Sitework takeoffs
Cut and fill, stripping, and undercut quantities for Macon County sites with clay soils and high water tables.
CY · SF · LSScope Precision Estimate provides quantity takeoffs and cost estimates for Decatur contractors, developers, and owners. We price Macon County work with ZIP-code-adjusted material and labor rates and deliver Excel and PDF takeoffs by CSI MasterFormat division in 24–48 hours.
Decatur pricing turns on four local cost drivers: deep foundation work in Macon County's clay soils, freeze-thaw cycles that drive concrete air entrainment and roofing ice-barrier quantities, industrial and agricultural processing construction, and a small new-residential pipeline — 3 permitted units in 2025, all single-family — that keeps remodel and small-commercial estimating demand steady.
Decatur sits in Macon County at the center of Illinois, where the construction mix runs to industrial and agricultural processing buildings, institutional work, and small commercial projects rather than high-volume subdivision building. The U.S. Census Bureau's 2025 Building Permits Survey shows 3 new privately-owned residential units permitted in the city, all single-family, with a permitted value of $3M — a pace that puts remodel, tenant-improvement, and industrial estimating at the center of local bid work.
That mix changes what a takeoff has to capture. Industrial and processing projects carry heavy process piping, structural steel, and equipment pads; institutional work carries Division 09 finishes and Division 23 mechanical scope that general contractors frequently self-perform or split across subcontracts. Our takeoffs follow CSI MasterFormat divisions and mark up the plan set so you can see exactly what was measured. If you bid across the region, our Illinois construction estimating page covers the state, and our Bloomington and Schaumburg pages cover nearby markets with different labor and material pricing.
For bidders. You need quantities you can defend in a bid review. We deliver line items by division with marked-up plans, so your estimate shows where every CY, LF, and TON came from before you submit.
For builders. You are buying out framing, concrete, and MEP packages. We break scope by trade and unit so you can compare subcontractor quotes against a measured baseline instead of a lump sum.
For owners. You are budgeting a remodel, addition, or industrial fit-out. We price the scope you have, flag what is missing, and give you a cost basis for deciding whether to bid or rebid.
Select a bar to compare Decatur with the largest Illinois markets we cover.
3 new housing units in 2025 (0% vs 2024).
3 single-family · 0 multifamily (0%).
The 2025 permit data for Decatur shows 3 new privately-owned residential units, unchanged from 3 in 2024, with a permitted value of $3M and an average value per unit of $989,700. All 3 units were single-family; multifamily was zero. That is a 0% change year over year and ranks 23rd of 25 covered Illinois cities by units, with a 0% share of the 6,710 covered state units. For bidders, the read is direct: new-construction volume is thin, so remodel, addition, and small-commercial work carries more of the local pipeline, and your estimates need to capture existing-condition scope — demolition, temporary protection, and tie-ins — that new-build takeoffs often omit. Confirm current permit thresholds and inspection requirements with the City of Decatur building department before you price.
Decatur's economy has long been anchored by industrial and agricultural processing, and that shows up in the estimating mix: process buildings, equipment pads, tank foundations, and plant utility work rather than tract housing. Those projects pull in Division 03 concrete, Division 05 structural steel, Division 22/23 piping and mechanical, and Division 26 electrical in larger quantities than a typical commercial building. Our industrial estimating services and MEP estimating services pages describe how we structure those takeoffs. Because the state's overall demand is concentrated in the Chicago area, per the state demand drivers, Decatur bids compete with contractors from Arlington Heights and Palatine who may price labor differently. We adjust material and labor by ZIP code so your Decatur number reflects local conditions, not a metro-Chicago average.
We measure and price the divisions that carry the most cost on Decatur-area projects, from clay-soil foundations to industrial mechanical scope.
Cut and fill, stripping, and undercut quantities for Macon County sites with clay soils and high water tables.
CY · SF · LSFootings, slabs, equipment pads, and exterior flatwork priced with air-entrained mixes for Illinois freeze-thaw cycles.
