Waukegan sits on Lake Michigan in Lake County, where residential permits jumped from 2 units in 2024 to 13 units in 2025. We produce CSI-organized takeoffs and estimates for contractors bidding that work and the surrounding industrial and commercial pipeline.

24–48 hours for most projectsTypical turnaround
Every CSI divisionSitework through MEP
Waukegan ZIP pricingLocal material and labor
Price confirmed firstBefore any work starts
Census BPS · Waukegan · 2025
Waukegan new housing permits2025
New housing units13Change vs. 2024+550%Permitted construction value$3MAverage value per unit$198,400Rank among covered Illinois cities#17
Single-family: 13 (100%)Multifamily: 0 (0%)
U.S. Census Bureau, Building Permits Survey, 2025. Residential only.
Real permit data

What makes construction estimating in Waukegan, IL different?

Lake Michigan wind loads on roof and framing takeoffs, clay and glacial till soils affecting foundation excavation and backfill, a split between scattered residential infill and large industrial shells, ZIP-code-adjusted material and labor pricing for Lake County, and permit review through the city building department using the locally adopted code edition.

  • Waukegan permitted 13 new housing units in 2025, #17 among the Illinois cities we cover.
  • About 0% were in multifamily buildings; 100% were single-family.
  • Permit volume was up 550% compared with 2024.

Waukegan is the tenth-largest city in Illinois and the seat of Lake County, with a building stock that mixes older residential blocks, lakefront commercial property, and industrial land along the corridors west of the harbor. The permit numbers reflect a small but real residential market: 13 new privately-owned units in 2025 against 2 in 2024, all single-family, with a permitted value of $3M and an average of $198,400 per unit. That is a niche, not a boom, and it means bidders here win on accuracy rather than volume.

We build estimates the way a general contractor prices a bid: quantity takeoff first, then labor and material by CSI MasterFormat division, then a review of the scope gaps that move a number. For Waukegan work we use RSMeans data adjusted to the local ZIP code, so material and labor lines reflect Lake County rather than a national average. If you are pricing a project in the region, start with our Illinois construction estimating services page, or see how we handle similar scopes in Arlington Heights and Elgin.

Coverage
Waukegan and nearby Illinois communities
Deliverable
Excel estimate + marked-up PDF plans
Pricing basis
Waukegan ZIP-code material and labor costs
Turnaround
24–48 hours for most projects
Software
Bluebeam Revu, PlanSwift, RSMeans data
01

For bidders. You need a quantity takeoff that survives a scope review. We deliver marked-up plan sets with Excel and PDF line items organized by CSI division, so you can see exactly what is counted and what is excluded before you submit.

02

For builders. You are buying out trades and ordering material. We break down concrete, framing, roofing, and MEP quantities by unit of measure so your purchase orders and subcontracts match the plans rather than a lump sum.

03

For owners. You are comparing bids or checking a budget. We provide a division-level estimate with assumptions listed, so you can see where the number is firm and where it depends on soil, code, or schedule decisions still open.

Waukegan by the numbers

Waukegan's residential construction pipeline

Select a bar to compare Waukegan with the largest Illinois markets we cover.

13New housing units, 2025
0.2%Of all units in the Illinois cities we cover
$3MPermitted residential value
0%In multifamily buildings
New housing units permitted in 2025. Source: U.S. Census Bureau, Building Permits Survey.
This city

Waukegan

13 new housing units in 2025 (+550% vs 2024).

13 single-family · 0 multifamily (0%).

What the 2025 residential permit data says for bidders

The city issued permits for 13 new privately-owned residential units in 2025, up from 2 in 2024 — a 550% change on a very small base. All 13 were single-family, with no multifamily units permitted, and the permitted value was $3M, or $198,400 per unit on average. Waukegan ranked 17th of 25 covered state cities by units and accounted for 0.2% of the 6,710 units permitted across those cities. For a bidder, that means the residential pipeline is thin and scattered, so each project carries more overhead per unit. Price your sitework, foundation, and framing carefully; on small infill lots, excavation and concrete often swing the bid more than the structure itself. Our residential estimating services are built for that scale of work.

Industrial and commercial work around Lake County

Waukegan's larger opportunity is not in the 13 residential units; it is in the commercial and industrial base that runs along the lakefront and the corridors toward North Chicago and Gurnee. Lake County sits inside the Chicago area, which remains a major commercial and industrial hub with a strong logistics and data-center pipeline. That work brings tilt-up and structural steel shells, heavy electrical and mechanical scopes, and sitework packages with large cut-and-fill quantities. If you are bidding those jobs, the estimate has to separate building shell from tenant fit-out and carry clear exclusions. See our commercial estimating services and industrial estimating services for how we structure those divisions.

