Sitework takeoff
Clearing, stripping, cut and fill, and backfill quantities for Springfield sites with deep frost and clay till.
CY · SF · LFSpringfield, IL estimating for bidders, builders and owners. We produce quantity takeoffs and line-item estimates organized by CSI MasterFormat division, priced with ZIP-code-adjusted material and labor data, delivered in Excel and PDF in 24–48 hours for most projects.
Springfield pricing turns on four things: deep frost depth and clay till foundation work, central Illinois labor and material pricing rather than Chicago-area rates, a small but active multifamily share mixed into mostly single-family residential permits, and renovation work around the Capitol Avenue and downtown historic districts where selective demolition and matching details drive cost.
Springfield sits in Sangamon County at the center of the state, and its construction market looks different from the Chicago-area work that dominates Illinois permit volume. The city issued 146 new privately-owned residential units in 2025, up from 87 in 2024 — a 68% increase — with 106 single-family and 40 multifamily units. That mix means most of the plans crossing our desk here are wood-frame residential, small commercial infill, and institutional renovation, not high-rise. We build takeoffs for all three.
We work the way a Springfield bid schedule demands. Plans arrive as PDFs, and we return marked-up plan sets plus an Excel workbook sorted by CSI MasterFormat division, so your concrete, framing, roofing and MEP scopes can be split to subcontractors without re-keying. Pricing uses ZIP-code-adjusted material and labor data, not a statewide average, because central Illinois rates do not track the Chicago market. Our Illinois construction estimating team covers Springfield alongside Peoria, Champaign and Joliet, and turnaround is 24–48 hours for most projects with rush available.
For bidders. You need quantities you can defend in a bid opening. We return marked-up plan sets and a division-sorted Excel workbook so your concrete, framing and MEP numbers are traceable to a sheet and a detail, not a lump sum.
For builders. You need to buy out scopes fast. We break the estimate into CSI divisions with units and waste factors stated, so your concrete, framing and roofing subs can price from your takeoff rather than starting their own.
For owners. You need a budget before design is finished. We estimate from schematic drawings, flag scope gaps and allowances, and show the cost drivers — foundation depth, roof geometry, mechanical systems — so you can decide what to cut.
Select a bar to compare Springfield with the largest Illinois markets we cover.
146 new housing units in 2025 (+67.8% vs 2024).
106 single-family · 40 multifamily (27%).
Springfield issued 146 new privately-owned residential units in 2025 against 87 in 2024, a 68% increase, with a permitted value of $47M and an average of $323,800 per unit. Multifamily accounted for 40 units, or 27% of the total. That is a modest market — 2.2% of the 6,710 units permitted across the Illinois cities we cover, ranking 7th of 25 by units — so residential bidders here compete on fewer jobs and estimate tighter. The average value per unit tells you the product type: custom and semi-custom single-family, plus small apartment and townhome buildings, not large production subdivisions. On jobs like these, the difference between a winning and losing bid is usually foundation and framing accuracy, not overhead. Our residential estimating services and multi-family estimating services are built for that scale. See the statewide picture on our Illinois construction estimating page.
Two local conditions shape nearly every estimate we produce here. First, foundations: frost depth in central Illinois is deep, and the clay till and loess soils common around Springfield push footing elevations and backfill quantities higher than bidders from other regions expect. Second, renovation: work near the Capitol Avenue and downtown historic districts brings selective demolition, structural repair and detail matching that a new-build template will miss. Commercial and institutional work — state offices, healthcare, higher education, warehousing along the I-55 and I-72 corridors — runs through commercial estimating services and industrial estimating services, where mechanical, electrical and process scopes usually carry the largest share of cost. For plans with heavy earthwork, start with sitework estimating services.
Every takeoff below is returned in Excel and PDF, organized by CSI MasterFormat division with marked-up plan sets, priced with ZIP-code-adjusted material and labor data, in 24–48 hours for most projects.
