foot and linear foot.

Watch for: Slab thickness, dock equipment, and yard drainage

Local factors

What changes a construction estimate in Murray

Two buildings with the same square footage can price 15 percent apart in Murray depending on what the ground and the code office require. These are the six things we check before we send a number.

Permit set and adopted code

Murray reviews under the Utah uniform codes, but the adopted edition and any local amendments change what you build. We price from the approved set, not the marketing plan, and if the drawings predate the current edition we say so. Confirm the adopted edition and any overlay requirements with the Murray City building department before you lock a bid. Fees and plan-review comments land in the soft-cost column, not the trade divisions.

Murray City building department · IBC/IRC · IECC

Soils and foundation design

The valley floor carries lake-deposit silts and clays, and benches near the east side change quickly. A geotechnical report drives footing width, over-excavation, and whether you need a structural fill. We take off footing and stem wall quantities from the foundation plan and carry the soil correction as a separate line so you can see it. On older lots, we also watch for buried debris and abandoned utilities.

Geotechnical report · Footing and stem walls · Over-excavation

Snow, freeze and wind

Ground snow load and frost depth drive roof framing and footing depth more than the average Utah bidder assumes. Roof drainage has to handle snowmelt, so we check scupper and downspout sizing against the roof plan. Wind exposure on taller mid-rise frames affects cladding attachment and shear detailing. We carry these as framing and envelope quantities rather than lump-sum allowances.

Ground snow load · Frost depth · Roof drainage

Labor market and crew availability

The Wasatch Front runs one of the tightest construction labor markets in the country, and Murray sits in the middle of it. Framing, drywall and mechanical crews book out weeks ahead, so we price labor at current local rates and note where a schedule slip will move the number. Overtime, shift work and small-crew premiums show up as separate lines instead of hiding in a general conditions percentage.

Wasatch Front labor · Crew loading · Overtime premiums

Site, drainage and land use

Small Murray lots leave little room for stormwater storage, and the city's drainage requirements can force underground retention or oversized swales. We take off sitework from the grading and drainage plan, including utility trenching, curb and gutter, and asphalt repair. Setbacks, parking counts and landscaping ratios come from the zoning approval, so we price to the approved site plan. Confirm the current zoning and any conditional-use conditions with the city.

Grading and drainage plan · Utility trenching · Zoning approval

Materials, lead times and tax

Material pricing is adjusted to the Murray ZIP code, which matters on commodities like ready-mix, asphalt and lumber. Long-lead items such as switchgear, elevators and rooftop units can set the schedule, so we flag them at takeoff. Utah's sales tax treatment of construction materials affects the buyout, and we keep material and labor separate so your accountant can apply the right rate. Freight and small-order premiums get their own lines.

ZIP-code pricing · Long-lead equipment · Utah sales tax
Murray estimating guide

How Murray conditions show up in a takeoff, trade by trade

Murray sits in Salt Lake County between the Wasatch foothills and the Jordan River, and the mix of tear-down infill, small multifamily and older commercial stock changes what we measure and how we price it. These are the trades where the local conditions bite hardest.

Sitework and excavation

Along the Jordan River corridor and the low ground west of State Street you hit a water table that sits high in spring, so we carry dewatering, sump pits and gravel backfill as separate lines rather than burying them in a general excavation allowance. On the east bench toward the foothills, the same cut exposes cobbles and cemented gravel that slows a track hoe and often needs a rock clause. We measure stripping by square yard, structural fill by compacted cubic yard, and import or export by truck count with a stated swell factor. If your project includes parking, curb or utility runs, our sitework estimating services break those out by station so you can compare bids line for line.

Framing and sheathing

Utah snow load and wind exposure govern the roof structure, so we take off rafters or trusses by count and span, then check the sheathing and nailing schedule against the engineered drawings rather than a generic detail. Wall framing is measured by linear foot of plate with stud counts derived from spacing, plus headers, blocking and backing. Floor joists, rim board, subfloor adhesive and joist hangers are separate lines. On the tear-down infill lots common around Murray, we also price temporary shoring and the removal of existing foundation walls that a clean-lot takeoff would miss. Framing estimating services return the whole division 06 package with waste shown per material.

Mechanical, electrical and plumbing

Murray's older housing stock means a lot of remodel work where the existing panel, water service and drain lines do not match what the new plan assumes. We count fixtures, floor drains, gas outlets, receptacles, switches and light fixtures from the plans, then list panel schedules and feeder runs by size and length. Ductwork is measured by linear foot by size, with boots, registers and flex connections counted. On commercial and tech-adjacent buildouts, the mechanical and electrical scope is where bid spread is widest, so we show counts and lengths rather than allowances. MEP estimating services produce division 22, 23 and 26 takeoffs that you can hand to a subcontractor for pricing.

