Sitework takeoff
Strip, cut and fill volumes, detention basin excavation and utility trenching for flat suburban lots with clay soils.
CY · LFWe produce quantity takeoffs and construction estimates for Tinley Park contractors and developers. Plans come back organized by CSI MasterFormat division in Excel and PDF, with marked-up plan sets, typically in 24–48 hours.
Tinley Park pricing turns on Cook County wage and material costs, flat suburban lots with deep frost footings, a residential permit mix that ran 98 single-family units in 2025, and the logistics and data-center construction pushing up steel and concrete demand across the Chicago region.
Tinley Park sits in Cook County, and most of the work we price here is single-family residential and low-rise commercial along the corridors near Harlem Avenue, 159th Street and Oak Park Avenue. Because the village issues its own permits, your estimate has to survive a plan review that looks closely at footing depth, lot grading and stormwater detention before you ever mobilize. We build takeoffs the same way your field crew will build the job: measured quantities by assembly, then priced with ZIP-code-adjusted material and labor rates.
Our deliverables come in Excel and PDF, sorted by CSI MasterFormat division, with marked-up plan sets so you can see exactly where each quantity came from. That format matters when you are bidding against three other subcontractors on the same Tinley Park package and need to defend a line item. For residential builders, our residential estimating services cover everything from footing to final grade. For commercial and industrial work tied to the Chicago logistics pipeline, see our commercial estimating services and industrial estimating services.
For bidders. You need a defensible number before the bid date. We return division-sorted quantities with marked-up plans so you can check every footing, joist and square of roofing against the drawings before you sign.
For builders. You are buying material and scheduling crews. We price to your ZIP code, flag long-lead items, and break out waste factors so your purchase orders match what the job actually consumes.
For owners. You want a budget before design is finished. We estimate from schematic plans, note assumptions, and give you a division-level cost picture you can carry into the next design meeting.
Select a bar to compare Tinley Park with the largest Illinois markets we cover.
98 new housing units in 2025 (-40.2% vs 2024).
98 single-family · 0 multifamily (0%).
Tinley Park issued 98 new privately-owned residential units in 2025, all single-family, down from 164 the previous year, a 40% drop. Permitted value was $36M, or $365,500 per unit on average. For bidders, that means the pipeline is detached houses and small infill, not apartment buildings. Your takeoff should expect full basement excavations, frost-depth footings, and detached garages. There is no multifamily volume to spread overhead across, so each house stands alone on its own cost basis. If you also bid in neighboring suburbs, our Orland Park construction estimating and Oak Lawn construction estimating pages cover the same residential profile. Statewide, Tinley Park ranked 10th of 25 covered cities by units and accounted for 1.5% of the 6,710 units in those cities.
Every line item we price for Tinley Park carries Cook County labor rates and Chicago-area material pricing, adjusted to the local ZIP code. The region's logistics and data-center construction keeps demand steady for structural steel, cast-in-place concrete and electrical gear, which shows up as longer lead times and firmer pricing on those packages. Residential bidders feel it indirectly through concrete and lumber pricing. Because the permit mix is thin on multifamily, commercial bidders should watch the industrial and warehouse work moving through the I-80 and I-57 corridors. Our Illinois construction estimating overview explains how we handle state and county cost differences, and MEP estimating services covers the mechanical, electrical and plumbing packages that drive industrial bids.
We estimate the scopes that show up on Tinley Park plans, from residential footings to warehouse slabs. Each takeoff is measured, priced and sorted by CSI division.
Strip, cut and fill volumes, detention basin excavation and utility trenching for flat suburban lots with clay soils.
CY · LFFrost-depth footings, basement walls, garage slabs and driveways priced with Chicago-area ready-mix and finishing rates.
CY · SFFormwork, reinforcement, damp proofing and drainage board for full basements and crawl spaces under Cook County frost lines.