Services

Construction estimating services in Waukegan

We cover the divisions that show up on Waukegan and Lake County projects, from dirt to MEP. Each takeoff is delivered in Excel and PDF with marked-up plan sets.

Sitework takeoff

Clearing, excavation, backfill, and grading quantities for Waukegan lots with clay and glacial till soils.

CY · SF · LF

Concrete estimating

Footings, foundation walls, slab-on-grade, and flatwork measured from plans with typical waste factors applied.

CY · SF

Foundation estimating

Formwork, reinforcement, waterproofing, and drainage scopes sized to Lake County soil and frost depth conditions.

SF · LF · TON

Framing takeoff

Floor, wall, and roof framing with lumber, sheathing, and hardware counted by member and sheet.

BF · SF · EA

Roofing estimating

Roof areas, edge metal, and underlayment for steep-slope and low-slope assemblies exposed to lakefront wind.

SQ · LF

MEP estimating

Plumbing, HVAC, and electrical quantities by fixture, run, and device for residential and light commercial scopes.

EA · LF · TON

Residential estimating

Division-level budgets for the single-family infill projects now permitted in Waukegan.

SF · EA

Commercial estimating

Shell and fit-out takeoffs for retail, office, and light industrial buildings in the Waukegan corridor.

SF · CY · TON
Who we provide estimates for

Who hires us for Waukegan estimates

General contractors

You are bidding Lake County work against two or three local firms. A division-level takeoff with marked-up plans lets you see the same scope your competitor priced, and catch the exclusions before submission.

Residential builders

Waukegan permitted 13 single-family units in 2025, up from 2 in 2024. Small-volume infill means each house carries fixed costs, so framing, foundation, and MEP quantities need to be tight.

Industrial and warehouse developers

Lake County sits in the Chicago industrial pipeline. You need slab, structural steel, and MEP quantities priced for a large-footprint building, with clear assumptions for racking, dock equipment, and site utilities.

Commercial remodelers

Older downtown and lakefront buildings mean selective demolition, unknown structural conditions, and phased occupancy. We separate demolition from new work so your change-order baseline is defensible.

Subcontractors

You bid concrete, framing, roofing, or MEP packages and need quantities by unit of measure. We deliver takeoffs you can drop into your own pricing sheet without re-measuring the plans.

Owners and property managers

You are budgeting a roof replacement, facade repair, or interior fit-out on an existing building. A division-level estimate with listed assumptions helps you compare contractor proposals on the same scope.

Where we provide estimates

Waukegan areas and nearby communities we cover

We estimate projects across Waukegan and the surrounding Lake County and northeast Illinois communities. If your project is outside these areas, send the plans and we will confirm coverage.

Waukegan

  • Downtown Waukegan
  • Harbor and lakefront
  • South Waukegan
  • North Waukegan
  • Washington Street corridor
  • Green Bay Road corridor

Nearby Lake County

  • North Chicago
  • Gurnee
  • Zion
  • Beach Park
  • Park City
  • Lake Bluff
  • Libertyville
Property types

Types of Waukegan properties we estimate

The 2025 permit mix was entirely single-family, with no multifamily units permitted. That shapes the residential side of our work, while the commercial and industrial side follows Lake County's logistics and manufacturing base.

Single-family infill

New houses on scattered lots, often with older utilities and narrow access. We take off foundation, framing, roofing, and MEP by unit of measure so your bid reflects the actual plan rather than an average house.

Watch for: Confirm lot grading, utility tap fees, and driveway scope.

Residential renovation

Older Waukegan housing stock often needs structural repair, window replacement, and service upgrades. We separate demolition, repair, and new work so you can price the unknown conditions as an allowance.

Watch for: Watch for asbestos, lead paint, and concealed framing rot.

Commercial fit-out

Retail, office, and restaurant spaces in older downtown and corridor buildings. We count partitions, ceilings, storefront, HVAC distribution, and electrical devices from the permit set and note what the landlord is providing.

Watch for: Verify existing sprinkler, HVAC capacity, and ADA upgrades.

Industrial and warehouse

Manufacturing and distribution buildings near the harbor and west-side corridors. We take off slab, structural steel, roof, dock equipment, and process utilities, then list exclusions for owner-furnished racking and machinery.

Watch for: Confirm slab thickness, dock count, and utility capacity.

