Sitework and earthwork
Mass cut and fill, clay till undercut, granular base, and utility trenching for Will County subdivisions and industrial pads.
CY · SF · LFJoliet issued 455 new privately-owned residential permits in 2025, and the city's industrial and logistics work keeps bid calendars full. We produce CSI MasterFormat takeoffs with ZIP-adjusted pricing for contractors bidding Will County and the Chicago corridor.
Joliet pricing reflects Will County's mix of new residential subdivisions, warehouse and distribution shells, and I-55/I-80 logistics work. Cost drivers include clay till excavation and frost-depth foundations, prevailing-wage labor on public work, steel and PEMB pricing for industrial shells, and ZIP-code-adjusted material and labor rates rather than a single Chicago metro number.
Joliet sits at the center of Will County, where new residential permits rose from 353 units in 2024 to 455 units in 2025 — a 29% increase — and the city ranked third among the 25 Illinois cities we cover by residential units. That growth shows up in subdivision infrastructure, municipal water and sewer extensions, and the warehouse and distribution shells that follow the I-55 and I-80 corridors. Estimating here means pricing both a residential lot program and an industrial tilt-up or PEMB shell in the same week.
We build takeoffs in Bluebeam Revu and PlanSwift and price them with RSMeans data adjusted to the project ZIP code, so a Joliet address does not carry downtown Chicago rates. Deliverables arrive in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets you can hand to a superintendent. Most projects turn in 24–48 hours, with rush available. If you are comparing markets, start with our Illinois construction estimating page, then look at Aurora and Naperville for the DuPage and Kane County side of the same labor pool.
For bidders. You need a defensible number before the bid date. We return division-by-division quantities with waste factors, unit costs, and marked-up plans so you can see exactly where the concrete, framing, and MEP scope sits.
For builders. You are buying out subs and ordering material. We break quantities into buy units — CY, LF, SF, TON, EA — so your purchase orders and subcontract scopes match the takeoff rather than a lump sum.
For owners. You are testing a pro forma or a change order. We price the scope as drawn, flag missing divisions, and give you a format you can compare against contractor bids line by line.
Select a bar to compare Joliet with the largest Illinois markets we cover.
455 new housing units in 2025 (+28.9% vs 2024).
271 single-family · 184 multifamily (40%).
The 2025 permit data shows 455 new privately-owned residential units in Joliet, up from 353 in 2024. Single-family accounted for 271 units and multifamily 184 units, or 40% of the total. Permitted value was $119M, an average of $261,200 per unit. For a bidder, that mix matters: a 184-unit multifamily share means more podium or garden-style buildings, more repeat floor plans, and more per-unit pricing rather than one-off custom homes. It also means your takeoff has to separate building common areas, sitework, and parking from the unit count. Joliet's 6.8% share of the 6,710 units permitted across the covered Illinois cities puts it behind only two other cities in our coverage. If your workload spans the metro, see how Chicago and Elgin compare.
Joliet's position on I-55 and I-80 keeps warehouse, distribution, and data-center work in the pipeline across Will County. Those projects price differently from residential: large slab-on-grade areas measured in SF, tilt-up or PEMB panels, ESFR sprinkler systems under NFPA 13, and heavy electrical service for refrigeration or rack loads. Sitework is usually the swing item — cut and fill balanced on paper but rarely in the field, with clay till that may require undercut and granular replacement. Because so much of this work is design-build or negotiated, the estimate often has to be built from a preliminary site plan and a shell drawing rather than a full set. Our industrial estimating and sitework estimating teams handle that stage. Confirm local frost depth and adopted code editions with the Joliet building department before you lock foundation and utility depths.
We cover the divisions that drive Joliet bids, from subdivision sitework to industrial shells and multifamily buildings.
Mass cut and fill, clay till undercut, granular base, and utility trenching for Will County subdivisions and industrial pads.
CY · SF · LFFrost-depth footings, slab-on-grade, tilt-up panels, and warehouse slabs priced by area and thickness.
CY · SFWood-frame multifamily and single-family takeoffs with plate counts, joist and truss layouts, and sheathing.
LF · SF · EAAsphalt shingle, TPO, and EPDM systems with insulation, flashing, and typical waste factors for low-slope industrial roofs.
SQ · SFPlumbing, HVAC, and electrical quantities for multifamily buildings and warehouse shells, including ESFR sprinkler mains.
LF · EA · TONPer-unit and per-building pricing for garden-style and podium projects, with common area and sitework separated.
EA · SFTenant fit-out quantities for offices, retail, and light industrial space, organized by CSI division.
