Sitework takeoff
Clearing, stripping, cut and fill, and disposal quantities for tight infill lots and redevelopment sites across DuPage County.
CY · SF · TONWheaton sits in DuPage County, where a steep drop in permitted residential units in 2025 changed the bidding picture. We produce line-item takeoffs and estimates for contractors, developers and owners working here and across the Chicago suburbs.
Three drivers shape numbers here: DuPage County clay till and frost depth, which push foundation and backfill quantities; older housing stock and small infill lots, which raise demolition, shoring and staging costs; and Cook County proximity, which pulls labor and material pricing toward Chicago-area rates. Permitted residential volume also fell sharply in 2025.
Wheaton's 2025 permit data tells a clear story. The city issued 9 new privately-owned residential units, all single-family, down from 340 in 2024 — a 97% drop. Permitted value was about $3M, averaging $364,100 per unit. That mix matters when you bid: fewer large multifamily starts means more small infill, teardown-rebuild and addition work, where quantity takeoff errors on foundations and framing hit margin fast.
We build estimates from your plan set, organized by CSI MasterFormat division, in Excel and PDF, with marked-up drawings returned alongside. Material and labor pricing is ZIP-code adjusted, so DuPage County rates are not blended with downstate numbers. Most projects turn in 24–48 hours, with rush available. If you are comparing coverage across the region, see our Illinois construction estimating page, or the nearby Tinley Park and Oak Lawn pages for how we handle those markets.
For bidders. You need a defensible number before the bid date. We return division-by-division quantities with marked-up plans so you can check every line, adjust waste factors and carry the right general conditions.
For builders. On teardown-rebuild and addition work, scope gaps between demolition, foundation and framing are where budgets break. We reconcile those divisions against the same plan set before you buy out trades.
For owners. You want a budget you can hold a contractor to. We price from the drawings, flag allowances and exclusions, and separate hard costs from soft costs so the number is comparable across bids.
Select a bar to compare Wheaton with the largest Illinois markets we cover.
9 new housing units in 2025 (-97.4% vs 2024).
9 single-family · 0 multifamily (0%).
The city permitted 9 new privately-owned residential units in 2025 versus 340 in 2024, with zero multifamily units in both the current count and the multifamily share. Permitted value of about $3M and an average of $364,100 per unit point to single-family and small infill projects rather than subdivision or apartment work. For bidders, that means fewer repeat production plans and more one-off custom drawings — which raises takeoff time per unit and makes accurate foundation, framing and roofing quantities more important, not less. Wheaton ranked 20th of 25 covered state cities by units, with 0.1% of the covered state total of 6,710 units. If your backlog leans on multifamily, look at how we handle multi-family estimating before you rebid the same crews.
Wheaton sits on glacial till with heavy clay, and local frost depth drives footing depth, granular base and backfill quantities on every foundation takeoff. Older lots near the downtown core often mean tight staging, hand excavation near utilities and more disposal than a greenfield site. Because DuPage County trades price off the Chicago labor market, a ZIP-adjusted rate for 60187 or 60189 will not match a downstate number. We use RSMeans data adjusted to the project ZIP, and we separate earthwork, concrete and MEP so you can see which division is moving your bid. Confirm local frost depth and soil requirements with the Wheaton building department before finalizing footings.
These are the divisions we take off most often for Wheaton and DuPage County work, from teardown-rebuild foundations to full commercial packages.
Clearing, stripping, cut and fill, and disposal quantities for tight infill lots and redevelopment sites across DuPage County.
CY · SF · TONFootings, frost walls, slab on grade and waterproofing priced to local frost depth and clay till conditions.
CY · LF · SFFormwork, reinforcement, flatwork and finishes, with waste factors carried per division rather than lumped into one line.
CY · SF · LBFloor, wall and roof framing with stud, joist, sheathing and hardware counts reconciled to the architectural set.
LF · EA · BFSlope, eave, valley and penetration quantities for steep-slope residential re-roofs and low-slope commercial assemblies.
SQ · LF · EAPlumbing, HVAC and electrical counts by fixture and device, coordinated with the equipment schedule before pricing.
EA · LF · TONCustom homes, additions and teardown-rebuilds, where one-off drawings make accurate quantities the difference in a bid.
SF · EA · LSTenant fit-outs, retail and small office work along the Roosevelt Road and downtown corridors, priced by division.
SF · EA · LSOn Wheaton teardown-rebuild and addition jobs, you need demolition, foundation and framing quantities reconciled before you buy out trades. We return division-by-division takeoffs with marked-up plans so your bid holds through buyout.
Concrete, framing and roofing bidders in DuPage County work from the same plan sets. We scope your division only — formwork, rebar, studs, sheathing, squares — so you are not carrying another trade's omissions.
