Sitework takeoff
Strip, excavate, backfill and grading quantities for tight Oak Lawn infill lots, including granular fill and drainage runs.
CY · LF · TONWe prepare quantity takeoffs and cost estimates for contractors, developers, architects and owners working in Oak Lawn, Cook County, Illinois. Deliverables are organized by CSI MasterFormat division with marked-up plan sets, using ZIP-code-adjusted material and labor pricing.
Cook County wage and material pricing, deep suburban lot drainage and clay soil conditions, Village of Oak Lawn permit review and inspection sequencing, older housing stock near 95th Street and Cicero Avenue needing selective demolition, and small multifamily infill where five- and six-unit buildings dominate new residential permits.
Oak Lawn sits in Cook County, roughly 15 miles southwest of the Loop, and its construction market runs on two tracks. One is small residential infill and rebuild work on established blocks, where Census Building Permits Survey data for 2025 shows 11 new privately-owned residential units permitted, up from 1 in 2024, split 5 single-family and 6 multifamily. The other is commercial and institutional renovation along corridors like 95th Street, Cicero Avenue and Southwest Highway, plus industrial and logistics work tied to the wider Chicago market.
Both tracks punish loose estimates. On infill lots you are pricing tight sites, selective demolition of older slabs and foundations, and storm drainage that has to work with the existing grade. On commercial fit-outs you are pricing MEP rough-in, rooftop units and code-driven upgrades against an occupied building. We build takeoffs line by line from your plan set, mark up the sheets, and deliver Excel and PDF files organized by CSI MasterFormat division. Most projects turn around in 24–48 hours. Send drawings through the estimate request page and we will confirm scope, format and schedule before we start. If you work across the region, our Illinois construction estimating coverage and the Orland Park and Tinley Park pages show how we handle nearby suburbs.
For bidders. You get a division-by-division takeoff with quantities you can defend in a bid review. We flag scope gaps, alternates and unit-price items so your number holds up against the other bids.
For builders. You get material quantities by phase — footings, framing, roofing, MEP rough-in — with waste factors stated. Use them for purchase orders, sub scopes and schedule-of-values line items.
For owners. You get a budget organized by CSI division with marked-up plans, so you can compare contractor proposals on the same scope and see where allowances and contingencies sit.
Select a bar to compare Oak Lawn with the largest Illinois markets we cover.
11 new housing units in 2025 (+1000% vs 2024).
5 single-family · 6 multifamily (55%).
Oak Lawn issued 11 new privately-owned residential units in 2025 against 1 in 2024 — a 1,000% increase off a very small base. Six of the 11 units, about 55%, were multifamily, and permitted value was about $3M, or roughly $235,800 per unit. That mix tells you the work is small multifamily and single-family infill, not subdivision-scale. For bidders, the lesson is that per-unit costs on these jobs swing hard with site conditions: narrow lots, shared driveways, and utility relocations can move the number more than the building itself. Ranked 19th of 25 covered state cities by units and holding 0.2% of the covered state total of 6,710 units, Oak Lawn is a small but active pocket inside a very large market. Our commercial estimating services and multi-family estimating services cover both sides of that split.
Cook County labor and material pricing sits above downstate Illinois, and we adjust unit costs by ZIP code so your estimate reflects what suppliers and subs actually charge in Oak Lawn rather than a statewide average. Frost depth in this part of Illinois drives footing elevations, and the clay-heavy soils common across the southwest suburbs mean over-excavation, granular backfill and positive drainage are real line items, not afterthoughts. Winter concrete placement, temporary heat and cold-weather protection belong in the schedule and the cost. On renovation work, older housing stock near the 95th Street and Cicero Avenue corridors brings asbestos and lead-paint testing, selective demolition and underslab plumbing replacement into scope. Confirm all code requirements — including the adopted edition of the Illinois Plumbing Code and any local amendments — with the Village of Oak Lawn building department before you finalize a bid.