SF · LFComparison sheets that line up subcontractor quotes against your takeoff so scope gaps surface before award.
LS · EABidding municipal, school, and warehouse work in Will County means carrying the right waste factors and unit costs. We return division-by-division quantities you can defend line by line.
With 271 single-family units permitted in 2025, lot programs need consistent per-plan takeoffs. We price framing, concrete, and MEP by buy unit so your purchase orders match the model.
Tilt-up and PEMB shells along the I-55 and I-80 corridors live or die on slab, steel, and sitework quantities. We separate building scope from yard and paving scope.
Concrete, framing, roofing, and MEP subs bidding Joliet jobs need quantities they can buy from. We break scope into CY, LF, SF, TON, and EA so your quote covers what you install.
You need a cost check before a permit set is finalized. We flag missing divisions and quantify alternates so your client sees the budget impact of design choices.
Pro formas and change orders need a neutral number. We price as drawn, show assumptions, and give you a format you can compare against contractor bids.
We estimate projects across Joliet and the surrounding Will County communities, from the downtown core to the industrial corridors along I-55 and I-80. If your project is in the Chicago metro, we cover it.
Joliet's permit mix shows 455 new residential units in 2025, with 40% multifamily, plus a steady flow of industrial and commercial work. We estimate all of these property types.
Production and custom homes across Joliet subdivisions need consistent takeoffs for concrete, framing, roofing, and MEP. We price per plan and per lot so your model stays accurate as you scale.
Watch for: Foundation type, wall heights, and roof pitch drive quantity swings.
With 184 multifamily units permitted in 2025, apartment and townhome projects require careful quantity separation by building type. We break out common areas, unit mixes, and sitework.
Watch for: Unit mix changes, corridor lengths, and shared MEP runs.
Joliet's logistics pipeline along I-55 and I-80 means tilt-up and PEMB shells. We quantify slab, steel, dock equipment, and yard paving separately from building scope.
Watch for: Slab thickness, racking loads, and truck court dimensions.
Process-heavy facilities need accurate MEP, piping, and equipment support estimates. We coordinate with your process drawings to price the building and utility scope.
Watch for: Equipment pads, process piping, and high-bay lighting.
Strip centers, restaurants, and office fit-outs in Will County require division-by-division takeoffs. We price storefronts, MEP, and site improvements to match your pro forma.
Watch for: Storefront systems, grease interceptors, and ADA upgrades.
Schools, municipal buildings, and public works projects need defensible quantities for bonding and bid alternates. We format takeoffs to match your bid schedule.
Watch for: Prevailing wage, alternates, and phased occupancy.
Joliet's location, soil, and climate all affect what you pay for construction. We adjust our estimates for these local conditions.
Joliet enforces the Illinois adopted codes, including the IBC and IRC with local amendments. Permit fees and review times vary by project type, and the city may require separate permits for sitework, utilities, and signs. We recommend confirming the adopted code edition and any local amendments with the Joliet Building Department before finalizing your estimate, as requirements can change.
Joliet Building Department · IBC · IRCWill County soils often include clay and glacial till, which can require over-excavation, engineered fill, or deep foundations. We price foundation systems based on the geotechnical report, and we flag potential rock excavation or dewatering if the report indicates it. Without a soils report, we use typical local assumptions and note them clearly.
Geotechnical report · over-excavation · engineered fillJoliet sees cold winters, freeze-thaw cycles, and occasional severe storms. These drive frost depths, insulation requirements, and roof snow loads. We include for frost-protected footings, exterior envelope detailing, and roof drainage sized for heavy rain. Wind and hail resistance may also affect roofing and cladding specifications.
Frost depth · snow load · freeze-thawThe Chicago metro labor pool covers Joliet, but trade availability fluctuates with the volume of industrial and residential work. Union rates and prevailing wage apply to public projects. We use RSMeans data adjusted for the project ZIP code to reflect local labor costs, and we note if a trade is in high demand.
RSMeans · prevailing wage · union ratesJoliet's topography and proximity to the Des Plaines River can require stormwater management, detention, and erosion control. We quantify sitework separately from building scope, including grading, paving, and utility trenching. Land use approvals and stormwater permits can add cost and time, so we recommend early coordination with the city and county.
Stormwater detention · erosion control · Des Plaines RiverJoliet's location on I-55 and I-80 gives good access to suppliers, but material prices fluctuate. We use current RSMeans data and note any long-lead items. Sales tax and local fees apply to materials, and we include them where applicable. For projects with tight schedules, we can price alternates for accelerated procurement.