Multifamily and mixed-use

Small apartment and mixed-use buildings, including upper-floor residential over ground-floor commercial. We break out dwelling units, common areas, and separate utility metering so your pro forma lines match the plan.

Watch for: Check unit mix, corridor lengths, and separate metering.

Institutional and civic

Schools, churches, and municipal buildings in Waukegan and Lake County. These projects carry prevailing wage, phased occupancy, and strict submittal requirements, so we organize the estimate by division and phase.

Watch for: Confirm prevailing wage, bonding, and phasing requirements.

Local factors

What changes a construction estimate in Waukegan

Waukegan sits on the Lake Michigan shore in Lake County, where the building code, soils, and winter weather all move the number. These are the drivers we adjust for on every estimate.

Code and permitting

Waukegan enforces the Illinois building code as adopted locally, and Lake County review adds time for site, stormwater, and health department items. We price to the code edition shown on your permit set and flag anything that depends on the adopted edition. Confirm the current edition and any local amendments with the Waukegan building department before you lock the number.

Waukegan building department · Lake County · Illinois building code

Soils and foundations

Lake County soils range from lakefront sand and fill near the harbor to denser clay inland, and the water table can be shallow near the shore. Foundation type, backfill, and dewatering change the concrete and excavation quantities. We price from the geotechnical report where you have one, and list a soil allowance where you do not.

Geotechnical report · Lake Michigan shoreline · clay and fill soils

Climate and winter work

Northeast Illinois winters bring freeze-thaw cycles, lake-effect snow, and wind-driven rain off Lake Michigan. That drives temporary heat, winter concrete protection, and roofing schedule risk. We add seasonal allowances for cold-weather procedures and note which divisions carry the most weather exposure.

Lake-effect snow · freeze-thaw · temporary heat

Labor and union rates

Chicago-area trades are heavily unionized, and Lake County labor rates sit above downstate Illinois. We use ZIP-code-adjusted labor pricing so your estimate reflects the trades you will actually hire. If your project is prevailing wage or Davis-Bacon, tell us at the start so we price the correct rate.

Chicago-area unions · prevailing wage · Davis-Bacon

Site, drainage, and land use

Many Waukegan sites are redevelopment parcels with existing foundations, buried tanks, or combined sewers. Stormwater detention, utility relocation, and pavement replacement can rival the building cost on tight urban lots. We take off sitework separately so you can see the civil scope before it disappears into a general conditions line.

Stormwater detention · buried tanks · combined sewers

Materials and logistics

Waukegan is inside the Chicago material market, so concrete, steel, and roofing supply is generally available, but delivery windows and laydown space on small infill lots are tight. We price material at current ZIP-adjusted rates and note long-lead items such as switchgear, elevators, and rooftop units. Sales tax treatment depends on whether the contract is a improvement to real property; confirm with your accountant.

Chicago material market · long-lead equipment · Illinois sales tax
Waukegan estimating guide

How Waukegan conditions show up in a takeoff, trade by trade

Waukegan sits in Lake County, where lake-effect snow, clay till soils, and a steady mix of industrial, commercial, and residential work shape what you actually count. Here is how those conditions land in each division of a takeoff.

Sitework and utilities

Lake County's clay till and a water table that rises with lake levels drive the sitework line items. You will see over-excavation below footings, granular backfill, footing drains with washed stone, and sump discharge piping. On the city's older industrial parcels, plan on soil testing for metals and petroleum before you price disposal; contaminated soil goes to a licensed facility, not a clean fill site. Storm structures are sized to the adopted Illinois plumbing code and local drainage rules, so confirm the edition with the Waukegan building department. For a sharper sitework number, send the grading and utility sheets to our sitework estimating services.

Framing and envelope

Wood framing dominates residential and light commercial here, with engineered floor systems over basements and crawl spaces. You will count joists, rim board, hangers, and blocking, plus sheathing and house wrap. Because winter design temperatures are low, wall assemblies often carry R-20 or better cavity insulation with continuous exterior insulation; the thermal break changes your fastener lengths and window jamb details. Roofs take snow load and ice dam protection at eaves, so underlayment and metal drip edge are not optional. Our framing estimating services and roofing estimating services price these assemblies by the square and by the linear foot.