Clearing, stripping, cut and fill, and backfill quantities for Springfield sites with deep frost and clay till.
CY · SF · LFFootings, stem walls, slab-on-grade and waterproofing measured to the frost depth the drawings specify.
CY · SF · LFFormwork, reinforcement and placed concrete for foundations, slabs, walks and flatwork, by mix and thickness.
CY · SF · TONStuds, plates, headers, joists, sheathing and trusses counted from floor plans and sections, with waste stated.
LF · SF · EASlope, area, underlayment, ice barrier and flashing for central Illinois snow and freeze-thaw exposure.
SQ · LF · EAPlumbing, HVAC and electrical counts and runs for small commercial, multifamily and institutional projects.
LF · EA · TONSelective demolition, structural repair and finish matching for downtown and historic-district renovation work.
SF · LF · EASubcontractor quotes compared line by line against our quantities to expose scope gaps before you sign.
LS · EAYou bid Springfield residential and small commercial work against local crews. We return a division-sorted workbook so your concrete, framing and roofing numbers hold up at bid opening.
You need quantities your foreman can check against the drawings. We mark up the sheets and state units and waste factors, so your takeoff matches the scope you actually install.
You are underwriting 106-unit-scale single-family lots and 40-unit multifamily projects across Sangamon County. We build a budget from schematic plans and flag the allowances before you commit.
You issue revisions through permitting and need quantities that follow. We price from the current sheet set and note the division each change touches, so your cost model stays current.
You are renovating institutional buildings near downtown or adding to an existing campus. We separate repair from replacement scope so you can phase the work across budget years.
You buy out framing, roofing and MEP packages on tight schedules. We turn plans around in 24–48 hours so your suppliers can price from one set of quantities.
We estimate from plans for projects anywhere in Sangamon County and the surrounding central Illinois counties. The neighborhoods and towns below are the ones that show up most often in the plan sets we receive.
Springfield's 2025 permit mix was 106 single-family and 40 multifamily units, so most of our local takeoffs are wood-frame residential with small commercial and institutional renovation alongside. The six property types below cover that work.
New houses on infill lots and in the county subdivisions. We take off foundation, framing, roof, windows, siding and MEP from the architectural and structural sheets, with waste factors stated per material.
Watch for: Foundation type, roof pitch and window count drive cost.
Two- to four-story wood-frame and podium projects. We separate unit-by-unit finishes from common-area and site scope, because the per-unit cost is what your lender will underwrite.
Watch for: Unit repetition, corridor lengths and fire separation details.
Retail, office and medical infill near the commercial corridors. We estimate tenant improvements and shell separately, and price storefront, ceiling and mechanical scopes by division.
Watch for: Storefront glazing, HVAC tonnage and ADA restroom scope.
Schools, churches and public buildings in and around downtown. Renovation takeoffs require existing-condition allowances, so we carry demolition, patching and temporary protection as separate line items.
Watch for: Hazardous-material allowances and phased occupancy.
Pre-engineered metal buildings and light industrial shells. We estimate slab, steel erection, insulated wall panels and dock equipment, and note what the PEMB supplier typically excludes.
Watch for: Slab thickness, bay spacing and dock count.
Room additions, kitchen and bath remodels, and roof replacements on older housing stock. We measure from the existing plans and photograph set, and list what cannot be quantified until demolition.
Watch for: Framing tie-ins, matching existing finishes and roof tie-ins.
Two estimates for the same square footage can differ by a wide margin once these six local factors enter the pricing. We identify which ones apply before we return a number.
Springfield and Sangamon County review residential and commercial permits through separate offices, and the adopted edition of the Illinois building and energy codes is what governs your drawings. Plan review comments on egress, energy envelope and fire separation can add scope after bid. Confirm the currently adopted code edition with the city or county building department before you price, and build plan-review response time into your schedule.