RSMeans · sales tax · long-lead itemsJoliet's mix of infill residential, warehouse shells, and industrial retrofits means your takeoff has to handle both tight urban lots and wide-open pad sites. These are the trades where local conditions change the quantities, not just the unit prices.
Will County sits on glaciated ground: you will hit clay till, pockets of sand and gravel, and shallow bedrock in spots along the Des Plaines River corridor. On a warehouse pad in the Caton Farm Road area, stripping depth often runs deeper than the geotech report suggests because of old farm drainage tiles. A takeoff that carries only a 6-inch topsoil strip will miss the over-excavation and backfill undercut that shows up in the field. We break mass excavation into cut, haul, structural fill, and unsuitable material, and we separate the lime-stabilized subgrade from the granular base. For the dirt side, see our sitework estimating services.
Wood-frame apartments and townhomes are still the bulk of new residential units here, and the framing takeoff has to account for engineered floor systems, fire-rated separations between units, and more blocking than a single-family plan because of the MEP chases. In Joliet's older neighborhoods, a gut rehab means you are taking off new framing against existing out-of-square walls, so add waste for plate and header stock. Roof pitch on Midwest residential is typically 6/12 to 8/12, which changes sheathing and underlayment quantities versus a flat commercial roof. Our framing estimating services and roofing estimating services both carry the ice-and-water membrane at eaves and valleys, which is standard practice in this climate.
Finishes are where a Joliet takeoff can drift if you price from a national square-foot average. Drywall thickness, level of finish, and the number of corners in a unit plan drive the board count and the taping labor. In multifamily, you also carry unit-turn finishes, corridor carpet and resilient flooring, and the fire-rated door assemblies with closers. Warehouse interiors are simpler but not empty: you still need dock seals, bollards, and painted line striping. Our residential estimating services and multi-family estimating services both break finishes out by room and by unit type so you can see the cost per unit before you mark it up.
Residential and light commercial foundations in Joliet are usually cast-in-place wall footings with a slab-on-grade, but frost depth drives the footing elevation to roughly 42 inches below grade, and that depth changes your wall forms, rebar lap lengths, and backfill volume. Basement walls need exterior drainage board and footing drains on most lots because of the clay. On the industrial side, slab thickness jumps for racking leg loads and forklift traffic, and you need to price the vapor barrier, welded wire or macro fiber, and control-joint layout separately. Our concrete estimating services covers both, and foundation estimating services handles the footing and wall takeoff line by line.
Joliet residential work is mostly forced-air gas furnaces with central AC, and the takeoff has to include condensate lines, flue penetrations, and the electrical for the air handler. In multifamily, you are counting separate meters, fire-rated penetrations, and corridor smoke detection. Industrial and warehouse projects bring in high-bay lighting, dock equipment power, and process piping, which are different divisions entirely. We take off MEP by system and by floor so your mechanical and electrical subs can price from the same quantities. See our MEP estimating services for the division-by-division breakdown, and commercial estimating services if you are bidding a retail or office fit-out.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Cast-in-place concrete, footings | 184 | CY |
| 03 30 00 | Cast-in-place concrete, foundation walls | 312 | CY |
| 05 12 00 | Structural steel, lintels and posts | 2.4 | TON |
| 06 10 00 | Wood framing, floor and roof | 48,600 | BF |
| 07 21 00 | Thermal insulation, walls and ceilings | 22,400 | SF |
| 09 29 00 | Gypsum board, hung and finished | 38,200 | SF |
| 23 00 00 | HVAC, per-unit split systems | 24 | EA |
| 31 23 00 | Excavation and backfill | 1,150 | CY |
This is an illustrative warehouse bay, not a real project. You are taking off a slab-on-grade for a 100 ft by 200 ft bay, with a 6-inch slab thickness, a 10-mil vapor barrier, and a granular base. The slab area is the starting point, then thickness converts to volume, then waste and the base course are added. All dimensions are illustrative.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 100 ft × 200 ft | 20,000 | SF |
| Concrete volume | 20,000 SF × 0.5 ft | 10,000 | CF |
| Convert to cubic yards | 10,000 CF ÷ 27 | 370.4 | CY |
| Add 5% waste | 370.4 CY × 1.05 | 388.9 | CY |
| Vapor barrier | 20,000 SF × 1.10 lap | 22,000 | SF |
| Granular base, 6 in. | 20,000 SF × 0.5 ft ÷ 27 | 370.4 | CY |
| Base with 10% compaction waste | 370.4 CY × 1.10 | 407.4 | CY |
| Formwork, perimeter | 2 × (100 + 200) | 600 | LF |
From there you add the reinforcement: welded wire fabric at 6x6-W2.9xW2.9 over the full area, with extra bars at construction joints and column pedestals. Control joints are saw-cut at 12 to 15 feet on center, so a 100 ft by 200 ft bay needs roughly 14 to 16 cuts in one direction and 7 to 8 in the other, which is 21 to 24 cuts total at 200 ft and 100 ft lengths. If the geotech calls for a thicker slab under racking legs, you re-run the volume for that zone separately rather than averaging it across the whole bay. For the full division breakdown, see our concrete estimating services and industrial estimating services.
