Sitework takeoffs
Mass excavation, engineered fill and utility runs for Champaign County clay sites, measured from grading and civil sheets.
CY · LF · TONChampaign permitted 645 new private residential units in 2025, 88% of them multifamily. We produce CSI-organized takeoffs and estimates for bidders, builders and owners across Champaign County.
Champaign's 2025 permit mix — 565 multifamily units against 80 single-family — drives costs through podium and Type III wood framing, deep foundations in central Illinois clay, IECC thermal envelope requirements, and University of Illinois-area infrastructure work. Multifamily share of 88% means most estimates hinge on unit-mix repetition rather than one-off custom details.
Champaign is the second-ranked city by residential permit volume among the 25 Illinois cities we cover, with 645 new private units in 2025 against 378 in 2024 — a 71% increase. That growth is almost entirely multifamily: 565 units, or 88% of the total, at an average permitted value of $157,700 per unit. For bidders, that means the estimate that wins is the one that prices repeated unit types cleanly and catches the shared scope — corridors, elevators, trash rooms, roof decks — where multifamily budgets usually leak.
We build takeoffs from your plan set in Bluebeam Revu and PlanSwift, price material and labor with ZIP-code-adjusted RSMeans data, and deliver Excel and PDF files organized by CSI MasterFormat division with the marked-up drawings attached. Turnaround is 24–48 hours on most projects. If you are bidding work in Champaign County or anywhere along the I-57 and I-74 corridors, start with our Illinois construction estimating page or send plans through get an estimate.
For bidders. You need a number you can defend in a bid opening. We break out quantity, unit and unit cost by division so you can adjust waste, labor burden or a subcontractor quote without rebuilding the estimate.
For builders. You need buyout and change-order support after award. We re-takeoff revised sheets, track scope changes against the original, and keep the estimate aligned with what is actually being installed in the field.
For owners. You need a budget before design is finished. We estimate from concept drawings and program areas, flag scope gaps, and give you a division-level budget you can carry into the contractor selection process.
Select a bar to compare Champaign with the largest Illinois markets we cover.
645 new housing units in 2025 (+70.6% vs 2024).
80 single-family · 565 multifamily (88%).
Champaign issued permits for 645 new private residential units in 2025, up from 378 in 2024 — a 71% jump. Multifamily accounted for 565 of those units, 88% of the total, while single-family accounted for 80. The permitted value was $102M, averaging $157,700 per unit. For an estimator, that mix means most of the local residential bid volume is in repeated unit plans, not custom homes: you can amortize takeoff effort across identical kitchens, baths and mechanical rooms, but you must price the shared building shell, corridor finishes, elevator and sprinkler scope separately. Champaign ranked 2 of 25 among the Illinois cities we cover by units, at 9.6% of the 6,710-unit covered total. See how the rest of the state breaks down on our Illinois construction estimating page.
Champaign County sits on deep, moisture-sensitive clay soils, so foundation estimates routinely carry over-excavation, engineered fill and sometimes drilled piers rather than simple spread footings — a line item that swings hard with the geotechnical report. The climate drives IECC envelope requirements: higher R-values in walls and attics, continuous insulation, and tighter air-sealing details that add labor to every exterior trade. On the commercial side, university-area and Campustown work brings renovation estimating — selective demolition, existing-structure tie-ins, and MEP upgrades in occupied buildings — where the takeoff depends on field verification as much as drawings. Nearby work in Bloomington and Springfield follows similar soil and code conditions, so the same pricing basis carries across central Illinois.
We estimate the trades that dominate Champaign's multifamily, commercial and institutional pipeline, from sitework through MEP.
Mass excavation, engineered fill and utility runs for Champaign County clay sites, measured from grading and civil sheets.
CY · LF · TONFoundations, slab-on-grade and podium decks for multifamily buildings, including rebar and formwork quantities by pour strip.
CY · SF · LBSpread footings, drilled piers and over-excavation priced against the geotechnical report for central Illinois soils.
CY · LF · EAType III and wood-frame multifamily framing, with studs, joists, sheathing and hardware counted by unit type and floor.
LF · SF · EATPO, EPDM and shingle systems with insulation, flashing and taper details for low-slope multifamily roofs.
SF · SQ · LFMechanical, electrical and plumbing scope for multifamily and commercial buildings, priced by fixture, run and equipment item.
EA · LF · TONSingle-family and small multifamily estimates from plan sets, with division-level quantities and waste factors applied.
SF · EA · LFTenant fit-outs, retail and institutional work around Campustown and downtown Champaign, including renovation and tie-in scope.
SF · EA · LFCampus-adjacent projects repeat unit plans, so shared scope — corridors, elevators, trash rooms — decides the margin. We separate typical-unit cost from common-area cost so your bid holds up.