SF · LFFloor joists, wall studs, headers, sheathing and roof trusses counted from plans, with typical waste factors applied by member type.
BF · EAArchitectural shingle squares, underlayment, ice-and-water membrane at eaves, flashing and ventilation for steep-slope residential roofs.
SQ · LFRough-in counts for plumbing fixtures, HVAC tonnage and ductwork, and electrical devices, panels and feeders for homes and tenant build-outs.
EA · TON · LFFull-house budgets from footing to final grade for the single-family permits that make up Tinley Park's entire 2025 residential count.
LS · SFDivision-level pricing for retail, office and warehouse shells along the Harlem Avenue and 159th Street corridors.
SF · LSYou are bidding village-issued residential and low-rise commercial work along Harlem Avenue and 159th Street. We return division-sorted quantities with marked-up plans so your bid holds up against three other numbers.
Your Tinley Park lots are infill and subdivision parcels with detention requirements. We price footing-to-final-grade takeoffs and flag long-lead items so your purchase orders match what the crew consumes.
You bid concrete, framing, roofing or MEP packages to the same GC. We break your scope out by CSI division with quantities you can check against the drawings before the bid date closes.
You are evaluating a Cook County infill site before design is complete. We estimate from schematic plans, state assumptions, and give you a division-level cost picture you can carry into the next design meeting.
Your drawings go through village plan review on footing depth, grading and stormwater detention. We quantify the assemblies you drew so your cost narrative matches the permit set.
You need a budget for a tenant build-out or a roof replacement on an existing Tinley Park building. We measure existing conditions from your plans and price the repair scope by division.
We price work across Tinley Park and the surrounding Cook and Will County suburbs. If your project sits near any of these communities, the takeoff method and pricing basis are the same.
The village issued 98 new privately-owned residential units in 2025, all single-family, with no multifamily permits. That mix drives what we price here: detached houses, small commercial buildings and industrial shell space.
New detached homes on infill and subdivision lots, plus major renovations. We take off footing and foundation, framing, roofing, siding, windows, insulation and interior finishes by CSI division, priced to your ZIP code.
Watch for: Footing depth, lot grading, detention basin, joist spans
Retail, office and restaurant buildings along Harlem Avenue and 159th Street. We measure structural steel or masonry shell, storefront glazing, roof assemblies, and MEP rough-in from the permit set.
Watch for: Storefront glazing, roof drains, grease interceptor, ADA restrooms
Shell and tenant improvement work tied to the Chicago logistics pipeline. We quantify slab-on-grade, tilt-up or precast panels, dock equipment, and racking-ready electrical service.
Watch for: Slab thickness, dock levelers, fire sprinkler coverage, clear height
Although no multifamily units were permitted in 2025, the village has zoned corridors for attached housing. We estimate party walls, shared MEP risers, and unit-by-unit finish schedules.
Watch for: Party wall fire rating, riser shaft, unit mix, parking count
Second-story additions, kitchen and bath gut renovations, and finished basements in established Tinley Park neighborhoods. We measure existing conditions from your plans and price the new work separately.
Watch for: Header sizing, egress windows, duct relocation, temporary weather protection
Schools, churches and municipal buildings in the village and surrounding townships. We take off masonry, structural framing, roofing, and MEP systems, and note phasing if the building stays occupied.
Watch for: Occupied phasing, asbestos survey, fire alarm zones, accessibility upgrades
Tinley Park sits in Cook County, where permit review, soil conditions and stormwater rules all move the number. These are the six drivers we check before we price a line item.
The village issues its own building permits and reviews footing depth, lot grading and stormwater detention before you mobilize. Confirm the adopted code edition with the Tinley Park building department, because the review comments can add engineering, survey or plan-revision cost that belongs in your soft-cost line rather than your trade packages.