CY · SF · LFSpread footings, caissons, and grade beams measured from structural drawings, with formwork and reinforcing by size.
CY · TON · SFMembrane, insulation, and ice-barrier quantities for low-slope industrial roofs and steep-slope replacement work.
SQ · LF · SFWood and light-gauge studs, joists, and sheathing counted by member size with typical waste factors applied.
LF · EA · SFPiping, ductwork, and electrical raceway for processing and institutional buildings, broken out by system.
LF · EA · TONFull-division takeoffs for retail, office, and institutional projects, organized by CSI MasterFormat division.
SF · EA · LSCustom homes, additions, and remodels priced at the small-volume pace Decatur's permit data reflects.
SF · EA · LFYou bid industrial and institutional work against a short list of local competitors, so a defensible Division 03 and 05 quantity set matters more than a low number. We mark up the plans so your bid review holds.
Decatur bid work runs to concrete, steel erection, mechanical, and roofing packages. We measure your trade scope only, by division and unit, so you can price labor and equipment without carrying another trade's risk.
With only 3 new residential units permitted in 2025, most local developer work is adaptive reuse, tenant fit-out, and small commercial. We give you a cost basis before you commit to a pro forma.
You need a quantity check on your own drawings before they go out to bid. We measure from the same set, flag missing details, and return a division-organized takeoff you can attach to the specification.
Plant expansions, roof replacements, and mechanical upgrades at Decatur processing sites are budgeted long before design is complete. We price the scope you have and list the assumptions in writing.
Older building stock in Macon County means recurring roof, envelope, and interior renovation scopes. We estimate those repeat packages the same way each time so you can compare bids across properties.
We take off plans for projects anywhere in Macon County and the surrounding central Illinois counties. Send the address or the plan set and we price to the ZIP code where the work sits.
The 2025 permit data shows 3 new single-family units and no multifamily permits, so local estimating volume sits in industrial, institutional, and renovation work rather than new subdivisions.
Decatur's economy runs on agricultural processing, so we take off structural steel, equipment pads, process piping supports, and Division 13 special construction. These projects carry long-lead equipment and heavy concrete.
Watch for: Anchor bolt templates, equipment pad elevations, pipe rack steel tonnage.
Schools, healthcare, and municipal buildings in Macon County carry full Division 09 finishes and Division 23 mechanical scope. We measure ceilings, partitions, and ductwork by area so bid alternates can be priced separately.
Watch for: Acoustical ceiling quantities, fire-rated partition types, duct insulation.
Retail, office, and restaurant tenant improvements turn over in older downtown and corridor buildings. We measure demolition, new partitions, storefront, and MEP rough-in against existing conditions you cannot see on the lease plan.
Watch for: Demolition scope, existing ceiling height, sprinkler head relocation.
With 3 single-family units permitted in 2025 at an average permitted value of $989,700, local custom homes are high-spec and low-volume. We take off framing, foundation, and finishes from the full plan set.
Watch for: Wall framing by plate height, footing sizes, window and door schedule counts.
Distribution and storage buildings along the I-72 and Route 51 corridors are slab-on-grade structures with tilt-up or metal panel envelopes. We measure slab area, panel square footage, and dock equipment.
Watch for: Slab thickness and reinforcement, panel joint layout, dock leveler count.
Decatur's older building stock generates steady re-roof and masonry repair work. We measure roof area by membrane type, flashing linear footage, and insulation thickness so the replacement scope is complete.
Watch for: Tear-off layers, tapered insulation, parapet and coping lengths.
Central Illinois pricing is not Chicago pricing. These are the variables that move a Decatur number most, and each one is priced into our takeoffs rather than left as an allowance.
Decatur and Macon County each review their own permits, and the adopted edition of the Illinois building and residential codes can differ from what a plan set was drawn to. Plan review comments on egress, fire separation, and accessibility can add scope after bid. We list code-driven items as separate line items so you can see what a comment cycle may cost, and we tell you to confirm the adopted edition with the local building department before you price.