IBC · IRC · IECC · local building departmentCentral Illinois soils include loess and clay that shrink and swell with moisture, and a geotechnical report often calls for over-excavation, engineered fill or deeper footings than the drawings show. On additions, the existing footing depth may not match current code. We carry a foundation allowance and list the assumption, then adjust once the soils report is issued.
Geotechnical report · engineered fill · footing depth · frost depthSpringfield sees both winter freeze-thaw and summer storm events, including hail and high wind. Roof assemblies, flashing details and exterior sealants have to handle that range, and wind uplift requirements can change fastener schedules and sheathing nailing. Snow load and frost depth affect structural sizing. We note which assemblies carry weather-related cost and where the drawings are silent.
Snow load · frost depth · wind uplift · hail resistanceSpringfield is a smaller labor market than the Chicago area, so trade availability varies by season and specialty. Framing and concrete crews can be booked out during the building season, and mechanical and electrical subcontractors may carry travel time from Decatur or Bloomington. We price labor from ZIP-code-adjusted data and flag trades where a single-source bid is likely.
RSMeans data · ZIP-code adjustment · trade availability · prevailing wageFlat lots and clay soils make stormwater detention and grading a real line item, not an afterthought. Many Springfield sites need retention basins, swales or revised grading to meet local drainage requirements, and the earthwork quantity depends on the site plan more than the building. We take off cut and fill from the grading plan and separate it from building scope.
Stormwater detention · cut and fill · grading plan · erosion controlSpringfield sits between the Chicago, St. Louis and Peoria supply markets, so material pricing and delivery lead times depend on which distributor serves the job. Lumber, trusses and mechanical equipment may ship from out of town, and freight adds to the delivered price. We use ZIP-code-adjusted material pricing and note where a long-lead item could affect your schedule.
Delivered material pricing · freight · lead times · local distributorsSpringfield sits on loess and glacial till in Sangamon County, and that ground, plus a continental climate with freeze depths near 36 inches, changes what you quantify in every division. Here is how the work breaks down trade by trade.
Springfield's silty loess soils are erodible and lose bearing strength when wet, so a takeoff that stops at cut and fill misses the real scope. You should see stripping depths, undercut limits, and imported granular borrow measured separately from on-site cut, because borrow is priced per cubic yard delivered and compacted, not per yard in the bank. Silt fence, inlet protection, and a stabilized construction entrance are line items under Division 31 25 00, not allowances. On the west side near the IL-4 corridor, where grades roll, retaining and shoring quantities often appear where a flat-site template would show none. Our sitework estimating services quantify these by area and volume from the grading plan rather than a lump sum.
Springfield's 2025 permit mix was mostly single-family, so wood-frame takeoffs dominate, but the envelope is where bids drift. Quantify wall framing by linear feet of plate and stud count on center, then apply a waste factor in the typical 5 to 10 percent range for dimensional lumber and more for engineered members cut on site. Roof sheathing and underlayment go by square (100 square feet), and ice barrier at eaves is a separate line item under Division 07 30 00 — a real cost in central Illinois winters, not a detail. Our framing estimating services and roofing estimating services carry these as distinct rows so you can see where the money sits.
Division 01 is where Springfield bids are won or lost quietly. Supervisory labor, temporary heat through a central Illinois winter, temporary power, final cleaning, and dumpster counts should be quantified against the schedule, not a percentage. If the project runs through December to March, temporary heating and weather protection are measurable costs. Add permit and inspection fees, submittal and closeout labor, and a defined contingency line rather than burying it in each trade. When you send plans through our Illinois construction estimating services, we return Division 01 as its own section so you can compare general conditions across competing bids.
With a frost depth in the mid-30-inch range, footings in Springfield are set below that line, and a takeoff that uses a generic 24-inch depth will under-run concrete and excavation. Measure continuous footings by linear feet times width times depth, then add pier and column pad counts separately. Slab-on-grade quantities should carry a vapor retarder under slab (Division 03 30 00 related) and a capillary break, plus control joint layout by square feet. For residential subdivisions and small commercial pads, our concrete estimating services and foundation estimating services break formwork by contact area, not floor area, because that is where the labor hours actually land.
