Scope Precision EstimateContact Us
Logan, UT

Construction estimating services in Logan, UT

We produce line-item construction estimates and quantity takeoffs for builders, subcontractors, and owners working in Logan, Utah. Deliverables arrive in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the drawing.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Logan ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Logan · 2025
Logan new housing permits2025
New housing units430Change vs. 2024+50%Permitted construction value$88MAverage value per unit$205,600Rank among covered Utah cities#9
Single-family: 194 (45%)Multifamily: 236 (55%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Logan, UT different?

Logan pricing turns on Cache Valley soil conditions and frost depth, short building seasons that compress concrete and framing schedules, hillside and bench excavation on the east side, university and tech-campus MEP scope, and a multifamily share of 55% of permitted units — all of which shift labor and equipment costs against the Wasatch Front average.

  • Logan permitted 430 new housing units in 2025, #9 among the Utah cities we cover.
  • About 55% were in multifamily buildings; 45% were single-family.
  • Permit volume was up 50% compared with 2024.

Logan sits in Cache Valley at roughly 4,500 feet, and that elevation drives real cost differences from the rest of the Wasatch Front. Frost depths, snow-load design, and a shorter window for exterior concrete and roofing all push labor and equipment line items above what a Salt Lake County estimate would show. We price from ZIP-code-adjusted material and labor data rather than a statewide average, so your bid reflects what trades actually charge here.

We work from the same documents you bid from: architectural and structural sets, civil and grading plans, MEP drawings, and specifications. Takeoffs come back organized by CSI MasterFormat division with marked-up plan sets, in Excel and PDF, typically within 24–48 hours. If you are comparing markets across the state, start with our Utah construction estimating services and see how Logan sits against Lehi and Draper.

Cache County soils range from gravelly bench ground on the east side to clay-heavy valley floor, and both affect excavation, backfill, and foundation design. The city's building department enforces the adopted Utah code editions, so confirm the current IBC and IRC amendments with them before you lock your scope. We also cover Millcreek and Murray if your work crosses the Wasatch Front.

Coverage
Logan and nearby Utah communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Logan ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need quantities you can defend in a bid review. We return division-level takeoffs with marked-up plans so you can check concrete, framing, and MEP counts line by line before the deadline.

02

For builders. You are buying out trades and need a budget that holds. We break scope by division and unit of measure so you can compare subcontractor quotes against a consistent baseline.

03

For owners. You are testing feasibility or a lender draw schedule. We give you a cost structure tied to the drawings, with assumptions stated, so you can challenge the numbers.

Logan by the numbers

Logan's residential construction pipeline

Select a bar to compare Logan with the largest Utah markets we cover.

430New housing units, 2025
3.6%Of all units in the Utah cities we cover
$88MPermitted residential value
55%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Logan

430 new housing units in 2025 (+50.3% vs 2024).

194 single-family · 236 multifamily (55%).

Permit volume and what it means for bid competition

Logan issued permits for 430 new privately-owned residential units in 2025, up from 286 in 2024 — about a 50% increase, per the U.S. Census Bureau Building Permits Survey. That ranks the city 9th of 25 covered Utah cities and accounts for 3.6% of the 11,785 covered statewide units. For bidders, rising volume means more general contractors chasing the same framers, concrete crews, and mechanical subs. When you price a Logan job, carry realistic labor rates and escalation rather than assuming last year's numbers. Multifamily is 55% of permitted units, so apartment and townhome scopes are where the competition is sharpest. Compare the pressure with Millcreek and Murray before you set your margin.

Unit values and the multifamily split

Permitted value for 2025 was $88M across 430 units, averaging $205,600 per unit. That average blends 194 single-family units with 236 multifamily units, so it is not a per-square-foot construction cost — it is a permit-value figure and should be read that way. In practice, the multifamily share means more podium and garden-style apartment work, which concentrates cost in MEP rough-in, fire protection, and site utilities. Single-family work on the bench and hillside lots concentrates cost in excavation, retaining, and foundation. If your scope is multifamily, see our multi-family estimating services; for single-family and townhome work, residential estimating services covers the trade breakdown.

Services

Construction estimating services in Logan, UT

These are the takeoff and estimating packages we run most often for Cache Valley projects, each priced from ZIP-code-adjusted material and labor data.