Champaign multifamily framing bids turn on wall-type counts and plate quantities. We take off per-unit and per-floor, and flag where plan sheets disagree before you sign a lump sum.
Champaign County soils push many projects to engineered fill or deeper footings. We quantity footing, slab and pier scope from the structural sheets so your bid reflects the geotech, not the architect's guess.
Multifamily plumbing and HVAC counts repeat per unit, and riser diagrams are where quantities drift. We count fixtures, runs and equipment per unit type and reconcile against the schedules.
With 565 multifamily units permitted in 2025, developers here are pricing early. We build concept-level budgets by division so you can test a pro forma before committing to a full design.
Older Champaign housing stock needs scope defined before bid. We take off demolition, framing repair and MEP replacement from existing conditions so contractors bid the same work.
We estimate from plan sets for projects across Champaign County and the surrounding I-57 and I-74 corridors. Send drawings for any of these areas and we will price them with the same ZIP-code-adjusted material and labor basis.
Champaign's 2025 permit mix was 88% multifamily, and that shapes what we price most often. The remaining work is single-family, student housing, light industrial and institutional renovations tied to the university and the Interstate Research Park.
Three- and four-story wood-frame and podium projects dominate the 565 multifamily units permitted in 2025. We take off per unit type, then add common areas, corridors, elevators and amenity spaces as separate line items so nothing hides in the unit cost.
Watch for: Shared corridors, trash rooms, roof decks, elevator shafts
Campustown projects pack high fixture counts and short construction windows into small sites. We count plumbing fixtures, kitchenettes and bedroom outlets per unit, and price the fire-rated assemblies that drive cost in these buildings.
Watch for: Fire-rated assemblies, fixture counts, tight staging
Eighty single-family units were permitted in 2025, mostly infill and small subdivisions. We estimate from the architectural and structural sets, with separate line items for excavation, foundation, framing, roofing and finishes.
Watch for: Excavation, footing depth, roof geometry
The Interstate Research Park and north Champaign corridors carry warehouse and flex projects. We take off slab area, tilt-up or metal panel, dock equipment and racking loads, and price MEP by system rather than by square foot.
Watch for: Slab thickness, dock equipment, MEP by system
University and hospital renovations come with phased schedules and occupied-building constraints. We break the estimate by phase and by system so you can price after-hours work and temporary partitions separately.
Watch for: Phasing, occupied-building premiums, temporary partitions
Downtown and Midtown building conversions mix demolition with new MEP. We take off existing conditions from the drawings you provide and flag where the scope depends on what is actually found behind the walls.
Watch for: Demolition, existing conditions, MEP replacement
Champaign pricing is not the same as Chicago pricing, and it is not the same as downstate rural pricing either. These are the variables that move a Champaign County estimate most.
The City of Champaign reviews residential and commercial permits, and Champaign County handles unincorporated sites. Illinois has adopted statewide building and energy codes, but the edition in force and local amendments vary, so confirm the adopted code edition with the local building department before you price fire-rated assemblies, egress or insulation. Plan review comments can add scope after bid.
City of Champaign · Champaign County · Illinois adopted codesChampaign County soils include loess and clay till with seasonal moisture movement. Geotechnical reports often call for over-excavation, engineered fill or deeper footings than the architectural sheets show. We price foundation scope from the structural drawings and flag where the geotech recommendation changes footing depth, pier length or slab thickness.
Loess soils · Clay till · Geotechnical reportCentral Illinois winters drive frost depth, snow load and freeze protection. Footings must bear below the local frost line, and exterior concrete needs air entrainment and proper curing. Roof snow load and ice barrier requirements affect roofing quantities. Confirm the adopted code edition with the local building department for the current frost depth and snow load.
Frost depth · Snow load · Ice barrierChampaign labor rates sit below Chicago but above rural downstate, and university-area work competes for the same crews. Prevailing wage applies to many public and institutional projects, which changes the labor burden line. We price labor with ZIP-code-adjusted data and adjust when Davis-Bacon or Illinois prevailing wage is in the specification.
Prevailing wage · Davis-Bacon · ZIP-adjusted laborFlat sites and clay soils make storm drainage and detention a real cost line. Projects near the Boneyard Creek watershed often need detention or retention, and the city requires stormwater management for new impervious area. We take off pipe, structures, grading and detention volume from the civil sheets rather than carrying a square-foot allowance.
Boneyard Creek · Stormwater detention · Clay soilsChampaign sits on I-57 and I-74, so material delivery is straightforward, but specialty items and long-lead equipment still come from Chicago or Indianapolis. We price the specified products and flag long-lead items early. Sales tax treatment differs between material purchases and installed work, so confirm how your supplier is billing before you finalize the estimate.
