Sitework and earthwork
Mass excavation, structural fill, Fox River floodplain over-excavation, dewatering, and utility trench quantities for Elgin sites.
CY · LF · TONWe produce CSI MasterFormat takeoffs and estimates for Elgin contractors, developers and owners. Plans go through Bluebeam Revu and PlanSwift, quantities price against ZIP-adjusted RSMeans data, and most projects return in 24–48 hours.
Elgin sits in Kane County on the Fox River, so estimates carry Fox River floodplain and dewatering scope, shallow bedrock and clay soils in foundation quantities, Illinois prevailing-wage labor on public work, cold-weather concrete and masonry protection, and ZIP-adjusted material pricing for the 60120–60124 area.
Elgin is the seventh-largest city in Illinois by our state coverage, and the permit mix shows what that means for takeoffs. The city issued 241 new privately-owned residential units in 2025, down about 39% from 398 in 2024, with 201 single-family and 40 multifamily units. Average permitted value per unit was $388,600, so the residential work we price here is not entry-level production housing. It is custom and semi-custom single-family, infill multifamily, and the commercial and industrial shell work that follows the Chicago-area logistics and data-center pipeline.
We estimate from the documents you actually bid: architectural, structural, civil, and the MEP sets that drive your division 22, 23 and 26 numbers. Plans are marked up in Bluebeam Revu, quantities are taken in PlanSwift, and pricing is ZIP-code-adjusted RSMeans data for Elgin and the surrounding Kane County ZIPs. Deliverables are Excel and PDF organized by CSI MasterFormat division, with the marked-up plan set so you can see where every quantity came from. Start with our Illinois construction estimating coverage or send drawings through the get an estimate page.
For bidders. You need division-level quantities fast enough to beat the bid date. We return most takeoffs in 24–48 hours with marked-up plans, so you can check our assumptions against your own scope before you sharpen the number.
For builders. You are buying out framing, concrete, roofing and MEP after award. We break quantities into the units your subs price in — board feet, cubic yards, squares, linear feet — so purchase orders match the estimate.
For owners. You are comparing budgets across sites or phasing a project. We price alternates and addenda separately and flag scope gaps, so the number you carry into financing reflects what the drawings actually show.
Select a bar to compare Elgin with the largest Illinois markets we cover.
241 new housing units in 2025 (-39.4% vs 2024).
201 single-family · 40 multifamily (17%).
Elgin permitted 241 new privately-owned residential units in 2025 against 398 in 2024, a 39% drop, and the city still ranked fifth of 25 covered Illinois cities by units with 3.6% of the covered state total. Multifamily was only 17% of units, so the volume is mostly single-family. For a bidder that means fewer large apartment packages and more scattered custom homes, additions and small commercial. Those jobs carry proportionally more mobilization, utility connection and sitework per unit, and they punish anyone who prices from a per-square-foot number. Take off the sitework separately, and check our Joliet construction estimating and Springfield construction estimating pages if your crews bid outside Kane County.
The Chicago region remains a major commercial and industrial hub with a strong logistics and data-center pipeline, and Elgin's position on I-90 and the Fox River puts warehouse, light-industrial and utility-heavy projects in the same bid folder as the residential work. Those jobs shift the estimate toward structural steel, tilt-up panels, slab-on-grade, and large electrical and mechanical packages. Data-center and logistics shells are priced by weight, area and connected load, not by residential unit counts. If your backlog mixes both, keep separate labor constants and separate waste factors; a 5% framing waste factor on a custom home is not the right allowance on a panelized warehouse. Our commercial estimating and industrial estimating teams handle those divisions.
We take off and price the divisions that drive Elgin bids, from Fox River sitework to the MEP packages on industrial shells.
Mass excavation, structural fill, Fox River floodplain over-excavation, dewatering, and utility trench quantities for Elgin sites.
CY · LF · TONFootings, foundation walls, slab-on-grade and flatwork taken off by thickness and area, with formwork and reinforcement separated.
CY · SF · LBFloor joists, wall studs, headers, sheathing and truss counts for Kane County custom homes and small commercial framing.
BF · LF · EASlope and area measured from roof plans, with squares, underlayment, flashing and typical waste factors shown separately.
SQ · LF · EAPlumbing, HVAC and electrical takeoffs by fixture, run and device count for residential and light-commercial Elgin projects.
EA · LF · TONCustom single-family, additions and infill priced division by division against the 2025 Elgin permit mix.
SF · EA · LSUnit-mix matrices, repeated floor plans and common-area scope for the smaller multifamily share of Elgin permits.
UNIT · SF · EATilt-up, structural steel, warehouse slabs and data-center MEP packages for the I-90 corridor pipeline.