Illinois Building Code · Macon County · local building departmentCentral Illinois soils include clay and loess deposits that shrink and swell with moisture, and some sites carry prior fill or demolition debris. That drives over-excavation, engineered fill, and deeper footings than a generic estimate assumes. We take off footing and slab quantities from the geotechnical recommendation when you have it, and flag the foundation scope as an assumption when you do not.
geotechnical report · engineered fill · footing depthFrost depth in this part of Illinois puts footings well below grade, and winter concrete work needs blankets, accelerators, and heated enclosures. Summer brings high-wind and hail exposure on roofs, which affects membrane selection, fastening schedules, and warranty terms. Both drive real cost in a Decatur estimate and both are easy to leave out.
frost depth · winter concrete protection · hail warrantyDecatur is a smaller labor market than Chicago, so specialty trades such as process piping, rigging, and temperature controls may travel in from Bloomington, Springfield, or Champaign. Travel and per diem belong in the estimate, not in a contingency. We price labor at ZIP-code-adjusted rates and note where a trade is likely to come from outside Macon County.
RSMeans data · ZIP-code-adjusted labor · travel and per diemFlat ground and clay subgrade mean stormwater has nowhere to go, so detention, swales, and underdrain are common scope on Decatur sites. Demolition of prior structures adds removal and disposal quantities that never appear on the architectural sheets. We measure cut and fill, pipe runs, and structure removal from the civil set and reconcile it against the architectural drawings.
detention basin · underdrain · demolition and disposalDecatur sits between several major suppliers, so trucking distance and delivery minimums affect structural steel, precast, and ready-mix pricing. Illinois sales tax treatment on materials and the way a supplier quotes freight can shift a bid by more than the labor rate. We carry material pricing with freight and note where a supplier quote is required to firm the number.
ready-mix delivery · Illinois sales tax · freight termsDecatur sits on glacial till and loess soils in Macon County, where frost depth and freeze-thaw cycles drive foundation, flatwork and roofing quantities. The city's permit volume is small — 3 new privately-owned residential units in 2025, all single-family, per the U.S. Census Bureau Building Permits Survey — so most takeoff work here is commercial, industrial and renovation rather than subdivision tract housing.
Strip topsoil to a defined depth, then cut and fill to the geotech-recommended subgrade — on Decatur's silty clay, that often means over-excavating below the footing line and backfilling with granular borrow. We quantity clearing by acre, topsoil by cubic yard, structural fill by compacted cubic yard, and undercut by square foot of footprint. Storm lines take 15-inch through 36-inch RCP by linear foot, plus structures, trench bedding and backfill. Because flat Decatur sites pond, we price detention basins and swales separately. See our sitework estimating services for the full division 31 breakdown.
Wood-frame walls, floor trusses and roof trusses are priced by piece count and linear foot from the plan dimensions, not by rule of thumb. On Decatur projects we track stud count by length, plate and blocking linear footage, sheathing by sheet, housewrap by square, and both batt and rigid insulation separately because the energy code treats them differently. Roof trusses need a supplier quote, so we carry an allowance and flag it. Wind uplift and snow drift at valleys and parapets change nailing and hardware quantities. Framing estimating services lists the divisions we cover for these packages.
Decatur's mix of older masonry buildings and newer light-commercial shells means MEP takeoffs must follow the drawings, not a per-square-foot average. We count fixtures, devices, receptacles, light fixtures and panels by type and count; pipe and duct by linear foot and size; and equipment by tag with curb, pad, disconnect and controls noted. Rooftop units need structural curb and screening allowances. The current Illinois plumbing and mechanical code editions should be confirmed with the local building department before you finalize fixture counts. Our MEP estimating services produce division 21–28 quantities keyed to the plan sheets.
Footings, stem walls, slab-on-grade and exterior flatwork each get their own line. Frost depth in this part of Illinois typically pushes footing bottoms to 36–42 inches below grade, so stem wall height and form area are larger than a southern-market takeoff would show. We measure continuous footings by linear foot, spread footings by count, slab by square foot at a stated thickness, and add typical waste of 5–8% on formed concrete and 8–10% on flatwork. Air-entrainment and 4,000 psi mixes are standard for exterior work here. Our foundation estimating services cover the division 03 package end to end.
