Sitework takeoff
Clearing, excavation, backfill, and grading quantities for Waukegan lots with clay and glacial till soils.
CY · SF · LFWaukegan sits on Lake Michigan in Lake County, where residential permits jumped from 2 units in 2024 to 13 units in 2025. We produce CSI-organized takeoffs and estimates for contractors bidding that work and the surrounding industrial and commercial pipeline.
Lake Michigan wind loads on roof and framing takeoffs, clay and glacial till soils affecting foundation excavation and backfill, a split between scattered residential infill and large industrial shells, ZIP-code-adjusted material and labor pricing for Lake County, and permit review through the city building department using the locally adopted code edition.
Waukegan is the tenth-largest city in Illinois and the seat of Lake County, with a building stock that mixes older residential blocks, lakefront commercial property, and industrial land along the corridors west of the harbor. The permit numbers reflect a small but real residential market: 13 new privately-owned units in 2025 against 2 in 2024, all single-family, with a permitted value of $3M and an average of $198,400 per unit. That is a niche, not a boom, and it means bidders here win on accuracy rather than volume.
We build estimates the way a general contractor prices a bid: quantity takeoff first, then labor and material by CSI MasterFormat division, then a review of the scope gaps that move a number. For Waukegan work we use RSMeans data adjusted to the local ZIP code, so material and labor lines reflect Lake County rather than a national average. If you are pricing a project in the region, start with our Illinois construction estimating services page, or see how we handle similar scopes in Arlington Heights and Elgin.
For bidders. You need a quantity takeoff that survives a scope review. We deliver marked-up plan sets with Excel and PDF line items organized by CSI division, so you can see exactly what is counted and what is excluded before you submit.
For builders. You are buying out trades and ordering material. We break down concrete, framing, roofing, and MEP quantities by unit of measure so your purchase orders and subcontracts match the plans rather than a lump sum.
For owners. You are comparing bids or checking a budget. We provide a division-level estimate with assumptions listed, so you can see where the number is firm and where it depends on soil, code, or schedule decisions still open.
Select a bar to compare Waukegan with the largest Illinois markets we cover.
13 new housing units in 2025 (+550% vs 2024).
13 single-family · 0 multifamily (0%).
The city issued permits for 13 new privately-owned residential units in 2025, up from 2 in 2024 — a 550% change on a very small base. All 13 were single-family, with no multifamily units permitted, and the permitted value was $3M, or $198,400 per unit on average. Waukegan ranked 17th of 25 covered state cities by units and accounted for 0.2% of the 6,710 units permitted across those cities. For a bidder, that means the residential pipeline is thin and scattered, so each project carries more overhead per unit. Price your sitework, foundation, and framing carefully; on small infill lots, excavation and concrete often swing the bid more than the structure itself. Our residential estimating services are built for that scale of work.
Waukegan's larger opportunity is not in the 13 residential units; it is in the commercial and industrial base that runs along the lakefront and the corridors toward North Chicago and Gurnee. Lake County sits inside the Chicago area, which remains a major commercial and industrial hub with a strong logistics and data-center pipeline. That work brings tilt-up and structural steel shells, heavy electrical and mechanical scopes, and sitework packages with large cut-and-fill quantities. If you are bidding those jobs, the estimate has to separate building shell from tenant fit-out and carry clear exclusions. See our commercial estimating services and industrial estimating services for how we structure those divisions.
We cover the divisions that show up on Waukegan and Lake County projects, from dirt to MEP. Each takeoff is delivered in Excel and PDF with marked-up plan sets.
Clearing, excavation, backfill, and grading quantities for Waukegan lots with clay and glacial till soils.
CY · SF · LFFootings, foundation walls, slab-on-grade, and flatwork measured from plans with typical waste factors applied.
CY · SFFormwork, reinforcement, waterproofing, and drainage scopes sized to Lake County soil and frost depth conditions.
SF · LF · TONFloor, wall, and roof framing with lumber, sheathing, and hardware counted by member and sheet.
BF · SF · EARoof areas, edge metal, and underlayment for steep-slope and low-slope assemblies exposed to lakefront wind.
SQ · LFPlumbing, HVAC, and electrical quantities by fixture, run, and device for residential and light commercial scopes.
EA · LF · TONDivision-level budgets for the single-family infill projects now permitted in Waukegan.