MEP is usually the largest single block in a Springfield commercial or multifamily estimate, and it is the block most often carried as a square-foot allowance that later blows up. A defensible takeoff counts plumbing fixtures by type, domestic water and drain, waste and vent by linear feet and diameter, HVAC tonnage by zone, and electrical by device count, panel schedules, and feeder lengths. Confirm the adopted code edition with the local building department, since Illinois adopts plumbing and mechanical codes with local amendments. Our MEP estimating services produce fixture and device schedules tied to the plan sheets, so a reviewer can trace every count back to a sheet number.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 10 00 | Site clearing and topsoil strip | 4,200 | SF |
| 31 23 16 | Excavation, footings and basement | 310 | CY |
| 03 30 00 | Footing concrete, below frost depth | 42 | CY |
| 03 30 00 | Slab-on-grade concrete, 4 in. | 1,850 | SF |
| 06 10 00 | Wall framing, 2x6 at 16 in. OC | 1,240 | LF |
| 07 30 00 | Ice barrier membrane at eaves | 180 | LF |
| 07 31 13 | Asphalt shingles, architectural | 31 | SQ |
| 26 50 00 | Recessed and surface light fixtures | 46 | EA |
This example uses illustrative dimensions for a simple rectangular footprint. The point is the sequence, not the specific numbers: perimeter length, then width and depth, then waste, then conversion to cubic yards.
Given (illustrative): a 40 ft by 28 ft rectangle of continuous footing, 16 in. wide and 36 in. deep, set below Springfield's local frost depth. Confirm that depth with the building department before you price it.
Step 1 — Perimeter. 2 × (40 + 28) = 136 LF of continuous footing.
Step 2 — Cross-section area. 16 in. ÷ 12 = 1.333 ft wide; 36 in. ÷ 12 = 3.0 ft deep; 1.333 × 3.0 = 4.0 SF.
Step 3 — Net volume. 136 LF × 4.0 SF = 544 CF.
Step 4 — Convert to cubic yards. 544 ÷ 27 = 20.15 CY.
Step 5 — Waste. Add 5 percent for spillage and over-excavation: 20.15 × 1.05 = 21.16 CY, round to 21.2 CY.
Step 6 — Pads. Six column pads at 3 ft × 3 ft × 1 ft = 9 CF each; 6 × 9 = 54 CF; 54 ÷ 27 = 2.0 CY.
Step 7 — Total. 21.2 + 2.0 = 23.2 CY of footing concrete.
| Step | Calculation | Result | Unit |
|---|---|---|---|
| Perimeter | 2 × (40 + 28) | 136 | LF |
| Section area | 1.333 × 3.0 | 4.0 | SF |
| Net volume | 136 × 4.0 | 544 | CF |
| In cubic yards | 544 ÷ 27 | 20.15 | CY |
| With 5% waste | 20.15 × 1.05 | 21.2 | CY |
| Column pads | 6 × 9 ÷ 27 | 2.0 | CY |
| Total | 21.2 + 2.0 | 23.2 | CY |
Two things change this number fast. First, if the frost depth you confirm is shallower or deeper than 36 in., the section area moves and every downstream figure moves with it. Second, formwork is priced by contact area, not volume: the sides of that footing are 136 LF × 3.0 ft × 2 faces = 816 SF, which is the labor driver your concrete sub will actually bid. Our foundation estimating services return both the volume and the contact area so the two can be checked against each other. If your plans show stepped footings or a basement, send them through our concrete estimating services and we will break the runs by elevation.