SF · TON · EAYou are pricing against three or four local bidders on the same Elgin drawings. We return division-level quantities in 24–48 hours with marked-up plans so you can verify scope before the bid date.
At an average permitted value of $388,600 per unit, Elgin's single-family work is semi-custom, not production. We take off framing, foundation and finishes to the level your trade contractors actually price.
Forty of the 241 residential units permitted in 2025 were multifamily, so the projects are small enough that one missed scope gap hurts. We break unit types apart and price shared sitework separately.
The Chicago-area logistics and data-center pipeline reaches Elgin's industrial corridors. We quantify concrete, structural steel, MEP rough-in and sitework so your bid covers the divisions you self-perform.
You need a budget before the documents are complete. We price what is drawn, flag the gaps, and organize the takeoff by CSI MasterFormat division so your team can carry it into the next design phase.
You are comparing renovation budgets across older Elgin buildings or planning a phased project. We separate alternates and addenda and show quantities in Excel so your capital plan reflects real scope.
We price projects across Elgin and the surrounding Kane, Cook and McHenry County communities. Send drawings for any of these areas and we will take off to the same standard.
Elgin's 2025 permit mix was 201 single-family and 40 multifamily units, with the commercial and industrial shell work that follows the Chicago logistics corridor. These are the property types we take off most often here.
Semi-custom and custom homes on infill lots and in subdivisions across west and south Elgin. We take off foundation, framing, roofing, siding, drywall, trim and MEP rough-in by floor level, with waste factors stated separately.
Watch for: Wall heights, bump-outs, and garage slab thickness.
Small apartment and townhome buildings, typically three to twelve units, where 40 of the city's 2025 residential permits landed. We separate unit-type quantities, common area, and sitework so shared costs do not disappear into a per-unit number.
Watch for: Unit mix duplication and corridor MEP runs.
Warehouse, distribution and light-manufacturing buildings along Elgin's industrial corridors. We quantify slab-on-grade, tilt-up or precast panels, structural steel, dock equipment, and the office fit-out as separate scopes.
Watch for: Slab flatness, dock openings, and fire-rated demising walls.
Strip centers, standalone retail and restaurant build-outs on the Randall Road and Route 20 corridors. We price grease duct, hoods, walk-in coolers, storefront glazing and ADA restroom counts as separate line items.
Watch for: Grease interceptor, hood curb, and make-up air.
Professional office and clinic spaces in downtown Elgin and near the hospital district. We take off partition types, ceiling systems, casework, exam-room plumbing counts and dedicated HVAC zones from the MEP set.
Watch for: Plumbing fixture counts and after-hours HVAC zones.
Older masonry and timber buildings in and around downtown Elgin, where selective demolition and structural repair drive cost. We quantify demolition, shoring, masonry repointing and new MEP penetrations from the existing conditions drawings.
Watch for: Hidden structural repair and asbestos abatement scope.
Elgin sits in Kane County on the Fox River, where the code cycle, soils, winter weather and labor market all move the number. These are the drivers we check before we finalize a takeoff.
Elgin enforces the Illinois adoption of the IBC family for commercial work and the IRC for residential, with local amendments covering fire separation, stormwater and historic districts. Permit review timelines vary with project size and completeness. Confirm the adopted code edition and any local amendments with the Elgin building department before you lock your scope, because plan review comments can add fire-rated assemblies or sprinkler scope after bid.
IBC · IRC · Elgin building department · Kane CountyMuch of the Fox River valley has glacial till, silty clay and areas of fill near the river and older industrial parcels. Bearing capacity and frost depth control footing size, and frost depth in northern Illinois is typically deeper than many bidders assume. Geotechnical borings, undercutting, engineered fill and dewatering near the river can add foundation cost that never appears on the architectural sheet.
Geotechnical report · frost depth · engineered fill · dewateringElgin winters bring freeze-thaw cycles, snow load and cold-weather concrete protection. Winter pours require heated enclosures, accelerators or blankets, and masonry cannot proceed below a certain temperature without protection. Roofing and sitework schedules compress in spring. If your bid date is in fall, price the temporary heat, hoarding and weather protection as separate line items rather than burying them in general conditions.
Ground snow load · freeze-thaw · temporary heat · winter concreteElgin draws from the Chicago metropolitan labor pool, so union and open-shop rates, prevailing wage on public work and per-diem for out-of-area crews all affect the labor column. Specialty trades such as fire protection, elevator and controls can be booked out weeks ahead. We use ZIP-code-adjusted labor pricing for Elgin and note where crew size or shift work changes the productivity assumption.