Village of Tinley Park building department · Cook County · IBC · IECCMuch of the Chicago region sits on glacial till and clay, with pockets of fill from older agricultural use. That drives deeper frost footings, engineered fill under slabs, and sometimes caissons or helical piers. We price foundation scope by soil report, not by a default depth, because a footing that is two feet deeper across a whole subdivision changes the concrete and excavation quantities significantly.
Glacial till · clay · frost depth · geotechnical reportNorthern Illinois freeze-thaw cycles govern exterior assemblies. We price air barriers, flashing, and roof underlayment details that meet the adopted energy code, and we check that concrete flatwork has the right air entrainment and joint spacing. Snow load and ice dam protection belong in the roofing scope, not left as an allowance.
IECC · freeze-thaw · snow load · ice dam protectionCook County labor rates reflect a strong union presence in the trades, and the Chicago-area commercial pipeline keeps crews busy. We price labor from ZIP-code-adjusted RSMeans data and note where a trade shortage could push overtime or per-diem cost. If your schedule is tight, that premium should be visible in the estimate, not hidden in a contingency.
RSMeans data · Cook County · union labor · overtimeThe village and Cook County require stormwater detention for new impervious area, which means basins, restrictor structures, and often engineered fill. We take off excavation, haul-off, and pipe separately from building scope, because detention work can be a large share of a small residential project and is easy to miss when you price only the structure.
Stormwater detention · Cook County · impervious area · restrictor structureTinley Park is served by Chicago-area suppliers, so most material is local, but long-lead items like switchgear, transformers and specialty windows still set the schedule. We flag those in the takeoff and price sales tax on material where it applies. Confirm current Illinois and local tax treatment with your accountant before you finalize the bid.
Chicago-area suppliers · long-lead items · Illinois sales tax · switchgearTinley Park sits in Cook and Will counties, where the flat, clay-heavy ground and a long freeze-thaw cycle shape almost every trade. Your takeoff has to reflect those local realities, from footing depth to the way crews price winter work.
Most Tinley Park residential work lands on glacial till and silty clay, so a foundation takeoff has to carry footing depths below the local frost line, which in this part of Illinois is typically 42 inches. That drives concrete volume, rebar, and formwork. For a full basement, you are looking at 8- or 9-foot walls, exterior dampproofing, and often a sump system. Garage slabs and driveway aprons need air-entrained mix to survive winter deicing salts. If the geotech report calls for over-excavation, add granular fill and a separation geotextile. We price these items by cubic yard for concrete and by square foot of contact area for formwork, using ZIP-code-adjusted material and labor rates.
Steep-slope asphalt shingle roofs are the norm on Tinley Park houses, with some standing-seam metal on higher-end builds. A roofing takeoff must include underlayment, ice-and-water shield at eaves and valleys, drip edge, ridge vent, and pipe boots. Because of freeze-thaw, ventilation and attic insulation are critical; we check that the roof plan shows proper intake and exhaust. Tear-off quantities depend on existing layers, and disposal costs vary by landfill. We measure roof area from the plan and add 10–15% for hips, valleys, and waste. For steep pitches, labor rates increase, so we note pitch in the takeoff.
The flat topography in Tinley Park means stormwater detention is a major cost driver. A sitework takeoff includes mass grading, topsoil stripping, and a detention basin with an outlet structure. You also need sanitary sewer and water service trenches, often in the same easement. Because the water table can be high in spring, dewatering may be required. We measure cut and fill by cross-section, then apply a shrink/swell factor. Pavement sections typically include 6–8 inches of aggregate base and 2–3 inches of asphalt. Sidewalks and aprons are measured by square foot. All quantities are adjusted for local material prices.
Wood framing dominates Tinley Park’s single-family and townhome construction. A framing takeoff here includes 2x6 exterior walls for the Illinois energy code, engineered floor joists, and roof trusses or rafters sized for snow load. You have to account for headers over garage doors and window openings, plus blocking for future finishes. Waste factors run 5–10% on dimensional lumber and up to 15% on sheathing and trim. Panel counts should be based on wall area minus openings, then converted to 4x8 sheets. Don’t forget treated bottom plates and sill sealer where framing meets concrete.