Low-slope commercial roofs here are usually mechanically attached or adhered TPO/EPDM over polyiso, measured in squares with a 10–15% waste factor for cuts, hips and penetrations. Steep-slope work is architectural shingle or standing seam metal, with ice-and-water shield at eaves and valleys, synthetic underlayment, drip edge by linear foot, and ridge vent by linear foot. We separate tear-off, disposal and deck repair from new roofing, since on Decatur re-roofs the decking replacement is the biggest swing item. Flashing at curbs, pipes and scuppers is counted individually. Roofing estimating services covers both assemblies.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Structural excavation, footing trenches | 410 | CY |
| 31 23 23 | Granular backfill under slab | 260 | CY |
| 03 30 00 | Continuous footings, 24" x 12" | 620 | LF |
| 03 30 00 | Slab-on-grade, 5" reinforced | 8,400 | SF |
| 04 20 00 | CMU exterior wall, 8" | 3,150 | SF |
| 05 31 00 | Steel roof deck, 1.5" composite | 8,400 | SF |
| 07 54 19 | TPO membrane, 60 mil, adhered | 92 | SQ |
| 23 81 26 | Rooftop units, 10-ton, with curb | 4 | EA |
This example prices a 100 ft x 84 ft slab-on-grade for a light-industrial building in Decatur. Dimensions are illustrative; substitute your own plan measurements. The slab is 5 inches thick over a vapor barrier and granular base, with a thickened edge at the overhead doors.
Base area is 100 x 84 = 8,400 SF. At 5 inches, volume is 8,400 x (5/12) = 3,500 CF, or 3,500 / 27 = 129.6 CY. Add the thickened edge: 40 LF of door openings at 12" x 18" gives 40 x 1.5 x 1.0 = 60 CF = 2.2 CY. Total neat concrete is 131.8 CY.
Waste on slab concrete typically runs 5–8% for pump loss, spillage and overpour. At 7%, add 9.2 CY, for a bid quantity of 141.0 CY. Reinforcement is #4 rebar at 18" on center each way: bars across the 100 ft direction number 84 / 1.5 + 1 = 57 bars at 100 ft, and bars the other way number 100 / 1.5 + 1 = 68 bars at 84 ft. Total linear feet is 57 x 100 + 68 x 84 = 5,700 + 5,712 = 11,412 LF; at 0.668 lb/LF for #4 bar that is about 7,623 lb, or 3.8 tons, before 5% lap and waste.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Base slab volume | 100 x 84 x (5/12) | 3,500 | CF |
| Base slab volume | 3,500 / 27 | 129.6 | CY |
| Thickened edge | 40 x 1.5 x 1.0 | 60 | CF |
| Neat concrete | 129.6 + 2.2 | 131.8 | CY |
| Waste at 7% | 131.8 x 0.07 | 9.2 | CY |
| Bid concrete | 131.8 + 9.2 | 141.0 | CY |
| Rebar, #4 @ 18" OC | 57 x 100 + 68 x 84 | 11,412 | LF |
| Rebar weight | 11,412 x 0.668 | 7,623 | LB |
Vapor barrier is 8,400 SF plus 10% laps, or 9,240 SF. Granular base at 6 inches is 8,400 x 0.5 = 4,200 CF, or 155.6 CY compacted. Material and labor pricing is adjusted to the Decatur ZIP code through RSMeans data, and the finished takeoff is delivered in Excel and PDF by CSI division with the marked-up plan set. Our concrete estimating services handle this package for commercial and industrial shells.
We do not publish a flat price because scope drives the effort: a single-trade concrete takeoff on a small shell is a fraction of the work of a full division 03–26 package on a plant expansion. Send the plan set and we will quote the fee before starting. Turnaround is 24–48 hours for most projects, with rush available. The quote reflects the number of sheets, the divisions you want priced, and whether you need marked-up drawings returned with the quantities. There is no charge to review the plans and tell you what the estimate will involve.