SF · EAShell and fit-out takeoffs for retail, office, and light industrial buildings in the Waukegan corridor.
SF · CY · TONYou are bidding Lake County work against two or three local firms. A division-level takeoff with marked-up plans lets you see the same scope your competitor priced, and catch the exclusions before submission.
Waukegan permitted 13 single-family units in 2025, up from 2 in 2024. Small-volume infill means each house carries fixed costs, so framing, foundation, and MEP quantities need to be tight.
Lake County sits in the Chicago industrial pipeline. You need slab, structural steel, and MEP quantities priced for a large-footprint building, with clear assumptions for racking, dock equipment, and site utilities.
Older downtown and lakefront buildings mean selective demolition, unknown structural conditions, and phased occupancy. We separate demolition from new work so your change-order baseline is defensible.
You bid concrete, framing, roofing, or MEP packages and need quantities by unit of measure. We deliver takeoffs you can drop into your own pricing sheet without re-measuring the plans.
You are budgeting a roof replacement, facade repair, or interior fit-out on an existing building. A division-level estimate with listed assumptions helps you compare contractor proposals on the same scope.
We estimate projects across Waukegan and the surrounding Lake County and northeast Illinois communities. If your project is outside these areas, send the plans and we will confirm coverage.
The 2025 permit mix was entirely single-family, with no multifamily units permitted. That shapes the residential side of our work, while the commercial and industrial side follows Lake County's logistics and manufacturing base.
New houses on scattered lots, often with older utilities and narrow access. We take off foundation, framing, roofing, and MEP by unit of measure so your bid reflects the actual plan rather than an average house.
Watch for: Confirm lot grading, utility tap fees, and driveway scope.
Older Waukegan housing stock often needs structural repair, window replacement, and service upgrades. We separate demolition, repair, and new work so you can price the unknown conditions as an allowance.
Watch for: Watch for asbestos, lead paint, and concealed framing rot.
Retail, office, and restaurant spaces in older downtown and corridor buildings. We count partitions, ceilings, storefront, HVAC distribution, and electrical devices from the permit set and note what the landlord is providing.
Watch for: Verify existing sprinkler, HVAC capacity, and ADA upgrades.
Manufacturing and distribution buildings near the harbor and west-side corridors. We take off slab, structural steel, roof, dock equipment, and process utilities, then list exclusions for owner-furnished racking and machinery.
Watch for: Confirm slab thickness, dock count, and utility capacity.
Small apartment and mixed-use buildings, including upper-floor residential over ground-floor commercial. We break out dwelling units, common areas, and separate utility metering so your pro forma lines match the plan.
Watch for: Check unit mix, corridor lengths, and separate metering.
Schools, churches, and municipal buildings in Waukegan and Lake County. These projects carry prevailing wage, phased occupancy, and strict submittal requirements, so we organize the estimate by division and phase.
Watch for: Confirm prevailing wage, bonding, and phasing requirements.
Waukegan sits on the Lake Michigan shore in Lake County, where the building code, soils, and winter weather all move the number. These are the drivers we adjust for on every estimate.
Waukegan enforces the Illinois building code as adopted locally, and Lake County review adds time for site, stormwater, and health department items. We price to the code edition shown on your permit set and flag anything that depends on the adopted edition. Confirm the current edition and any local amendments with the Waukegan building department before you lock the number.
Waukegan building department · Lake County · Illinois building codeLake County soils range from lakefront sand and fill near the harbor to denser clay inland, and the water table can be shallow near the shore. Foundation type, backfill, and dewatering change the concrete and excavation quantities. We price from the geotechnical report where you have one, and list a soil allowance where you do not.
Geotechnical report · Lake Michigan shoreline · clay and fill soilsNortheast Illinois winters bring freeze-thaw cycles, lake-effect snow, and wind-driven rain off Lake Michigan. That drives temporary heat, winter concrete protection, and roofing schedule risk. We add seasonal allowances for cold-weather procedures and note which divisions carry the most weather exposure.
Lake-effect snow · freeze-thaw · temporary heatChicago-area trades are heavily unionized, and Lake County labor rates sit above downstate Illinois. We use ZIP-code-adjusted labor pricing so your estimate reflects the trades you will actually hire. If your project is prevailing wage or Davis-Bacon, tell us at the start so we price the correct rate.