Local frost depth in central Illinois is commonly in the mid-30-inch range, and footings are typically set below that line, but the exact figure depends on the adopted code edition and local amendments. Do not price a footing takeoff from a national average. Confirm the required depth with the Springfield building department or your engineer of record, then measure continuous footings by linear feet times width times depth. A 12-inch error in assumed depth on a 136-linear-foot run moves roughly 5 cubic yards of concrete.
Single-family construction dominates. Of the 146 new privately-owned residential units permitted by the city in 2025, 106 were single family and 40 were multifamily, so multifamily was about 27 percent of the total. That mix matters for takeoff: single-family work is driven by framing, envelope, and MEP counts per house, while multifamily adds repeated unit types, common-area systems, and fire-rated assemblies. If you are bidding either, our residential estimating services and multi-family estimating services handle the two scopes differently.
The figures come from the U.S. Census Bureau Building Permits Survey for 2025, counting permits issued by the city itself for new privately-owned residential units only. That means additions, alterations, and commercial permits are not in the count. Springfield issued 146 residential units in 2025 against 87 in 2024, a 68 percent increase, with a permitted value of $47M and an average of $323,800 per unit. Use these as market context, not as a pricing input for a specific project.
Much of the Springfield area is underlain by loess and glacial till, and loess is highly erodible and loses strength when saturated. A takeoff should separate topsoil strip, on-site cut, and imported borrow, because borrow is priced per cubic yard delivered and compacted while cut is priced per yard moved. Undercut below footing bearing elevation is a real line item on sites with soft pockets. Read the geotechnical report before you finalize quantities, and carry erosion control items under Division 31 25 00 rather than as a lump allowance.
No. Material and labor pricing is adjusted by ZIP code, so a takeoff for a Springfield address reflects local pricing rather than a national mean. That matters on labor-heavy divisions like concrete formwork, framing, and drywall, where regional wage differences move the number more than material costs do. We use RSMeans data as the pricing backbone and show quantities separately from unit costs, so you can substitute your own subcontractor pricing without rebuilding the takeoff.
Most projects are returned in 24 to 48 hours, with rush turnaround available when a bid date is close. Deliverables come as Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly which sheets each quantity came from. For a competitive bid with multiple addenda, send the current set and note the addendum numbers; re-pricing a superseded set wastes everyone's time. Start with our get an estimate page and attach the drawings.
Send the full set if you can. On commercial work, MEP and Division 01 general conditions are where bids diverge most, followed by sitework and concrete. If you only have partial documents, send the architectural and structural sheets plus any MEP drawings available, and flag what is missing so we can note the exclusions. Our commercial estimating services and industrial estimating services cover the non-residential side, and we list exclusions explicitly rather than hiding them in a contingency.
Central Illinois winters affect two divisions directly. In Division 01, temporary heat, weather protection, and snow removal should be quantified against the construction schedule rather than carried as a percentage. In Division 03, cold-weather concrete protection and curing measures are separate line items when pours fall below the threshold in the specification. If your schedule runs through December to March, tell us, because the seasonal scope changes the general conditions total and sometimes the sequencing of foundation work.
Yes. Alongside Springfield we cover Peoria, Champaign, Rockford, Joliet, Elgin, and Naperville, and the statewide program is described on our Illinois construction estimating services page. Pricing is ZIP-code adjusted, so a takeoff for Peoria or Champaign reflects that location rather than Springfield. If your project spans multiple sites, send one set per location and we will return separate quantity breakdowns so you can compare them line by line.
Send the architectural, structural, civil, and MEP drawings in PDF, plus any specifications, the geotechnical report, and the addenda list. Tell us the bid date, the delivery format you want, and whether you need quantities only or quantities with unit costs. Marked-up plan sets come back with the estimate, so a reviewer can trace each row to a sheet. If you have a preferred division breakdown or a subcontractor bid form, include it and we will match the structure.
Send your drawings and specifications and we will return a division-organized takeoff in 24 to 48 hours, with rush turnaround available for tight bid dates.