Roofing and exterior finishes

Steep-slope roofs on residential, low-slope membrane on commercial and industrial. For shingle roofs, count squares, starter course, ridge and hip, valley flashing, and ice barrier at eaves. For flat roofs, count membrane by the square, insulation by thickness and R-value, cover board, and tapered crickets at drains. Waukegan's freeze-thaw cycles punish poorly detailed transitions, so flashing at walls, curbs, and penetrations deserves its own line. Gutters, downspouts, and splash blocks belong in the same takeoff so the water gets away from the foundation. Our roofing estimating services and residential estimating services cover both sides of that work.

Concrete and foundations

Frost depth in this part of Illinois is typically 42 to 48 inches, so wall and column footings sit well below grade. On clay, a common detail is a wider footing with a granular base and a vapor barrier under the slab. Count formwork by contact area, not by slab area, and add reinforcing by bar size and lap. For a small commercial building, a typical mix is 4,000 psi for footings and 3,500 psi for interior slabs, with air entrainment for exterior flatwork. Our foundation estimating services and concrete estimating services break these out by division.

Mechanical, electrical, and plumbing

Waukegan's housing stock runs from pre-war bungalows to newer subdivisions, and that changes MEP scope. In older homes, a renovation takeoff often includes replacing galvanized supply lines, adding a grounded panel, and running new venting for high-efficiency furnaces. In new construction, you will count separate heating and cooling systems sized for a cold climate, ductwork with sealed joints, and bath and kitchen exhaust to the exterior. Commercial work adds make-up air and code-driven ventilation. Confirm the adopted mechanical, electrical, and plumbing code editions with the city before you finalize counts; our MEP estimating services handle the division-by-division build-up.

Scope gaps we see on Waukegan bids

  • Under slab vapor barrier and granular base omitted, then added as a change order after the first pour.
  • No allowance for contaminated soil testing or disposal on older industrial parcels near the lakefront.
  • Ice dam protection and drip edge left out of roofing scopes, then required by the inspector at final.
  • Temporary heat and winter protection not carried, even though concrete and masonry work often runs in freezing weather.
  • Permit fees, plan review, and inspections listed as owner costs when the contract makes them the contractor's responsibility.
  • Final cleaning, testing, and commissioning excluded from MEP scopes, leaving the general contractor to absorb them.
Free tool

Concrete volume calculator

Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.

Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.

Result
19.4CY
Net volume18.5 CY
Cubic feet500 CF
Ready-mix trucks (10 CY)2
80 lb bags (premix)875

Need the full takeoff with pricing? Upload your plans.

How it works

How we estimate a Waukegan project

  1. Read the full setArchitectural, structural, civil and MEP drawings, the geotechnical report and every addendum.
  2. Check Waukegan conditionsLocal code edition, site and drainage requirements, soils and any hazard rules are confirmed before the takeoff starts.
  3. Take off by CSI sectionQuantities measured and color-coded on the plans, so every number traces to a sheet.
  4. Price to WaukeganMaterial and labor costs adjusted to the project ZIP code, or to your own supplier quotes and crew rates.
  5. Check and deliverA second estimator checks quantities before the estimate goes out.
Sample output

Sample takeoff: Waukegan single-family house

Sample format — illustrative quantities
SectionLine itemQtyUnit
03 30 00Footing concrete, 24 in x 12 in7.5CY
03 20 00Footing rebar, #41,850LF
04 20 00CMU foundation wall, 8 in1,240SF
06 10 00Wall framing, 2x6 studs3,600LF
06 10 00Floor joists, I-joist1,450LF
07 30 00Asphalt shingles32SQ
09 29 00Drywall, 1/2 in7,800SF
15 00 00HVAC, forced air1LS

Worked example: footing concrete for a Waukegan single-family house

A typical Waukegan house on a full basement needs a continuous perimeter footing. The dimensions below are illustrative; use your own plan dimensions for a real bid.

Assume a rectangular footprint of 40 ft by 28 ft, with a 24 in wide by 12 in thick footing. The perimeter is 2 x (40 + 28) = 136 LF. Add an interior bearing wall of 28 ft, so total footing length is 164 LF.

StepCalculationResult
Perimeter2 x (40 ft + 28 ft)136 LF
Plus interior bearing136 LF + 28 LF164 LF
Footing volume164 LF x 2 ft x 1 ft328 CF
Convert to cubic yards328 CF / 2712.15 CY
Waste factor12.15 CY x 1.0512.76 CY

Order 13 CY, which allows for spillage and a small overpour. If the footing steps down a slope, break the run into segments and add the vertical drops. For reinforcing, a common detail is two continuous #4 bars with #4 dowels at 4 ft on center into the wall; count lap splices at 40 bar diameters and add 10 percent for cutting waste. Formwork is priced by contact area: 164 LF x 2 ft of height on both sides, or 656 SF, less any portions poured against earth. If the plans show a granular base under the footing, add 4 in of compacted stone at the same length and width, which is 164 LF x 2 ft x 0.33 ft = 108 CF, or about 4 CY. Confirm the adopted building code and inspection requirements with the Waukegan building department before you finalize the submittal.