Tinley Park follows the Illinois Plumbing Code and the International Residential Code for mechanical and electrical work, with local amendments. An MEP takeoff here includes PVC drain lines sized per fixture units, PEX or copper supply lines, and a high-efficiency furnace with AC. Ductwork is often flex in attics, but you still need to count registers, returns, and a condensate pump. Electrical counts include receptacles, switches, smoke/CO detectors, and a 200-amp panel. We break out fixtures by type and count, and we verify that the plan’s symbol legend matches the schedule. Confirm the adopted code edition with the Tinley Park building department before finalizing.
Quick check for a single element. For a full drawing set, send the plans and we measure everything, including the items calculators miss.
Typical waste: 3–5% for slabs, 5–10% for footings and walls. Truck count assumes 10 CY loads; confirm load size with your ready-mix supplier.
Need the full takeoff with pricing? Upload your plans.
| Section | Line item | Qty | Unit |
|---|---|---|---|
| 03 30 00 | Footing concrete, 24"x12" continuous | 18.5 | CY |
| 03 30 00 | Foundation wall concrete, 8" thick | 32.0 | CY |
| 03 20 00 | Rebar, #4 and #5, including dowels | 4,800 | LB |
| 06 10 00 | 2x6 exterior wall framing, 9' plate | 3,200 | LF |
| 06 10 00 | Floor joists, engineered I-joists | 2,400 | LF |
| 07 30 00 | Asphalt shingles, 30-year, with underlayment | 38 | SQ |
| 22 00 00 | PEX water lines, 1/2" and 3/4" | 1,150 | LF |
| 31 20 00 | Detention basin excavation and grading | 1,800 | CY |
This example shows how we build a foundation takeoff from the plan. Dimensions are illustrative and not a quote.
Given: A rectangular house 40 ft by 30 ft, with a full basement. Footing is 24 in wide by 12 in thick, continuous around the perimeter. Foundation wall is 8 in thick, 9 ft high, with 8 in of the wall above grade. A 4 in slab sits inside.
Step 1 – Footing volume: Perimeter = 2 × (40 + 30) = 140 ft. Footing cross-section = 2 ft × 1 ft = 2 sq ft. Volume = 140 × 2 = 280 cu ft. Convert to cubic yards: 280 ÷ 27 = 10.37 CY. Add 10% waste: 10.37 × 1.10 = 11.4 CY. Round to 11.5 CY.
Step 2 – Wall volume: Wall area = perimeter × height = 140 × 9 = 1,260 sq ft. Subtract openings: two 3 ft × 4 ft windows and one 3 ft × 7 ft door = 24 + 21 = 45 sq ft. Net area = 1,215 sq ft. Volume = 1,215 × (8/12) ft = 810 cu ft. Convert: 810 ÷ 27 = 30 CY. Add 5% waste: 30 × 1.05 = 31.5 CY.
Step 3 – Slab volume: Interior area = 40 × 30 = 1,200 sq ft. Slab thickness = 4 in = 0.333 ft. Volume = 1,200 × 0.333 = 400 cu ft = 14.8 CY. Add 10% waste: 16.3 CY.
Step 4 – Rebar: Assume #4 bars at 12 in on center each way in footing and wall. Footing: 140 ft × 2 directions = 280 ft of bar per layer; with two layers, 560 ft. Wall: vertical bars at 12 in o.c. = 140 bars × 9 ft = 1,260 ft; horizontal bars at 12 in o.c. = 9 layers × 140 ft = 1,260 ft. Total bar length = 560 + 1,260 + 1,260 = 3,080 ft. #4 bar weighs 0.668 lb/ft, so 3,080 × 0.668 = 2,058 lb. Add 10% for laps and waste: 2,264 lb. Round to 2,300 lb.