We price the scopes that actually show up on Oak Lawn plan sets, from tight-lot sitework to multifamily MEP rough-in.
Strip, excavate, backfill and grading quantities for tight Oak Lawn infill lots, including granular fill and drainage runs.
CY · LF · TONFootings, frost walls, slab-on-grade and flatwork priced to Cook County frost depth and clay soil conditions.
CY · SF · LFFloor, wall and roof framing counts with stud, plate, joist, sheathing and hardware quantities by floor level.
LF · EA · BFRoof area, tear-off, underlayment, flashing and insulation for re-roofs and new low-slope or steep-slope assemblies.
SQ · LF · SFPlumbing, HVAC and electrical rough-in and fixture counts for multifamily infill and commercial fit-outs.
LF · EA · TONInterior strip-out, slab removal and disposal quantities for renovation work on older Oak Lawn housing stock.
SF · CY · TONPartitions, ceilings, finishes, doors and storefront scopes for retail and office work along 95th Street.
SF · LF · EACross-check of sub quotes against the takeoff to expose missing divisions, exclusions and allowance carryover.
DIV · LS · EABidding Oak Lawn infill and 95th Street commercial work, you need quantities you can defend against three or four other bids, plus alternates and unit-price items carried separately.
Concrete, framing and roofing subs pricing tight Oak Lawn lots need takeoffs by phase so you can buy material once and not eat the difference on a short pour or missed rake.
Small multifamily and mixed-use infill near Cicero Avenue and Southwest Highway lives or dies on a hard budget; we give you a division-by-division number before you commit to a site.
When your Oak Lawn client asks for a cost check at 60 percent documents, we return a marked-up set and quantities by CSI division so your detail changes can be priced against a baseline.
Renovating an occupied Oak Lawn commercial building means phasing and temporary conditions; we break those out so your contractor proposals compare on the same scope.
Roof replacements, parking lot repairs and unit turnovers across Oak Lawn rental stock need repeatable line items and waste factors so each vendor bid lands on the same quantity sheet.
We estimate from plan sets for projects across Oak Lawn and the surrounding Cook County suburbs. If your site is near one of these areas, note it when you send drawings so we apply the right ZIP-code-adjusted pricing.
Oak Lawn's 2025 permit mix was 11 new privately-owned residential units — 5 single-family and 6 multifamily — with the rest of the work coming from renovation and commercial fit-out. We price all of it, from a single infill house to a multi-tenant retail shell.
New houses on tight Oak Lawn lots, often after a teardown. We take off selective demolition, footing and foundation, framing, roofing, and MEP rough-in with waste factors stated by phase.
Watch for: Tight lot access, existing slab removal, and utility relocation.
Two-to-six-unit buildings and townhome rows, the 55 percent share of Oak Lawn's 2025 residential permits. We break out common walls, fire separation, separate utility runs, and per-unit finishes.
Watch for: Fire-rated assemblies, party walls, and per-unit MEP counts.
Retail, restaurant and office build-outs along 95th Street and Cicero Avenue. We price demising walls, storefront, ceiling, HVAC distribution, and electrical and plumbing rough-in against an occupied shell.
Watch for: Roof curb locations, grease and venting, and ADA restroom scope.
Schools, churches and municipal buildings in Cook County that need phased work. We separate base scope from alternates and allowances so the owner can see what each phase costs.
Watch for: Phasing, temporary heat, and hazardous material allowances.
Small warehouse, shop and logistics space tied to the Chicago market. We take off slab, structural steel or tilt-up, dock equipment, and MEP for unheated and conditioned areas separately.
Watch for: Slab thickness, dock levelers, and fire protection demand.
Roof replacement, tuckpointing and parking lot work on Oak Lawn's older building stock. We measure roof areas by plane, count penetrations, and carry flashing and edge metal as separate line items.
Watch for: Tear-off layers, deck condition, and penetration count.