I-57 · I-74 · Long-lead equipmentChampaign's mix of multifamily infill and institutional work changes what an estimator prices, from deep frost footings to tight downtown staging. Here is how the local conditions you already know about translate into line items and quantities.
Champaign sits on mostly level ground with silt loam and clayey till, so mass grading quantities stay modest but undercut and over-excavation are common where undocumented fill exists. Storm systems are sized to Illinois EPA and local drainage criteria, and you should confirm the adopted stormwater ordinance with the Champaign Public Works Department. Sanitary laterals in older core blocks may be vitrified clay, which means televising and replacement allowances. Detention basins, silt fence, inlet protection and temporary seeding are separate line items, not general conditions. If your scope includes a full site package, our sitework estimating services break out cut, fill, haul-off and utility trenching by station.
Wood-frame multifamily and student housing dominate Champaign's residential permits, so wall, floor and roof framing takeoffs are usually by member count, not by square foot. You need to price engineered lumber, hangers, hold-downs, sheathing, house wrap and flashing separately. Illinois adopts the IECC, and the energy code drives wall R-values, ceiling insulation and air-sealing details that show up as line items. Confirm the adopted edition with the Champaign building department before you lock in insulation thickness. Truss packages, crane picks and sheathing waste are common places bids drift. Our framing estimating services and residential estimating services cover both stick-framed and panelized scopes.
Multifamily and institutional projects in Champaign bring mechanical rooms, corridor sprinkler mains, unit distribution and common-area HVAC. Plumbing fixture counts, domestic water riser sizing and fire sprinkler head counts by hazard class need to be taken off per unit and per floor. Electrical takeoffs should include unit panels, house panels, meter stacks, corridor lighting and fire alarm devices. Interior finishes are driven by unit type matrices, so price each unit plan separately and multiply. Our MEP estimating services and multi-family estimating services organize these scopes by floor and by building, which keeps the bid comparable when the architect issues unit-type revisions.
Frost depth in central Illinois is typically 36 to 42 inches, so continuous footings and pier foundations carry more concrete and rebar per linear foot than southern markets. Basement and crawlspace walls need exterior drainage board, footing drains and dampproofing as separate lines. Slab-on-grade work usually includes a vapor retarder, granular base and welded wire or fiber reinforcement, and the mix design must match the exposure class on the drawings. Post-tensioned or mat foundations appear on taller multifamily buildings. For footing and slab takeoffs, our foundation estimating services and concrete estimating services price formwork, rebar and ready-mix by pour sequence.
Champaign gets hail and high-wind events, so roof systems are usually specified with a Class 4 impact-rated shingle or a membrane with enhanced attachment. On low-slope multifamily, TPO or EPDM over polyiso with tapered insulation, crickets and edge metal is common. Steep-slope takeoffs need ridge, hip, valley, starter and ice-and-water membrane measured by linear foot, not lumped into squares. Tear-off, deck repair and disposal are separate line items. If your project is a re-roof, the existing layers and deck condition drive the number more than the roof area. Our roofing estimating services price shingles, underlayment, flashing and metal by slope and penetration count.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 36 in. wide x 12 in. deep | 42 | CY |
| 03 20 00 | Footing rebar, #5 bars, lap and dowels | 6.8 | TON |
| 05 12 00 | Structural steel columns and beams | 11.5 | TON |
| 06 10 00 | Wall framing, 2x6 studs at 16 in. o.c. | 18400 | LF |
| 06 16 00 | Roof sheathing, 7/16 in. OSB | 13200 | SF |
| 07 21 00 | Batt insulation, R-21 walls and R-49 ceilings | 28600 | SF |
| 09 29 00 | Gypsum board, 5/8 in. type X, one layer | 41200 | SF |
| 21 13 13 | Wet sprinkler heads, light hazard, per unit | 168 | EA |
This example sizes continuous footings for a four-story wood-frame building on a Champaign lot. The dimensions are illustrative; use your own plan dimensions and confirm the adopted code and frost depth with the Champaign building department.
Assume a rectangular building 120 ft long by 60 ft wide, with a continuous perimeter footing and one interior bearing line running the long direction. Footing width is 36 in. and thickness is 12 in.
Perimeter length = 2 x (120 + 60) = 360 LF. Interior bearing line = 120 LF. Total footing length = 480 LF.
Convert width to feet: 36 in. / 12 = 3.0 ft. Thickness: 12 in. / 12 = 1.0 ft. Volume per linear foot = 3.0 x 1.0 = 3.0 CF/LF. Total volume = 480 LF x 3.0 CF/LF = 1,440 CF. Convert to cubic yards: 1,440 / 27 = 53.3 CY.