Prevailing wage · RSMeans labor rates · union rates · crew productivityThe Fox River, Tyler Creek and local detention requirements drive earthwork, storm sewer, retaining walls and erosion control on Elgin sites. Kane County and municipal stormwater rules may require on-site detention and water-quality treatment. On tight infill lots, staging, crane access and spoil removal add cost. We quantify cut and fill, pipe runs, structures and stone from the civil set before we price the building.
Stormwater detention · erosion control · cut and fill · Tyler CreekElgin sits on the I-90 corridor, so most material deliveries are straightforward, but Illinois sales tax treatment, fuel surcharges and supplier lead times still move the number. Steel, switchgear, roofing membrane and mechanical equipment can carry long lead times. We price material at ZIP-code-adjusted rates for Elgin and list the items where lead time or freight should be verified with your supplier before you commit.
I-90 corridor · Illinois sales tax · lead times · freightElgin sits in Kane and Cook counties along the Fox River, where a mix of river-adjacent redevelopment and suburban infill drives the work we price. Each trade below carries a local condition that changes quantities, not just unit costs.
Fox River corridor parcels often carry fill, prior structure demolition, and shallow groundwater, so we separate stripping, unsuitable excavation, and structural fill instead of lumping them as "earthwork." Storm lines and detention sizing follow local ordinance and the adopted state plumbing code, and you should confirm the current edition with the Elgin building department. On the west side, deeper frost penetration drives water service burial depth. We price sanitary and storm separately, with trench backfill and compaction in cubic yards and pipe runs in linear feet. For a full site package, our sitework estimating services break out clearing, erosion control, and pavement section by layer.
Most Elgin residential and light commercial framing is wood, with engineered floor systems over basements and garages. We count studs by wall segment and plate height, add headers and blocking by opening, and convert sheathing to sheets with a typical 10 percent waste. Roof trusses are quoted from the supplier's layout when available; otherwise we take off rafters and ridge by linear feet. Wind and snow loads for the adopted code edition affect connector and hold-down counts, so confirm the current edition locally. Our framing estimating services deliver a wall-by-wall count you can hand to a lumber yard for a quote.
MEP is where Elgin bids most often miss scope. We take off fixtures by count, piping by diameter and linear feet, ductwork by pound and linear feet, and electrical by device, fixture, and home run. Illinois adopts plumbing and electrical codes at the state level with local amendments, so verify the enforced edition with the Elgin building department before you price. Basement and garage spaces add circuits, exhaust, and sometimes a sump and ejector pump. Our MEP estimating services separate rough-in from trim-out so you can compare subcontractor quotes line by line rather than on a single lump sum.
Basement and garage slab work in Elgin has to account for frost depth, so footings sit lower than in southern Illinois and formwork quantities rise. We take off continuous footings in linear feet, pad footings by count and size, and slab-on-grade by square feet with a typical 5 to 10 percent waste factor on ready-mix. River-adjacent sites may require a soils report before you commit to spread footings versus caissons. Flatwork is separated from structural concrete because mix designs, reinforcement, and finishing rates differ. Our foundation estimating services and concrete estimating services both itemize rebar by bar size and length rather than a single allowance.
Elgin roofs see freeze-thaw cycling and ice damming at eaves, so underlayment, ice-and-water shield, and drip edge quantities matter as much as shingle squares. We measure roof planes from the plan or elevation, add ridge, hip, and valley lengths in linear feet, and apply a typical 10 percent waste on shingles and 5 percent on underlayment. Commercial flat roofs are taken off by membrane square and insulation thickness, with tapered insulation by area. Flashing at walls, curbs, and penetrations is itemized separately because that is where bids usually run thin. Roofing estimating services from our team include a marked-up plan set showing each measured plane.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, continuous | 48 | CY |
| 03 20 00 | Rebar, footing and wall | 3,150 | LB |
| 05 10 00 | Structural steel beam and posts | 420 | LB |
| 06 10 00 | Wall framing, 2x6 studs | 1,840 | LF |
| 06 10 00 | Floor and roof sheathing | 4,600 | SF |
| 07 30 00 | Asphalt shingles with underlayment | 32 | SQ |
| 09 29 00 | Gypsum board, walls and ceilings | 6,900 | SF |
| 22 10 00 | Plumbing rough-in, PEX and PVC | 310 | LF |
This example shows how we build a slab-on-grade quantity for a full-basement house in Elgin. Dimensions are illustrative and do not represent a specific project.