Two sites a block apart can price differently in Oak Lawn because of lot width, soil, and how much of the existing building stays. These are the drivers we check before we put numbers on a takeoff.
Oak Lawn enforces the Illinois-adopted model codes with local amendments, and Cook County review can add layers on commercial and multifamily work. Confirm the adopted code edition and any local amendments with the Oak Lawn building department before you lock a scope. Plan review comments on egress, fire separation and energy compliance can move quantities after bid.
Cook County · Illinois adopted codes · local building departmentMuch of Oak Lawn sits on glacial till and clay soils with a shallow water table in wet seasons. That drives over-excavation, engineered fill, and sometimes deeper footings or caissons than a generic takeoff assumes. We price foundation drainage, granular base and backfill separately so a soil report change does not wipe out your contingency.
glacial till · clay soils · foundation drainageNortheast Illinois frost depth and winter freeze-thaw cycles set footing depth, slab insulation and exterior detailing. Roof snow load and ice-dam protection at eaves are real line items, not allowances. We carry them explicitly so your estimate matches what the inspector and the lender expect to see.
frost depth · snow load · ice-dam protectionCook County carries Chicago-area trade wages and union agreements, which can run above downstate Illinois rates for the same scope. We price labor by trade and by ZIP code so your Oak Lawn number reflects the crews who will actually build it, not a statewide average.
Cook County wages · union agreements · ZIP-code-adjusted laborOak Lawn's older blocks have narrow lots, existing garages at the rear, and storm sewers that may not take additional flow. Detention, grading, and utility relocation can be a meaningful share of an infill budget. We take off sitework quantities from the civil sheets and flag where the scope depends on a village or MWRD review.
narrow lots · detention · utility relocation · MWRDConcrete, lumber and steel pricing moves with the Chicago market and delivery distance from suppliers in the southwest suburbs. Small infill sites also limit where a truck can stage, which affects pump and crane charges. We note access assumptions in the takeoff so your bid does not assume equipment that cannot reach the pour.
Chicago material market · supplier distance · staging accessOak Lawn sits on Cook County's older glacial soils with a suburban mix of tear-down single-family, low-rise multifamily and commercial infill along Cicero Avenue and 95th Street. Each trade carries quantities that reflect that mix.
Most Oak Lawn lots were graded decades ago, so a takeoff usually starts with demolition and haul-off rather than mass cut. We measure existing asphalt and concrete driveway removal by square yard, then topsoil strip by cubic yard using an assumed 6-inch depth. Because the local soils include clay till, we separate unsuitable subgrade from reusable material and price structural fill by compacted cubic yard, not loose. Storm structures, catch basins and yard inlets are counted by each, and underdrain is measured by linear foot. If your project involves a full site package, our sitework estimating services break these items out by CSI division so your excavator's bid lines match ours.
Oak Lawn's housing stock includes a large share of post-war ranches and split-levels, so additions and second-story pop-tops are common. For those, we count floor joists by each with hangers, rim board by linear foot, and wall studs by piece using 16-inch on-center spacing plus plates. Roof framing is taken off by rafter or truss piece, with sheathing by square foot and 4x8 sheet count. Waste factors are typical: 5 to 10 percent on dimension lumber, 10 percent on sheathing. Headers and beams are listed by size and length because engineered lumber pricing moves with the mill. Our framing estimating services return a piece count your crew can order from directly.
MEP takeoffs in Oak Lawn follow the Illinois plumbing code and the adopted electrical and energy codes, so fixture counts, pipe sizing and insulation values need to match the edition the village has adopted. Confirm that edition with the Oak Lawn building department before you price. We count plumbing fixtures by each, water and drain lines by linear foot by material, and gas piping by linear foot with fittings. HVAC is taken off by ton of cooling, linear foot of duct by size, and register by each. Electrical is counted by device, fixture, panel and home run. Our MEP estimating services organize all of it by CSI division so your subs can bid against the same quantities.