Add a typical waste and over-excavation allowance of 5 percent: 53.3 x 1.05 = 56.0 CY. Order 56 CY, rounded to the nearest full truck.
| Step | Calculation | Result |
|---|---|---|
| Perimeter length | 2 x (120 + 60) | 360 LF |
| Interior bearing line | given | 120 LF |
| Total footing length | 360 + 120 | 480 LF |
| Volume per LF | 3.0 ft x 1.0 ft | 3.0 CF/LF |
| Total volume | 480 x 3.0 | 1,440 CF |
| Volume in CY | 1,440 / 27 | 53.3 CY |
| With 5% waste | 53.3 x 1.05 | 56.0 CY |
If the geotechnical report requires over-excavation to 24 in. below footing, add the extra depth as a separate line and price the granular backfill by cubic yard. Keep footing concrete, rebar, formwork and excavation as separate CSI lines so a change to one does not distort the others. For a full foundation package, our foundation estimating services can carry these quantities through to the bid form.
Champaign issued 645 new privately-owned residential units in 2025, up 71 percent from 378 in 2024, according to the U.S. Census Bureau Building Permits Survey. That is the second-highest unit count among the 25 covered Illinois cities and 9.6 percent of the state total. For you, that means more concurrent multifamily and student-housing bids, tighter subcontractor calendars and longer lead times on trusses, switchgear and elevators. Build those into your schedule and your escalation assumptions.
Central Illinois frost depth is typically 36 to 42 inches, so continuous footings and pier foundations are commonly bottomed at 42 inches below finished grade. The geotechnical report and the adopted local code govern. Confirm the required depth with the Champaign building department before you finalize footing quantities, because an extra 6 inches of depth changes concrete, rebar, formwork and excavation on every linear foot of footing.
Most new multifamily buildings in Champaign include a wet sprinkler system in corridors, common areas and dwelling units, with design per NFPA 13 or NFPA 13R depending on height and construction type. Price heads by hazard class and by floor, plus risers, standpipes, backflow preventers and fire department connections. Keep sprinkler and fire alarm as separate CSI lines so the bid stays comparable if the design changes.
Detention is usually required for new impervious area, and the basin volume, outlet structure and release rate come from the civil drawings and the local stormwater ordinance. Take off excavation, liner, outlet pipe, riprap and landscaping separately. Confirm the adopted stormwater requirements with the Champaign Public Works Department. If the basin is underground, vaults and pumps become a major cost line and should not be buried in general conditions.
Price wall framing by linear foot of wall, by stud count and by plate, not by square foot of floor area. You need wall heights, stud spacing, openings, headers, blocking and sheathing as separate quantities. For a four-story wood-frame building, a stud count takeoff lets you compare bids when one contractor assumes 16 in. o.c. and another assumes 24 in. o.c. Our framing estimating services organize the takeoff this way.
Illinois adopts the IECC, and the adopted edition sets minimum wall and ceiling R-values, window U-factors and air-sealing requirements. Those values change insulation thickness, sheathing type and sometimes framing depth. Confirm the adopted edition with the Champaign building department, then price insulation by square foot of net wall and ceiling area, with separate lines for rim joists, headers and attic access. Do not carry a single blended R-value across the whole envelope.
Most of the cost sits in Division 03 concrete, Division 05 metals, Division 06 wood and plastics, Division 07 thermal and moisture protection, Division 09 finishes, and Divisions 21 through 26 for fire protection, plumbing, HVAC and electrical. Sitework falls in Divisions 31 and 33. Organizing your bid by these divisions makes it easier to compare subcontractor quotes and to isolate scope gaps before you submit.
Yes. Send the architectural, structural, civil and MEP drawings you have, plus any specifications and addenda. We mark up the plan set, note assumptions where drawings conflict, and list quantities by CSI division so you can see what is included. Turnaround is 24 to 48 hours for most projects, with rush available. The marked-up set and Excel workbook make it clear which items are based on incomplete information.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. They count new privately-owned residential units permitted by the city itself, not total construction value and not commercial or institutional permits. The 645 units, the 71 percent increase over 2024, and the 9.6 percent share of the covered state total are all from that source. Use them as a demand indicator, not as a measure of your specific project.
Yes. We cover Champaign and the surrounding region, including Springfield, Peoria, Bloomington, Elgin, Waukegan and Cicero. Pricing is adjusted by ZIP code for material and labor, so a takeoff for a Champaign project reflects local costs rather than a national average. If your project is in another part of Illinois, start with our Illinois construction estimating page and send the plans for a quote.
Upload your drawings and specifications and we will return a CSI-organized takeoff in Excel and PDF within 24 to 48 hours.