Concrete takeoff

Footings, stem walls, slabs, and flatwork quantities for Logan frost-depth foundations and short pour seasons.

CY · SF · LF

Foundation estimating

Excavation, backfill, waterproofing, and reinforcing for bench and hillside lots above the valley floor.

CY · TON · SF

Framing takeoff

Studs, plates, joists, sheathing, and trusses counted from plan, with waste factors typical for the trade.

LF · EA · BF

Roofing estimating

Snow-load-driven framing and roofing assemblies, underlayment, and flashing for Logan's design conditions.

SQ · LF · EA

MEP estimating

Mechanical, electrical, and plumbing rough-in counts for apartments, student housing, and campus-adjacent buildings.

LF · EA · TON

Sitework estimating

Grading, utilities, curb, and pavement quantities for valley-floor subdivisions and infill lots.

CY · LF · TON

Commercial estimating

Division-level budgets for retail, office, and institutional work along Main Street and the university corridor.

SF · EA · LS

Industrial estimating

Process-supporting structures, slabs, and utility scope for light industrial and warehouse projects in the valley.

SF · CY · TON
Who we provide estimates for

Who we prepare Logan construction estimates for

General contractors

You bid Cache County school, church, and commercial work against Salt Lake firms. We return division-level quantities with marked-up plans so your bid review holds up.

Residential builders

Logan permitted 430 new privately-owned residential units in 2025, 55% multifamily. We take off unit-by-unit for townhome and apartment buildings so your buyout matches the density.

Subcontractors

Concrete, framing, and roofing crews here fight a short exterior season. We give you quantities by elevation and area so you can schedule pours and truss sets without remobilizing.

Developers

You are testing land in Cache Valley against Wasatch Front pricing. We build a cost structure from the drawings with assumptions stated, so you can compare sites before you option them.

Architects

Your Logan projects run through city plan review and Utah code amendments. We check drawing completeness against CSI divisions and flag missing scope before it becomes a change order.

Owners and facility managers

You need a budget for a renovation or an addition at a Logan site. We price from ZIP-code-adjusted data so the number reflects local labor, not a statewide average.

Where we provide estimates

Logan areas and nearby communities we cover

We estimate from plans for projects anywhere in Cache Valley and along the Wasatch Front. If your site is in one of these areas, send the drawings and we will price it from the same documents you bid from.

Logan City

  • Downtown Logan
  • Utah State University area
  • Bridger
  • Adams
  • Wilson
  • Hillcrest

Cache Valley

  • North Logan
  • River Heights
  • Providence
  • Hyrum
  • Smithfield
  • Nibley
Property types

Types of Logan properties we estimate

Logan's 2025 permit mix was 430 new privately-owned residential units, 55% multifamily and 45% single-family, with $88M in permitted value. That mix shapes what we take off most weeks.

Single-family homes

Custom and production houses on bench lots and valley floor infill. We take off foundation, framing, roofing, and MEP by floor and elevation, with waste factors typical for each material.

Watch for: Frost depth, snow load, and window flashing details

Townhomes and rowhouses

Party-wall buildings common near USU and along the Logan corridors. We count units, shared walls, and fire separations so your framing and drywall quantities track the repetition.

Watch for: Party-wall fire ratings and unit-to-unit plumbing stacks

Multifamily apartments

Three- and four-story wood-frame buildings with podium or slab-on-grade. We break out unit counts, corridor lengths, and common-area MEP so your buyout matches the schedule.

Watch for: Type III vs Type V construction and elevator scope

Student and senior housing

Higher-density projects near Utah State University and along Main Street. We price unit turnovers, common laundry, and amenity spaces that drive finish and MEP counts.

Watch for: Acoustic separations and high-turnover finish specs

Commercial and retail

Main Street storefronts, office fit-outs, and service buildings. We take off tenant improvements by division so you can separate base-building scope from tenant scope.

Watch for: Storefront glazing, sprinkler coverage, and ADA upgrades

Industrial and warehouse

Light industrial and storage buildings on the valley floor and near the airport. We price slab thickness, column spacing, and dock equipment as separate line items.

Watch for: Slab flatness, fire walls, and utility trenching

Local factors

What changes a construction estimate in Logan

Logan is not a Wasatch Front suburb with different ZIP codes; it is a separate valley with its own code amendments, soils, and haul distances. These six factors move your numbers most.