Foundations in Oak Lawn are typically cast-in-place wall footings bearing below the local frost depth, which the building department enforces at plan review. We take off continuous footings by linear foot with width and thickness, column pads by each, and foundation walls by square foot of face area, then convert to cubic yards at 27 CF per CY. Slab-on-grade is measured by square foot at the specified thickness, with vapor barrier and granular base as separate lines. Rebar is priced by pound using the placing drawings, not a percentage allowance. Our foundation estimating services and concrete estimating services both itemize formwork by square foot of contact area, which is where most self-performed bids lose margin.
Aging roofs on Oak Lawn's older housing stock drive steady tear-off and replacement work. We measure roof area by square (100 SF) from the plan or an aerial, then add typical waste of 10 percent for field shingles and 15 percent for hip and valley cuts. Underlayment, ice-and-water shield along eaves, drip edge, ridge vent and pipe boots are separate lines by linear foot or each. On commercial flat roofs, we measure membrane by square foot, insulation by board foot at the specified R-value, and tapered insulation by the cricket and saddle count. Our roofing estimating services keep tear-off, disposal and decking replacement out of the shingle line so nothing is buried.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24 in x 12 in | 4.2 | CY |
| 03 30 00 | Slab-on-grade, 4 in thick | 620 | SF |
| 03 20 00 | Rebar, #4 and #5 combined | 1,850 | LB |
| 06 10 00 | Wall framing, 2x6 at 16 in OC | 1,340 | LF |
| 06 10 00 | Roof trusses and rafters | 38 | EA |
| 07 30 00 | Asphalt shingles, tear-off included | 24 | SQ |
| 22 00 00 | Plumbing fixtures and supply lines | 9 | EA |
| 23 00 00 | Flex and sheet metal ductwork | 180 | LF |
This example sizes a continuous wall footing for a two-story addition on a typical Oak Lawn lot. Dimensions are illustrative — your plan governs. We assume a 24-inch-wide by 12-inch-thick footing running 140 linear feet around the addition perimeter, with two interior pad footings at 3 ft x 3 ft x 12 in.
Step 1 — continuous footing volume. Convert thickness to feet: 12 in ÷ 12 = 1.0 ft. Width: 24 in ÷ 12 = 2.0 ft. Volume per linear foot = 2.0 ft × 1.0 ft × 1.0 ft = 2.0 CF. Total = 140 LF × 2.0 CF = 280 CF. Divide by 27 CF per CY: 280 ÷ 27 = 10.37 CY.
Step 2 — pad footings. Each pad = 3.0 ft × 3.0 ft × 1.0 ft = 9.0 CF. Two pads = 18.0 CF ÷ 27 = 0.67 CY.
Step 3 — subtotal and waste. Subtotal = 10.37 + 0.67 = 11.04 CY. Add a typical 5 percent waste for spillage and over-excavation: 11.04 × 1.05 = 11.59 CY. Order 11.5 CY, rounding to the nearest quarter yard your ready-mix supplier will batch.
| Step | Calculation | Quantity | Unit |
|---|---|---|---|
| Continuous footing | 140 LF × 2.0 ft × 1.0 ft | 280.0 | CF |
| Convert to CY | 280 ÷ 27 | 10.37 | CY |
| Pad footings | 2 × (3.0 × 3.0 × 1.0) | 18.0 | CF |
| Pads in CY | 18.0 ÷ 27 | 0.67 | CY |
| Subtotal | 10.37 + 0.67 | 11.04 | CY |
| With 5% waste | 11.04 × 1.05 | 11.59 | CY |
Two checks matter here. First, the footing must bear below the frost depth the Oak Lawn building department enforces — confirm the required depth with them before you finalize excavation quantities. Second, rebar is priced separately by pound, not as a percentage of concrete volume. If you are pricing the whole foundation package, our foundation estimating services handle both the concrete and the reinforcing steel so the two bids reconcile. Send your plan set and we will return the same breakdown in Excel and PDF within 24–48 hours.