Assume a rectangular basement 36 ft by 52 ft, with a 4 in. slab, thickened edges at 12 in. by 12 in., and a 10 percent waste factor on ready-mix. We take the slab area first, then add the thickened perimeter, then convert volume to cubic yards and apply waste.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Slab area | 36 ft × 52 ft | 1,872 | SF |
| Slab volume | 1,872 SF × (4 in. ÷ 12) | 624 | CF |
| Perimeter | 2 × (36 ft + 52 ft) | 176 | LF |
| Thickened edge volume | 176 LF × (12 in. ÷ 12) × (12 in. ÷ 12) | 176 | CF |
| Total volume | 624 CF + 176 CF | 800 | CF |
| Convert to CY | 800 CF ÷ 27 | 29.6 | CY |
| With 10% waste | 29.6 CY × 1.10 | 32.6 | CY |
We round to 33 CY for the order. Vapor barrier is taken off at the slab area plus a typical 10 percent lap and waste, so 1,872 SF × 1.10 = 2,059 SF, ordered as 2,100 SF. Reinforcement is priced separately: welded wire fabric at the slab area, and #4 bars at the thickened edge by linear feet. If the geotechnical report calls for a gravel base, we add that by cubic yard using the specified depth. The same sequence applies to garage slabs, but the slab thickness and reinforcement usually differ, so we keep them as separate line items under CSI 03 30 00 rather than combining them into one concrete figure. For a full package across trades, start with our residential estimating services or send plans through the get an estimate page.
Pricing depends on the size, trade count, and drawing quality, so we quote after reviewing your plans. We do not publish a flat rate because a single-trade concrete takeoff and a full-division commercial estimate are very different scopes. Send the plan set and the divisions you need, and we will return a fixed quote before any work begins. The quote covers the marked-up plan set, Excel workbook, and PDF report, so there are no surprise charges after delivery.
Most projects are returned in 24 to 48 hours, with rush turnaround available when your bid date is tight. Large commercial or industrial packages with many divisions may take longer, and we tell you that up front. The clock starts when we have a complete, legible plan set and your scope notes. If drawings are missing details, we will send a short list of questions before we start, so the turnaround time does not slip.
We deliver Excel workbooks and PDF reports organized by CSI MasterFormat division, plus a marked-up plan set showing what was measured. The Excel file is set up so you can adjust waste factors, unit costs, and quantities without rebuilding formulas. If your estimating software needs a specific import layout, tell us and we will match it. The PDF includes a summary by division and a detailed line-item list with quantities and units for each scope.
Yes. We use ZIP-code-adjusted material and labor pricing, so Elgin rates reflect the Chicago metro market rather than a national average. We work from RSMeans data and adjust for the trades and materials in your scope. If you have current supplier or subcontractor quotes, send them and we will reconcile the takeoff to your numbers. That way your bid reflects what you are actually paying, not a generic cost database.
The permit figures come from the U.S. Census Bureau Building Permits Survey, which counts new privately-owned residential units permitted by the city itself. It does not include commercial, industrial, or renovation permits. The 2025 survey year showed 241 total residential units in Elgin, down from 398 the previous year, with 201 single-family and 40 multifamily units. That is a 39 percent drop, which means fewer new residential starts but potentially more renovation and infill work.
Yes. Many Elgin clients send us one division, such as concrete, framing, or roofing, because that is where their bid is exposed. We take off that scope in detail and leave the rest of the project alone. If you later need the full package, we can extend the same model rather than starting over. Partial scopes are often returned faster because there are fewer divisions to price and fewer drawings to review.
We do. The Chicago area remains a major commercial and industrial hub with a strong logistics and data-center pipeline, and Elgin sits inside that market. Warehouse shells, tenant fit-outs, and industrial process scopes are taken off division by division. Our commercial estimating services and industrial estimating services cover those packages, including sitework and MEP. For industrial work, we separate process piping, equipment pads, and specialty electrical from the base building scope.
We apply the ground snow load and frost depth for the adopted code edition when those values are provided in your drawings or specifications. They affect footing depth, roof framing, and connector counts, so they change quantities, not just notes. Confirm the enforced edition with the Elgin building department, since local amendments can differ from the model code. If your drawings do not state the values, we will flag it as a scope gap and ask you to confirm before we finalize quantities.
Send the architectural, structural, and MEP drawings, the specification book if one exists, and any geotechnical report for the site. Tell us the bid date, the divisions you want priced, and whether you have supplier or subcontractor quotes to match. A marked-up plan set or a previous estimate also helps us align with how you bid. If you have a schedule or phasing plan, include it, because phased work can change quantities for temporary facilities and site logistics.
Yes. We estimate across the Chicago metro and northern Illinois, including Kane, Cook, DuPage, and McHenry county work. If your project is outside Elgin, our Illinois construction estimating services page covers the rest of the state, and we also serve nearby markets such as Joliet, Rockford, Waukegan, and Champaign. We also cover Peoria and Springfield for clients with projects in central Illinois. The same ZIP-code-adjusted pricing and CSI-formatted deliverables apply to all these areas.
Email your drawings, scope notes, and bid date, and we will return a fixed quote and a division-by-division takeoff in 24 to 48 hours.