Chicago-area unions · prevailing wage · Davis-BaconMany Waukegan sites are redevelopment parcels with existing foundations, buried tanks, or combined sewers. Stormwater detention, utility relocation, and pavement replacement can rival the building cost on tight urban lots. We take off sitework separately so you can see the civil scope before it disappears into a general conditions line.
Stormwater detention · buried tanks · combined sewersWaukegan is inside the Chicago material market, so concrete, steel, and roofing supply is generally available, but delivery windows and laydown space on small infill lots are tight. We price material at current ZIP-adjusted rates and note long-lead items such as switchgear, elevators, and rooftop units. Sales tax treatment depends on whether the contract is a improvement to real property; confirm with your accountant.
Chicago material market · long-lead equipment · Illinois sales taxWaukegan sits in Lake County, where lake-effect snow, clay till soils, and a steady mix of industrial, commercial, and residential work shape what you actually count. Here is how those conditions land in each division of a takeoff.
Lake County's clay till and a water table that rises with lake levels drive the sitework line items. You will see over-excavation below footings, granular backfill, footing drains with washed stone, and sump discharge piping. On the city's older industrial parcels, plan on soil testing for metals and petroleum before you price disposal; contaminated soil goes to a licensed facility, not a clean fill site. Storm structures are sized to the adopted Illinois plumbing code and local drainage rules, so confirm the edition with the Waukegan building department. For a sharper sitework number, send the grading and utility sheets to our sitework estimating services.
Wood framing dominates residential and light commercial here, with engineered floor systems over basements and crawl spaces. You will count joists, rim board, hangers, and blocking, plus sheathing and house wrap. Because winter design temperatures are low, wall assemblies often carry R-20 or better cavity insulation with continuous exterior insulation; the thermal break changes your fastener lengths and window jamb details. Roofs take snow load and ice dam protection at eaves, so underlayment and metal drip edge are not optional. Our framing estimating services and roofing estimating services price these assemblies by the square and by the linear foot.
Steep-slope roofs on residential, low-slope membrane on commercial and industrial. For shingle roofs, count squares, starter course, ridge and hip, valley flashing, and ice barrier at eaves. For flat roofs, count membrane by the square, insulation by thickness and R-value, cover board, and tapered crickets at drains. Waukegan's freeze-thaw cycles punish poorly detailed transitions, so flashing at walls, curbs, and penetrations deserves its own line. Gutters, downspouts, and splash blocks belong in the same takeoff so the water gets away from the foundation. Our roofing estimating services and residential estimating services cover both sides of that work.
Frost depth in this part of Illinois is typically 42 to 48 inches, so wall and column footings sit well below grade. On clay, a common detail is a wider footing with a granular base and a vapor barrier under the slab. Count formwork by contact area, not by slab area, and add reinforcing by bar size and lap. For a small commercial building, a typical mix is 4,000 psi for footings and 3,500 psi for interior slabs, with air entrainment for exterior flatwork. Our foundation estimating services and concrete estimating services break these out by division.
Waukegan's housing stock runs from pre-war bungalows to newer subdivisions, and that changes MEP scope. In older homes, a renovation takeoff often includes replacing galvanized supply lines, adding a grounded panel, and running new venting for high-efficiency furnaces. In new construction, you will count separate heating and cooling systems sized for a cold climate, ductwork with sealed joints, and bath and kitchen exhaust to the exterior. Commercial work adds make-up air and code-driven ventilation. Confirm the adopted mechanical, electrical, and plumbing code editions with the city before you finalize counts; our MEP estimating services handle the division-by-division build-up.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 7.5 | CY |
| 03 20 00 | Footing rebar, #4 | 1,850 | LF |
| 04 20 00 | CMU foundation wall, 8 in | 1,240 | SF |
| 06 10 00 | Wall framing, 2x6 studs | 3,600 | LF |
| 06 10 00 | Floor joists, I-joist | 1,450 | LF |
| 07 30 00 | Asphalt shingles | 32 | SQ |
| 09 29 00 | Drywall, 1/2 in | 7,800 | SF |
| 15 00 00 | HVAC, forced air | 1 | LS |
A typical Waukegan house on a full basement needs a continuous perimeter footing. The dimensions below are illustrative; use your own plan dimensions for a real bid.