Code edition and permitting

Logan enforces the adopted Utah code editions, which track the IBC, IRC, IECC, and NEC with state amendments. Plan review checks energy compliance, snow load, and seismic detailing before you pull a permit. Confirm the current adopted editions and any local amendments with the Logan building department before you lock your scope, because a mid-cycle code change can add insulation, glazing, or bracing line items.

IBC · IRC · IECC · NEC

Soils and foundation design

Cache County ground runs from gravelly bench soils on the east side to clay-heavy valley floor. Excavation, backfill, and footing design change with each. Expansive clay may require over-excavation, import, or a post-tensioned slab. On the bench, rock and cobbles slow trenching and can force rock removal line items. We price foundation scope from the geotechnical report and structural drawings, not a default detail.

Geotechnical report · Structural drawings · Frost depth

Climate and snow load

Logan sits around 4,500 feet with a design snow load well above Salt Lake Valley values. Roof framing, truss spacing, and snow retention are not optional here. The exterior season is shorter, so concrete, roofing, and sitework carry winter conditions and temporary heat. We carry those items explicitly rather than burying them in general conditions.

Ground snow load · Truss spacing · Winter conditions

Labor market and crew availability

Cache County has a smaller trade base than the Wasatch Front, so crews often travel from Ogden or Salt Lake. That travel time shows up in labor rates and mobilization. During USU semesters, housing work competes with campus construction for the same trades. We price labor from ZIP-code-adjusted data and flag scopes where the local crew pool is thin.

Travel time · Mobilization · Trade availability

Sitework, drainage, and land use

Logan's topography and irrigation history mean drainage and grading get scrutiny at plan review. Bench lots need retaining walls and erosion control; valley floor sites need storm detention and sump systems. Setbacks, parking ratios, and hillside ordinances vary by zone. We take off sitework from the civil set and separate it from building scope so you can see what the dirt actually costs.

Civil drawings · Storm detention · Retaining walls

Materials, logistics, and taxes

Logan is roughly 80 miles from Salt Lake suppliers, so delivery charges and lead times on structural steel, trusses, and mechanical equipment add cost. Concrete batch plants are local, but specialty finishes often ship from the Front. Utah sales tax applies to materials, and we carry it as a separate line so your budget does not absorb it silently.

Delivery charges · Lead times · Utah sales tax
Logan estimating guide

How Logan conditions show up in a takeoff, trade by trade

Logan's mix of steep east-bench lots, cold winters, and a heavy multifamily share changes what you measure and how you price it. Here is how that plays out division by division.

Division 31 — Sitework and earthwork

Logan sits in Cache Valley, where bench lots on the east side drop toward the valley floor and valley-floor lots hit high groundwater and silty clays. A takeoff here separates cut and fill by area, not by a single site number: stripping depth, structural fill under slabs and pavers, and over-excavation below footings all get their own lines. Rock excavation is usually carried as an allowance until a geotech report confirms depth. Winter grading means frozen subgrade protection and possibly imported granular fill. Measure drainage separately — swales, area drains, and downspout extensions matter on lots that shed toward neighbors. Our sitework takeoff breaks each of these out so your bid reflects the actual dirt, not an average.

Division 06 — Framing and wood structures

Logan's snow load drives truss and rafter design, and that shows up in the framing takeoff as deeper members, closer spacing, and more blocking at bearing points. On multifamily, we count studs by wall type and height, plates by linear foot, headers by span and ply, joists and rim by span and spacing, and sheathing by sheet with waste. Floor-to-floor alignment on stacked units is where quantities drift — a missed double top plate or a shear wall segment can add hundreds of feet across a building. Our framing estimating services team tags shear panels and hold-downs separately so you can compare against the structural sheets.

Divisions 22/23/26 — MEP rough-in

Mechanical, plumbing, and electrical rough-in is where Logan multifamily bids most often go sideways, because fixture counts, home-run lengths, and panel schedules have to be reconciled across repeated unit plans. We count plumbing fixtures by type, water and drain lines by developed length and material, HVAC equipment by tonnage and zone, ductwork by pound and linear foot, and electrical devices by count with feeder and branch lengths. Snowmelt and freeze protection on exterior walls affect pipe insulation and heat trace. Our MEP estimating services group prices these divisions from the plan set and schedules, not from a square-foot allowance.