Most projects are back to you in 24 to 48 hours, and rush turnaround is available if your bid date is tight. A single-family plan set is faster than a multifamily building with repeated unit types, because we can set up typical-unit quantities once and multiply. Warehouse and industrial shells take longer because the civil, structural, and MEP scopes are larger and the sitework quantities depend on the geotech report. Send the plans, the geotech if you have it, and your bid date, and we will confirm the schedule before we start.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts permits issued by the city itself for new privately-owned residential units only. That means the 455 total units, the 271 single-family and 184 multifamily split, and the $119M permitted value do not include commercial, industrial, or renovation permits. They are a measure of residential construction activity, not total construction spending in Joliet. Use them as a demand signal, and pull your own numbers from the city for a specific bid.
Soils and frost depth. Will County clay till means you carry over-excavation and structural backfill more often than a national average would suggest, and the roughly 42-inch frost depth drives footing elevations on unheated structures. Both change your concrete, backfill, and drainage quantities. On the industrial side, the flat sites near the interstates are easier to mass-grade, but you still have to price the lime stabilization and the granular base separately. Confirm the geotech recommendations for your specific site before you lock the earthwork quantities.
Yes. We take off single-family, townhome, and multifamily residential, plus commercial retail, office, and warehouse shells. The divisions differ, but the method is the same: quantity by quantity, organized by CSI MasterFormat division, with the units and waste factors shown so you can audit the math. For a warehouse, that means more sitework, structural steel, and MEP. For a townhome, it means more framing, fire separation, and finishes. See our commercial estimating services and residential estimating services for the scope lists.
We price from ZIP-code-adjusted material and labor data, so Joliet quantities carry Will County pricing rather than a national average. That matters for concrete, steel, and mechanical trades where the Chicago area runs above the national midpoint. We do not publish a single square-foot rate because the trade mix changes the answer, and a warehouse shell and a multifamily building at the same square footage have very different division breakdowns. If you have recent local quotes, send them and we will reconcile our pricing to your actual buyout.
A complete plan set, the specification book, and the geotech report if earthwork is in scope. If you have a bid form or a scope matrix, send that too, because it tells us which divisions you are carrying and which are by others. For a warehouse or industrial project, the civil drawings and the structural foundation plan are the two sheets we look at first. If you only have a partial set, tell us what is missing and we will note the assumptions on the takeoff rather than guessing silently.
Yes, and for multifamily work we usually do. We set up typical unit types, take off one of each, and then multiply by the count, which keeps the takeoff readable and makes it easy to see cost per unit. For a multi-building project, we separate quantities by building so your superintendent can phase the work. If you are bidding a Joliet project against other contractors, that unit-type breakdown is often what lets you sharpen the number without cutting scope.
Yes. Deliverables come in Excel and PDF, organized by CSI MasterFormat division, and we return marked-up plan sets showing where the quantities came from. That matters on a Joliet bid with a short fuse, because you can check a footing count or a door schedule against the sheet instead of re-measuring it yourself. If you need a different format for your estimating software, tell us at the start and we will match it. See our Illinois construction estimating page for the full deliverable list.
We show them as separate lines so you can see them. Typical waste runs 5 to 10 percent on concrete and masonry, 10 percent on framing lumber, and 10 to 15 percent on drywall and finishes, depending on the complexity of the layout. Those are industry-typical ranges, not a rule; a building with many corners and small rooms wastes more board than a wide-open warehouse. If your company uses its own waste factors, send them and we will apply yours instead of ours.
Yes. We cover the surrounding region, including Chicago, Aurora, Naperville, Rockford, Springfield, and Elgin. If your project is in Will County but outside the city limits, the takeoff method is the same, though the permit authority and the adopted code edition may differ, so confirm those with the local building department. Pricing is ZIP-code adjusted, so a project in a neighboring suburb will carry that area's material and labor rates rather than Joliet's. Send the address with the plans and we will price it to the right location.
Send your plans, specs, and bid date, and we will return a division-by-division takeoff with marked-up sheets in 24 to 48 hours.