Assume a rectangular footprint of 40 ft by 28 ft, with a 24 in wide by 12 in thick footing. The perimeter is 2 x (40 + 28) = 136 LF. Add an interior bearing wall of 28 ft, so total footing length is 164 LF.
| Step | Calculation | Result |
|---|---|---|
| Perimeter | 2 x (40 ft + 28 ft) | 136 LF |
| Plus interior bearing | 136 LF + 28 LF | 164 LF |
| Footing volume | 164 LF x 2 ft x 1 ft | 328 CF |
| Convert to cubic yards | 328 CF / 27 | 12.15 CY |
| Waste factor | 12.15 CY x 1.05 | 12.76 CY |
Order 13 CY, which allows for spillage and a small overpour. If the footing steps down a slope, break the run into segments and add the vertical drops. For reinforcing, a common detail is two continuous #4 bars with #4 dowels at 4 ft on center into the wall; count lap splices at 40 bar diameters and add 10 percent for cutting waste. Formwork is priced by contact area: 164 LF x 2 ft of height on both sides, or 656 SF, less any portions poured against earth. If the plans show a granular base under the footing, add 4 in of compacted stone at the same length and width, which is 164 LF x 2 ft x 0.33 ft = 108 CF, or about 4 CY. Confirm the adopted building code and inspection requirements with the Waukegan building department before you finalize the submittal.
No. We work from your drawings and specifications, and we price material and labor using ZIP-code-adjusted data for Waukegan and the surrounding Lake County area. What matters is that you send a complete set: architectural, structural, and MEP sheets, plus any addenda. If a sheet is missing, tell us and we will flag the gap rather than guess. Most projects come back in 24 to 48 hours, and rush turnaround is available.
Renovations add demolition and protection lines. You will see removal of existing finishes, temporary partitions, dust control, and disposal. In older Waukegan homes, that often means abatement testing for lead paint and asbestos before demolition starts. We also count patching and matching for existing finishes, which new construction never carries. Send the demolition plan and the existing conditions survey if you have one; it changes the number more than any other document.
We carry temporary heat, enclosures, and cold-weather concrete protection as separate line items when the schedule runs from late fall through early spring. Concrete placed below freezing needs heated water, blankets, or accelerators, and masonry needs heated mortar materials. Those costs do not belong in the base concrete or masonry price. If your schedule is not set, we can price both a winter and a spring start so you can compare.
Yes. Lakefront and older industrial sites often need environmental testing, deeper foundations, and utility upgrades. We will price the structural and sitework scope from the drawings and list the testing and disposal costs as allowances until you have lab results. If you already have a Phase I or Phase II report, send it; it lets us convert those allowances into firm numbers for the bid.
Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly where each quantity came from. The Excel file is set up so you can adjust waste factors, add your own labor rates, or roll the takeoff into your estimating software. We use Bluebeam Revu, PlanSwift, and RSMeans data to build the quantities and pricing.
Both. Our standard takeoff includes material quantities, and we can add labor hours and costs using ZIP-code-adjusted rates for Waukegan. If you only want quantities, tell us and we will leave the pricing columns blank. Many contractors use our quantities and plug in their own crew rates, which keeps their bid aligned with how they actually build.
We price materials at the supplier level and note where sales tax applies. Illinois has specific rules for construction contractors that differ from retail, so confirm the current treatment with your accountant or the Illinois Department of Revenue. Delivery charges are listed separately when the supplier quotes them that way, and we flag any item that is typically picked up rather than delivered.
We estimate everything from a single-room addition to a multi-building commercial project. The takeoff method does not change with size, but the deliverable does: a small project may get a one-page summary, while a larger one gets a full division-by-division breakdown. If you are unsure whether a project is worth estimating, send the plans and we will tell you what the takeoff would cover.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. That survey counts new privately-owned residential units permitted by the city itself, so it does not include commercial, industrial, or renovation permits. In 2025 Waukegan issued 13 new residential units, all single-family, with a permitted value of $3M. Use those numbers as a demand signal, not as a count of all construction activity in the city.
Yes. We cover Lake County and the wider Chicago area, including Elgin, Arlington Heights, Cicero, and other suburbs. If your project is in a different jurisdiction, the main difference is the adopted code edition and local permit fees, which we confirm before pricing. Send the address with the plans and we will apply the right local adjustments.
Send your drawings and specifications and we will return a division-by-division takeoff in Excel and PDF, usually within 24 to 48 hours.