Division 03 — Concrete

Foundations on the Logan bench often require stepped footings, deeper stem walls on the downhill side, and continuous perimeter drains. On valley-floor lots, we see thickened slabs and vapor barriers specified more aggressively. A concrete takeoff here counts footing linear feet by width and depth, stem wall height by wall segment, slab area by thickness, and flatwork by square foot with control joints and finish called out. Rebar is converted from linear feet to tons. Cold-weather curing and blanket protection are real line items from November through March. If you need a second set of eyes on formwork and rebar quantities, our concrete estimating services group works from the same marked-up plan set.

Division 07 — Roofing and envelope

Ice dam protection, underlayment laps, and valley flashing are not optional in Logan. Roof takeoffs measure slope area, not plan area, then add eave and rake linear feet for drip edge, valley linear feet, and penetration counts for vents and stacks. Steeper pitches on the bench add waste and fall-protection cost. On the wall side, we count weather-resistive barrier by square foot with seam tape, flashings by type and length, and window/door openings by unit with pan flashing. Attic ventilation is a common miss — ridge vent, soffit vent, and baffles need to be on the takeoff or they get absorbed. Our roofing estimating services page walks through how we handle slope and waste factors.

Scope gaps we see on Logan bids

  • Rock excavation and over-excavation carried as a lump sum with no unit rate or allowance cap, then absorbed when the geotech report comes back deeper than assumed.
  • Perimeter drainage, footing drains, and downspout extensions left off the sitework scope because they appear on the civil sheets, not the architectural set.
  • Snow load-driven framing changes — deeper members, added blocking, extra shear panels — priced from an older plan revision that predates the structural update.
  • Ice dam protection, valley flashing, and attic ventilation omitted from the roofing scope and treated as roofer extras after contract award.
  • Multifamily unit-to-unit repetition assumed identical, missing mirrored units, end units, and accessible units that carry different fixture and device counts.
  • Cold-weather concrete curing, blankets, and temporary heat left out of the winter schedule even though the work falls between November and March.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Logan project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Logan conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to LoganMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: three-story wood-frame multifamily building, Logan

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Footing concrete, 24" x 12"186CY
03 20 00Rebar, footing and stem wall14.2TON
06 10 002x6 studs, 9' walls, 16" o.c.11,450LF
06 10 00Shear wall panels, tagged38EA
06 16 00Roof sheathing, 7/16" OSB178SHT
07 30 00Ice dam membrane, eave412LF
22 10 00Plumbing fixtures, per unit type96EA
26 20 00Branch wiring, 12/2 and 14/226,800LF

Worked example: footing concrete for a Logan multifamily building

This example sizes continuous footings for a three-story wood-frame building on a valley-floor lot in Logan. Dimensions are illustrative — your geotech report and structural sheets govern.

Assume a perimeter of 420 LF with a 24" wide by 12" deep continuous footing, plus 180 LF of interior bearing footings at the same size. We convert inches to feet first, then multiply to get cubic feet, then divide by 27 for cubic yards.

StepCalculationResult
Perimeter footing volume420 LF × 2.0 ft × 1.0 ft840 CF
Interior footing volume180 LF × 2.0 ft × 1.0 ft360 CF
Subtotal840 + 3601,200 CF
Convert to cubic yards1,200 ÷ 2744.4 CY
Waste and overpour (typical 5%)44.4 × 1.0546.6 CY
Order quantityround up47 CY

Now add the pier pads and column footings, which are counted by each, not by linear foot. If the structural set shows 22 pads at 30" × 30" × 12", that is 22 × 6.25 CF = 137.5 CF, or 5.1 CY, and 5.4 CY with the same 5% allowance.

Two Logan-specific adjustments change the number. First, stepped footings on a sloped lot add depth at the downhill side — measure each step rather than averaging the run, because averaging understates concrete. Second, cold-weather placement between November and March may require accelerator or heated blankets, which are separate line items and should not be buried in the concrete unit price.

Rebar follows the same logic: count longitudinal bars by footing length, add dowels at the stem wall, add tie wire and chairs, then convert pounds to tons. A footing this size typically lands near 14 tons once stem wall verticals are included. If you want this broken out against your own plan set, send the drawings through our foundation estimating services team.

FAQ

Logan construction estimating questions

Where does the Logan permit data on this page come from?

The figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means additions, remodels, commercial buildings, and accessory structures are not in the count. Logan issued 430 residential units in 2025, up from 286 in 2024, with 194 single-family and 236 multifamily units. The permitted value was $88M, averaging $205,600 per unit. Use these as a demand signal, not as a construction cost benchmark.

How does Logan's snow load affect my framing takeoff?

Ground snow load in Cache Valley drives member sizing, spacing, and connection details, which changes quantities rather than just unit prices. You will see deeper rafters or trusses, more blocking at bearing walls, and additional shear and hold-down hardware. Because the structural sheets govern, we take off from the stamped drawings and tag each member by span and spacing. If the structural revision changes after your bid, the framing quantities change with it. Confirm the adopted code edition and snow load with the Logan building department before you finalize.

Do you price from RSMeans or from local supplier quotes?

We use RSMeans data with ZIP-code adjustments for Logan material and labor pricing, which gives a defensible baseline. That said, local suppliers and subcontractors move faster than published data, so we flag the line items most sensitive to local pricing — concrete, lumber, and mechanical equipment — so you can overlay your own quotes. If you have recent supplier pricing, send it with the plans and we will reconcile it against the RSMeans baseline in the deliverable.

What turnaround should I expect on a Logan multifamily estimate?

Most projects come back in 24 to 48 hours, and rush turnaround is available if your bid date is close. Multifamily work takes longer than a single house because unit types repeat and every mirrored, end, and accessible unit has to be reconciled separately. A three-story building with four unit plans is a different scope of work than a custom home, even at similar square footage. Send the full set — architectural, structural, civil, and MEP — so we are not guessing at scope.

What do you need from me to start a takeoff?

Send the plan set in PDF, the structural and civil sheets if they exist, any specifications, and the bid date. If you have a geotech report, include it — it changes foundation quantities materially in Cache Valley. If the project is a repeat of a plan you have built before, tell us which revision is current. We return Excel and PDF organized by CSI MasterFormat division with marked-up plan sets so you can trace every quantity back to the sheet it came from.

Can you estimate just the concrete and foundation scope?

Yes. Many Logan builders split the estimate by trade and only need footing, stem wall, slab, and flatwork quantities. We can deliver Division 03 on its own with rebar converted to tons, formwork by square foot of contact area, and flatwork by square foot with finish and jointing called out. That works well when you are self-performing concrete and subbing the rest. If you need the full building, we can bundle it with the other divisions.

How do you handle waste factors on a Logan takeoff?

Waste is applied per material, not as one blanket percentage. Typical ranges run about 5% on concrete, 5% to 10% on framing lumber depending on cut complexity, 10% on roof and wall sheathing, and 10% to 15% on tile and flooring. Steeper roofs, complex hips and valleys, and heavy penetration counts push sheathing and roofing waste toward the high end. We show the waste line separately in the spreadsheet so you can adjust it if your crew's habits differ from the assumption.

Do you cover projects outside Logan in Cache Valley?

We cover Logan and the surrounding Cache Valley communities, and we also work across the Wasatch Front. Nearby cities we estimate in include Lehi, Millcreek, Taylorsville, Murray, Draper, and Bountiful. Pricing is ZIP-code adjusted, so a project in one of those cities gets material and labor rates for that location rather than a single statewide number. If your project is in a smaller Cache Valley town, send the address and we will confirm coverage.

What is the difference between your residential and commercial takeoffs?

Residential takeoffs focus on repeated unit types, framing by wall segment, and finish schedules, with quantities driven by plan dimensions. Commercial work adds specification-driven assemblies, submittal-level detail on mechanical and electrical, and often a bid form that has to be matched line for line. Logan's tech-campus and institutional work falls into the commercial category. We organize both by CSI MasterFormat division, but the level of detail and the reconciliation steps differ. Tell us which bid form you are filling out and we will match it.

Can you estimate a project from a preliminary design?

Yes, with the understanding that preliminary drawings produce a preliminary estimate. We take off what is drawn, flag assumptions where dimensions or assemblies are missing, and list the items most likely to change once the design is finalized. That gives you a working number for budgeting without pretending it is a bid-level quantity. When the stamped set arrives, we update the takeoff and show what moved. Confirm adopted code requirements with the local building department as the design progresses.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Logan project plans for a quote

Send your plan set and bid date, and we will return a MasterFormat-organized takeoff with marked-up drawings in 24 to 48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us