With Wheaton issuing 9 single-family units in 2025, small infill and lot-split projects carry the pipeline. We price sitework, foundation and shell separately so you can compare land costs against hard costs.
You need a quantity check before drawings go to bid. We take off from your issued set and flag missing dimensions, unlabeled assemblies and scope gaps between architectural and structural sheets.
Rebuild and addition budgets in Wheaton are sensitive to foundation and MEP scope. We separate hard costs from allowances and exclusions so your number is comparable across contractor bids.
Repairs and capital work across Wheaton's older housing stock need unit-price pricing. We build line items for roofing squares, concrete flatwork and MEP replacements you can reuse across multiple properties.
We estimate from plan sets for projects throughout Wheaton and DuPage County. If your job sits in one of these areas or a neighboring suburb, send the drawings and we will price to that location.
Wheaton's 2025 permit mix was 9 single-family units and no multifamily, so most of our local takeoffs are small residential and light commercial. Here is how we scope each property type.
New custom homes and infill on Wheaton lots. We take off foundation, framing, roofing, siding and MEP rough-in from the full set, with waste factors applied per assembly.
Watch for: Foundation type and wall heights drive concrete and framing quantities.
Older Wheaton houses replaced with new construction. Demolition, haul-off and utility disconnects are separate line items before foundation work begins.
Watch for: Confirm demolition depth and asbestos survey before pricing.
Second-story additions, kitchen and bath remodels, and rear extensions. We price new work separately from existing construction so you can see the tie-in cost.
Watch for: Roof tie-in and MEP relocation are common scope gaps.
Retail, office and small mixed-use buildings along Wheaton's commercial corridors. We take off shell, interior partitions, ceilings, storefront and MEP by division.
Watch for: Storefront glazing and ADA restroom counts affect unit pricing.
Wheaton has a large institutional base. Additions, sanctuary renovations and classroom build-outs are priced from architectural and MEP sets with phased occupancy in mind.
Watch for: Acoustical and specialty finishes need allowance line items.
Even with no multifamily permits in 2025, existing condo and apartment buildings need repair and capital estimates. We price per-unit for roofing, siding and MEP replacements.
Watch for: Per-unit pricing must match building geometry and unit mix.
Wheaton sits in DuPage County, where code adoption, soil conditions and small-lot logistics all move the number. These are the drivers we adjust for on every takeoff.
Wheaton enforces the Illinois Plumbing Code and adopts the International Residential Code and International Building Code with local amendments. Energy requirements follow the Illinois Energy Conservation Code. Permit review, inspections and utility coordination add soft costs you must carry separately from hard costs. Confirm the adopted code edition and any local amendments with the Wheaton building department before you finalize the estimate.
International Residential Code · Illinois Plumbing Code · Wheaton building departmentDuPage County soils range from glacial till to clay, and some Wheaton lots carry fill from earlier grading. Clay soils require over-excavation and engineered fill, which changes footing and slab quantities. A geotechnical report is the input we need before pricing foundation work; without it, we carry an allowance and flag it. Basement depth and water table also affect waterproofing and sump scope.
glacial till · clay soils · geotechnical reportNortheast Illinois winters bring frost depths that set footing elevation, and freeze-thaw cycles drive exterior detailing. Roof snow loads and ice-dam protection affect roofing quantities. Concrete work is seasonal, so winter pours require blankets, accelerators and heated enclosures. We adjust general conditions and temporary heat for the construction schedule you provide.
frost depth · freeze-thaw · ice-dam protectionWheaton trades are priced against the Chicago metro labor pool, where union and open-shop rates differ by trade. Carpenters, concrete finishers and mechanical trades carry the largest swings. We use ZIP-code-adjusted labor rates from RSMeans data, not a statewide average. If your project has prevailing wage or Davis-Bacon requirements, tell us before the takeoff so we price the correct rate.
Chicago metro labor · RSMeans data · prevailing wageWheaton lots are often narrow with mature trees, which limits equipment access and staging. Stormwater management requirements can add detention, grading and utility scope. Tree protection and removal, sidewalk replacement and driveway aprons are line items we carry when the site plan shows them. Confirm local stormwater and tree-preservation rules with the city before pricing sitework.
stormwater detention · tree protection · site accessWheaton is inside the Chicago materials distribution ring, so lumber, concrete and steel lead times are generally shorter than downstate. Supplier pricing still varies by yard and delivery distance. We price materials from ZIP-code-adjusted data and note when an item is a specialty order. Sales tax treatment on materials depends on your contract structure, so confirm it with your accountant.
Chicago distribution · ZIP-code pricing · sales taxWheaton sits in DuPage County, where most work is residential remodeling, small commercial fit-out, and institutional projects on tight suburban lots. That mix changes what an estimator measures, what waste factors apply, and which CSI divisions carry the risk.