Most projects are delivered in 24–48 hours from receipt of a complete plan set and specifications. Rush service is available when your bid date is closer. Incomplete drawings slow the process more than size does, so send the architectural, structural, civil and MEP sheets together if you have them. If only a portion of the set is available, tell us which sheets are missing and we will flag the quantities that depend on them. That way you know which numbers are firm and which are allowances before you submit.
Excel and PDF, organized by CSI MasterFormat division, with the marked-up plan set showing what was measured. You get quantities you can drop into your own pricing, plus a division-level summary. We use Bluebeam Revu, PlanSwift and RSMeans data, with pricing adjusted to the Decatur ZIP code. The marked-up drawings let your estimator or project manager trace any line back to the sheet it came from. If you want the Excel workbook structured to match your own bid form, tell us at kickoff and we will set it up that way.
Both. Material and labor pricing is ZIP-code adjusted, so the labor component reflects the Decatur market rather than a national average. Where you have your own crew rates or a subcontractor quote, we can carry your numbers instead and keep our quantities as the check. That is common on prevailing-wage work and on projects where a local subcontractor has already given you a firm number. We show the labor and material split separately so you can swap either side without rebuilding the takeoff.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city itself — 3 units, all single-family, with $3M in permitted value. They do not include commercial, industrial or renovation permits, so they understate total construction activity in Decatur. Use them as a signal about residential volume only, not as a measure of the commercial and industrial work that drives most takeoff requests in Macon County. The same survey ranked Decatur 23rd of 25 covered Illinois cities by units.
Footing depth is set by the geotechnical report and the locally adopted code, and in this part of Illinois frost protection typically puts footing bottoms around 36–42 inches below grade. Confirm the adopted code edition and the required frost depth with the local building department, and use the geotech report for bearing capacity and undercut. Those two documents control the quantity: frost depth sets stem wall height and form area, while the geotech sets how much unsuitable soil comes out and how much granular backfill goes in.
Yes. Renovation takeoffs are slower than new construction because existing conditions are not dimensioned on the drawings. We measure from the plan and flag assumptions for field verification — deck condition on re-roofs, wall substrate behind finishes, and existing MEP routing are the usual unknowns. Those flagged items keep your bid from carrying an invisible contingency. On downtown masonry buildings, we also separate selective demolition from new work so the disposal and patching quantities do not get buried in the trade that follows.
Yes. We cover Macon County and the surrounding region, and nearby markets including Bloomington, Arlington Heights, Evanston, Schaumburg, Bolingbrook and Palatine. Pricing stays ZIP-code adjusted for each location, so quantities travel with the project and the labor and material rates follow the site. That matters when the same building type is bid in two markets, because the quantity takeoff is identical but the labor cost is not. See our Illinois construction estimating page for how we handle projects across the state.
A complete plan set and specifications, the bid date, and the trade scope you want priced. If you only need one division, say so and we will measure that division and leave the rest alone. Marked-up drawings from a previous estimate are also useful, because they show us what was already counted. Tell us the bid form structure if you have one, and note any alternates or unit prices the owner requires. The more of that you send up front, the fewer assumptions end up in the final document.
Yes. Multi-family takeoffs are unit-type driven: we build a quantity per unit type, then multiply by the unit mix and add the common areas, corridors, stairs and roof. Decatur permitted no new multi-family units in 2025, but renovation and adaptive reuse work still comes through. Our multi-family estimating services cover the full division set. On conversions of older buildings, we separate the shell work from the unit fit-out so you can phase the pricing and see which portion carries the risk.
Send your plan set, bid date and the divisions you want priced, and we will return a CSI-organized takeoff with marked-up drawings in 24–48 hours. If your bid date is tight, ask for rush service when you send the files. Include the specifications and any alternates the owner requires, and tell us whether you want material and labor pricing or quantities only. We cover Macon County and the surrounding region, with ZIP-code-adjusted pricing for each site. Get an estimate to start.