Summary table:
| Item | Quantity | Unit |
|---|---|---|
| Footing concrete | 11.5 | CY |
| Wall concrete | 31.5 | CY |
| Slab concrete | 16.3 | CY |
| Rebar #4 | 2,300 | LB |
We apply ZIP-code-adjusted material and labor rates to these quantities to produce a bid-ready estimate. For a full scope that includes sitework and framing, see our residential estimating services.
Yes. Tinley Park straddles Cook and Will counties, and permit requirements can differ slightly between the two. We build the takeoff from your drawings and note any county-specific code items, such as amendments to the Illinois Plumbing Code or local stormwater ordinances. Because the adopted code edition can change, always confirm the current version with the applicable building department before you finalize your bid. We can also flag any items that may require a separate permit in one county but not the other.
We check the local frost depth requirement, which is typically 42 inches in this region, and ensure footings are set below it. If the plan shows a shallower depth, we flag it as a potential code issue. We then calculate concrete and rebar quantities based on the actual footing dimensions shown. If the drawings are unclear, we will note the assumption and recommend you verify with the building department. This prevents costly changes during construction.
Most residential estimates are delivered within 24–48 hours. Rush service is available if you have a bid deadline. We provide Excel and PDF files organized by CSI MasterFormat division, with marked-up plan sets so you can see exactly what we measured. Our pricing uses ZIP-code-adjusted material and labor rates for the Tinley Park area. If you need a faster turnaround, let us know when you send the plans and we will confirm availability.
Yes. We handle commercial estimating for retail, office, and light industrial projects. The Chicago area has a strong logistics and data-center pipeline, and we see those project types in the southern suburbs. Our commercial estimates cover all divisions, from sitework to MEP and finishes. We use the same CSI MasterFormat structure and provide detailed quantity takeoffs. If your project includes specialized systems, we can accommodate those as well.
We use RSMeans data adjusted by ZIP code to reflect material and labor costs in Tinley Park. That means your estimate reflects local union rates and material pricing, not a national average. We also note any trade-specific labor factors, such as winter conditions. For example, concrete work in cold weather may require heating and protection, which we include as a separate line item. This gives you a more accurate picture of actual costs.
We can, but structural and MEP drawings improve accuracy. If you only have architectural plans, we will make reasonable assumptions for framing, foundations, and systems, and clearly note them. For a more precise estimate, send the full set, including civil and structural. We will also identify any missing information that could affect pricing. This helps you avoid surprises later.
Typical waste factors are 5–10% for dimensional lumber and up to 15% for sheathing and trim. We adjust based on the complexity of the design. For example, a house with many hips and valleys will have higher waste than a simple gable roof. We also consider the grade of lumber and the efficiency of the framing plan. These factors are applied to the net quantities to arrive at the final order quantities.
No. Permit fees are set by the local jurisdiction and vary by project valuation and type. We recommend you obtain a fee schedule from the Tinley Park building department. Our estimates cover construction costs, not soft costs like permits, design fees, or impact fees. If you need help understanding which permits are required, we can provide a general checklist based on the project scope, but the final fees must come from the city.
The permit data we reference comes from the U.S. Census Bureau’s Building Permits Survey. It counts new privately-owned residential units permitted by the city itself. In 2025, Tinley Park issued permits for 98 single-family units, down from 164 in 2024. This data helps us understand local market trends but is not a substitute for project-specific pricing. We use it to gauge overall activity and adjust our estimating resources accordingly.
Yes, we cover the entire Chicago area, including Orland Park, Oak Lawn, and other suburbs. The same local conditions apply, though each municipality has its own code amendments. We adjust the estimate accordingly. If you have projects in multiple suburbs, we can provide consistent formatting and pricing across all of them. Just let us know the locations when you send the plans.
Email your drawings and we will return a detailed, CSI-formatted estimate within 24–48 hours.