Wheaton lots are typically 50 to 70 feet wide with mature trees, so a takeoff rarely shows the full building footprint as clearable area. Measure tree protection zones, stump removal, and haul-off separately from general clearing. DuPage County soils include silty clay and areas of poor drainage, so over-excavation under footings is common; carry a per-cubic-yard allowance for granular fill and geotextile rather than assuming bearing at the planned subgrade. Storm connections often tie to combined or older municipal systems, which means television inspection and possible spot repair before backfill. For a complete sitework takeoff, see our sitework estimating services. Confirm utility separation requirements with the City of Wheaton and the local sanitary district before pricing trenching.
Framing takeoffs here are driven by two things: roof geometry and the age of the existing structure. On additions and second-story projects, measure the tie-in wall separately, including temporary shoring, because cutting into an existing bearing wall adds labor that a clean new-build takeoff misses. Roof pitches in Wheaton commonly run 6/12 to 9/12 on houses and near-flat on small commercial, so rafter length and sheathing waste differ sharply between the two. Count headers, hangers, and blocking by piece, not by allowance. Engineered lumber is common for long spans, so price per piece from a supplier quote rather than a generic board-foot figure. See our framing estimating services and residential estimating services for unit-by-unit breakdowns.
MEP is where Wheaton renovation takeoffs most often miss scope. Count fixtures, receptacles, switches, and light fixtures by device, then add home runs and panel capacity separately; a panel upgrade is a line item, not an allowance. For HVAC, measure duct runs by linear foot and count boots, dampers, and returns individually, because retrofit ductwork in a finished house is labor-heavy. Plumbing rough-in should be measured by fixture and by linear foot of pipe, with separate pricing for cast iron versus PVC where the jurisdiction requires it. Our MEP estimating services break this out by system. Verify permit and inspection requirements for mechanical, electrical, and plumbing work with the City of Wheaton before finalizing.
Basement and garage slab work dominates the concrete scope in Wheaton. Take off footings by linear foot of wall, not by area, and separate the stepped footing runs common on sloped lots. Foundation walls are usually 8-inch or 10-inch cast-in-place, with formwork measured by contact area and a waste allowance on rebar of roughly 5 to 10 percent typical for cut lengths. Garage slabs need control joints, vapor barrier, and granular base measured under slab area. In older neighborhoods, expect to price underpinning or shoring when a new foundation abuts an existing one. Our concrete estimating services and foundation estimating services cover this scope in detail. Verify the adopted code edition and inspection sequence with the Wheaton building department.
Wheaton gets freeze-thaw cycles, hail, and wind-driven rain, so roofing takeoffs need underlayment, ice barrier at eaves, drip edge, and flashing counted as line items, not lumped into the shingle square count. Measure valleys and hips by linear foot; they consume material and labor faster than field area. For steep-slope tear-off, include disposal by weight or by square, and separate decking replacement as a unit-price allowance, since soft spots appear only after tear-off. Siding and trim takeoffs should include house wrap, flashing at penetrations, and caulking by linear foot of joint. Our roofing estimating services can price the full assembly. Confirm local amendment requirements for ice barrier and ventilation with the building department.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 31 23 16 | Excavation, footing and slab area | 310 | CY |
| 03 30 00 | Footings, 24 in x 12 in continuous | 186 | LF |
| 03 30 00 | Foundation wall, 10 in cast-in-place | 1,240 | SF |
| 04 20 00 | CMU backup at garage, 8 in | 420 | SF |
| 06 10 00 | Wall framing, 2x6 at 16 in o.c. | 2,860 | SF |
| 06 10 00 | Roof framing, 8/12 pitch, rafters and ridge | 1,950 | SF |
| 07 30 00 | Asphalt shingles, ice barrier at eaves | 22 | SQ |
| 09 29 00 | Gypsum board, walls and ceilings, 1/2 in | 4,100 | SF |
This example sizes continuous footing concrete for a two-story addition on a typical Wheaton lot. Dimensions are illustrative and must be replaced with the actual plan dimensions and the geotechnical report before you order material.
Assume a continuous footing 24 inches wide by 12 inches deep, running 186 linear feet around the addition perimeter, including the garage tie-in. Convert dimensions to feet: 24 in = 2.0 ft, 12 in = 1.0 ft.
| Step | Calculation | Result |
|---|---|---|
| Cross-section area | 2.0 ft x 1.0 ft | 2.00 SF |
| Volume, no waste | 2.00 SF x 186 LF | 372 CF |
| Convert to cubic yards | 372 CF ÷ 27 | 13.78 CY |
| Waste factor, typical 5% | 13.78 CY x 1.05 | 14.47 CY |
| Order quantity, round up | 14.47 CY → 15 CY | 15 CY |
The 5 percent waste allowance covers spillage, over-excavation at trench bottom, and slight variation in footing width. On silty clay in DuPage County, trench walls can slough, so many estimators carry 8 to 10 percent instead. If the geotech report requires over-excavation and granular fill, add that as a separate cubic-yard line beneath the footing.