Concrete and foundations

Frost depth here drives footings deeper than a contractor from a warmer market expects, and the freeze-thaw cycle pushes air-entrained mixes and tighter joint spacing on flatwork. We take off continuous footings by linear foot with width and depth shown, stem walls by linear foot with height, and slab on grade by square foot with thickness and reinforcement called out. Anchor bolt counts, hold-down embed plates and vapor barrier overlap all get their own lines because they are the items most often left in a lump sum. Basement and retaining walls on sloped lots get formwork measured by contact area, not by wall face. Concrete estimating services cover the full division 03 package, including curing and finish.

Roofing and envelope

The freeze-thaw pattern and spring snowmelt make ice dam protection and underlayment coverage a real cost item, not a footnote. We measure roof area by slope plane, add for hips, valleys and ridge, and convert to squares with a stated waste factor. On low-slope commercial roofs we separate membrane, insulation thickness by R-value, cover board, flashing and metal edge. Wall assemblies get taken off by area with WRB, flashing, insulation and cladding broken out, because the thermal envelope requirements in the adopted energy code affect continuous insulation thickness. Confirm the code edition in force with the Murray building department before you lock the assembly. Roofing estimating services handle steep-slope and low-slope separately.

Scope gaps we see on Murray bids

  • Demolition of existing footings, slabs and utility stubs on infill lots, left out when the bid assumes a clean site.
  • Dewatering and gravel backfill near the Jordan River corridor, carried as an allowance instead of measured quantities.
  • Rock excavation clauses and cobble removal on east bench cuts, missing from the excavation scope entirely.
  • Ice dam protection, valley flashing and drip edge on steep-slope roofs, omitted from the roofing square count.
  • Panel upgrades, meter relocation and temporary power on remodels where the existing service is undersized.
  • Final grading, topsoil, landscape and irrigation restoration after utility trenching, unassigned between trades.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Murray project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Murray conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to MurrayMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: Murray, UT two-story single-family residence

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Footing concrete, 24 in x 12 in continuous148CY
03 30 00Slab on grade, 4 in, 3,000 psi air-entrained1,850SF
05 12 00Structural steel beam, W8x1842LF
06 10 002x6 wall framing, 16 in o.c., 9 ft plate612LF
06 16 007/16 in OSB wall sheathing4,120SF
07 30 00Steep-slope shingle roofing, 6:12 pitch31SQ
09 29 001/2 in gypsum board, walls and ceilings8,640SF
22 11 00PEX domestic water piping, 1/2 in and 3/4 in1,240LF

Worked example: slab-on-grade concrete for a Murray duplex

We are pricing the slab on grade for a two-unit duplex on a flat infill lot in Murray. The footprint is a simple rectangle. All dimensions below are illustrative — substitute your own plan dimensions before using these numbers.

The slab is 48 ft wide by 62 ft deep, poured at 4 in thick over a 4 in gravel base with 6 mil vapor barrier and 6x6-W1.4xW1.4 welded wire mesh. We add a 12 in x 12 in thickened edge at the perimeter for the bearing wall.

Step 1 — slab area. 48 ft x 62 ft = 2,976 SF.

Step 2 — slab volume. 2,976 SF x (4 in / 12) = 992 CF. Divide by 27: 992 / 27 = 36.7 CY.

Step 3 — thickened edge. Perimeter = 2 x (48 + 62) = 220 LF. Extra depth beyond the 4 in slab = 8 in = 0.667 ft. Additional volume = 220 LF x 1.0 ft x 0.667 ft = 146.7 CF = 5.4 CY.

Step 4 — waste. Typical waste for slab concrete is 5 percent. (36.7 + 5.4) x 1.05 = 44.2 CY. Order 44 CY.

Step 5 — gravel base. 2,976 SF x (4 in / 12) = 992 CF, divided by 27 = 36.7 CY compacted. With a typical 20 percent compaction and handling factor, order about 44 CY.

Step 6 — vapor barrier and mesh. Vapor barrier = 2,976 SF plus 10 percent lap and perimeter = 3,274 SF. Mesh = 2,976 SF plus 10 percent lap = 3,274 SF.

StepItemCalculationQuantityUnit
1Slab area48 x 622,976SF
2Slab volume2,976 x 0.333 / 2736.7CY
3Thickened edge220 x 1.0 x 0.667 / 275.4CY
4Concrete with 5% waste(36.7 + 5.4) x 1.0544.2CY
5Gravel base992 / 27 x 1.2044.1CY
6Vapor barrier2,976 x 1.103,274SF

Two things change this number in Murray. First, the thickened edge depth is set by the footing detail your engineer draws, and frost depth governs it — check the approved plan, not a rule of thumb. Second, if the lot sits near the river corridor with a high water table, add dewatering and a thicker gravel base, and price the vapor barrier as a heavier mil product. Our concrete estimating services will run this same sequence against your drawings and return it in Excel by CSI division.