The mix we see from Oak Lawn is older single-family housing with additions, tear-downs and low-rise multifamily, plus commercial infill along the Cicero Avenue and 95th Street corridors. That means a lot of foundation, framing and roofing takeoffs on residential work, and full site, concrete and MEP packages on the commercial side. If your project is a two-story addition or a small commercial building, we can usually return quantities in 24–48 hours.
Footing depth is set by the frost depth the local building department enforces, and that requirement is confirmed at plan review. We do not assume a depth on your behalf — we take it from your approved plans or from the depth your engineer specifies. If your drawings do not state it, call the Oak Lawn building department before you finalize excavation and concrete quantities, because the footing volume changes directly with depth.
Yes. We use ZIP-code-adjusted material and labor pricing from RSMeans data, which reflects the wage scales that apply in Cook County. That means your concrete, framing and MEP lines carry labor costs that match what local crews actually charge, rather than a national average. If your project is prevailing wage or has a project labor agreement, tell us and we will note it so your bid reflects the correct labor burden.
Yes. Tear-downs are common here, and they add demolition, haul-off and often undercutting of unsuitable clay subgrade to the takeoff. We measure existing structure removal, driveway and stoop demolition, and disposal separately from new construction, then price structural fill by compacted cubic yard. Narrow lots also affect staging, so we flag access constraints in the notes. Send the demolition plan along with the new construction set and we will price both scopes.
Send the architectural, structural and MEP plan sets in PDF, plus any specifications and the geotechnical report if you have one. If you have a preferred CSI division breakdown or a bid form your client requires, include that too. We mark up the plan set in Bluebeam Revu and return quantities in Excel and PDF organized by CSI MasterFormat division. Most Oak Lawn projects come back in 24–48 hours, and rush turnaround is available.
Yes. We cover Oak Lawn and the surrounding Cook County area, including Orland Park, Tinley Park, Berwyn, Des Plaines and Wheaton. If your project sits in one of those towns, the same ZIP-code-adjusted pricing and CSI-formatted deliverables apply, and our Illinois construction estimating page covers the statewide picture. Send the address with your plans and we will price to the correct location.
Older homes often have layered shingles, so tear-off is measured separately from new roofing. We count roof area by square from the plan or an aerial, add typical waste of 10 percent for field shingles and 15 percent for hip and valley cuts, and list underlayment, ice-and-water shield, drip edge, ridge vent and pipe boots as separate lines. Decking replacement is priced by sheet, not buried in the shingle line. Our roofing estimating services return a breakdown your roofer can order from.
The permit figures come from the U.S. Census Bureau Building Permits Survey for 2025, which counts new privately-owned residential units permitted by the city itself. Oak Lawn issued 11 such units in 2025, up from 1 in 2024 — 5 single-family and 6 multifamily, with a permitted value of $3M and an average value per unit of $235,800. The survey covers residential only, so commercial and industrial permits are not included in those numbers.
Both. We can return a single combined MEP package organized by division, or split mechanical, electrical and plumbing into separate sections so each subcontractor bids against their own quantities. Fixtures are counted by each, pipe and duct by linear foot by size and material, and devices and panels by each. If your project is a small commercial building in Oak Lawn, splitting the package usually gets you cleaner sub bids. Tell us your preference when you send the plans.
Most projects return in 24–48 hours, and rush turnaround is available if your bid date is close. Multifamily takeoffs take longer than a single-family addition because of repeated unit types, corridor and stair framing, and shared MEP risers, so send the full set including typical unit plans and roof plans. We organize the return by CSI MasterFormat division in Excel and PDF with a marked-up plan set, so your team can trace every quantity back to the drawing.
Send your plan set and we will return CSI-formatted quantities in Excel and PDF within 24–48 hours.