Reinforcement follows the same logic. Two continuous #4 bars in a 186 LF footing equals 372 LF of bar, plus 10 percent for laps and cut waste, or about 409 LF. Convert to tons only after confirming bar size and lap requirements with the structural drawings.
Formwork is measured by contact area. A 12-inch-deep footing with one face formed gives 186 SF of contact area; add a second face where the trench is wide. Do not carry footing formwork at the same rate as wall formwork, since footing forms are shallower and often reused.
Before pricing, confirm the adopted code edition, inspection hold points, and any DuPage County soil requirements with the local building department. For a full division-by-division takeoff on a project like this, our foundation estimating services and residential estimating services cover the scope.
Additions carry tie-in scope: temporary shoring at the cut wall, new footing transitions where the addition meets the existing foundation, flashing and weather barrier at the roof-to-wall intersection, and patching of interior finishes disturbed by the new opening. Measure these as separate line items rather than allowances. On older Wheaton houses, also carry a unit-price allowance for unforeseen framing repair once walls are opened, since that condition cannot be confirmed from plans alone.
Silty clay and areas of poor drainage can require over-excavation below the planned footing elevation, replacement with granular fill, and geotextile separation. Those items are measured by cubic yard and square foot, not as a lump sum. If the geotechnical report calls for a deeper bearing stratum, the footing volume, rebar, and formwork all change. Confirm the required bearing depth and any soil remediation with the local building department and the project geotechnical engineer before finalizing quantities.
For asphalt shingles on 6/12 to 9/12 pitches, a typical waste factor is 10 percent, rising toward 15 percent on complex roofs with multiple valleys, hips, and dormers. Ice barrier at eaves, underlayment, drip edge, and ridge vent are measured separately by linear foot or by square, not folded into the shingle quantity. Tear-off disposal is priced by square or by weight. Confirm local amendment requirements for ice barrier coverage with the building department.
Yes. MEP scope is taken off by system: fixtures and devices counted individually, pipe and duct measured by linear foot, and equipment priced per unit from supplier data. Panel capacity and service upgrades are separate line items. General conditions items such as temporary power, dumpsters, and permits are carried separately so you can see the true cost of each trade. This structure also makes it easier to compare subcontractor bids against the same quantities.
Permit fees and inspection costs are typically carried as a separate line in general conditions, not buried in a trade. The amount depends on project valuation, type of work, and the fee schedule in effect at the time of application. Because fee schedules change, we recommend confirming the current schedule with the City of Wheaton building department and updating the line before you submit a bid. We do not estimate fees from a fixed percentage.
The permit figures we reference come from the U.S. Census Bureau, Building Permits Survey. That survey counts new privately-owned residential units permitted by the city itself; it does not include commercial permits, additions, or remodeling. In 2025, Wheaton issued 9 new residential units, all single-family, compared with 340 units in 2024. Because the survey covers residential only, use it as a demand signal, not as a measure of total construction activity in the city.
Yes, with stated assumptions. If architectural drawings are complete but structural or MEP sheets are missing, we take off what is shown and list the missing scope as an exclusion with an assumed quantity where possible. That lets you bid with a clear picture of the risk. Send whatever you have, including the site plan and any survey, and we will tell you what additional sheets would tighten the quantities before you commit to a number.
Most projects are returned in 24 to 48 hours, with rush service available. Turnaround depends on sheet count, the number of trades requested, and whether structural and MEP drawings are included. A single-family addition with full drawings is faster than a multi-building scope with incomplete documentation. Deliverables come in Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets so you can trace every quantity back to the drawing.
Yes. We cover Wheaton and surrounding communities, including Tinley Park, Oak Lawn, and Berwyn, using ZIP-code-adjusted material and labor pricing. That matters because labor rates and material delivery costs vary across the Chicago region even when the scope is identical. If your project spans multiple municipalities, we can break the estimate out by location so you can see where the cost differences sit. See our Illinois construction estimating services for the full coverage area.
Deliverables are Excel and PDF, organized by CSI MasterFormat division, with marked-up plan sets. The Excel file is structured so you can adjust quantities, waste factors, and unit prices without rebuilding formulas. Each line ties to a drawing reference or a dimension, so a reviewer can trace the math. If you need a different structure for your estimating software, tell us at kickoff and we will match the column layout you use.
Send your drawings and the trades you need priced, and we will return a division-by-division takeoff in 24 to 48 hours.