FAQ

Murray construction estimating questions

Where does the Murray permit data on this page come from?

The unit counts and permitted value come from the U.S. Census Bureau Building Permits Survey, and they cover new privately-owned residential units only — not additions, remodels, tenant improvements or commercial work. For 2025 the survey recorded 80 residential units in Murray, down from 316 in 2024, with 39 single-family and 41 multifamily units. That is a 75 percent drop year over year. Treat it as a signal about residential volume, not as a measure of total construction activity in the city.

Does Murray's permit volume affect how you price a takeoff?

It affects the labor side more than the material side. When residential starts fall off sharply, framing and concrete crews that were booked out are suddenly available, and unit labor rates soften. We still price from ZIP-code-adjusted material and labor data rather than guessing, but we flag the trades where you have room to negotiate. On the flip side, a slow residential market pushes more contractors toward commercial and multifamily work, which can tighten bidding on those scopes.

What soil and groundwater conditions should I tell you about?

Send the geotechnical report if you have one. Near the Jordan River corridor we expect a high water table in spring, which drives dewatering, a thicker granular base and sometimes a waterproofing membrane under the slab. On the east bench toward the foothills, cuts often hit cobbles and cemented gravel, so we carry a rock excavation line and slower production rates. If there is no geotech report, we note the assumption on the takeoff so your bid carries a stated condition rather than a silent risk.

How does Utah snow load change a framing takeoff?

Ground snow load in this part of the Wasatch Front is high enough that roof framing is engineered, not prescriptive, on most projects. That means we take off trusses or rafters against the stamped drawings and check the nailing schedule, sheathing thickness and connection hardware against the same sheet. We do not substitute a generic detail from a different market. If the structural sheets are not issued yet, we say so and price the framing as an allowance with the assumption listed.

Do you take off both single-family and multifamily for Murray projects?

Yes. Multifamily was 51 percent of Murray's permitted residential units in 2025, so a duplex, townhome row or small apartment building is common here. Multifamily takeoffs repeat unit types, which means we build a typical unit once and multiply, then price the common areas, corridors, stairs, elevator and roof separately. That structure makes it easy to see your per-unit cost and to compare a wood-frame over podium scheme against a different structural system.

What do you need from me to start a Murray takeoff?

Send the full plan set — architectural, structural, civil, mechanical, electrical and plumbing — plus any specifications, the geotechnical report and the schedule. Marked-up PDFs are fine. If only part of the set is available, tell us which disciplines are missing so we can list them as exclusions rather than quietly leaving them out. We return Excel and PDF organized by CSI MasterFormat division with marked-up plan sets, typically in 24 to 48 hours for most projects, with rush available.

How do you handle the tear-down and infill work common in Murray?

Infill is a different takeoff from a clean-lot build. We add demolition of the existing structure, foundation walls, driveways and flatwork, plus utility abandonment or relocation and any hazardous material survey allowance. We also price temporary shoring when the new foundation sits close to a property line or an existing structure. If the demolition scope is not drawn, we list it as an exclusion and give you a separate allowance so it does not disappear into a general conditions line.

Can you break out the MEP scope so I can bid it to subcontractors?

That is usually how it gets used. We produce division 22, 23 and 26 takeoffs with fixture counts, pipe and duct lengths by size, device counts and panel schedules. A plumbing or electrical subcontractor can price directly from those quantities instead of re-measuring the whole set. On older Murray buildings, we also note where the existing service, drain lines or ductwork appear undersized for the new load, because that is where change orders start.

Which nearby cities do you cover along with Murray?

We work across the Wasatch Front, including Millcreek, Taylorsville, Draper, Bountiful, Riverton and Logan, plus the broader state through our Utah construction estimating services. Pricing is adjusted by ZIP code, so a Millcreek or Taylorsville project gets the material and labor rates for that location rather than a Murray figure. If your project spans more than one city, tell us and we will price each site separately so you can see the difference.

What is the difference between a takeoff and an estimate?

A takeoff is measured quantities: linear feet of pipe, square feet of sheathing, cubic yards of concrete. An estimate applies unit costs, labor hours, waste, overhead and markup to those quantities. We deliver the takeoff with quantities and units clearly shown, and can extend it to a priced estimate using RSMeans data adjusted for the local ZIP code. Keeping the two separate lets you swap in your own labor rates or a subcontractor quote without rebuilding the measurement.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Murray project plans for a quote

Send your plan set and we will return a CSI-organized takeoff in Excel and PDF, typically within 24 to 48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us