FAQ

Waukegan construction estimating questions

Do you need to be local to estimate a Waukegan project?

No. We work from your drawings and specifications, and we price material and labor using ZIP-code-adjusted data for Waukegan and the surrounding Lake County area. What matters is that you send a complete set: architectural, structural, and MEP sheets, plus any addenda. If a sheet is missing, tell us and we will flag the gap rather than guess. Most projects come back in 24 to 48 hours, and rush turnaround is available.

What does a takeoff for a Waukegan renovation include that new construction does not?

Renovations add demolition and protection lines. You will see removal of existing finishes, temporary partitions, dust control, and disposal. In older Waukegan homes, that often means abatement testing for lead paint and asbestos before demolition starts. We also count patching and matching for existing finishes, which new construction never carries. Send the demolition plan and the existing conditions survey if you have one; it changes the number more than any other document.

How do you handle winter conditions in a Waukegan estimate?

We carry temporary heat, enclosures, and cold-weather concrete protection as separate line items when the schedule runs from late fall through early spring. Concrete placed below freezing needs heated water, blankets, or accelerators, and masonry needs heated mortar materials. Those costs do not belong in the base concrete or masonry price. If your schedule is not set, we can price both a winter and a spring start so you can compare.

Can you estimate a project on the Waukegan lakefront or in an older industrial building?

Yes. Lakefront and older industrial sites often need environmental testing, deeper foundations, and utility upgrades. We will price the structural and sitework scope from the drawings and list the testing and disposal costs as allowances until you have lab results. If you already have a Phase I or Phase II report, send it; it lets us convert those allowances into firm numbers for the bid.

What file formats do you deliver?

Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly where each quantity came from. The Excel file is set up so you can adjust waste factors, add your own labor rates, or roll the takeoff into your estimating software. We use Bluebeam Revu, PlanSwift, and RSMeans data to build the quantities and pricing.

Do you price labor, or only materials?

Both. Our standard takeoff includes material quantities, and we can add labor hours and costs using ZIP-code-adjusted rates for Waukegan. If you only want quantities, tell us and we will leave the pricing columns blank. Many contractors use our quantities and plug in their own crew rates, which keeps their bid aligned with how they actually build.

How do you treat sales tax and material delivery in Illinois?

We price materials at the supplier level and note where sales tax applies. Illinois has specific rules for construction contractors that differ from retail, so confirm the current treatment with your accountant or the Illinois Department of Revenue. Delivery charges are listed separately when the supplier quotes them that way, and we flag any item that is typically picked up rather than delivered.

What is the smallest project you will take on?

We estimate everything from a single-room addition to a multi-building commercial project. The takeoff method does not change with size, but the deliverable does: a small project may get a one-page summary, while a larger one gets a full division-by-division breakdown. If you are unsure whether a project is worth estimating, send the plans and we will tell you what the takeoff would cover.

Where does the Waukegan permit data on this page come from?

The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025. That survey counts new privately-owned residential units permitted by the city itself, so it does not include commercial, industrial, or renovation permits. In 2025 Waukegan issued 13 new residential units, all single-family, with a permitted value of $3M. Use those numbers as a demand signal, not as a count of all construction activity in the city.

Can you help with a bid in a nearby city?

Yes. We cover Lake County and the wider Chicago area, including Elgin, Arlington Heights, Cicero, and other suburbs. If your project is in a different jurisdiction, the main difference is the adopted code edition and local permit fees, which we confirm before pricing. Send the address with the plans and we will apply the right local adjustments.

RH

Reviewed by Ryan H.

Senior Estimator, 15+ years in construction estimating and cost planning.

  • Construction cost estimating
  • Quantity takeoffs
  • Material and labor cost analysis
  • Bid preparation and evaluation
  • Drawing and specification review
  • Project budgeting

Send your Waukegan project plans for a quote

Send your drawings and specifications and we will return a division-by-division takeoff in Excel and PDF, usually within 24 to 48 hours.

  1. We review the set and check for missing sheets or addenda.
  2. You get a quote with a price and a delivery date.
  3. You approve and we start the takeoff.
  4. You receive the Excel estimate and marked-up plans.
Upload plans for a quote
Call Us